Sintered ore manufacturing method and control device

The method and control device enhance sintered ore production efficiency by identifying key indicators through a productivity estimation model, enabling effective management and improvement of productivity.

JP7589825B2Active Publication Date: 2024-11-26JFE STEEL CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023544613
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2022-03-28
Filing Date
2023-03-08
Publication Date
2024-11-26
Estimated Expiration
2043-03-08

AI Technical Summary

Technical Problem

Existing methods for monitoring the productivity of sintered ore in blast furnace iron manufacturing do not effectively identify the key factors influencing productivity, leading to inefficient production.

Method used

A method and control device that utilize a productivity estimation model to identify the intermediate index with the highest impact on sintered ore productivity by analyzing various intermediate indicators, such as exhaust gas oxygen concentration, and adjust production conditions accordingly.

Benefits of technology

This approach allows for efficient monitoring and management of sintered ore production by focusing on the most influential intermediate indices, thereby maintaining and improving productivity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007589825000001
    Figure 0007589825000001
  • Figure 0007589825000002
    Figure 0007589825000002
  • Figure 0007589825000003
    Figure 0007589825000003
Patent Text Reader

Abstract

This sintered ore manufacturing method forms a charge layer by charging granulated particles, which are granulated from a sintering raw material including an iron-containing raw material and a carbon-containing raw material, into an endless moving pallet 32 of a sintering machine 30 and manufactures a sintered ore by sintering the charge layer. The sintered ore manufacturing method comprises: a step for generating a productivity estimate model with, as an input, a plurality of intermediate indexes pertaining to manufacturing the sintered ore and, as an output, an index pertaining to the productivity of the sintered ore; and a step for using the productivity estimation model and specifying an intermediate index having the highest level of influence to an index pertaining to the productivity among a plurality of intermediate indexes.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a method and a control device for producing sintered ore. [Background technology]

[0002] In the blast furnace ironmaking process, sintered ore is used as an iron source. Sintered ore is produced by granulating sintering raw materials including an iron-containing raw material and a carbon-containing raw material, and sintering the granulated particles in a sintering machine.

[0003] In the production of sintered ore using a sintering machine, the operation is monitored during production in order to stably produce sintered ore.

[0004] For example, Patent Document 1 discloses a technology for measuring online the temperature distribution in a specific region in a sintering raw material layer formed when the sintering raw material is charged into a sintering machine, and for monitoring the operation of the sintering machine based on the measured temperature distribution. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2013-83400 A Summary of the Invention [Problem to be solved by the invention]

[0006] Even if the operation of a sinter machine is monitored based on a specific index for the purpose of maintaining and improving the productivity of sintered ore, the index does not necessarily have the greatest effect on the productivity of sintered ore.

[0007] For example, Patent Document 1 discloses a technique for monitoring the operation of sintered ore based on the temperature distribution in a specific region, but the temperature distribution in the specific region does not necessarily have the greatest effect on the productivity of sintered ore.

[0008] Thus, even if the operation of a sinter machine is monitored based on a specific index, there is a problem in that it is not necessarily possible to efficiently monitor the productivity of sintered ore.

[0009] An object of the present disclosure is to provide a method and a control device for producing sintered ore that can efficiently monitor the productivity of sintered ore. [Means for solving the problem]

[0010] A method for producing sintered ore according to one embodiment of the present disclosure includes: A method for producing sintered ore, comprising the steps of: charging granulated particles produced from a sintering raw material containing an iron-containing raw material and a carbon-containing raw material into an endless moving pallet of a sintering machine to form a charging bed; and sintering the charging bed to produce sintered ore, A step of generating a productivity estimation model in which a plurality of intermediate indicators related to the production of the sintered ore are input and an indicator related to the productivity of the sintered ore is output; using the productivity estimation model to identify an intermediate indicator having the highest influence on the productivity-related indicator from among the plurality of intermediate indicators; Includes.

[0011] A control device according to an embodiment of the present disclosure includes: A control device used in a sintering facility in which granulated particles obtained by granulating a sintering raw material including an iron-containing raw material and a carbon-containing raw material are charged onto an endless moving pallet of a sintering machine to form a charging bed, and the charging bed is sintered to produce sintered ore, A productivity estimation model is generated using a plurality of intermediate indicators related to the production of the sintered ore as input and an indicator related to the productivity of the sintered ore as output; a control unit that identifies an intermediate index having a highest influence on the productivity-related index from among the plurality of intermediate indexes using the productivity estimation model; Equipped with. Effect of the Invention

[0012] According to the sintered ore manufacturing method and control device disclosed herein, it is possible to identify intermediate indicators that have the greatest impact on sintered ore productivity, and therefore the productivity of sintered ore can be efficiently monitored by using the identified intermediate indicators. [Brief description of the drawings]

[0013] [Figure 1] FIG. 1 is a diagram illustrating a configuration example of a sintering facility according to an embodiment of the present disclosure. [Diagram 2] FIG. 2 is a diagram illustrating a configuration example of a control device according to an embodiment of the present disclosure. [Diagram 3] 1 is a flowchart illustrating an example of a procedure for a method for producing sintered ore according to an embodiment of the present disclosure. [Figure 4A] 1 is a graph showing the correlation between exhaust gas oxygen concentration and sintered ore yield in an example. [Figure 4B] 1 is a graph showing the correlation between exhaust gas temperature and sintered ore yield in an example. [Diagram 5] 1 is a graph showing the correlation between exhaust gas oxygen concentration and sintered ore yield in an example. [Figure 6] 1 is a graph showing the correlation between the carbon gas flow rate and the exhaust gas oxygen concentration in an ignition furnace of a sintering machine in an example. [Figure 7] FIG. 2 is a graph showing changes over time in the carbon gas flow rate, the exhaust gas oxygen concentration, and the return ore generation rate of an ignition furnace in an example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings.

[0015] 1 is a diagram showing a schematic configuration example of a sintering equipment 1 according to an embodiment of the present disclosure. The sintering equipment 1 is an equipment capable of producing sintered ore from sintering raw materials including an iron-containing raw material and a carbon-containing raw material.

[0016] The sintering equipment 1 includes a control device 10, a granulator 20, a sinterer 30, a crusher 40, a cooler 50, and a sieving device 60.

[0017] The control device 10 is capable of communicating with the granulator 20, the sintering machine 30, the crusher 40, the cooler 50, and the sieving device 60. The control device 10 controls the granulator 20, the sintering machine 30, the crusher 40, the cooler 50, and the sieving device 60.

[0018] The configuration and functions of the control device 10 will be described in detail later.

[0019] The granulator 20 granulates granulated particles from the sintering raw material containing the iron-containing raw material and the carbon-containing raw material. When the granulator 20 granulates the granulated particles, granulation water is added to the sintering raw material. The sintering raw material may further contain a calcium oxide (CaO)-containing raw material as an auxiliary raw material. The granulated particles granulated by the granulator 20 are transported to the sintering machine 30. The iron-containing raw material may be, for example, iron ore. The carbon-containing raw material may be, for example, coke powder. The CaO-containing raw material may be, for example, limestone.

[0020] Granulator 20 may be any granulator capable of producing granulated particles, but may be, for example, a drum mixer.

[0021] The sintering machine 30 may be any sintering machine that sinters granulated particles, for example, a Dwight Lloyd type sintering machine. The sintering machine 30 includes a sintering material supply device 31, a pallet 32, an ignition furnace 33, and a wind box 34.

[0022] The sintering raw material supplying device 31 charges the granulated particles supplied from the granulator 20 onto a pallet 32 ​​.

[0023] The pallet 32 ​​is an endless movable pallet. When the granulated particles are charged onto the pallet 32 ​​from the sintering raw material supply device 31, a charging layer of the sintering raw material is formed on the pallet 32.

[0024] The ignition furnace 33 ignites the carbon-containing raw material contained in the surface layer of the charging bed formed on the pallet 32.

[0025] The wind box 34 sucks air downward in the sintering bed formed on the pallet 32. When the air in the sintering bed is sucked downward by the wind box 34, the combustion and molten materials in the sintering bed move downward in the sintering bed. In this way, the combustion and molten materials move in the sintering bed, so that the sintering bed is sintered. By sintering the sintering bed, a sintered cake is obtained.

[0026] The crusher 40 crushes the sintered cake supplied from the sinterer 30. The crusher 40 supplies the crushed sintered cake to the cooler 50.

[0027] The cooler 50 cools the crushed sintered cake supplied from the crusher 40. The crushed sintered cake cooled by the cooler 50 is supplied to a sieving device 60.

[0028] The sieving device 60 sieves the crushed sintered cake cooled by the cooler 50 according to the particle size of the crushed material. For example, the sieving device 60 sieves the crushed sintered cake into sintered ore having a particle size of 5 mm or more and return ore having a particle size of less than 5 mm.

[0029] In this manner, sintered ore is finally produced by sieving using the sieving device 60. The return ore sieved using the sieving device 60 may be reused as a sintering raw material.

[0030] Next, a description will be given of the configuration and functions of the control device 10. First, an overview of the functions of the control device 10 will be given.

[0031] The control device 10 acquires the production conditions for sintered ore. The control device 10 also acquires sensor information from various sensors installed in the sintering machine 30.

[0032] The control device 10 calculates a plurality of intermediate indicators related to the production of sintered ore based on the acquired production conditions and sensor information. The plurality of intermediate indicators may include estimated values ​​of the intermediate indicators estimated based on the production conditions and the sensor information.

[0033] The control device 10 identifies, from among the multiple intermediate indexes, the intermediate index that has the highest degree of influence on the index related to the productivity of sintered ore.

[0034] The indicator of the productivity of sintered ore may be, for example, the yield of sintered ore. The yield of sintered ore may be, for example, a value calculated by the following formula (1). (Mass of sintered ore with a particle size of 5 mm or more × 100) / (Mass of sintered ore with a particle size of 5 mm or more + Mass of return ore with a particle size of less than 5 mm) (1)

[0035] In this embodiment, the indicator of the productivity of sintered ore is the yield of sintered ore, but the indicator of the productivity of sintered ore is not limited to the yield of sintered ore. The indicator of the productivity of sintered ore may be the speed of the pallet 32, the strength of the sintered ore, etc.

[0036] The control device 10 specifies a target value of the intermediate index having the highest influence on the productivity index so that the sintered ore productivity index exceeds the target value. Hereinafter, the target value of the sintered ore productivity index is also referred to as the "first target value." The target value of the intermediate index having the highest influence on the productivity index is also referred to as the "second target value." That is, the control device 10 specifies a second target value of the intermediate index having the highest influence on the productivity index so that the sintered ore productivity index exceeds the first target value.

[0037] The control device 10 may further specify a set value of the sintered ore production condition for setting the intermediate index having the highest influence on the productivity index as the second target value. The sintered ore production condition may be, for example, the speed of the pallet 32, the moisture content of the sintered raw material during granulation, the content ratio of the CaO-containing raw material in the sintered raw material, the content ratio of the carbon-containing raw material in the sintered raw material, etc.

[0038] Next, the configuration of the control device 10 will be described.

[0039] 2 is a diagram showing a schematic configuration example of the control device 10 according to an embodiment of the present disclosure. The control device 10 may be a general-purpose computer such as a workstation or a personal computer, or may be a dedicated computer configured to function as the control device 10 of the sintering equipment 1.

[0040] The control device 10 includes a control unit 11, an input unit 12, an output unit 13, a storage unit 14, and a communication unit 15.

[0041] The control unit 11 includes at least one processor, at least one dedicated circuit, or a combination of these. The processor is a general-purpose processor such as a central processing unit (CPU) or a graphics processing unit (GPU), or a dedicated processor specialized for a specific process. The dedicated circuit is, for example, a field-programmable gate array (FPGA) or an application specific integrated circuit (ASIC).

[0042] The control unit 11 reads the programs, data, etc. stored in the storage unit 14 and executes various functions. The control unit 11 controls the granulator 20, the sintering machine 30, the crusher 40, the cooler 50, and the sieving device 60.

[0043] By executing the program read from the memory unit 14, the control unit 11 can cause the control unit 11 to function as a sensor information acquisition unit 111, an intermediate index acquisition unit 112, an intermediate index identification unit 113, a target value acquisition unit 114, and a guidance information acquisition unit 115.

[0044] The processes executed by the sensor information acquisition unit 111, the intermediate index acquisition unit 112, the intermediate index specification unit 113, the target value acquisition unit 114, and the guidance information acquisition unit 115 will be described later.

[0045] The input unit 12 includes one or more input interfaces that detect a user input and acquire input information based on a user operation. The input unit 12 includes, for example, physical keys, capacitive keys, a touch screen that is integral with the display of the output unit 13, or a microphone that accepts voice input.

[0046] The output unit 13 includes one or more output interfaces that output information to notify a user. The output unit 13 includes, for example, a display that outputs information as an image, a speaker that outputs information as sound, etc. The display included in the output unit 13 may be, for example, an LCD (Liquid Crystal Display), a CRT (Cathode Ray Tube) display, etc.

[0047] The storage unit 14 is, for example, a flash memory, a hard disk, an optical memory, etc. A part of the storage unit 14 may be outside the control device 10. In this case, the part of the storage unit 14 may be a hard disk, a memory card, etc. connected to the control device 10 via an arbitrary interface.

[0048] The storage unit 14 stores programs for the control unit 11 to execute each function, data used by the programs, and the like.

[0049] The communication unit 15 includes at least one of a communication module corresponding to wired communication and a communication module corresponding to wireless communication. The control device 10 is capable of communicating with other terminal devices and the like via the communication unit 15.

[0050] Next, the processes executed by the sensor information acquisition unit 111, the intermediate index acquisition unit 112, the intermediate index specification unit 113, the target value acquisition unit 114, and the guidance information acquisition unit 115 will be described.

[0051] The sensor information acquisition unit 111 acquires information on the production conditions of sintered ore from the sintering machine 30. The sensor information acquisition unit 111 may acquire the information on the production conditions by an input operation by an operator to the input unit 12. The sensor information acquisition unit 111 may also acquire information on the production conditions by receiving the information on the production conditions input by an operator to another terminal device via the communication unit 15.

[0052] Furthermore, the sensor information acquisition unit 111 acquires, as the sensor information, for example, temperature information of the exhaust gas, component information of the exhaust gas, and flow rate information of the exhaust gas. The sensor information acquisition unit 111 may obtain the sensor information from various sensors installed in the sintering machine 30. Alternatively, the sensor information acquisition unit 111 may acquire the sensor information by an input operation by an operator to the input unit 12. Furthermore, the sensor information acquisition unit 111 may acquire the sensor information by receiving the sensor information input by the operator to another terminal device via the communication unit 15.

[0053] For example, the sensor information acquiring unit 111 may acquire temperature information of the exhaust gas from a temperature sensor installed in the wind box 34. In addition, the sensor information acquiring unit 111 may acquire flow rate information of the exhaust gas from a gas flow meter installed at an end of the wind box 34.

[0054] Furthermore, the component information of the exhaust gas can be obtained by sampling the exhaust gas in the wind box 34 and performing a chemical analysis such as gas chromatography on the sampled exhaust gas. The sensor information acquisition unit 111 may acquire the component information of the exhaust gas obtained in this manner through an input operation by an operator into the input unit 12.

[0055] The sensor information acquiring unit 111 outputs the acquired information on the production conditions of the sintered ore and the acquired sensor information to the intermediate indicator acquiring unit 112.

[0056] The intermediate indicator acquisition unit 112 calculates a plurality of intermediate indicators based on the information on the production conditions of the sintered ore and the sensor information acquired from the sensor information acquisition unit 111. The intermediate indicators are indicators related to the production of sintered ore in the sintering machine 30.

[0057] In this embodiment, the intermediate indicator acquisition unit 112 calculates exhaust gas temperature, exhaust gas CO2 (carbon dioxide) concentration, exhaust gas CO (carbon monoxide) concentration, exhaust gas oxygen concentration, exhaust gas flow rate, BTP (Burn Through Point), and BRP (Burn Rising Point) as multiple intermediate indicators when sintered ore is produced in the sintering machine 30. BTP means the position of the highest exhaust gas temperature in the machine longitudinal direction of the sintering machine 30. BRP means the position of the exhaust gas reaching any temperature within the range of 100 to 300°C in the machine longitudinal direction of the sintering machine 30.

[0058] The intermediate index acquiring unit 112 can obtain the exhaust gas temperature, BTP, and BRP based on the exhaust gas temperature information acquired from the sensor information acquiring unit 111. Also, the intermediate index acquiring unit 112 can obtain the exhaust gas CO2 concentration, the exhaust gas CO concentration, and the exhaust gas oxygen concentration based on the exhaust gas component information acquired from the sensor information acquiring unit 111. Also, the intermediate index acquiring unit 112 can obtain the exhaust gas flow rate based on the exhaust gas flow rate information acquired from the sensor information acquiring unit 111.

[0059] The intermediate indicator acquisition unit 112 may obtain estimated values ​​of BTP and BRP, for example, using a physical model disclosed in Reference 1 shown below and information on the production conditions of sintered ore acquired from the sensor information acquisition unit 111. (Reference 1: Yamaoka et al. ISIJ International,Vol.45,No.4,pp.522)

[0060] In addition, the intermediate indicator acquisition unit 112 may obtain estimated values ​​of BTP and BRP, for example, using a heat transfer model disclosed in Reference 2 shown below and information on the production conditions of sintered ore acquired from the sensor information acquisition unit 111. (Reference 2: Koichiro Ohno and 4 others, Effect of coke combustion rate equation on numerical simulation of temperature distribution estimation in sintering process layer, Iron and Steel, Vol. 101, (2015), No. 1, pp. 19-24)

[0061] The intermediate index identifying unit 113 identifies an intermediate index having the highest degree of influence on the index related to the productivity of sintered ore from among the multiple intermediate indexes obtained by the intermediate index acquiring unit 112.

[0062] When the intermediate indicator specifying unit 113 acquires the actual value of the sintered ore yield from the sintering machine 30, the intermediate indicator specifying unit 113 stores in the storage unit 14 a data set including a plurality of intermediate indicators and the actual value of the sintered ore yield at that time as one pair.

[0063] When a predetermined number of sets of data sets are stored in the storage unit 14, the intermediate index identification unit 113 performs machine learning using the stored data sets to generate a productivity estimation model, which is a trained machine learning model. The intermediate index identification unit 113 generates the productivity estimation model by performing machine learning using a plurality of intermediate indicators as input and the yield of sintered ore, which is an index related to the productivity of sintered ore, as output. The predetermined number of sets of data sets may be, for example, 50 sets of data sets. The intermediate index identification unit 113 stores the generated productivity estimation model in the storage unit 14. For example, SPSS manufactured by IBM may be used as the machine learning model.

[0064] The intermediate index identifying unit 113 uses the productivity estimation model thus generated to identify, from among the multiple intermediate indexes, an intermediate index that has the highest degree of influence on the index related to the productivity of sintered ore.

[0065] For example, the intermediate index identification unit 113 creates a graph showing the relationship between each intermediate index and the yield of sintered ore, and calculates the correlation between the intermediate index and the yield of sintered ore from the graph. The intermediate index identification unit 113 identifies the intermediate index with the largest correlation coefficient as the intermediate index with the highest influence on the yield of sintered ore. A large correlation coefficient means that the correlation between the change in the intermediate index and the change in the yield of sintered ore is high, so it can be said that the intermediate index has a high influence on the yield of sintered ore. On the other hand, a small correlation coefficient means that the correlation between the change in the intermediate index and the change in the yield of sintered ore is low, that is, the intermediate index and the yield of sintered ore change without being related to each other, so it can be said that the intermediate index has a low influence on the yield of sintered ore.

[0066] Also, for example, when the units of the multiple intermediate indicators are the same, the intermediate indicator specifying unit 113 may create a graph showing the relationship between each intermediate indicator and the yield of sintered ore, and calculate the slope of the regression line from the graph. The intermediate indicator specifying unit 113 may specify the intermediate indicator with the largest slope of the regression line as the intermediate indicator with the highest influence on the yield of sintered ore.

[0067] The intermediate indicator specifying unit 113 outputs the specified intermediate indicator to the output unit 13 .

[0068] The output unit 13 outputs the intermediate index acquired from the intermediate index identifying unit 113. For example, if the output unit 13 includes a display, the output unit 13 displays the intermediate index acquired from the intermediate index identifying unit 113 on the display.

[0069] An operator visually recognizes the intermediate indicator that has the greatest influence on the yield of sintered ore, which is displayed on the display, and can monitor the production of sintered ore by the sintering machine 30 based on the intermediate indicator.

[0070] For example, when the yield of sintered ore is higher than the target value, the operator maintains the production conditions of sintered ore by the sintering machine 30 so that the intermediate indicator that has the highest impact on the yield of sintered ore does not change. This allows the yield of sintered ore to be maintained higher than the target value. On the other hand, when the yield of sintered ore is lower than the target value, the operator changes the intermediate indicator that has the highest impact on the yield of sintered ore. In this case, the operator can change the intermediate indicator that has the highest impact on the yield of sintered ore by adjusting the production conditions of sintered ore by the sintering machine 30.

[0071] The control device 10 may specify a target value (second target value) of the intermediate index having the highest influence on the yield of sintered ore so that the yield of sintered ore exceeds the target value (first target value).

[0072] In this case, the intermediate indicator specifying unit 113 outputs to the target value acquiring unit 114 the intermediate indicator that has been specified as the intermediate indicator having the highest influence on the yield of sintered ore.

[0073] When the target value acquisition unit 114 acquires the intermediate index identified as the intermediate index having the highest influence on the yield of sintered ore from the intermediate index identification unit 113, the target value acquisition unit 114 reads out the productivity estimation model stored in the storage unit 14 from the storage unit 14 and acquires a first target value. The first target value may be determined in advance and stored in the storage unit 14, or may be acquired by an input operation to the input unit 12 by an operator.

[0074] The target value acquisition unit 114 estimates the yield of sintered ore while changing the value of the intermediate index to be input to the productivity estimation model, and determines whether the estimated yield of sintered ore exceeds the first target value. The target value acquisition unit 114 may change the value of the intermediate index in increments of one unit within a predetermined range and input it to the productivity estimation model, and specify the value of the intermediate index when the estimated yield of sintered ore exceeds the first target value as a second target value of the intermediate index.

[0075] The target value acquisition unit 114 outputs the specified second target value of the intermediate index to the guidance information acquisition unit 115. Note that, when the yield of the sintered ore does not exceed the first target value even if the value of the intermediate index is changed within a predetermined range, the target value acquisition unit 114 may output information indicating that the second target value could not be acquired to the guidance information acquisition unit 115.

[0076] When the guidance information acquisition unit 115 acquires the second target value of the intermediate indicator from the target value acquisition unit 114, it identifies a setting value of the sintered ore production conditions for setting the intermediate indicator to the second target value. The guidance information acquisition unit 115 identifies at least one setting value as the setting value of the sintered ore production conditions.

[0077] For example, when the intermediate indicators are BTP, BRP, exhaust gas component concentration and exhaust gas temperature, the guidance information acquisition unit 115 can calculate the values ​​of the above intermediate indicators by inputting the raw material bulk density, exhaust gas flow rate, speed of the pallet 32, moisture content of the sintering raw material at the time of granulation, content ratio of CaO-containing raw material in the sintering raw material, content ratio of carbon-containing raw material in the sintering raw material, etc. into the physical model disclosed in the above-mentioned Reference 1.

[0078] For this reason, the guidance information acquisition unit 115 calculates values ​​of intermediate indicators such as BTP, BRP, exhaust gas component concentrations, and exhaust gas temperature while changing the speed of the pallet 32, the moisture content of the sintering raw material during granulation, the content ratio of CaO-containing raw material in the sintering raw material, and the content ratio of carbon-containing raw material in the sintering raw material, among the items to be input into the physical model, and identifies the speed of the pallet 32, the moisture content of the sintering raw material during granulation, the content ratio of CaO-containing raw material in the sintering raw material, and the content ratio of carbon-containing raw material in the sintering raw material when the calculated values ​​of the intermediate indicators become equal to or greater than the second target value.

[0079] The guidance information acquisition unit 115 can determine the setting value of at least one of these sintered ore production conditions based on the identified speed of the pallet 32, the moisture content of the sintered raw material during granulation, the content ratio of CaO-containing raw material in the sintered raw material, and the content ratio of carbon-containing raw material in the sintered raw material.

[0080] The influence of the sintered ore production conditions on each intermediate index does not have to be expressed by a physical model. For example, an experiment may be performed in advance to confirm how each intermediate index changes when the production conditions are actually changed, and data of the experimental results may be stored in the storage unit 14. The control unit 11 may generate an intermediate index estimation model by machine learning a machine learning model that inputs the sintered ore production conditions and outputs the intermediate index that has the highest influence on the sintered ore yield among multiple intermediate indexes. In this case, the guidance information acquisition unit 115 uses the intermediate index estimation model to identify the setting value of the production conditions for setting the intermediate index that has the highest influence on the productivity index as the second target value.

[0081] When the guidance information acquisition unit 115 identifies at least one setting value of the production conditions for sintered ore, the guidance information acquisition unit 115 outputs the identified setting value to the output unit 13.

[0082] The output unit 13 outputs the setting values ​​of the manufacturing conditions acquired from the guidance information acquisition unit 115. For example, when the output unit 13 includes a display, the output unit 13 displays the setting values ​​of the manufacturing conditions acquired from the guidance information acquisition unit 115 on the display.

[0083] An operator visually checks the set values ​​of the production conditions shown on the display, adjusts the sintered ore production conditions to the set values, and operates the sintering machine 30, thereby producing sintered ore so that the sintered ore yield satisfies the first target value.

[0084] Alternatively, the guidance information acquisition unit 115 may automatically set the identified set value as the set value of the sintered ore production condition. This allows the sintering machine 30 to automatically produce sintered ore such that the yield of the sintered ore satisfies the first target value.

[0085] In addition, when the guidance information acquisition unit 115 acquires information indicating that the second target value could not be acquired from the target value acquisition unit 114, it may output error information to the output unit 13 without identifying the setting value of the sintered ore production conditions, and cause the error information to be displayed on the output unit 13.

[0086] The method for producing sintered ore executed by the sintering equipment 1 according to this embodiment will be described with reference to the flowchart shown in FIG.

[0087] In step S101, the control unit 11 of the control device 10 generates a productivity estimation model that receives a plurality of intermediate indicators related to the production of sintered ore as input and outputs an indicator related to the productivity of sintered ore.

[0088] In step S102, the control unit 11 uses the productivity estimation model to identify, from among the multiple intermediate indicators, the intermediate indicator that has the highest influence on the productivity indicator. The control unit 11 may output the identified intermediate indicator that has the highest influence on the productivity indicator to the output unit 13 and cause the output unit 13 to display it.

[0089] (Example) An example of a method for producing sintered ore in the sintering equipment 1 according to this embodiment will be described with reference to Figs. 4A to 7.

[0090] Fig. 4A is a graph showing the correlation between the exhaust gas oxygen concentration and the yield of sintered ore, and Fig. 4B is a graph showing the correlation between the exhaust gas temperature and the yield of sintered ore.

[0091] 4A and 4B, the correlation coefficient between the exhaust gas oxygen concentration and the sintered ore yield is larger than the correlation coefficient between the exhaust gas temperature and the sintered ore yield. This shows that the exhaust gas oxygen concentration has a higher influence on the sintered ore yield as an intermediate indicator than the exhaust gas temperature.

[0092] In addition, when the correlation coefficients between the intermediate indicators, namely exhaust gas temperature, exhaust gas CO2 concentration, exhaust gas CO concentration, exhaust gas oxygen concentration, exhaust gas flow rate, BTP, and BRP, and the sintered ore yield, the intermediate indicator with the greatest impact on the sintered ore yield was found to be the exhaust gas oxygen concentration.

[0093] Fig. 5 is a graph showing how the correlation between the exhaust gas oxygen concentration and the yield of sintered ore depends on the thickness of the sintered ore bed formed on the pallet 32. Fig. 5 shows plots for sintered ore bed thicknesses of 650.0 mm, 647.5 mm, 645.0 mm, 642.5 mm, and 640.0 mm. The thickness of the sintered ore bed is one of the production conditions for sintered ore.

[0094] The slope of the regression line between the exhaust gas oxygen concentration and the sintered ore yield was calculated for each thickness of the sintering bed, and the results are as follows: Thickness of sinter layer [mm] Slope of regression line 650.0 -1.01 647.5 -1.48 645.0 -1.36 642.5 -1.73 640.0 -1.72

[0095] In this way, it was found that the impact of the exhaust gas oxygen concentration, which is an intermediate indicator, on the sintered ore yield changes when the thickness of the sintered ore bed, which is a sintered ore production condition, changes. In addition, this result shows that the intermediate indicator that has the greatest impact on the sintered ore yield can change when the sintered ore production conditions change.

[0096] FIG. 6 is a graph showing the correlation between the carbon gas flow rate (C gas flow rate) of the ignition furnace 33 of the sintering machine 30 and the exhaust gas oxygen concentration.

[0097] 6, it can be seen that the exhaust gas oxygen concentration, which is an intermediate indicator, can be changed by changing the carbon dioxide flow rate of the ignition furnace 33, which is a production condition for sintered ore. In other words, if a second target value of the exhaust gas oxygen concentration that can set the yield of sintered ore to the first target value is obtained, it is possible to identify the set value of the carbon dioxide flow rate of the ignition furnace 33 that can set the exhaust gas oxygen concentration to the second target value.

[0098] 7 is a diagram showing time variations in the carbon gas flow rate (C gas flow rate), the exhaust gas oxygen concentration, and the return ore generation rate of the ignition furnace 33. Note that the lower the return ore generation rate, the higher the yield of sintered ore.

[0099] In the example shown in FIG. 7, the carbon gas flow rate of the ignition furnace 33, which is one of the production conditions of sintered ore, is set to 1300 [Nm 3 / hr], the intermediate indicator, exhaust gas oxygen concentration, could be set to the second target value. At this time, the return ore generation rate was 20.0 mass%, and the sintered ore yield was improved to 80 mass%. The sintered ore yield at this time achieved the first target value.

[0100] As described above, in the sintered ore manufacturing method according to the present embodiment and the control device 10 according to the present embodiment, the control device 10 executes a step of generating a productivity estimation model in which a plurality of intermediate indicators related to the production of sintered ore are input and an indicator related to the productivity of sintered ore is output, and a step of identifying an intermediate indicator having the highest influence on the indicator related to the productivity from among the plurality of intermediate indicators using the productivity estimation model. As a result, the control device 10 can identify an intermediate indicator having the highest influence on the indicator related to the productivity of sintered ore from among the plurality of intermediate indicators related to the production of sintered ore. As a result, the operator can monitor the production of sintered ore using the intermediate indicator that has the greatest influence on the productivity of sintered ore, and therefore, the production of sintered ore can be efficiently monitored from the viewpoint of maintaining and improving the productivity of sintered ore. Therefore, the sintered ore manufacturing method according to the present embodiment and the control device 10 according to the present embodiment can efficiently monitor the productivity of sintered ore.

[0101] In addition, in the sintered ore manufacturing method according to the present embodiment and the control device 10 according to the present embodiment, the control device 10 can specify a second target value of the intermediate index having the highest influence on the productivity index so that the productivity index of the sintered ore exceeds the first target value, and specify the set value of the manufacturing conditions for setting the intermediate index to the second target value. This allows the operator to adjust the set value of the manufacturing conditions for the sintered ore so that the intermediate index having the highest influence on the productivity index becomes the second target value. Therefore, it is possible to manufacture sintered ore so that the target productivity of sintered ore can be achieved.

[0102] Managing all of the multiple intermediate indicators related to the production of sintered ore is a heavy burden. Therefore, the production of sintered ore is usually managed based on a specific intermediate indicator. Conventionally, the production of sintered ore has often been managed based on a specific intermediate indicator without grasping the degree of influence on the productivity of sintered ore, and the production conditions have been managed based on an intermediate indicator that has a small influence on the productivity of sintered ore, and the production conditions have been adjusted. In this way, it is difficult to produce sintered ore so as to achieve the target productivity of sintered ore. In contrast, the production method of sintered ore according to the present embodiment identifies the intermediate indicator that has the highest influence on the indicator related to the productivity of sintered ore, so that the production of sintered ore can be efficiently managed based on the intermediate indicator. In addition, by adjusting the production conditions of sintered ore so that the intermediate indicator that has the highest influence on the indicator related to the productivity of sintered ore becomes the target value, it is possible to produce sintered ore so as to achieve the target yield of sintered ore.

[0103] The present disclosure is not limited to the above-described embodiments. For example, multiple blocks shown in the block diagram may be integrated, or one block may be divided. Instead of executing multiple steps shown in the flowchart in chronological order as described, each step may be executed in parallel or in a different order depending on the processing capacity of the device executing each step, or as necessary. Other modifications are possible without departing from the spirit of the present disclosure.

[0104] For example, in the above-described embodiment, an example was given of the intermediate index acquisition unit 112 calculating multiple intermediate indexes, such as exhaust gas temperature, exhaust gas CO2 concentration, exhaust gas CO concentration, exhaust gas oxygen concentration, exhaust gas flow rate, BTP and BRP, but the intermediate index acquisition unit 112 only needs to calculate at least two of the exhaust gas temperature, exhaust gas CO2 concentration, exhaust gas CO concentration, exhaust gas oxygen concentration, exhaust gas flow rate, BTP and BRP.

[0105] Furthermore, in the above embodiment, the control unit 11 has the function of the guidance information acquisition unit 115. However, this is not limiting, and the control unit 11 does not need to have the function of the guidance information acquisition unit 115. However, if the control unit 11 has the function of the guidance information acquisition unit 115, it becomes possible to manufacture sintered ore so as to achieve a target sintered ore yield, so it is preferable that the control unit 11 has the function of the guidance information acquisition unit 115. [Explanation of symbols]

[0106] 1 Sintering equipment 10 Control device 11 Control section 12 Input section 13 Output section 14 Storage section 15 Communications Department 20 Granulator 30 Sintering machine 31 Sintering material supply device 32 palettes 33 Ignition Furnace 34 Windbox 40 Crusher 50 Cooler 60 Sieving device 111 Sensor information acquisition unit 112 Intermediate indicator acquisition part 113 Intermediate indicator identification section 114 Target value acquisition unit 115 Guidance information acquisition unit

Claims

1. A method for producing sintered ore, comprising the steps of: charging granulated particles produced from a sintering raw material containing an iron-containing raw material and a carbon-containing raw material into an endless moving pallet of a sintering machine to form a charging bed; and sintering the charging bed to produce sintered ore, A step of generating a productivity estimation model in which a plurality of intermediate indicators related to the production of the sintered ore are input and an indicator related to the productivity of the sintered ore is output; using the productivity estimation model to identify an intermediate indicator having the highest influence on the productivity-related indicator from among the plurality of intermediate indicators; Including, The intermediate indicators include at least two of an exhaust gas temperature, an exhaust gas CO2 (carbon dioxide) concentration, an exhaust gas CO (carbon monoxide) concentration, an exhaust gas oxygen concentration, an exhaust gas flow rate, a BTP (Burn Through Point), and a BRP (Burn Rising Point); the step of generating the productivity estimation model includes storing a data set in which actual values ​​of the plurality of intermediate indicators and an actual value of an indicator related to the productivity are paired, and performing machine learning using a predetermined number of the stored data sets to generate the productivity estimation model; In the method for producing sintered ore, the step of identifying an intermediate indicator having the highest influence on the productivity index includes calculating a correlation between each of the multiple intermediate indicators and the productivity index, and identifying the intermediate indicator with the largest correlation coefficient as the intermediate indicator having the highest influence on the productivity index.

2. The method for producing sintered ore according to claim 1 , further comprising: specifying a second target value of an intermediate index having a highest influence on the productivity index so that the productivity index of the sintered ore exceeds a first target value.

3. A step of generating an intermediate indicator estimation model having sintered ore production conditions as input and the plurality of intermediate indicators as output; using the intermediate indicator estimation model, specifying a set value of the manufacturing condition for setting the intermediate indicator having the highest influence on the productivity-related indicator as the second target value; Further comprising:

3. The method for producing sintered ore according to claim 2, wherein the step of generating the intermediate indicator estimation model includes storing data of experimental results on how each of the plurality of intermediate indicators changes when the production conditions are changed, and performing machine learning using the stored data of the experimental results to generate the intermediate indicator estimation model.

4. The method for producing sintered ore according to claim 1 , wherein the indicator relating to the productivity of the sintered ore is a yield of the sintered ore or a speed of the pallet.

5. A control device used in a sintering facility in which granulated particles obtained by granulating a sintering raw material including an iron-containing raw material and a carbon-containing raw material are charged onto an endless moving pallet of a sintering machine to form a charging bed, and the charging bed is sintered to produce sintered ore, A productivity estimation model is generated using a plurality of intermediate indicators related to the production of the sintered ore as input and an indicator related to the productivity of the sintered ore as output; a control unit that uses the productivity estimation model to identify an intermediate indicator having a highest influence on the productivity-related indicator from among the plurality of intermediate indicators; A storage unit; Equipped with The intermediate indicators include at least two of an exhaust gas temperature, an exhaust gas CO2 (carbon dioxide) concentration, an exhaust gas CO (carbon monoxide) concentration, an exhaust gas oxygen concentration, an exhaust gas flow rate, a BTP (Burn Through Point), and a BRP (Burn Rising Point); the control unit stores in the storage unit a data set in which the actual values ​​of the plurality of intermediate indicators and the actual value of the productivity-related indicator are paired, and performs machine learning using a predetermined number of the data sets stored in the storage unit to generate the productivity estimation model; The control unit calculates the correlation between each of the multiple intermediate indicators and the indicator related to productivity, and identifies the intermediate indicator with the largest correlation coefficient as the intermediate indicator having the greatest influence on the indicator related to productivity.

Citation Information

Patent Citations

  • Method for sintering operation

    JP1988100137A

  • Operation monitoring device of sintering process, operation monitoring method of sintering process, and program

    JP2013083400A

  • Operation state evaluation device, operation state evaluation method, computer program, and computer-readable storage medium

    JP2013140548A

  • Control device of sintered ore production facility, sintered ore production facility, and production method of sintered ore

    JP2019196515A

  • Manufacturing condition output device, quality management system, and program

    JP2022002111A