Anchor frame construction management system
The construction management system uses tag-based identification and positioning to ensure accurate installation of anchor frames, preventing misalignment and reducing rework by visually confirming alignment with design specifications.
Patent Information
- Application Number
- JP2020159818
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-09-24
- Publication Date
- 2024-11-20
- Estimated Expiration
- 2040-09-24
AI Technical Summary
There is a risk of mistakenly installing anchor frames with specifications different from those determined at the time of design, leading to misalignment of anchor bolts and bolt holes, necessitating the removal and reinstallation of the column base anchor structure after it is buried in foundation concrete.
A construction management system that includes a reading unit to identify anchor frame specifications through tags, a position information acquisition unit to determine the frame's position, and a display unit to compare actual placement with designed specifications, ensuring accurate installation.
Prevents the installation of anchor frames with incorrect specifications by visually confirming alignment with design plans, thereby avoiding costly rework and ensuring proper anchoring.
Smart Images

Figure 0007587381000001 
Figure 0007587381000002 
Figure 0007587381000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a construction management system for an anchor frame used to fix a base plate of a column base to foundation concrete. [Background technology]
[0002] Conventionally, a column base anchor structure for fixing a column base to a concrete foundation has been known (for example, Patent Document 1). The conventional column base anchor structure includes a base placed on the leveled concrete, and an anchor frame installed on the base. The anchor frame has a lower form plate attached directly to the base, anchor bolts fixed to the lower form plate, and an upper form plate. The anchor bolts are bolts for fixing a base plate joined to the column base to the concrete foundation. The upper form plate is a member for maintaining the pitch between the anchor bolts when the anchor frame is installed.
[0003] The specifications of the mounting base and the anchor frame are determined in advance by standards, and are selected according to the type and size of the base plate. Furthermore, these components constituting the column base anchor structure are generally assembled at the construction site. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2018-53563 A Summary of the Invention [Problem to be solved by the invention]
[0005] Anchor frames with various specifications are delivered to construction sites. In addition, anchor frames with specifications slightly different from those specified at the time of design may be installed on the mounting base. Therefore, there is a risk that an anchor frame with specifications different from those specified at the time of design may be mistakenly installed on the mounting base.
[0006] If an anchor frame with specifications different from those specified during design is attached to the mounting base, the positions of the anchor bolts on the anchor frame will not match the positions of the bolt holes formed in the base plate, making it impossible to fix the base plate with the anchor bolts.
[0007] At the stage of fixing the base plate with anchor bolts, the anchor frame is already embedded in the foundation concrete. Therefore, if an anchor frame with specifications different from those specified at the time of design is mistakenly installed on the mounting base, it will be necessary to chip away the foundation concrete and reinstall the column base anchor structure.
[0008] An object of the present invention is to provide a construction management system for anchor frames that can reliably prevent an anchor frame having specifications different from those selected at the time of design from being installed on a rack. [Means for solving the problem]
[0009] The invention according to claim 1 is a construction management system for an anchor frame having a plurality of anchor bolts, which is used for fixing a base plate of a column base to foundation concrete, comprising: a reading unit that reads identification information including information indicating a type of the anchor frame from a tag attached to a member constituting the anchor frame; a position information acquisition unit that acquires position information indicating a position of the anchor frame when the identification information is read by the reading unit; an output unit that outputs the identification information read by the reading unit and the position information acquired by the position information acquisition unit; and a control unit that outputs the identification information read by the reading unit and the position information acquired by the position information acquisition unit. and a placement information creation unit that creates placement information indicating the placement of a plurality of anchor frames from the identification information of the anchor frame and the position information of the plurality of anchor frames acquired by the position information acquisition unit, a design information storage unit that stores design information that defines the installation locations of the anchor frames, and a display unit that displays the information output from the output unit, wherein the output unit outputs the placement information created by the placement information creation unit and the design information stored in the design information storage unit, and the display unit displays the placement information and the design information side by side in a manner that allows the type of each of the plurality of anchor frames to be recognized. The invention of claim 2 is an anchor frame construction management system as described in claim 1, wherein the reading unit is capable of reading delivery destination information indicating the delivery destination of the anchor frame from the tag, and the system is equipped with a receiving site information storage unit that stores receiving site information indicating the construction site where the anchor frame will be received, and a judgment unit that judges whether the receiving site information stored in the receiving site information storage unit matches the delivery destination information read by the reading unit, and the output unit further outputs the judgment result of the judgment unit. The invention of claim 3 is a construction management system for an anchor frame as described in claim 1 or claim 2, further comprising a processing unit that analyzes an image obtained by imaging the components that constitute the anchor frame and generates the identification information, and a tag information creation unit that embeds the identification information generated by the processing unit in the tag. The invention of claim 4 is a construction management system for anchor frames described in any one of claims 1 to 3, further comprising an identification information storage unit that stores the identification information read from the tag by the reading unit, and a calculation unit that calculates the quantity of each identification information of the anchor frames to which the tags are attached based on the identification information stored in the identification information storage unit, and the output unit further outputs the quantity calculated by the calculation unit. The invention of claim 5 is a construction management system for an anchor frame described in any one of claims 1 to 4, wherein the components constituting the anchor frame are a lower form plate, an upper form plate, or the multiple anchor bolts that fix the multiple anchor bolts. As another invention, the following may be also provided. Method 1 is:The construction management system for an anchor frame having a plurality of anchor bolts includes a reading unit that reads identification information of the anchor frame from a tag attached to a member that constitutes the anchor frame, a position information acquisition unit that acquires position information indicating the position of the anchor frame when the identification information is read by the reading unit, and an output unit that outputs the identification information read by the reading unit and the position information acquired by the position information acquisition unit.
[0010] Means 2 The apparatus further includes a placement information creation unit that creates placement information indicating a placement of the plurality of anchor frames from the identification information of the plurality of anchor frames read by the reading unit and the position information of the plurality of anchor frames acquired by the position information acquisition unit, and the output unit further outputs the placement information created by the placement information creation unit. Means 1 2 is a construction management system for the anchor frame described in the above.
[0011] Means 3 The present invention further includes a design information storage unit that stores design information that defines an installation location of the anchor frame, and the output unit further outputs the design information stored in the design information storage unit. Means 2 2 is a construction management system for the anchor frame described in the above.
[0012] Means 4 The method further includes a display unit that displays the information output from the output unit, and the display unit displays the layout information and the design information. Means 3 2 is a construction management system for the anchor frame described in the above.
[0013] Means 5The reading unit is capable of reading delivery destination information indicating a delivery destination of the anchor frame from the tag, and is equipped with a receiving site information storage unit that stores receiving site information indicating a construction site where the anchor frame is to be received, and a determination unit that determines whether the receiving site information stored in the receiving site information storage unit matches the delivery destination information read by the reading unit, and the output unit further outputs a determination result made by the determination unit. Any of means 1 to 4 2 is a construction management system for the anchor frame described in the above.
[0014] Means 6 The present invention further includes a processing unit that analyzes an image obtained by capturing an image of the member that constitutes the anchor frame and generates the identification information, and a tag information creation unit that embeds the identification information generated by the processing unit in the tag. Any of means 1 to 5 2 is a construction management system for the anchor frame described in the above.
[0015] Means 7 the tag reading section further includes an identification information storage section that stores the identification information read from the tag by the reading section, and a calculation section that calculates a quantity of the anchor frames to which the tag is attached for each of the identification information based on the identification information stored in the identification information storage section, and the output section further outputs the quantity calculated by the calculation section. Any of means 1 to 6 2 is a construction management system for the anchor frame described in the above.
[0016] Means 8 The identification information is information indicating the type of the anchor frame. Any of means 1 to 7 2 is a construction management system for the anchor frame described in the above.
[0017] Means 9 The members constituting the anchor frame are a lower plate, an upper plate, or the anchor bolts, which fix the anchor bolts. Any of means 1 to 8 2 is a construction management system for the anchor frame described in the above. Effect of the Invention
[0018] This can reliably prevent an anchor frame having specifications different from those selected at the time of design from being mounted on a rack. [Brief description of the drawings]
[0019] [Figure 1] FIG. 1 is a perspective view showing an example of a column base anchor structure. [Diagram 2] FIG. 1 is a front view showing an example of a column base anchor structure. [Diagram 3] FIG. 4 is a plan view showing an example of a lower plate. [Figure 4] 2 is a block diagram showing an example of a hardware configuration of a tag information generating device; FIG. [Diagram 5] 2 is a block diagram showing an example of a hardware configuration of a tag information output device. FIG. [Figure 6] FIG. 2 is a block diagram showing an example of functions of a tag information generating device. [Figure 7] FIG. 2 is a block diagram showing an example of functions of a tag information output device. [Figure 8] 11A and 11B are diagrams illustrating an example of a display form of layout information and design information displayed by a display unit. [Figure 9] 13 is a diagram showing an example of a display mode of the quantity of anchor frames for each model displayed on a display unit. FIG. [Figure 10] 11 is a flowchart illustrating an example of a process performed when an anchor frame is received. [Figure 11] 11 is a flowchart illustrating an example of a process when an anchor frame is installed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0020] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. However, it goes without saying that the present invention is not limited to this embodiment.
[0021] 1 to 3 show a column base anchor structure.
[0022] This embodiment relates to a construction management system for an anchor frame 3 for fixing a base plate 11 joined to the lower end of a column 1. The anchor frame 3 is installed on a base 2 to form a column base anchor structure, and is embedded in a concrete foundation 4.
[0023] The mount 2 is a member placed on the leveled concrete 5 poured on the ground to support the anchor frame 3. The mount 2 is determined at the time of design by selecting an optimal mount 2 from mounts 2 of various specifications according to the shape, size, etc. of the base plate 11.
[0024] The frame 2 is formed into a rectangular parallelepiped shape by joining steel materials such as shaped steel, for example. The frame 2 has pillars 21, horizontal members 22, supports 23, and a base 24. These members are manufactured in a factory, sent to a construction site, and assembled at the construction site. Alternatively, these members may be preassembled at a factory and sent to the construction site.
[0025] The pillars 21 are disposed at the four corners of the stand 2 in a plan view. The pillars 21 are disposed perpendicular to the leveling concrete 5. The pillars 21 are made of steel such as angle iron.
[0026] The horizontal member 22 is installed between the upper ends of the two pillars 21 to connect the pillars 21 to each other. The horizontal member 22 is made of a steel material such as an angle iron.
[0027] The support parts 23 are parts that protrude horizontally and away from each other from the upper ends of at least a pair of opposing horizontal members 22. The upper surface of the support part 23 supports the anchor frame 3. The longitudinal length of the support part 23 is set to a length that does not interfere with the anchor bolts 31 (described later) when the anchor frame 3 is installed on the rack 2.
[0028] In order to more stably support the anchor frame 3, the support parts 23 may protrude from the upper ends of all the cross members 22 as long as they do not interfere with the anchor bolts 31. In addition, when the cross members 22 are made of angle iron, the support parts 23 are formed integrally with the cross members 22.
[0029] The base 24 is a member that connects the lower ends of the columns 21 and ensures the stability of the pedestal 2.
[0030] The anchor frame 3 is a member that is installed on the mounting base 2. After the anchor frame 3 is installed on the mounting base 2, these members are buried in the foundation concrete 4.
[0031] The anchor frame 3 has anchor bolts 31, a lower plate 32, nuts 33, an upper plate 34, and nuts 35. These members are manufactured in a factory, sent to a construction site, and assembled at the construction site.
[0032] The anchor bolt 31 is a member that is inserted into a bolt hole 12 formed at a predetermined position in the base plate 11 and fixes the base plate 11 to the foundation concrete 4 together with a nut 35 .
[0033] The lower plate 32 is a frame-shaped iron plate that connects the lower ends of the anchor bolts 31. As shown in Fig. 3, the lower plate 32 has anchor bolt insertion holes 321 formed at predetermined positions. Also, a rectangular through hole 322 is formed in the center of the lower plate 32. The anchor bolt insertion holes 321 are formed at positions corresponding to the bolt holes 12 drilled in the base plate 11.
[0034] The type of the lower plate 32 having the optimum specifications is selected and determined at the time of design from a plurality of types of lower plate 32 differing in size and in the positions of the anchor bolt insertion holes 321, in accordance with the size of the base plate 11 and the positions of the bolt holes 12. Different types of lower plate 32 result in different specifications of the anchor frame 3. In other words, anchor frames 3 with different specifications have different types of lower plate 32, and if the type of lower plate 32 can be identified, the specifications of the anchor frame can be specified.
[0035] The anchor bolt 31 is inserted into the anchor bolt insertion hole 321 of the lower plate 32, and the anchor bolt 31 is fixed to the lower plate 32 by screwing two nuts 33 onto the anchor bolt 31 while the lower plate 32 is sandwiched between the nuts 33.
[0036] The lower plate 32 is placed on the support portion 23 of the frame 2 and joined to the frame 2 by welding or the like.
[0037] The upper form plate 34 is a temporary fixing member that connects the upper ends of the anchor bolts 31 and maintains each anchor bolt 31 in a vertical state. The upper form plate 34 has a structure substantially similar to that of the lower form plate 32. If the type of the lower form plate 32 is different, the type of the upper form plate 34 will be different accordingly, and the specifications of the anchor frame 3 will be different. In other words, anchor frames 3 with different specifications will have different types of upper form plates 34, and if the type of the upper form plate 34 can be identified, the specifications of the anchor frame 3 can be specified.
[0038] The mount 2 is placed on the leveled concrete 5, and the anchor frame 3 is installed on the mount 2. After that, the foundation concrete 4 is poured until it reaches a height slightly below the upper form plate 34. Therefore, most of the mount 2 and the anchor frame 3 are buried in the foundation concrete 4.
[0039] Once the foundation concrete 4 has hardened, the upper plate 34 is removed. Then, the anchor bolts 31 protruding upward from the surface of the foundation concrete 4 are inserted into the bolt holes 12 of the base plate 11, and the base plate 11 is placed on the foundation concrete 4. Finally, the nuts 35 are tightened onto the anchor bolts 31, thereby fixing the base plate 11 onto the foundation concrete 4.
[0040] Next, a description will be given of a construction management system for the anchor frame 3. The construction management system for the anchor frame 3 includes a tag information generating device operated in a manufacturing factory for the anchor frame 3, and a tag information output device operated at the construction site.
[0041] 4 is a block diagram showing an example of a hardware configuration of the tag information generation device 6. The tag information generation device 6 includes an information acquisition device 61, a control device 62, a tag creation device 63, and an input device 64.
[0042] The information acquisition device 61 is a device that acquires information on the components (the lower form plate 32 in this embodiment) that constitute the anchor frame 3 manufactured in a manufacturing factory. The information acquisition device 61 is, for example, an imaging device such as a camera. When the information acquisition device 61 is an imaging device, the information acquisition device 61 acquires image information of the components that constitute the anchor frame 3. The information acquired by the information acquisition device 61 is output to the control device 62.
[0043] The control device 62 is a device that controls the tag information generation device 6. The control device 62 is, for example, a PC (Personal Computer). The control device 62 has a CPU (Central Processing Unit) 62a, a ROM (Read Only Memory) 62b, a RAM (Random Access Memory) 62c, and a non-volatile memory 62d.
[0044] The CPU 62a processes, for example, information input from the information acquisition device 61. The CPU 62a also controls the entire tag information generation device 6 based on a system program.
[0045] The ROM 62b is a storage device that stores a system program for controlling the tag information generation device 6, for example.
[0046] The RAM 62c is a storage device that temporarily stores information, for example, information calculated temporarily when the CPU 62a processes information acquired by the information acquisition device 61.
[0047] The non-volatile memory 62d is, for example, a solid state drive (SSD). The non-volatile memory 62d stores, for example, information related to the lower plate 32 acquired by the information acquisition device 61. Note that the control device 62 may store various information using an external storage device such as a cloud server in addition to the non-volatile memory 62d or instead of the non-volatile memory 62d.
[0048] The tag creation device 63 is a device for embedding identification information in a tag 323 (see FIG. 3) that is attached to the lower plate 32 as a member that constitutes the anchor frame 3. When the tag 323 is an RF (Radio Frequency) tag, the tag creation device 63 is a writing device that writes information into the RF tag.
[0049] The input device 64 is a device that accepts information input to the tag information generation device 6. The input device 64 is, for example, a user interface such as a touch panel or a keyboard. The information input to the input device 64 is output to the control device 62.
[0050] 5 is a block diagram showing an example of a hardware configuration of the tag information output device 7. The tag information output device 7 includes a tag reader 71, a management device 72, and a display device 73.
[0051] The tag reader 71 is a device that reads information embedded in the tag 323. When the tag 323 is an RF tag, the tag reader 71 is a reader for the RF tag.
[0052] The management device 72 is a device that stores or processes information read by the tag reading device 71. The management device 72 is, for example, a PC or a mobile terminal such as a smartphone. The management device 72 has a CPU 72a, a ROM 72b, a RAM 72c, and a non-volatile memory 72d.
[0053] The CPU 72a processes, for example, information read by the tag reader 71. The CPU 72a also controls the entire tag information output device 7 based on a system program.
[0054] The ROM 72b is a storage device that stores, for example, a system program of the tag information output device .
[0055] The RAM 72c is a storage device that temporarily stores information, for example, information calculated temporarily when the CPU 72a processes information read by the tag reader 71, and the like.
[0056] The non-volatile memory 72d is, for example, an SSD. The non-volatile memory 72d stores, for example, information read by the tag reading device 71. Note that the management device 72 may store various types of information using an external storage device such as a cloud server in addition to the non-volatile memory 72d or instead of the non-volatile memory 72d.
[0057] The display device 73 is a device that displays information processed by the management device 72. The display device 73 is, for example, a liquid crystal display of a PC or a display of a mobile terminal such as a smartphone.
[0058] FIG. 6 is a block diagram showing an example of the functions of the tag information generating device 6. As shown in FIG.
[0059] The information acquisition device 61 has an information acquisition section 611. The information acquisition section 611 acquires information on the members (the lower plate 32 in this embodiment) that constitute the anchor frame 3. The information on the members that constitute the anchor frame 3 is, for example, image information on the lower plate 32. That is, when the information acquisition device 61 is a camera, the information acquisition section 611 acquires image information of the lower plate 32 captured by the camera, and outputs the image information to the control device 62.
[0060] The control device 62 includes a processing unit 621 and a storage unit 622 .
[0061] The processing unit 621 analyzes the information of the lower plate 32 acquired by the information acquisition unit 611, and performs processing to identify the lower plate 32 indicated by the information. For example, the processing unit 621 compares the image information of the lower plate 32 acquired by the information acquisition unit 611 with image information of various types of lower plate 32 stored in the storage unit 622. The processing unit 621 identifies image information that matches the image information acquired by the information acquisition unit 611 from the image information of various types of lower plate 32 stored in the storage unit 622 through this processing, and identifies the identification information of the lower plate 32 indicated by the image information acquired by the information acquisition unit 611. The identification information is information that can identify the lower plate 32, and is, for example, information indicating the type of the lower plate 32.
[0062] The processing unit 621 identifies the lower plate 32 indicated by the image information acquired by the information acquisition unit 611, for example, by comparing the size of the lower plate 32 and the positions and number of anchor bolt insertion holes 321 indicated by the image information acquired by the information acquisition unit 611 with the sizes of various types of lower plate 32 indicated by the image information stored in the memory unit 622 and the positions and number of anchor bolt insertion holes 321. The processing unit 621 outputs identification information capable of identifying the lower plate 32 to the tag creation device 63.
[0063] As described above, the memory unit 622 stores information on various types of lower plate 32. The information on the lower plate 32 stored in the memory unit 622 includes, for example, image information on the lower plate 32, the size of the lower plate 32, the positions and number of the anchor bolt insertion holes 321, and identification information that can identify the lower plate 32.
[0064] The tag creation device 63 includes a tag information creation unit 631 and a writing unit 632 .
[0065] The tag information generating unit 631 encodes the identification information of the lower plate 32 specified by the processing unit 621 .
[0066] The writing unit 632 writes the identification information coded by the tag information creating unit 631 into the tag 323 .
[0067] The input device 64 has an input section 641 .
[0068] The input unit 641 accepts an input operation of information relating to the construction site to which the anchor frame 3 (lower form plate 32) is to be delivered from a user. The information relating to the construction site to which the anchor frame 3 (lower form plate 32) is to be delivered, input from the input unit 641, is sent to the tag creation device 63 via the control device 62.
[0069] The tag information creation unit 631 creates delivery destination information indicating the delivery destination by encoding information about the construction site of the delivery destination. The delivery destination information is, for example, the name of the structure to be constructed at the construction site to which the anchor frame 3 (lower form plate 32) is delivered, and the address of the construction site. The writing unit 632 writes the delivery destination information together with the above-mentioned identification information into the tag 323 attached to the member (lower form plate 32) constituting the anchor frame 3.
[0070] The tag 323 with the embedded identification information and delivery destination information is immediately attached to the surface of the lower form plate 32, which is a member constituting the corresponding anchor frame 3. The lower form plate 32 with the tag 323 attached is shipped to the construction site of the delivery destination. The model number of the lower form plate 32 is written separately on the surface of the lower form plate 32 with chalk or the like.
[0071] FIG. 7 is a block diagram for explaining an example of the function of the tag information output device 7. As shown in FIG.
[0072] The tag reader 71 has a reading unit 711 .
[0073] The reading unit 711 reads the information embedded in the tag 323. That is, the reading unit 711 reads the identification information and delivery destination information embedded in the tag 323 at the manufacturing factory of the anchor frame 3. The reading unit 711 outputs the read information to the management device 72.
[0074] The management device 72 has a position information acquisition unit 721, a placement information creation unit 722, an output unit 723, a design information memory unit 724, a receiving site information memory unit 725, a judgment unit 726, an identification information memory unit 727, a calculation unit 728, and a receiving information memory unit 729.
[0075] The position information acquisition unit 721 acquires, as the position of the anchor frame 3, the position of the tag reader 71 when the reading unit 711 reads the identification information embedded in the tag 323 of the lower plate 32.
[0076] The position information acquisition unit 721 acquires the position information of the lower plate 32 as the position of the anchor frame 3, for example, using a GPS (Global Positioning System). For example, the tag reader 71 includes a GPS receiver (not shown), and the position information acquisition unit 721 acquires the position of the GPS receiver when the reader 711 reads the identification information from the tag 323 of the lower plate 32 as the position of the anchor frame 3. In other words, when the reader 711 reads the identification information embedded in the tag 323 with the anchor frame 3 placed on the stand 2 at the construction site, the tag reader 71 is placed in a position in contact with or close to the tag 323, so that the position of the GPS receiver included in the tag reader 71 can be regarded as the position of the lower plate 32, that is, the anchor frame 3. The position information of the tag 323 includes, for example, information on the latitude and longitude of the position where the anchor frame 3 is placed.
[0077] The arrangement information creation unit 722 creates arrangement information indicating the arrangement of the multiple anchor frames 3 based on the identification information of the multiple anchor frames 3 read by the reading unit 711 and the position information acquired by the position information acquisition unit 721 when the identification information is read. The arrangement information is, for example, an arrangement diagram indicating the arrangement of the multiple anchor frames 3.
[0078] The output unit 723 outputs the arrangement information created by the arrangement information creating unit 722 to the display device 73 .
[0079] The display device 73 has a display unit 731. The display unit 731 displays the arrangement information output from the output unit 723 on the liquid crystal display of the display device 73, for example.
[0080] The design information storage unit 724 stores design information indicating the arrangement of the anchor frames 3 at the construction site determined at the time of design. The design information is, for example, a construction drawing indicating the installation positions of the anchor frames 3 determined at the time of design. The design information stored in the design information storage unit 724 is input via an input means (not shown).
[0081] The output unit 723 outputs the design information stored in the design information storage unit 724 together with the placement information created by the placement information creation unit 722 to the display device 73, and the display unit 731 displays the placement information and the design information side by side.
[0082] 8 is a diagram showing an example of the display form of the layout information and design information displayed by the display unit 731. The layout information is a layout drawing showing the actual layout of the anchor frame 3 when the identification information is read from the tag 323 of the anchor frame 3 installed on the pedestal 2. The design information is a construction drawing showing the layout of multiple anchor frames 3 determined at the time of design. The layout drawing and the construction drawing are arranged side by side on the display of the display device 73.
[0083] In FIG. 8, for example, a square indicates the anchor frame 3 of the lower form plate 32 of the first type for 300×300 [mm], a triangle indicates the anchor frame 3 of the lower form plate 32 of the second type for 350×350 [mm], a star indicates the anchor frame 3 of the lower form plate 32 of the third type for 400×400 [mm], and a circle indicates the anchor frame 3 of the lower form plate 32 of the fourth type for 500×500 [mm]. FIG. 8 shows that the arrangement of each lower form plate 32 in the construction drawing is the same as the arrangement of each lower form plate 32 in the layout drawing. In other words, the user can confirm that each lower form plate 32 is arranged as shown in the construction drawing by checking the relative position of each lower form plate 32 with reference to the display of the display device 73. Since the relative position can be displayed, even if an error occurs in the position information by GPS or the position where each anchor frame 3 is arranged is slightly deviated from the position shown in the construction drawing, it is possible to at least confirm whether the row itself is arranged correctly. By checking the arrangement of this lower plate 32, it is possible to check whether a specific anchor frame 3 is arranged in an appropriate position.
[0084] In addition, in the layout drawing and the construction drawing, information indicating the latitude and longitude of the position where the lower form plate 32 is arranged may be accurately reflected and displayed near each figure showing each lower form plate 32. This makes it possible to confirm the absolute position of each lower form plate 32.
[0085] Returning to FIG. 7, the description of the functions of the management device 72 will be continued.
[0086] The receiving site information storage unit 725 stores receiving site information indicating the receiving site where the anchor frame 3 is received. The receiving site is a construction site where the tag information output device 7 is installed and operated, and is the construction site where the anchor frame 3 is actually received. The receiving site information includes, for example, information regarding the name of a structure to be constructed at the construction site and the address of the construction site. The receiving site information stored in the receiving site information storage unit 725 is input via an input means not shown.
[0087] The determination unit 726 determines whether or not the delivery destination information read by the reading unit 711 matches the receiving site information stored in the receiving site information storage unit 725. For example, the determination unit 726 determines whether or not the name of a building indicated in the delivery destination information read by the reading unit 711 matches the name of a building at the receiving site indicated in the receiving site information.
[0088] The output unit 723 outputs the result of the determination by the determination unit 726 to the display device 73 , and the display unit 731 displays the result of the determination by the determination unit 726 .
[0089] The identification information storage unit 727 sequentially stores the identification information read from the tag 323 by the reading unit 711 .
[0090] The calculation unit 728 calculates the quantity of the lower form plates 32 for each piece of identification information read by the reading unit 711 as the quantity of anchor frames 3, based on the identification information stored in the identification information storage unit 727. In other words, the calculation unit 728 counts the lower form plates 32 received at the construction site where the tag information output device 7 is installed and operated, sorting them by type, and calculates the quantity of anchor frames 3 sorted by specification (type).
[0091] The receiving information storage unit 729 stores the identification information and the quantity of the anchor frames 3 to be received at the construction site. For example, the type and the quantity of each type of the lower form plate 32 to be used at the construction site are input by an input means (not shown) and stored in the receiving information storage unit 729.
[0092] The determination unit 726 determines whether or not the quantity of the lower form boards 32 for each piece of identification information calculated by the calculation unit 728 matches the quantity of the lower form boards 32 stored in the receipt information storage unit 729. This allows, for example, a determination to be made as to whether or not the quantity of materials received at the construction site matches the quantity of materials actually used at the construction site.
[0093] The output unit 723 outputs information indicating the quantity for each identification information of anchor frame 3 calculated by the calculation unit 728 and the judgment result by the judgment unit 726 to the display device 73, and the display unit 731 displays the quantity for each identification information of anchor frame 3 calculated by the calculation unit 728 and the judgment result indicating whether the quantity is appropriate.
[0094] Fig. 9 is a diagram showing an example of a display mode of the quantity and judgment result for each identification information of the anchor frames 3 displayed by the display unit 731. In Fig. 9, the quantity of each specification (type) of anchor frames 3 received at the construction site and the judgment result showing whether or not the quantity is appropriate are displayed in a table format. In Fig. 9, "OK" is displayed to the right of each quantity, indicating that the amount of anchor frames 3 of each type that will actually be used has been received. Note that if the quantity of each type received does not match the quantity that will actually be used, "NG" can be displayed.
[0095] Next, a process performed by the tag information output device 7 when the anchor frame 3 is received at the construction site will be described.
[0096] FIG. 10 is a flowchart showing an example of a process of the tag information output device 7 when the anchor frame 3 receives a package.
[0097] When the lower plate 32 receives the goods, the reading unit 711 reads the identification information and the delivery destination information embedded in the tag 323 attached to the lower plate 32 (step S01).
[0098] Next, the determination unit 726 determines whether the construction site indicated by the delivery destination information read by the reading unit 711 matches the construction site indicated by the receiving site information stored in the receiving site information storage unit 725 (step S02).
[0099] If it is determined that the construction site indicated by the delivery destination information matches the construction site indicated by the receiving site information (Yes in step S02), the output unit 723 outputs the determination result to the display device 73 (step S03), and the display unit 731 displays the determination result.
[0100] Next, the identification information read by the reading unit 711 is stored in the identification information storage unit 727 (step S04), and the process proceeds to step S06.
[0101] On the other hand, if it is determined that the construction site indicated by the delivery destination information does not match the construction site indicated by the receiving site information (No in step S02), the output unit 723 outputs the determination result to the display device 73 (step S05), and the display unit 731 displays the determination result.
[0102] In this case, the identification information read by the reading unit 711 is not stored in the identification information storage unit 727, and the process proceeds to step S06.
[0103] Next, it is determined whether or not the receipt of the goods is completed (step S06). For example, the tag information output device 7 may be provided with an end button, and when the end button is pressed, the determination unit 726 may determine that the receipt of the goods is completed.
[0104] If it is determined that the receipt of the goods is completed (Yes in step S06), the calculation unit 728 calculates the quantity for each identification information of the anchor frame 3 from the identification information stored in the identification information storage unit 727 (step S07).
[0105] Next, the determination unit 726 determines whether the quantity for each identification information calculated by the calculation unit 728 matches the quantity for each identification information stored in the consignment information storage unit 729, and the determination result is output by the output unit 723 to the display device 73 (step S08). Then, the display unit 731 displays the quantity for each identification information of the anchor frames 3 and information indicating whether the quantity is appropriate, and the process at the time of consignment is completed.
[0106] If it is determined in step S06 that the receipt of the goods is not completed, the process returns to step S01 again, and the reading unit 711 reads the identification information and the delivery destination information embedded in the tag 323 attached to the lower plate 32 of another anchor frame 3. The determination of No in step S06 is made by the user.
[0107] When the anchor frames 3 are received at the construction site, the above processing is executed, and the quantity of each identification information of the received anchor frames 3 and information indicating whether the quantity of the received anchor frames 3 is appropriate are displayed on the display device 73.
[0108] Next, a process performed by the tag information output device 7 when checking whether or not the anchor frame 3 is placed on a predetermined stand 2 will be described.
[0109] FIG. 11 is a flowchart showing an example of a process when the anchor frame 3 is installed.
[0110] First, after assembling the anchor frame 3 at the construction site, a worker places the anchor frame 3 on the mounting base 2 in accordance with the construction drawing of the anchor frame 3, by looking at the model written in chalk or the like on the lower form plate 32 of the components that make up the anchor frame 3.
[0111] The reading unit 711 reads the identification information from the tag 323 on the lower plate 32 of the anchor frame 3 installed on the stand 2 (step S11).
[0112] Next, the position information acquisition unit 721 acquires and stores the position information of the lower plate 32 at the time when the identification information is read by the reading unit 711 as the position information of the anchor frame 3 (step S12).
[0113] Next, it is determined whether or not reading of the identification information has been completed (step S13). For example, the tag information output device 7 may include the above-mentioned end button, and when the end button is pressed, the determination unit 726 may determine that reading of the identification information has been completed.
[0114] If it is determined that reading of the identification information has been completed (Yes in step S13), the arrangement information creating unit 722 creates an arrangement diagram showing the arrangement of the anchor frames 3 based on the identification information and position information (step S14).
[0115] Next, the output unit 723 outputs information indicating the layout drawing created by the layout information creation unit 722 and the construction drawing stored in the design information memory unit 724 to the display device 73, and the display unit 731 displays the layout drawing and the construction drawing on the display (step S15), thereby completing the processing for installing the anchor frame 3.
[0116] If it is determined in step S13 that reading of the identification information has not been completed, that is, if there is an anchor frame 3 for which the identification information has not yet been read, the process returns to step S11 and reading of the identification information continues.
[0117] Through this process, the worker can compare the layout drawing of the anchor frame 3 displayed on the display device 73 with the construction drawing of the anchor frame determined at the time of design, and verify whether the anchor frame 3 actually placed on the mounting base 2 is positioned as designed.
[0118] For a small-scale building, a layout plan is created for all of the anchor frames 3 used in the building. However, for a large-scale building, the building may be divided into multiple blocks and a layout plan created for each block.
[0119] In this embodiment, the identification information read by the reading unit 711 and the position information acquired by the position information acquiring unit 721 are output. Therefore, the worker can easily check whether or not a specific anchor frame 3 selected at the time of design is installed on a specific pedestal 2. As a result, it is possible to prevent installation errors of the anchor frame 3.
[0120] Furthermore, in this embodiment, arrangement information indicating the arrangement of a plurality of anchor frames 3 is created from the identification information and position information. Therefore, an operator can visually check the arrangement information and confirm whether or not a specific anchor frame 3 selected at the time of design is installed in a specific position. As a result, it is possible to prevent installation errors of the anchor frame 3.
[0121] In addition, in this embodiment, design information is output that defines the installation location of the anchor frame 3. Therefore, by comparing the layout information with the design information, the worker can more easily confirm whether or not a specific anchor frame 3 selected at the time of design is installed on a specific pedestal 2. As a result, installation errors of the anchor frame 3 can be prevented.
[0122] In addition, in this embodiment, the arrangement information and the design information are displayed at the same time. Therefore, the worker can more easily check on the display device 73 of the construction management system whether or not the predetermined anchor frame 3 selected at the time of design is installed on the predetermined stand 2. As a result, it is possible to prevent installation errors of the anchor frame 3.
[0123] In this embodiment, the result of the determination as to whether the receiving site information stored in the receiving site information storage unit 725 matches the delivery destination information read by the reading unit 711 is output. Therefore, the worker can easily check whether the anchor frame 3 has been delivered to the construction site, which is the predetermined delivery destination.
[0124] Furthermore, in this embodiment, the identification information is generated from the captured image, which makes it possible to prevent input errors in the identification information.
[0125] In addition, in this embodiment, the quantity of each identification information of the anchor frames 3 received at the construction site is calculated. Therefore, the worker can easily check whether or not a predetermined quantity of anchor frames 3 have been received at the construction site.
[0126] [Other embodiments] In the above-described embodiment, the tag 323 has been described as an RF tag. However, the tag 323 is not limited to an RF tag, and may be, for example, a sticker on which a matrix type two-dimensional code or a barcode is printed. In this case, the tag creation device 63 is, for example, a printer that prints the matrix type two-dimensional code or the barcode on a sticker. The tag reading device 71 is, for example, a code reader.
[0127] In the above-described embodiment, the columns are square columns, and the planar shapes of the base plate 11, the frame 2, the lower form plate 32 and the upper form plate 34 are rectangular, but if the columns have other shapes such as circular steel pipes, the base plate 11, the frame 2, the lower form plate 32 and the upper form plate 34 will also have other shapes to match the columns.
[0128] Further, the mount 2 may be any type that adjusts the height of the anchor frame 3, and is not limited to the structure shown in FIG.
[0129] In this embodiment, the layout drawing of the anchor frame 3 created from the identification information and position information, and the construction drawing of the anchor frame 3 that was determined at the time of design and specified in advance are displayed on the display simultaneously, but it is also possible to display only the layout drawing on the display and have the worker compare the construction drawing in front of him with the displayed layout drawing to verify it.
[0130] In this embodiment, the layout drawing and the construction drawing are simultaneously displayed on the same screen, but the layout drawing and the construction drawing may be displayed by switching between them. Alternatively, the layout drawing and the construction drawing may be displayed in an overlapping manner.
[0131] In this embodiment, a worker compares the layout drawing and the construction drawing, but the judgment unit 726 may automatically judge whether or not the identification information and position information of the anchor frame 3 placed on the stand 2 match the identification information and position information of the anchor frame 3 defined at the time of design, and the judgment result may be displayed on the display.
[0132] In this embodiment, a layout plan is created and displayed based on identification information and location information, but for example, the identification information and location information including latitude and longitude may be displayed in a table format.
[0133] In this embodiment, the identification information and position information are read from the tag 323 of the lower form plate 32 of the anchor frame 3, i.e., the lower form plate 32 corresponds to the member constituting the anchor frame according to the present invention, but this is not limited thereto, and the upper form plate 34 of the anchor frame 3 may be used. In this case, the position information of the upper form plate 34 is read before the foundation concrete 4 is poured and before the upper form plate 34 is removed. Also, both the lower form plate 32 and the upper form plate 34 may be targets for which identification information and position information are used, rather than being selective. In this case, the lower form plate 32 and the upper form plate 34 correspond to the member constituting the anchor frame 3 according to the present invention.
[0134] Furthermore, the members constituting the anchor frame according to the present invention may include at least one of the anchor bolts 31, nuts 33, nuts 35, and washers (not shown). That is, the tag 323 in which the identification information and delivery destination information of these members are embedded may be directly or indirectly attached to these members. In this case, when receiving the goods, the identification information and delivery destination information embedded in the tag 323 are read by the reading unit 711, and the quantity of each identification information of these members and information indicating whether this quantity is appropriate are displayed on the display device 73 based on the read information.
[0135] In the construction management system of this embodiment, the tag information generating device 6 includes an information acquiring device 61. However, the tag information generating device 6 does not have to include the information acquiring device 61. In this case, for example, the input device 64 accepts input of identification information of the anchor frame 3 from a user. This information may be coded by the tag information creating unit 631 and written to the tag 323 by the writing unit 632. [Explanation of symbols]
[0136] 1 Pillar 11 Base plate 12 Bolt holes 2 Mounting stand 21 Post 22 Lateral member 23 Support part 24 Pedestal 3 Anchor Frame 31 Anchor bolt 32 Bottom plate 321 Anchor bolt insertion hole 322 Through hole 323 Tags 33 Nut 34 Upper plate 4. Foundation Concrete 5. Leveling concrete 6. Tag information generator 61 Information acquisition device 611 Information Acquisition Department 62 Control device 62a CPU 62b ROM 62c RAM 62d Non-volatile memory 621 Processing section 622 Storage section 63 Tag Creation Device 631 Tag Information Creation Department 632 Writing Department 64 Input Devices 641 Input section 7. Tag information output device 71 Tag reader 711 Reading unit 72 Management device 72a CPU 72b ROM 72c RAM 72d Non-volatile memory 721 Location information acquisition unit 722 Location Information Creation Department 723 Output section 724 Design information storage section 725 Receiving site information storage unit 726 Judgment section 727 Identification information storage unit 728 Calculation Unit 73 Display device 731 Display section
Claims
1. A construction management system for an anchor frame having a plurality of anchor bolts, which is used to fix a base plate of a column base to foundation concrete, comprising: a reading unit that reads identification information including information indicating a type of the anchor frame from a tag attached to a member that constitutes the anchor frame; a position information acquisition unit that acquires position information indicating a position of the anchor frame when the identification information is read by the reading unit; an output unit that outputs the identification information read by the reading unit and the location information acquired by the location information acquisition unit; a placement information creation unit that creates placement information indicating a placement of the plurality of anchor frames from the identification information of the plurality of anchor frames read by the reading unit and the position information of the plurality of anchor frames acquired by the position information acquisition unit; a design information storage unit that stores design information that defines an installation location of the anchor frame; a display unit that displays the information output from the output unit, the output unit outputs the placement information created by the placement information creation unit and the design information stored in the design information storage unit; The display unit is an anchor frame construction management system that displays the placement information and the design information side by side in a manner that allows the type of each of the multiple anchor frames to be recognized.
2. The reading unit is capable of reading delivery destination information indicating a delivery destination of the anchor frame from the tag, A receiving site information storage unit that stores receiving site information indicating a construction site where the anchor frame is to be received; a determination unit that determines whether the receiving site information stored in the receiving site information storage unit matches the delivery destination information read by the reading unit; The anchor frame construction management system according to claim 1 , wherein the output unit further outputs a result of the determination made by the determination unit.
3. a processing unit that analyzes an image obtained by capturing an image of the member that constitutes the anchor frame and generates the identification information; The anchor frame construction management system according to claim 1 or 2, further comprising: a tag information creation unit that embeds the identification information generated by the processing unit in the tag.
4. an identification information storage unit that stores the identification information read from the tag by the reading unit; A calculation unit that calculates a quantity of the anchor frames to which the tags are attached for each of the identification information based on the identification information stored in the identification information storage unit, The anchor frame construction management system according to claim 1 , wherein the output unit further outputs the quantity calculated by the calculation unit.
5. 5. The anchor frame construction management system according to claim 1, wherein the components constituting the anchor frame are a lower form plate, an upper form plate, or the plurality of anchor bolts that fix the plurality of anchor bolts.
Citation Information
Patent Citations
Anchor bolt installation structure
JP2003336267A
Building inspection system
JP2006227961A
Identification tag for steel frame member, and management system for steel frame member
JP2010117647A
Management system for material, equipment and construction in construction site, and management method
JP2011022849A
Management device for work tool
JP2015075797A