Boiler system equipped with shock wave soot blower and method of operating same
The boiler system uses an impact force measuring device to precisely adjust shock wave soot blower operations, optimizing fuel usage and maintaining performance by directly measuring shock wave impact, thus reducing costs.
Patent Information
- Application Number
- JP2019236171
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2019-12-26
- Publication Date
- 2024-11-28
- Estimated Expiration
- 2039-12-26
AI Technical Summary
Existing boiler systems consume excess fuel gas and oxidizer gas while maintaining heat absorption performance, and adjustments to shock wave soot blowers are imprecise due to indirect temperature influences.
A boiler system with an impact force measuring device installed in the heat exchanger area to directly measure shock wave impact, allowing precise determination of operating conditions for the shock wave soot blower, including gas filling amount and operating frequency.
Direct measurement of impact force enables optimized operating conditions for the shock wave soot blower, maintaining heat absorption performance and reducing running costs effectively.
Smart Images

Figure 0007591347000001 
Figure 0007591347000002 
Figure 0007591347000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a boiler system equipped with a shock wave soot blower and a method for operating the same. [Background technology]
[0002] Conventionally, shock wave soot blowers have been used to remove dust adhering to the surface of a heat exchanger (such as a superheater or a coal economizer) of a boiler that uses exhaust heat from a waste incinerator (see, for example, Patent Document 1). This shock wave soot blower is configured to burn a mixture containing a fuel gas and an oxidizing gas such as oxygen to generate a shock wave, which is then released into the internal space of the device. The shock wave removes dust from the device surface.
[0003] Generally, a shock wave soot blower is equipped with a combustion chamber in which fuel gas and oxidizer gas are mixed and burned, and a fuel gas filling tank and an oxidizer gas filling tank in which the fuel gas and oxidizer gas to be supplied to the combustion chamber are stored. Conventionally, gas is supplied to the combustion chamber by filling each filling tank with fuel gas and oxidizer gas until they reach a predetermined set pressure value, and then transferring the gas in each filling tank to the combustion chamber for a predetermined time (a time sufficient for the pressure in each filling tank and the pressure in the combustion chamber to reach equilibrium). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2005-172418 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the operation of such boilers, the heat absorption performance of the boiler is maintained by effectively removing dust using a shock wave soot blower, but on the other hand, it is also required not to consume more fuel gas and oxidant gas than necessary. In order to maintain the heat absorption performance of the boiler and optimize the running cost, it is necessary to adjust the operating conditions, i.e., the operation frequency of the shock wave soot blower and the amount of gas charged per operation. In the past, data such as the boiler's exhaust heat temperature and steam temperature were used as the basis for making such adjustments. However, since the boiler's exhaust heat temperature and steam temperature only indirectly reflect the effect of dust removal and can also be affected by other factors, it was necessary to use data accumulated over a long period of time to operate appropriately.
[0006] Therefore, in order to solve the above problems, the object of the present invention is to provide a boiler system and an operating method thereof that can maintain the boiler's heat absorption performance and optimize running costs by determining the operating conditions of a shock wave soot blower with high accuracy over a short operation period. [Means for solving the problem]
[0007] In order to achieve the above object, the boiler system according to the present invention comprises: A boiler that generates steam; A shock wave soot blower that outputs shock waves by burning a mixture of a fuel gas and an oxidizer gas, and removes dust adhering to a surface of a heat exchanger that constitutes the boiler by using the shock waves; An impact force measuring device provided in an installation area of a heat exchanger from which dust is to be removed by the shock wave soot blower; Equipped with.
[0008] With this configuration, the impact force from the shock wave soot blower can be directly measured using an impact force measuring device installed in the installation area of the heat exchanger, making it possible to determine the operating conditions of the shock wave soot blower with high accuracy in a shorter operating period, thereby maintaining the boiler's heat absorption performance and optimizing running costs.
[0009] In a boiler system according to an embodiment of the present invention, an output port of the shock wave soot blower may be provided on a first wall surface facing the installation area, and the impact force measuring device may be installed on a second wall surface facing the installation area and facing the first wall surface across the heat exchanger. According to this configuration, since the shock wave measuring device is attached to the wall surface of the installation area, the influence on the performance of the heat exchanger is minimized, and the peripheral configuration such as wiring can be simplified compared to the case where the shock wave measuring device is attached to the heat exchanger itself.
[0010] In a boiler system according to an embodiment of the present invention, the heat exchanger may be disposed at a position that does not overlap with the axis of the output port, a first impact force measuring device may be installed at a position on the axis of the output port on the second wall surface, and a second impact force measuring device may be installed at a position on the second wall surface where the heat exchanger is interposed between the second wall surface and the center of the output port. According to this configuration, by installing the impact force measuring devices at a position on the second wall surface where the impact force is directly received and at a position on the back side of the heat exchanger where the impact force is weakened, it is possible to obtain highly accurate impact force measurement values while reducing the number of impact force measuring devices used.
[0011] The boiler system operation method of the present invention is a method for operating any of the boiler systems described above, and includes determining at least one of the filling amounts of fuel gas and oxidant gas in the shock wave soot blower and the operating frequency of the shock wave soot blower based on the measurement results by the impact force measuring device.
[0012] According to this configuration, the impact force measurement results obtained by the impact force measuring device are used to determine the gas filling amount and / or the operation frequency of the shock wave soot blower, which are operating conditions of the shock wave soot blower that are directly linked to the dust removal effect and running costs, making it possible to effectively optimize running costs over a short operating period. Effect of the Invention
[0013] As described above, according to the present invention, by directly measuring the impact force output from the shock wave sootblower, it is possible to determine the operating conditions of the shock wave sootblower with high accuracy over a shorter operating period. [Brief description of the drawings]
[0014] [Figure 1] 1 is a side view showing a schematic configuration of a waste incineration facility in which a boiler system according to an embodiment of the present invention is installed. [Diagram 2] FIG. 2 is a block diagram showing a schematic configuration of a shock wave soot blower used in the boiler system of FIG. 1. [Figure 3A] 2 is a cross-sectional view showing the structure of a soot blower used in the boiler system of FIG. 1 and the operation before combustion starts. [Figure 3B] 2 is a cross-sectional view showing the structure of a soot blower used in the boiler system of FIG. 1 and its operation after combustion starts. [Figure 4] 2 is a cross-sectional view showing an example of the arrangement of shock wave measuring instruments in a heat exchanger installation area of the boiler system of FIG. 1. [Diagram 5] FIG. 2 is a cross-sectional view showing an impact force effective area in a heat exchanger installation area of the boiler system of FIG. 1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] Hereinafter, an embodiment of the present invention will be described with reference to the drawings, but the present invention is not limited to this embodiment.
[0016] FIG. 1 shows a waste incinerator 1 in which a boiler system S according to an embodiment of the present invention is installed. In the waste incinerator 1, waste is incinerated in a combustion chamber, and high-temperature exhaust gas G generated by the incineration passes through a flue 3 connected downstream of the combustion chamber. The flue 3 has a structure in which it is folded back at multiple points at the top or bottom. In this specification, the entire flue 3 is divided by the folded back parts, and is referred to as a first flue 3a, a second flue 3b, a third flue 3c, and so on, from the upstream side. FIG. 1 shows up to the third flue 3c, and the downstream part is omitted.
[0017] The boiler 5 constituting the main body of the boiler system S generates steam by utilizing the heat of the exhaust gas G flowing through the flue 3 which is the flow path of the exhaust gas G. In this embodiment, the boiler 5 includes a drum 7, a number of water tubes (not shown) arranged in the flue 3, and a superheater 9 (a primary superheater 9A and a secondary superheater 9B in the illustrated example) which is a heat exchanger constituting the boiler 5. In this example, the water tubes are arranged in the first flue 3a and the second flue 3b which correspond to the upstream part of the flue 3. The superheater 9 is arranged in the third flue 3c which corresponds to the downstream part of the flue 3.
[0018] In addition to the boiler 5, the boiler system S is equipped with a shock wave soot blower (hereinafter simply referred to as the "soot blower") 11 and an impact force measuring device 13 (Figure 4). As will be described in detail later, the soot blower 11 is a device that outputs shock waves and removes dust adhering to the surfaces of heat exchangers that constitute the boiler 5, such as the superheater 9. The impact force measuring device 13 is provided in the installation area R of the heat exchanger from which dust is to be removed by the soot blower 11, and measures the impact force of the shock wave output from the soot blower 11.
[0019] As shown in the figure, in this embodiment, two superheaters 9A, 9B are installed in the third flue 3c, spaced apart from each other along the flow direction of the exhaust gas G. The shock wave soot blower 11 is installed so as to output a shock wave in the space between these superheaters 9A, 9B. The type and arrangement of the heat exchanger and the arrangement of the soot blower 11 in the boiler system S are not limited to this example. For example, although not shown, an evaporator and a soot blower for removing dust from the evaporator may be provided in the second flue 3b, and a coal economizer and a soot blower for removing dust from the coal economizer may be provided in the fourth flue connected downstream of the third flue 3c.
[0020] 2 shows a schematic configuration of a soot blower 11 according to one embodiment of the present invention. The soot blower 11 burns a mixture of fuel gas F and oxidant gas O, and outputs shock waves SP by discharging the resulting combustion gas B. In this embodiment, methane gas is used as the fuel gas F, and oxygen gas is used as the oxidant gas O. However, the fuel gas F and the oxidant gas O are not limited to these.
[0021] The sootblower 11 comprises a combustion chamber 15 and a sootblower body 17 integrated with the combustion chamber 15. The sootblower body 17 is provided with a discharge port 19 for discharging the combustion gas B generated in the combustion chamber 15. The sootblower 11 further comprises a fuel tank 21 which is a fuel supply source, and an oxidizer tank 23 which is an oxidizer supply source. A fuel storage tank 27 is provided between the fuel tank 21 and the combustion chamber 15, i.e., midway through a fuel supply path 25 which supplies fuel gas F from the fuel tank 21 to the combustion chamber 15. An oxidizer storage tank 31 is provided between the oxidizer tank 23 and the combustion chamber 15, i.e., midway through an oxidizer supply path 29 which supplies oxidizer gas O from the oxidizer tank 23 to the combustion chamber 15. In the following description, for convenience, the portion of the fuel supply path 25 from the fuel tank 21 to the fuel storage tank 27 is referred to as a first fuel supply path 25a, and the portion from the fuel storage tank 27 to the combustion chamber 15 is referred to as a second fuel supply path 25b. Similarly, the portion of the oxidizer supply path 29 from the oxidizer tank 23 to the oxidizer storage tank 31 is referred to as a first oxidizer supply path 29a, and the portion from the oxidizer storage tank 31 to the combustion chamber 15 is referred to as a second oxidizer supply path 29b.
[0022] The first fuel supply passage 25a and the second fuel supply passage 25b are provided with a first fuel supply passage on-off valve 33 and a second fuel supply passage on-off valve 35, respectively, and the first oxidizer supply passage 29a and the second oxidizer supply passage 29b are provided with a first oxidizer supply passage on-off valve 37 and a second oxidizer supply passage on-off valve 39, respectively. The fuel storage tank 27 and the oxidizer storage tank 31 are provided with a fuel storage tank pressure measuring device 41 and an oxidizer storage tank pressure measuring device 43 that measure the pressure inside the storage tanks 27, 31, respectively.
[0023] When operating the soot blower 11 configured in this manner, first, the first fuel supply passage on-off valve 33 and the first oxidizer supply passage on-off valve 37 are opened to fill the fuel storage tank 27 and the oxidizer storage tank 31 with the fuel gas F and the oxidizer gas O until the respective set pressure values are reached. Next, the first fuel supply passage on-off valve 33 and the first oxidizer supply passage on-off valve 37 are closed, and the second fuel supply passage on-off valve 35 and the second oxidizer supply passage on-off valve 39 are opened to supply the fuel gas F and the oxidizer gas O to the combustion chamber 15. When the fuel gas F and the oxidizer gas O are supplied to the combustion chamber 15, the second fuel supply passage on-off valve 35 and the second oxidizer supply passage on-off valve 39 are set to be opened only for a predetermined time (a time sufficient for the pressures in the storage tanks 27, 31 and the pressure in the combustion chamber 15 to reach equilibrium). After the supply of the fuel gas F and the oxidant gas O to the combustion chamber 15 is completed, the ignition device 55 causes combustion, and the soot blower body 17 outputs a shock wave SP.
[0024] Here, the structure of the sootblower 11 and the operating principle for generating the shock wave SP will be described with reference to Figures 3A and 3B. The combustion chamber 15 provided integrally with the sootblower body 17 has, in detail, a pair of main combustion chambers 45, 45 extending perpendicularly to the discharge direction of the combustion gas B from both sides of the sootblower body 17, and a preliminary combustion chamber 47 located between the pair of main combustion chambers 45, 45. A fuel supply passage 25 and an oxidizer supply passage 29 are connected to the pair of main combustion chambers 45, 45. A cylinder 49 is provided between the pair of main combustion chambers 45, 45. Inside the cylinder 49, a piston 51 is provided slidably on the inner peripheral wall of the cylinder 49. A nozzle 53 forming a discharge port 19 for the combustion gas B is provided at a portion of the sootblower body 17 facing the piston 51. That is, the piston 51 is provided movably in the discharge direction of the combustion gas B.
[0025] A head 51a provided at the rear end of the piston 51 (the end opposite the discharge port 19) is in sliding contact with the inner peripheral wall of the cylinder 49. The space between the head 51a of the piston 51 and the inner wall at the rear of the cylinder 49 is filled with a pressurized gas (nitrogen gas in this example) P for pressing the piston 51 forward. The portion of the space inside the cylinder 49 forward of the head 51a of the piston 51 forms the preliminary combustion chamber 47. In the state before the start of combustion shown in FIG. 3A, the piston 51 closes the discharge port 19 due to the pressure of the pressurized gas P.
[0026] The preliminary combustion chamber 47 is provided with an ignition device 55. When the mixed gas of fuel gas F and oxidizer gas O introduced into the main combustion chamber 45 and flowing into the preliminary combustion chamber 47 as shown in FIG. 3B is ignited by the ignition device 55 and combustion of the mixture starts in the preliminary combustion chamber 47, the piston 51 is pushed back backward by the increase in pressure in the preliminary combustion chamber 47 and the discharge port 19 is opened. While the discharge port 19 is open, the combustion of the mixture spreads from the preliminary combustion chamber 47 to the entire main combustion chamber 45, and the combustion gas B generated by this is discharged from the nozzle 53. The discharged combustion gas B outputs a shock wave SP.
[0027] In this manner, in this embodiment, the piston 51 and the pressurized gas P provided in the combustion chamber 15 constitute an opening / closing mechanism 57 configured to close the discharge port 19 of the combustion gas B before the start of combustion and to open the discharge port 19 after the start of combustion. However, the aspect of the opening / closing mechanism 57 described here is merely an example, and other mechanisms may be used as long as they function in this manner.
[0028] Next, a configuration for measuring the impact force of the shock wave SP output by the soot blower 11 will be described with reference to Fig. 4. In the following description, the superheater 9 is taken as an example of the heat exchanger from which dust is removed by the soot blower 11, and the third flue 3c of the waste incinerator 1 is taken as an example of the installation area R of this heat exchanger, but the heat exchanger and its installation area R are not limited to this example.
[0029] As shown in Fig. 4, in this example, a plurality of superheaters 9 are installed in the installation area R. Specifically, in the third flue 3c, a secondary superheater 9B and a primary superheater 9A are arranged in this order from the upstream side of the flow of the exhaust gas G, while being spaced apart from each other. A soot blower 11 is provided to remove dust from these two superheaters 9.
[0030] A nozzle 53, which is an output port of the soot blower 11, is disposed on one wall surface facing the third flue 3c. Hereinafter, the wall surface on which the nozzle 53 is disposed is referred to as a "first wall surface 59." Specifically, the nozzle 53 is inserted into a through hole formed in the first wall surface 59. More specifically, the nozzle 53 is disposed so as to face the gap between the two superheaters 9A, 9B. In other words, each superheater 9 is disposed at a position not overlapping with the axis A of the nozzle 53.
[0031] On the other hand, among the other wall surfaces facing the third flue 3c, an impact force measuring device 13 is provided on a wall surface (hereinafter referred to as a "second wall surface 61") that faces the superheater 9. In this embodiment, a pressure sensor is used as the impact force measuring device 13. Note that the impact force measuring device 13 is not limited to a pressure sensor, and other measuring means, such as a strain gauge, may be used as long as it can appropriately measure the impact force caused by a shock wave.
[0032] In this embodiment, a plurality of impact force measuring devices 13 are used. Specifically, one impact force measuring device 13 (first impact force measuring device 13A) is installed at a position on the second wall surface 61 on the axis A of the nozzle 53 (hereinafter referred to as "first measurement position P1"). In other words, the first measurement position P1 where the first impact force measuring device 13A is installed is a position on the second wall surface 61 where no superheater 9 exists between the position and the center C of the nozzle tip 53a, and is also a position where the distance from the center C of the nozzle tip 53a is the shortest.
[0033] The other impact force measuring device 13 (second impact force measuring device 13B) is installed at a position (hereinafter referred to as "second measurement position P2") on the second wall surface 61 where each superheater 9 is interposed between the center C of the nozzle tip 53a. In this example, a total of two second impact force measuring devices 13B are provided corresponding to the two superheaters 9, respectively.
[0034] More specifically, the second impact force measuring device 13B is arranged at a position on the second wall surface where, when viewed in a cross-sectional view on a plane parallel to the axial center A of the nozzle 53 and the flow direction of the exhaust gas G, the length of a straight line connecting the center C of the nozzle tip 53a and the second impact force measuring device 13B passing through the superheater 9 is the longest.
[0035] That is, in the illustrated example, the impact force measuring devices 13 are attached to the first measurement position P1 where the second wall surface 61 directly receives the impact force, and the second measurement position P2 where the impact force is weakened on the back side of the heat exchanger. By setting the attachment positions of the impact force measuring devices 13 in this way, it is possible to obtain highly accurate impact force measurement values while reducing the number of impact force measuring devices 13 used. In this example, only two impact force measuring devices 13 are used per one superheater 9. Also, as illustrated, by setting the first measurement position P1 at a position equidistant from the two superheaters 9A, 9B, it is possible to obtain highly accurate impact force measurement values using only three impact force measuring devices 13 for the two superheaters 9A, 9B arranged side by side.
[0036] In this embodiment, the position of the second measurement position P2 in the width direction (direction perpendicular to the axial center A direction of the nozzle 53 and the flow direction of the exhaust gas G) of the installation area R (flue 3) is the same position as the center C of the nozzle tip 53a, but is not limited to this and may be selected as appropriate.
[0037] The position where the impact force measuring device 13 is provided in the installation area R is not limited to the above example. For example, the impact force measuring device 13 may be provided at another position on the second wall surface 61, or on another wall surface. Furthermore, the impact force measuring device 13 may be directly attached to the superheater 9. However, from the viewpoint of minimizing the influence on the performance of the heat exchanger and simplifying the surrounding structure such as wiring, it is preferable to install the impact force measuring device 13 on the wall surface facing the installation area R. In this embodiment, the wall surface of the installation area R is formed by a membrane panel, and when the impact force measuring device 13 is attached to the wall surface, it is preferable to attach it to the fin portion of the membrane panel.
[0038] In addition, it is preferable that the impact force measuring device 13 is provided in the installation area R, particularly in an area (impact force effective area) Re where the shock wave SP of the soot blower 11 can substantially apply an impact force to the superheater 9 (heat exchanger). Specifically, the impact force effective area Re is an area surrounded by the center C of the nozzle tip 53a, the first measurement position P1, and the third measurement position P3 in a cross-sectional view on a plane parallel to the axial center A direction of the nozzle 53 of the superheater 9 and the flow direction of the exhaust gas G, as shown in Fig. 5. This third measurement position P3 is defined as the position furthest from the nozzle tip 53a, where a straight line connecting the center C of the nozzle tip 53a and the impact force measuring device 13 on the second wall surface 61 can pass through the superheater 9 in the above cross-sectional view.
[0039] Furthermore, the number of impact force measuring devices 13 provided in the installation area R is not limited to the above example, and may be three or more, or may be one, per heat exchanger.
[0040] Next, an operating method of the boiler system S configured as described above will be described. In this embodiment, at least one of the operating conditions of the soot blower 11, the charge amount of the fuel gas F and the oxidant gas O of the soot blower 11 (i.e., the pressure setting value of each storage tank) and the operation frequency of the soot blower 11, is determined based on the measurement results by the impact force measuring device 13. The determination of such operating conditions and the operation control based thereon are performed by a control device 63 of the soot blower 11 provided in the boiler system S, as shown in FIG. 2. Although not shown, the control device 63 may collect various measurement values for determining the heat absorption performance of the boiler 5 in addition to the measurement results by the impact force measuring device 13, and determine and control the operating conditions of the soot blower 11 based on these measurement results.
[0041] The measured value of the impact force and the corresponding operating conditions such as gas filling amount and operating frequency can be set by performing analysis or trial operation as a pre-verification. In this boiler system S, the impact force of the soot blower 11 is directly measured, making it possible to set optimal operating conditions through pre-verification and short-term practical operation. Alternatively, practical operation of the boiler system S may be started initially with standard operating conditions for the soot blower 11, and then the operating conditions for the soot blower 11 may be optimized based on the obtained measured values. In this case as well, the operating conditions for the soot blower 11 can be optimized through short-term operation.
[0042] According to the boiler system S and its operating method of this embodiment described above, the impact force from the shock wave soot blower 11 can be directly measured by the impact force measuring device 13 provided in the installation area R of the heat exchanger that constitutes the boiler 5, making it possible to determine the operating conditions of the shock wave soot blower 11 with high accuracy in a shorter operation period, thereby maintaining the heat absorption performance of the boiler 5 and optimizing running costs.
[0043] As described above, the preferred embodiment of the present invention has been described with reference to the drawings, but various additions, modifications, and deletions can be made without departing from the spirit of the present invention. Therefore, such additions, modifications, and deletions are also included in the scope of the present invention. [Explanation of symbols]
[0044] 5. Boiler 9 Superheater (heat exchanger) 11 Shock wave soot blower 13 Impact force measuring device 53 Nozzle (Outlet) 59 First Wall 61 Second Wall F Fuel gas O Oxidant gas R installation area SP Shock Wave
Claims
1. A boiler that generates steam; a shock wave soot blower having a soot blower body which outputs shock waves from a nozzle which forms a discharge port of the combustion gas by burning a mixture of a fuel gas and an oxidizer gas, and which removes dust adhering to a surface of a heat exchanger which constitutes the boiler by the shock waves; An opening / closing mechanism provided in the soot blower body and configured to close the discharge port by a pressurized gas before combustion starts and to open the discharge port after combustion starts; An impact force measuring device provided in an installation area of a heat exchanger from which dust is to be removed by the shock wave soot blower; Equipped with An output port of the shock wave soot blower is provided on a first wall surface facing the installation area, The impact force measuring device is installed on a second wall surface that faces the installation area and faces the first wall surface with the heat exchanger therebetween, The heat exchanger is disposed at a position not overlapping with an axis of the output port, a first impact force measuring device is installed on the axis of the output port of the second wall surface, a second impact force measuring device is installed at a position on the second wall surface where the heat exchanger is interposed between the second wall surface and the center of the output port, and where a length of a straight line connecting the second wall surface and the center of the output port passing through the heat exchanger is the longest; Boiler system.
2. 10. A method of operating the boiler system of claim 1, comprising: and determining at least one of the amount of fuel gas and oxidant gas charged in the shock wave soot blower and the operating frequency of the shock wave soot blower based on the measurement results by the impact force measuring device. How to operate a boiler system.
Citation Information
Patent Citations
Monitoring device for combustion vibration
JP1981023629A
JP1982083408U
Operation method of sound wave type soot blower
JP2004116799A
Dust removing method, dust removing device and dust attachment inhibiting method
JP2004278921A
Apparatus and method for cleaning surface within vessel
JP2005164229A