On-site mixing manufacturing unit for track construction, and track construction method using this on-site mixing manufacturing unit

The on-site kneading manufacturing unit addresses the challenges of track construction by integrating a mixer and conveyor system into a truck-bed unit, ensuring efficient and high-quality concrete production even in restricted areas, thus facilitating rapid and reliable track construction.

JP7617618B2Active Publication Date: 2025-01-20ALBOLDEMANSANA INC
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021031627
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-01
Publication Date
2025-01-20
Estimated Expiration
2041-03-01

AI Technical Summary

Technical Problem

Track construction is limited to nighttime due to train operations, requiring rapid and reliable completion within a short period, and existing on-site concrete mixing units face challenges in accessing and supplying the right amount of concrete efficiently, especially in restricted sites like mountainous areas or areas with electric wires.

Method used

An on-site kneading manufacturing unit integrated into a truck-bed loadable unit, equipped with a mixer, hoppers, conveyors, and a control system, allowing for high-quality concrete production under challenging conditions, including sites inaccessible from outside the track, with features like a movable upstream conveyor and jib crane to manage aggregate input safely and efficiently.

Benefits of technology

Enables efficient, high-quality concrete production at small-scale track construction sites, reducing labor and time requirements, and allowing continuous construction across multiple locations without delays, even in areas with height restrictions and electric wires.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007617618000001
    Figure 0007617618000001
  • Figure 0007617618000002
    Figure 0007617618000002
  • Figure 0007617618000003
    Figure 0007617618000003
Patent Text Reader

Abstract

To provide a field kneading production unit suitable for orbit construction.SOLUTION: A field kneading production unit comprises a plurality of related devices integrally incorporated on a unit stand 10. Each related device comprises a mixer 20, a load cell 21, a cement hopper 22, a screw feeder 26, a relay hopper 23, a downstream side belt conveyor 25, an upstream side belt conveyor 24, a water storage tank, a water feed apparatus 29, and a controller 30. The upstream side belt conveyor 24 is provided movably with respect to the unit stand 10, and further, a conveyor mounting stand 10f mounting the upstream side belt conveyor 24 so as to be transportable is provided so as to extend along either side of the unit stand 10.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The disclosed technology relates to an on-site mixing manufacturing unit that is primarily intended for construction work (track construction) carried out around the rails on which trains run, and a track construction method using this on-site mixing manufacturing unit. [Background technology]

[0002] The present applicant has previously proposed an on-site concrete mixing and manufacturing unit suitable for repair and renovation work on existing structures (Patent Document 1).

[0003] The on-site mixing production unit efficiently integrates the related equipment required for on-site mixing, such as a hopper and mixer, onto a unit platform that can be loaded onto the bed of a small truck and easily unloaded. Therefore, with this on-site mixing production unit, on-site mixing of concrete can be easily carried out even at small construction sites where a mixer truck cannot even be brought in, such as renovation work in an office building.

[0004] An example of prior art related to track construction is Patent Document 2. Patent Document 2 discloses a method in which rails are separately laid on both sides of the track, and a work platform equipped with a crane or the like is moved using the rails to replace utility poles and other items installed next to the track. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2016-159474 A [Patent Document 2] Japanese Patent Application Publication No. 59-150803 Summary of the Invention [Problem to be solved by the invention]

[0006] Track construction can only be done at night because trains run during the day. Furthermore, construction work is limited to a specific period at night, so it is necessary to complete the work quickly and reliably. Construction delays are unacceptable because they could disrupt the timetable.

[0007] For example, when rebuilding a utility pole, first a vertical hole is excavated at the installation site and a frame is placed inside it. The lower part of the utility pole is attached to the frame, and then concrete is poured. After the concrete has hardened, the upper part of the utility pole is attached, and the construction is complete.

[0008] In the past, ready mixed concrete was transported from factories in truck mixers for such utility pole reconstruction work. However, it is difficult to obtain ready mixed concrete at night due to the lack of manpower. Furthermore, depending on the work site, it can be extremely difficult to prepare the right amount of ready mixed concrete at the right time according to the progress of the work. This is especially true when only a small amount of concrete is required.

[0009] As a result, in this type of track construction, it has become common to mix concrete by hand at the work site, which, combined with a shortage of labor, has slowed progress.

[0010] In this regard, the on-site mixing production unit mentioned above can be effectively used in track construction, as the production equipment required for on-site mixing is unitized and transport is easy. It can automate concrete production at the work site and can steadily produce high-quality concrete, shortening construction time, reducing labor, and improving construction quality.

[0011] However, in the case of track construction, there are circumstances specific to tracks, and some work sites cannot be accessed from outside the tracks, such as mountainous areas. Furthermore, because electric wires and other things are installed around the tracks, it is difficult to access the work site from high places, and there are also restrictions on the input of materials to the on-site mixing manufacturing unit.

[0012] Therefore, it was found that even the above-mentioned on-site mixing manufacturing unit can be difficult to apply to track construction, and there is room for improvement.

[0013] In response to this, the present inventors have previously proposed an on-site mixing manufacturing unit suitable for track construction (Patent Application No. 2020-011906). As described above, track construction has various limitations that differ from normal construction. The present inventors have conducted further studies to overcome such limitations and carry out construction more efficiently.

[0014] The technology disclosed here is based on the results of that study. In other words, we have realized an on-site mixing manufacturing unit that is convenient, easy to use, and suitable for track construction. [Means for solving the problem]

[0015] One of the technologies disclosed relates to an on-site concrete mixing production unit for track construction.

[0016] The on-site mixing production unit comprises a unit base having a long rectangular shape from front to back when viewed from above, which can be loaded onto the bed of a truck and transported on roads and tracks, and a number of associated devices which are integrally assembled onto the unit base.

[0017] the associated devices include a mixer disposed at the front end of the unit table for mixing concrete; a load cell for measuring changes in weight of the mixer; a cement hopper disposed adjacent to the mixer on the rear end side of the unit table and into which cement is poured; a screw feeder for transporting the cement poured into the cement hopper and supplying it to the mixer; an intermediate hopper disposed at the rear end of the unit table and into which aggregate is poured; a downstream belt conveyor for transporting the aggregate poured into the intermediate hopper and supplying it to the mixer; an upstream belt conveyor for transporting the aggregate and pouring it into the intermediate hopper; a water storage tank for storing water used in producing concrete; a water supply device for supplying water from the water storage tank to the mixer; and a control device for controlling operation of the mixer, the screw feeder, the downstream belt conveyor, and the water supply device based on the measurement value of the load cell.

[0018] The upstream belt conveyor is arranged so as to be movable relative to the unit base, and a conveyor support base for placing the upstream belt conveyor on and transporting it is arranged to extend along one side of the unit base.

[0019] That is, this on-site mixing production unit can be loaded onto the bed of a truck, and the related devices required for on-site mixing are efficiently integrated on a unit base that can be transported on roads and tracks. Therefore, by transporting it on the road by truck and then on the track, it can be used at sites that cannot be accessed from outside the track. And at small-scale track construction sites such as utility pole replacement work, high-quality on-site mixing can be performed efficiently with little labor.

[0020] This on-site mixing unit is equipped with a water tank to store the water used in concrete production. Therefore, concrete can be produced even if water is not available at the work site.

[0021] As the hopper for storing concrete materials, only the hopper for cement with a small mixing ratio is installed, so a large hopper can be installed and a large amount of cement can be stored.

[0022] On the other hand, in order to feed aggregate with a high mixing ratio into the mixer, a relay hopper, a downstream belt conveyor, and an upstream belt conveyor are provided. The relay hopper is disposed at the rear end of the unit table, and the downstream belt conveyor transports the aggregate fed into the relay hopper and supplies it to the mixer.

[0023] On the other hand, the upstream belt conveyor that transports the aggregate and dumps it into the relay hopper is installed so that it can be moved relative to the unit base. Therefore, by moving the downstream belt conveyor at the work site, the aggregate can be dumped into the relay hopper from the side of the track at the work site. This provides excellent workability.

[0024] Moreover, a conveyor platform for placing the upstream belt conveyor on and transporting it is provided so as to extend along one side of the unit platform. Even if the upstream belt conveyor has a long overall length, it can be transported together with the unit platform. This provides excellent convenience. And, even at sites with large elevation differences, the upstream belt conveyor can be installed without hindrance. This provides excellent workability. Note that the on-site mixing production unit to which the disclosed technology is applied is suitable for track construction, and is therefore intended for track construction. Therefore, it is not limited to track construction, and can be applied to construction other than track construction.

[0025] The on-site mixing production unit may also further include a jib crane installed on the unit base at a predetermined height or below, and the upstream belt conveyor may be moved by the jib crane between a transportable state in which it is placed on the conveyor mounting base and a usable state in which it transports aggregate and deposits it into the relay hopper.

[0026] The jib crane only rotates horizontally, so it can avoid contact with the trolley wire. Therefore, it can be used safely on the track. And since the upstream belt conveyor is moved by the jib crane between a transportable state where it is placed on the conveyor platform and a usable state where it transports aggregate and puts it into the relay hopper, the burden on the worker for moving the upstream belt conveyor can be reduced. Therefore, it is convenient and easy to work with.

[0027] The on-site mixing production unit may also be configured such that the aggregate includes fine aggregate and coarse aggregate continuously supplied to the mixer by the upstream belt conveyor and the downstream belt conveyor, and the control device executes a supply amount calculation process to obtain the supply amounts of cement, water, fine aggregate, and coarse aggregate to the mixer according to the production amount of concrete to be mixed with the mixer, and an operation control process to control the operation of the mixer, the screw feeder, the downstream belt conveyor, and the water supply device so as to obtain the supply amounts obtained by the supply amount calculation process, and for the fine aggregate and coarse aggregate that have been added first, the operation of at least the downstream belt conveyor is controlled so that the amount of fine aggregate and coarse aggregate supplied is the calculated supply amount minus at least the remaining amount on the downstream belt conveyor.

[0028] In this manufacturing unit, the aggregate is transported along a single route consisting of an upstream belt conveyor, a relay hopper, a downstream belt conveyor, etc. Therefore, when there are two types of aggregate, fine aggregate and coarse aggregate, if these are transported continuously, when the aggregate is switched when the previously supplied aggregate reaches a predetermined amount, the previous aggregate remains on these belt conveyors. Therefore, these are also supplied to the mixer, resulting in oversupply.

[0029] Therefore, in this manufacturing unit, the operation of the belt conveyor is controlled so that the amount of aggregate that was previously added is the specified supply amount minus the remaining amount on the belt conveyor. In other words, the operation of the belt conveyor is controlled so that the specified supply amount will be reached when the remaining amount is added. Therefore, even if two types of aggregate are continuously fed to the mixer through the same route, they can be measured with high accuracy. High quality concrete can be produced.

[0030] The on-site mixing production unit preferably further includes an auxiliary unit shared with the on-site mixing production unit. The auxiliary unit may include a frame that can be loaded onto a truck bed and transported on roads and tracks, a first aggregate hopper and a second aggregate hopper that are supported by the frame and into which fine aggregate and coarse aggregate are respectively fed, and a pair of aggregate belt conveyors that transport the fine aggregate and coarse aggregate fed into the first aggregate hopper and the second aggregate hopper, respectively, and the pair of aggregate belt conveyors may be arranged close to each other in parallel with a vertical offset.

[0031] By using the auxiliary unit, large amounts of aggregate can be continuously fed into the mixer with almost no human intervention. A pair of aggregate conveyor belts are arranged close together in parallel with a vertical offset, allowing two types of aggregate to be fed into the relay hopper at the same time. The auxiliary unit can be transported on a track separate from the on-site mixing production unit, so it can be moved and used to replenish aggregate while the on-site mixing production unit is operating. This allows for efficient and effective track construction.

[0032] Another technique to be disclosed relates to a track construction method.

[0033] The track construction method includes a positioning step of transporting the on-site mixing production unit to a work site by a road-rail vehicle and positioning the unit base so that it faces the pouring area adjacent to the side of the track; an installation step of moving the upstream belt conveyor placed on the conveyor mounting table to position its upstream end beside the track and its downstream end above the relay hopper; a production step of using the cement hopper to supply a predetermined amount of cement to the mixer, and using the upstream belt conveyor, the relay hopper, and the downstream belt conveyor to supply a predetermined amount of aggregate to the mixer and supply a predetermined amount of water with the water supply device, and then mixing the concrete in the mixer; and a pouring step of dispensing the produced concrete from the mixer and pouring it into the pouring area.

[0034] According to this track construction method, concrete can be mixed on-site while aggregate is fed into the mixer from the side of the track using the upstream belt conveyor. This allows a relatively large amount of concrete to be produced efficiently, so that concrete can be poured efficiently and effectively in small-scale track construction such as the replacement of utility poles.

[0035] Also, instead of the upstream belt conveyor, an auxiliary unit may be used to feed the aggregate, which will allow for more efficient concrete production.

[0036] Furthermore, it is preferable to carry out construction work continuously at a plurality of locations by moving the road-rail vehicle on a track and repeating each of the positioning step, the installation step, the manufacturing step, and the pouring step.

[0037] By using the above-mentioned on-site mixing production unit to carry out track construction, it is possible to move between multiple sites and continuously pour concrete to carry out construction work. Furthermore, by sharing the auxiliary unit, a large amount of aggregate can be supplied to the on-site mixing production unit without interruption, further reducing the time and labor required for work. Effect of the Invention

[0038] An on-site mixing manufacturing unit that applies the disclosed technology can appropriately handle track construction even under harsh working conditions, thereby enabling track construction to be promoted. [Brief description of the drawings]

[0039] [Figure 1] FIG. 2 is a top view of the on-site kneading production unit. [Diagram 2] This is a view of the on-site mixing production unit from the right side. [Diagram 3] This is a rear view of the on-site kneading production unit. [Figure 4] This is a side view showing the on-site mixing manufacturing unit loaded onto a rail-road vehicle. [Diagram 5] FIG. 13 is a diagram for explaining an example of track construction work. [Figure 6A] FIG. 2 is a top view of the on-site kneading manufacturing unit installed at the work site. [Figure 6B] This is a rear view of the on-site kneading manufacturing unit installed at the work site. [Figure 7] FIG. 2 is a schematic diagram illustrating an auxiliary unit. [Figure 8] FIG. 13 is a diagram for explaining an example of track construction in an application example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0040] Hereinafter, an embodiment of the disclosed technology will be described in detail with reference to the drawings. However, the following description is essentially merely illustrative and does not limit the present invention, its applications, or its uses. Each drawing shows the front-back, left-right, and up-down directions used in the description.

[0041] <On-site kneading manufacturing unit> An example of an on-site mixing production unit is shown in Figures 1, 2, and 3 (also simply referred to as production unit 1). Figure 1 is a view of the production unit 1 seen from above. Figure 2 is a view of the production unit 1 seen from the right side. Figure 3 is a view of the production unit 1 seen from the rear.

[0042] This manufacturing unit 1 is configured to be suitable for track construction work that is mainly carried out at locations along the tracks along which trains and the like run. A specific example of track construction is the replacement of utility poles. Utility poles are installed at intervals along the tracks to install electric wires. Most of these utility poles are iron poles. Iron poles deteriorate due to corrosion and therefore need to be replaced periodically. The manufacturing unit 1 is used for pouring concrete in such track construction work.

[0043] The manufacturing unit 1 is a batch-type manufacturing device that can mix about 30 to 300 L of concrete at a time. It is configured by integrally incorporating multiple related devices required for on-site mixing onto a single compact unit base 10.

[0044] For example, the size and weight of the manufacturing unit 1 are designed to be within a range that can be loaded onto the bed of a medium-sized truck and transported on a road. It is also designed to be within a range that can be loaded onto the bed of a road-rail vehicle and transported on a railroad track.

[0045] Furthermore, there are contact wires (contact electric wires that supply power through the pantograph) located about 5m above the track. During track work, contact with the contact wires must be avoided. Therefore, there are limitations on the height at which work can be done. For example, a distance of at least 1.5m must be secured between the heads of workers performing track work and the contact wires.

[0046] Concrete production requires not only raw water but also washing water, so a relatively large amount of water must be secured. However, there are some sites where it is difficult to secure water. At such sites, if the capacity of the water supply tank is small, there is a risk that the required amount of concrete cannot be produced. Therefore, it is preferable to be able to store a large amount of water in the water supply tank.

[0047] Once water is available, it is preferable to be able to supply other concrete materials, such as cement and aggregates, efficiently and effectively and repeatedly. It is also preferable to be able to cast the mixed concrete efficiently and effectively. This manufacturing unit 1 is designed to be able to appropriately deal with these issues.

[0048] (10 units) The unit stand 10 is composed of a floor surface 10a, a support frame 10b, etc. The floor surface 10a is rectangular in shape when viewed from above, with the short side length W being set to about 2m and the long side length L being set to about 3m. The support frame 10b is formed into a substantially rectangular box shape by a plurality of support frames extending in the vertical direction and a plurality of beam frames extending in the front-rear or left-right direction. The height of the unit stand 10 is about 1m.

[0049] (Conveyor stand) The unit base 10 is provided with a crane base 10c, a first step 10d for work, a second step 10e for seating, a conveyor placement base 10f, etc. The crane base 10c, the first step 10d, and the second step 10e are provided along the rear edge of the unit base 10.

[0050] The crane platform 10c is a platform-like portion having excellent strength, and is installed at the left corner of the unit platform 10. The first step 10d is a scaffold that enables standing work, and is installed on the right side of the crane platform 10c as shown in FIG. 3. The first step 10d is located behind the screw feeder 26, which will be described later. Taking into consideration height restrictions and workability, the first step 10d is designed mainly for cement injection work.

[0051] The second step 10e is a platform that allows people to sit down, and is installed to the right of the first step 10d. The second step 10e is located behind the downstream belt conveyor 25, which will be described later. The second step 10e is located at a higher position than the first step 10d.

[0052] The conveyor placement table 10f is provided so as to extend along one side (the right side) of the unit base 10. The conveyor placement table 10f is made of a belt-shaped space that extends in the front-rear direction with a predetermined width and is designed so that the upstream belt conveyor 24 described later can be placed thereon and transported.

[0053] (Jib Crane) The manufacturing unit 1 includes a jib crane 11. Specifically, the jib crane 11 is provided on a crane platform 10c.

[0054] 2, the jib crane 11 has a pillar 11a erected on a crane base 10c, a shaft support 11b provided on the upper part of the pillar 11a, a rotating shaft 11c supported by the shaft support 11b so as to be rotatable about an axis extending in the vertical direction, a jib 11d extending horizontally from the rotating shaft 11c, and a crane 11e attached to the jib 11d. The jib 11d is configured so as to be rotatable within a predetermined angle range.

[0055] The length of the jib 11d is about 2 m, and is set so that it can be rotated counterclockwise as viewed from above to vertically overlap the unit base 10. In addition, the jib 11d is set so as to be located at a height of about 4 m above the track when it is loaded on the road-rail vehicle 40.

[0056] As mentioned above, in track construction work, contact with the contact wire must be reliably avoided. Therefore, it is difficult to actually use a crane that swings up and down. In contrast, in this manufacturing unit 1, a jib crane 11 is installed that is set at a predetermined height for safety reasons. Since the jib crane 11 only swings horizontally, it can reliably meet the height requirement. Therefore, track construction work can be carried out with peace of mind.

[0057] The associated devices include a mixer 20, a load cell 21, a cement hopper 22, a relay hopper 23, an upstream belt conveyor 24, a downstream belt conveyor 25, a screw feeder 26, a first water storage tank 27, a second water storage tank 28, a water supply device 29, and a control device 30. As shown in Fig. 2, the upstream belt conveyor 24 is provided independently of the unit base 10. The upstream belt conveyor 24 is usually placed on the unit base 10 during transportation, etc., and is removed from the unit base 10 at the work site during track construction.

[0058] All other related devices, except for the upstream belt conveyor 24 and the relay hopper 23, are installed on the unit base 10 so as to fit on the floor surface 10a and not extend beyond the floor surface 10a. The height from the floor surface 10a is also set not to exceed about 2m.

[0059] The total weight of the manufacturing unit 1 (weight at the time of transportation, including water) is set to be 3,500 kg or less. As a result, the manufacturing unit 1 can be easily transported by being loaded onto the bed of a medium-sized truck or road-rail vehicle, and it is also easy to get on and off.

[0060] (mixer) The mixer 20 is a so-called pan-type mixer. The mixer 20 has a shallow bottomed cylindrical kneading vessel with an agitating blade installed inside, a top lid covering the top of the kneading vessel, and an openable and closable outlet 20c. The agitating blade rotates by driving a motor (not shown) under the control of the control device 30. Depending on the concrete material used, a grout mixer may be used instead of the pan-type mixer.

[0061] As shown in Fig. 1, the discharge outlet 20c is disposed on the left side of the unit table 10. In other words, the discharge outlet 20c is disposed in a position facing one long side of the unit table 10. The discharge outlet 20c has a shooter extending diagonally downward so that the concrete mixed by the mixer 20 can be discharged to the side of the unit table 10.

[0062] The mixer 20 is located approximately in the center (slightly to the left) in the width direction (left-right direction) of the unit table 10, and is disposed at one end (front end) in the longitudinal direction of the unit table 10. When viewed from above, the mixer 20 has a diameter of approximately 2 / 3 the width of the unit table 10.

[0063] The mixer 20 is supported on the unit base 10 via a load cell 21. The load cell 21 is a sensor that converts a load into an electrical signal. The load cell 21 measures a change in weight of the mixer 20. The load cell 21 is electrically connected to the control device 30 and outputs a measured value to the control device 30.

[0064] (Cement hopper, screw feeder) The cement hopper 22 is a box-shaped container having a large rectangular inlet at the top and a small cement outlet at the bottom. As shown in Fig. 3, the cement hopper 22 has a substantially right-angled triangular shape when viewed from the front-rear direction, and is disposed so that its hypotenuse faces diagonally downward to the right.

[0065] A lid having a pair of doors 22a, 22a is attached to the inlet. The pair of doors 22a, 22a swing left and right to open and close (so-called double doors). The discharge outlet is located at the pointed lower end of the cement hopper 22. The cement hopper 22 is located approximately in the center of the width of the unit table 10, and is located on the rear end side of the unit table 10 adjacent to the mixer 20.

[0066] Cement is charged into the cement hopper 22 through an inlet. The cement charged into the cement hopper 22 is transported by a screw feeder 26 and charged into the mixer 20.

[0067] The screw feeder 26 is a known cylindrical device with a screw shaft provided inside, as shown in Fig. 2. Cement is transported by rotation of the screw shaft. The screw feeder 26 extends along the long side of the unit base 10. The rear end of the screw feeder 26 is disposed below the discharge outlet of the cement hopper 22. The front end of the screw feeder 26 is disposed above the mixer 20.

[0068] The screw feeder 26 is inclined upward from the rear end to the front end. The front end of the screw feeder 26 is accommodated in a feeder duct 26a that communicates with the inside of the kneading vessel 20a. The screw feeder 26 supplies cement to the inside of the kneading vessel 20a through the feeder duct 26a.

[0069] (Relay hopper, downstream belt conveyor) Aggregate is fed into the relay hopper 23. The downstream belt conveyor 25 transports the aggregate and supplies it to the mixer 20. Aggregate is a concrete material that has a high mixing ratio, and is generally composed mainly of sand (fine aggregate) and crushed stone or gravel (coarse aggregate) that has a larger grain size than sand. Although both fine aggregate and coarse aggregate are aggregates, they are treated as separate raw materials for concrete materials.

[0070] As shown in FIG. 1, the relay hopper 23 is disposed at the rear end of the unit base 10. In detail, the relay hopper 23 is disposed so as to protrude rearward from the second step 10e. The relay hopper 23 is formed in a fan shape (a quarter of a circle) when viewed from above. The relay hopper 23 has a fan-shaped inlet 23a at its upper portion and an aggregate outlet 23b at its lower portion. The relay hopper 23 is disposed so that its arc-shaped edge 23c faces leftward, similar to the discharge outlet 20c of the mixer 20.

[0071] The downstream belt conveyor 25 is disposed on the right side of the screw feeder 26. The downstream belt conveyor 25 passes below the cement hopper 22 and extends in the front-rear direction along the screw feeder 26. The downstream belt conveyor 25 is inclined upward from the rear end to the front end.

[0072] The rear end of the downstream belt conveyor 25 is disposed below the aggregate discharge port 23b of the relay hopper 23. The front end of the downstream belt conveyor 25 is accommodated in a conveyor duct 25a communicating with the inside of the mixer 20. The downstream belt conveyor 25 supplies aggregate to the inside of the mixer 20 through the conveyor duct 25a.

[0073] (First water tank, second water tank) Two water tanks are installed in this manufacturing unit 1 so that a large amount of water can be stored. Specifically, by devising an arrangement of each device, free space is secured on the unit base 10, and a first water tank 27 and a second water tank 28 are installed in the free space.

[0074] The first water storage tank 27 is a vertically long rectangular box tank installed on the support frame 10b, and is disposed in front of the crane platform 10c, to the left of the cement hopper 22, and along the left side of the unit platform 10. The second water storage tank 28 is a rectangular box tank with a smaller capacity than the first water storage tank 27, and is disposed on the floor surface 10a. The second water storage tank 28 is disposed in the right corner of the rear end of the unit platform 10.

[0075] Both the first water storage tank 27 and the second water storage tank 28 are designed to store at least 500 L of water. For example, if there is about 700 L of water, it is possible to store about 4 tons (2 m 3 ) of concrete can be produced. In addition, in consideration of making the production unit 1 portable, it is preferable that the volume be 700 L or less.

[0076] (water supply device) 1 shows the water supply device 29. Although not shown in detail, the water supply device 29 is composed of a pump, piping, an electromagnetic on-off valve, a flow meter, etc. The water supply device 29 operates the pump and the electromagnetic on-off valve according to instructions from the control device 30. As a result, the water supply device 29 supplies a predetermined amount of water stored in the first water storage tank 27 or the second water storage tank 28 to the mixer 20.

[0077] (Upstream conveyor belt) The upstream side belt conveyor 24 is a belt conveyor having a length of about 5 m. The upstream side belt conveyor 24 can be moved with respect to the unit base 10, and is provided separately from the unit base 10.

[0078] That is, as described above, the upstream belt conveyor 24 is normally placed on the conveyor placement table 10f during transportation, etc. (transportable state). During concrete production, the upstream belt conveyor 24 is moved by the jib crane 11 to a state where it transports aggregate and puts it into the relay hopper 23 (usable state).

[0079] (Control device 30) The control device 30 is installed on the floor surface 10a below the crane platform 10c, as shown in Fig. 3. The control device 30 is composed of a computer and various software implemented in the computer, and executes control for producing concrete. The control device 30 also includes a monitor capable of displaying the production conditions, etc., an input device capable of inputting the production conditions, etc., an output device capable of printing the production conditions, etc., and the like.

[0080] The control device 30 controls the operations of the mixer 20, the screw feeder 26, the downstream belt conveyor 25, and the water supply device 29 based on the measurement value of the load cell 21. That is, the control device 30 executes control related to production, such as the operation timing of the downstream belt conveyor 25 and the screw feeder 26, the water supply timing, and the operation time of the mixer 20.

[0081] For example, concrete materials consisting of cement, fine aggregate, coarse aggregate, raw water, etc. are continuously supplied to the mixer 20. The control device 30 resets the measurement for each of these concrete materials and automatically measures the supply amount.

[0082] At that time, powdered concrete material such as cement may pile up inside the mixer 20 and leak out of the mixer 20. The control device 30 operates the mixer 20 for a certain period of time during the metering process, and executes a process of leveling the concrete material inside the mixer 20 to a substantially flat surface (leveling process). This allows more concrete material to be accommodated in the mixer 20, thereby increasing the amount of concrete produced. The control device can also appropriately handle the production of concrete with biased settings that have large differences in the mix ratio, improving the quality of the concrete.

[0083] In order to automate concrete production, it is preferable to control the operation of the upstream belt conveyor 24 by the control device 30, but it may also be operated independently of the control device 30 (in the explanation, it will be assumed that it is operated independently).

[0084] The control device 30 executes a process (supply amount calculation process) for obtaining the amounts of cement, raw water, fine aggregate, and coarse aggregate to be supplied to the mixer 20, depending on the production amount of one batch of concrete to be mixed by the mixer 20. Then, the control device 30 executes a process (operation control process) for controlling the operation of the mixer 20, the screw feeder 26, the downstream belt conveyor 25, and the water supply device 29 so as to achieve the supply amounts obtained by the supply amount calculation process.

[0085] In the case of this manufacturing unit 1, fine aggregate and coarse aggregate are continuously supplied to the mixer 20 by using the same upstream belt conveyor 24 and downstream belt conveyor 25. For example, if fine aggregate is first supplied to the mixer 20 by the upstream belt conveyor 24 and downstream belt conveyor 25, then coarse aggregate is successively supplied to the mixer 20 by the upstream belt conveyor 24 and downstream belt conveyor 25.

[0086] When the amount of fine aggregate supplied previously reaches a predetermined amount, the operation of the downstream belt conveyor 25 is stopped and a buzzer and a lamp are activated to notify the operator. In response to this notification, the operator also stops the operation of the upstream belt conveyor 24. Then, the coarse aggregate is added next. However, at this time, fine aggregate remains on the upstream belt conveyor 24 and the downstream belt conveyor 25. Therefore, this is also supplied to the mixer 20.

[0087] Therefore, in this manufacturing unit 1, a correction process is executed in the operation control process. That is, the control device 30 controls the operation of the downstream belt conveyor 25 so that the amount of fine aggregate previously added is calculated by subtracting the amount of fine aggregate remaining on both the downstream belt conveyor 25 and the upstream belt conveyor 24 (conveyor remaining amount) from the calculated supply amount. In detail, the weight value of the load cell 21 is corrected. The conveyor remaining amount is obtained in advance by an experiment or the like and stored in the control device 30. The conveyor remaining amount may be input by an operator.

[0088] In other words, the operation of the downstream belt conveyor 25 is stopped at a timing when the supply amount obtained by the supply amount calculation process is less than the remaining amount on the conveyor, and the operation of the upstream belt conveyor 24 is also stopped by an alarm using a buzzer or a lamp. Then, the remaining amount on the conveyor is supplied to the mixer 20 by continuously feeding coarse aggregate. As a result, an appropriate amount of fine aggregate is supplied to the mixer 20.

[0089] When the amount of coarse aggregate added later reaches a predetermined amount based on the corrected weight value of the load cell 21, the operation of the downstream belt conveyor 25 is stopped and a buzzer and a lamp are activated to notify the user. As a result, an appropriate amount of coarse aggregate is supplied to the mixer 20. The same procedure is followed even if the order of adding the fine aggregate and the coarse aggregate is reversed.

[0090] Fine aggregate and coarse aggregate can be weighed with high accuracy even if they are continuously supplied to the mixer 20 using the same upstream belt conveyor 24 and downstream belt conveyor 25. High quality concrete can be produced. Note that it is also possible to feed aggregate from the relay hopper 23 without using the upstream belt conveyor 24. In that case, the amount of aggregate remaining on the downstream belt conveyor 25 can be regarded as the conveyor remaining amount.

[0091] Furthermore, the control device 30 is configured to be capable of executing a slump value measurement process for measuring the slump value and displaying it on a monitor when the concrete is mixed with the mixer 20. Normally, before concrete is poured, a slump test is performed to determine the slump value (an index relating to the fluidity of concrete) using the produced concrete in order to check the quality of the produced concrete. However, depending on the site, it may be difficult to perform a slump test.

[0092] In response to this, the control device 30 executes a slump value measurement process, using the load torque applied to the motor when the mixer 20 mixes the concrete, measures the slump value, and displays the value on the monitor. This eliminates the need for a separate slump test, reducing work time and labor. Since the slump value can be adjusted during production, concrete with an appropriate slump value can be stably produced.

[0093] Specifically, the control device 30 stores data (slump value conversion data) that enables the slump value to be calculated from the load torque applied to the motor according to the amount of concrete mixed in the mixer 20 (total weight of concrete material and water), based on the results of experiments conducted in advance.

[0094] The control device 30 measures the slump value using the current value output to the motor while the concrete is being mixed, the amount of concrete mixed in the mixer obtained based on the measurement value of the load cell 21, and the slump value conversion data. The slump value thus obtained is displayed on the monitor. Therefore, if there is a difference between the actually measured slump value and the desired slump value, the slump value after production can be adjusted during mixing.

[0095] (Concrete manufacturing) For example, a worker stands on the first step 10d and manually pours cement into the cement hopper 22. At this time, one door 22a of the inlet of the cement hopper 22 can be used as a platform for placing cement bags. If the door 22a is fully opened, cement can be easily poured in by a machine using a container bag or the like.

[0096] The worker also manually charges the fine aggregate and the coarse aggregate into the relay hopper 23. The fine aggregate and the coarse aggregate may be charged directly into the relay hopper 23, or may be charged using the upstream belt conveyor 24. Then, the worker operates the control device 30.

[0097] Thereby, the control device 30 supplies a predetermined amount of one batch of cement, fine aggregate, and coarse aggregate to the mixer 20. Furthermore, the water supply device 29 is operated to supply one batch of raw water to the mixer 20. Then, the control device 30 operates the mixer 20 to rotate the mixing blades for a predetermined time to mix the concrete. The mixed concrete is dispensed from the dispensing outlet 20c.

[0098] <Railway construction using on-site mixing manufacturing units> As mentioned above, the manufacturing unit 1 is configured to be used efficiently and effectively while loaded onto the bed of a road-rail vehicle for track construction work.

[0099] 4 shows a state in which the manufacturing unit 1 is loaded onto a road-rail vehicle 40. The road-rail vehicle 40 is a known vehicle capable of running on both roads and tracks, and various types are in practical use. The illustrated road-rail vehicle 40 is equipped with a loading platform 40a and a crane 40b.

[0100] In addition to wheels for running on roads, iron wheels 40c for running on tracks are mounted so that they can be raised and lowered on the body of the road-rail vehicle 40. The road-rail vehicle 40 enters the tracks at a railroad crossing or the like, and can run on the tracks by lowering the iron wheels 40c to match the tracks.

[0101] The manufacturing unit 1 is placed on the loading platform 40a of the road-rail vehicle 40 together with the generator 60 with its rear end facing rearward. The upstream conveyor belt 24 is placed on the conveyor loading platform 10f. The front and rear end portions of the upstream conveyor belt 24 protrude from the unit platform 10, but are designed not to interfere with loading and transportation on the loading platform 40a.

[0102] This road-rail vehicle 40 is equipped with a crane 40b, so that cement can be easily and reliably poured into the cement hopper 22 using a large-capacity container bag. Therefore, it is preferable to store a sufficient amount of cement in the cement hopper 22 at a location other than the work site before track construction. However, it is difficult to use this crane 40b on the track because there is a possibility of contact with the trolley wire.

[0103] Fine aggregate and coarse aggregate are prepared in advance at the track construction site, and are added by workers at the work site. Concrete is poured by continuously producing batch-type concrete using water stored in the first water storage tank 27 and the second water storage tank 28. An example of such a track construction method will be described below.

[0104] The upper diagram in Fig. 5 shows a track 100 on which trains run and the surrounding area. A utility pole 101 (iron pole) is installed next to the track 100 to install electric wires. A lower portion 101a of the utility pole 101 is filled with concrete and buried in the ground.

[0105] For example, assume that a new utility pole 101 is to be installed adjacent to an old utility pole 101 in order to replace the old utility pole 101.

[0106] In this case, first, as shown in the lower diagram of Fig. 5, a vertical hole 102 with a diameter of 0.5 to 1.5 m and a depth of 2 to 5 m is excavated at the installation site of a new utility pole 101. A concrete frame material 103 that will serve as a foundation is then placed in the hole, and the lower part 101a of the utility pole 101 is assembled to the frame material 103. Concrete is then poured into the vertical hole 102 and allowed to harden. After the concrete has hardened, the upper part is assembled to the lower part 101a of the utility pole 101.

[0107] Among these tasks, pouring concrete is particularly time-consuming and labor-intensive. Moreover, it is a heavy burden to complete the task reliably in a short period of time, even late at night. In contrast, the manufacturing unit 1 can pour concrete efficiently and effectively while mounted on the road-rail vehicle 40.

[0108] That is, the manufacturing unit 1 is transported to the work site by the road-rail vehicle 40, and the unit base 10 is positioned so that the discharge outlet 20c faces the adjacent pouring site next to the track 100, i.e., the vertical hole 102 (positioning step). Since the manufacturing unit 1 is mounted on the road-rail vehicle 40, it can be easily and quickly moved to the work site by running the road-rail vehicle 40 on the track 100, and can be positioned in an optimal position.

[0109] Next, the worker operates the jib crane 11 to move the upstream belt conveyor 24 placed on the conveyor placement table 10f to a state (usable state) in which it can transport aggregate and dump it into the relay hopper 23.

[0110] That is, the upstream belt conveyor 24 is hung from the jib crane 11, and the jib 11d is rotated. The jib 11d rotates only horizontally, so there is no risk of it coming into contact with the trolley wire. Then, the upstream end (upstream end) of the upstream belt conveyor 24 is placed next to the track 100 on the same side as the casting site, and the downstream end (downstream end) is placed above the relay hopper 23 (installation step).

[0111] For example, as shown in Figures 6A and 6B, the upstream belt conveyor 24 is disposed so as to be inclined diagonally backward and leftward with respect to the unit table 10. The relay hopper 23 has a sector-shaped inlet 23a, so that the downstream end can be placed on its arc-shaped edge 23c. In other words, the upstream belt conveyor 24 can be disposed at any angle with respect to the unit table 10 within the range from a position facing backward to a position facing leftward.

[0112] As described above, the fine aggregate and the coarse aggregate are prepared in advance at the work site, and the upstream end is placed nearby. At this time, the track 100 may be higher than the area beside it due to the piled soil, but since the upstream belt conveyor 24 has a length of 5 m, it can be moved to an appropriate state by adjusting the installation position and inclination angle.

[0113] When the worker operates the control device 30, the control device 30 supplies a predetermined amount of cement to the mixer 20 as described above. When pouring cement into the cement hopper 22 at the work site, one worker stands on the first step 10d. This is designed to be at an appropriate height relative to the cement hopper 22 within the height limit. Therefore, the cement can be poured efficiently.

[0114] An operator loads one of the fine aggregate and the coarse aggregate into the relay hopper 23 using the upstream belt conveyor 24. When a predetermined amount (amount obtained by subtracting the remaining amount on the conveyor) is reached, the downstream belt conveyor 25 stops and a buzzer and a lamp sound to notify the operator, so the operator stops the upstream belt conveyor 24.

[0115] The worker then uses the upstream belt conveyor 24 to load the other aggregate into the relay hopper 23. When a predetermined amount is reached, the downstream belt conveyor 25 stops and a buzzer and lamp sound to notify the worker, so the worker stops the upstream belt conveyor 24. Then, the control device 30 causes the water supply device 29 to supply a predetermined amount of raw water, and then the mixer 20 mixes the concrete (production step).

[0116] Thereafter, the concrete produced by the mixer 20 is discharged from the discharge outlet 20c and poured into the vertical hole 102 (casting step). At this time, the discharge outlet 20c is located on the side of the unit base 10, and the concrete can be discharged in the shortest distance toward the vertical hole 102. For example, by utilizing the height difference and bridging the gap between the shooter and the vertical hole 102 with a gutter-shaped member S (described later), the concrete can be poured into the vertical hole 102 easily and in a short time without spilling onto the track 100.

[0117] Once the production of one batch of concrete is completed, the production of the next batch can be started immediately. Even if water cannot be secured at the work site, at least about 4 tons of concrete can be produced because a large amount of water is stored in the first water storage tank 27 and the second water storage tank 28.

[0118] Therefore, it can be used at sites where a large amount of concrete is required, and at sites with multiple construction locations.

[0119] <Application example of on-site kneading manufacturing unit> In the method using the upstream belt conveyor 24 described above, workers must input fine aggregate and coarse aggregate for each batch. This requires a large burden of time and labor. In addition, in the case of a construction project such as the reconstruction of utility poles 101, it is common to move between multiple work sites and continuously pour concrete. Therefore, it is preferable to reduce manual labor, as this can shorten the construction period.

[0120] Therefore, the on-site mixing production unit 1 of the application example is further provided with an auxiliary unit 50 that is shared with the production unit 1 so that such continuous concrete pouring work can be carried out more efficiently and effectively.

[0121] 7 shows an example of the auxiliary unit 50. The auxiliary unit 50 is composed of a frame 51, a first aggregate hopper 52, a second aggregate hopper 53, a pair of aggregate belt conveyors 54, 54, and the like.

[0122] The frame 51 is a frame member formed to a size that can be loaded onto the bed of a truck and a road-rail vehicle for transport. A first aggregate hopper 52, a second aggregate hopper 53, and a pair of aggregate belt conveyors 54, 54 are supported by the frame 51. Each of the first aggregate hopper 52 and the second aggregate hopper 53 is a rectangular box-shaped container with an open top.

[0123] The first aggregate hopper 52 and the second aggregate hopper 53 are adjacent to each other and integrally configured. The lower portions of the first aggregate hopper 52 and the second aggregate hopper 53 are narrowed, and aggregate discharge ports 52a, 53a are formed at the lower ends thereof. For example, coarse aggregate is fed into the first aggregate hopper 52, and fine aggregate is fed into the second aggregate hopper 53.

[0124] Each aggregate belt conveyor 54 is installed below the first aggregate hopper 52 and the second aggregate hopper 53. Each aggregate belt conveyor 54 extends along below the aggregate discharge openings 52a, 53a of the first aggregate hopper 52 and the second aggregate hopper 53, and one (front) end (discharge end 54a) located above each of them protrudes from the frame 51. These aggregate belt conveyors 54 are supported by the frame 51 in a state of being inclined and parallel to each other.

[0125] These aggregate belt conveyors 54, 54 simultaneously transport the fine aggregate and the coarse aggregate fed into the first aggregate hopper 52 and the second aggregate hopper 53, respectively, and feed these aggregates into the same relay hopper 23. For this reason, these aggregate belt conveyors 54, 54 are arranged with their positions shifted in the vertical direction so that their discharge ends 54a are close to each other.

[0126] Furthermore, below these discharge ends 54a, 54a, a feed guide 55 is provided to guide the aggregate to the feed opening 23a of the relay hopper 23 so that the aggregate can be stably fed into the relay hopper 23. A vibrator 56 is attached to the second aggregate hopper 53 into which fine aggregate is fed so that no fine aggregate remains inside.

[0127] These discharge ends 54a, 54a are installed at a height that is located above the input port 23a of the relay hopper 23 when the auxiliary unit 50 is moved on the track toward the manufacturing unit 1. Therefore, as shown in Fig. 8, by placing a road-rail car 40 (manufacturing car A) on which the manufacturing unit 1 is mounted and a road-rail car 40 (auxiliary car B) on which the auxiliary unit 50 is mounted adjacent to each other on the track 100, the manufacturing unit 1 and the auxiliary unit 50 can be connected so that the discharge end 54a is located above the input port 23a of the relay hopper 23.

[0128] When each aggregate conveyor 54 is operated, the fine aggregate and coarse aggregate received in each of the first aggregate hopper 52 and the second aggregate hopper 53 are transported by these aggregate conveyors 54, 54 and fed into the relay hopper 23. Therefore, by feeding each of the fine aggregate and coarse aggregate stored in the auxiliary unit 50 into each of the first aggregate hopper 52 and the second aggregate hopper 53, a large amount of fine aggregate and coarse aggregate can be mechanically supplied continuously.

[0129] If fine aggregate and coarse aggregate are insufficient, the auxiliary vehicle B can be detached from the production unit 1 and moved to replenish the fine aggregate and coarse aggregate to the first aggregate hopper 52 and the second aggregate hopper 53, respectively. This makes it possible to continuously supply fine aggregate and coarse aggregate without stopping the work on the production vehicle A.

[0130] Therefore, the on-site mixing manufacturing unit 1 of this application example allows efficient and effective continuous track construction at multiple locations. For example, as shown in the upper diagram of Fig. 8, the manufacturing vehicle A is positioned relative to the pouring site (vertical hole 102) at the first site, and the auxiliary vehicle B is positioned so that the auxiliary unit 50 is connected to the manufacturing unit 1 (positioning step, installation step).

[0131] Then, the mixer 20 is charged with the required amount of cement, fine aggregate, coarse aggregate, and raw water for the vertical hole 102, and the mixer 20 is operated for a specified time to mix the concrete (production step). If there is a shortage of fine aggregate or coarse aggregate during this time, the auxiliary vehicle B is moved and the fine aggregate or coarse aggregate can be replenished at a location where the charging operation can be easily performed.

[0132] When the concrete is mixed, the dispensing outlet 20c is opened to dispense the produced concrete. The concrete is poured into the vertical hole 102 using a shooter or a gutter-shaped member S (casting step). This completes the work at the first site.

[0133] Next, as shown in the lower diagram of Fig. 8, the manufacturing vehicle A and the auxiliary vehicle B are moved and positioned to align with the vertical hole 102 at the second site. Then, concrete is poured in the same way as at the first site. By continuously repeating such operations, the electric poles 101 can be efficiently and effectively replaced at multiple locations.

[0134] Since a large amount of water is stored in the first water storage tank 27 and the second water storage tank 28, concrete can be produced continuously even at work sites where it is difficult to secure water.

[0135] Since it can carry out high-quality work in a short time, many construction projects can be completed even during limited time at night. Because it runs on tracks, it can be used at sites that cannot be accessed from outside the tracks. Work that requires height can be done in places without electric wires, so there are no work restrictions.

[0136] Therefore, such an on-site mixing manufacturing unit 1 can eliminate delays in track construction work.

[0137] The on-site mixing manufacturing unit for track construction according to the disclosed technology is not limited to the above-mentioned embodiment, but includes various other configurations. For example, the configurations of the manufacturing unit 1, the auxiliary unit 50, etc. are merely examples, and can be changed as appropriate according to the specifications. The manufacturing unit 1 and the auxiliary unit 50 may be transported on roads by normal trucks, and may be moved on tracks by transferring them to container cars or the like. [Explanation of symbols]

[0138] 1 On-site kneading manufacturing unit 10 units 10F Conveyor stand 11 Jib crane 20 Mixer 21 Load Cell 22 Cement Hopper 23 Relay Hopper 24 Upstream conveyor belt 25 Downstream conveyor belt 26 Screw feeder 27 First Water Tank 28 Second Water Tank 29 Water supply equipment 30 Control device 40 Railroad vehicles (trucks) 50 Auxiliary Unit

Claims

1. A site-mixed concrete manufacturing unit for track construction, comprising: A unit base that can be loaded onto a truck bed and transported on roads and tracks and has a rectangular shape long from front to back when viewed from above; A plurality of related devices are integrally assembled on the unit base; Equipped with The related device is A mixer disposed at a front end of the unit table for mixing concrete; A load cell for measuring a change in weight of the mixer; a cement hopper adjacent to the mixer at the rear end of the unit table and into which cement is introduced; A screw feeder that conveys the cement charged in the cement hopper and supplies it to the mixer; A relay hopper disposed at a rear end of the unit table and into which aggregate is input; a downstream belt conveyor that conveys the aggregate charged in the relay hopper and supplies it to the mixer; an upstream belt conveyor that conveys aggregate and deposits it into the relay hopper; A water tank for storing water used in the production of concrete; a water supply device for supplying water from the water storage tank to the mixer; a control device that controls the operation of the mixer, the screw feeder, the downstream belt conveyor, and the water supply device based on the measurement value of the load cell; Including, An on-site mixing production unit, in which the upstream belt conveyor is movable relative to the unit table, and a conveyor mounting table for placing the upstream belt conveyor on and transporting it is provided extending along one side of the unit table.

2. In the on-site mixing production unit according to claim 1, Further, a jib crane is installed on the unit base at a predetermined height or lower, An on-site mixing production unit in which the upstream belt conveyor is moved by the jib crane between a transportable state in which it is placed on the conveyor platform and a usable state in which it transports aggregate and deposits it into the relay hopper.

3. In the on-site kneading production unit according to claim 1 or 2, The aggregate includes fine aggregate and coarse aggregate continuously supplied to the mixer by the upstream belt conveyor and the downstream belt conveyor, The control device, A supply amount calculation process for obtaining the supply amount of each of cement, water, fine aggregate, and coarse aggregate to the mixer according to the production amount of concrete to be mixed by the mixer; an operation control process for controlling the operations of the mixer, the screw feeder, the downstream belt conveyor, and the water supply device so as to achieve the supply amount obtained by the supply amount calculation process; Run An on-site mixing production unit that controls the operation of at least the downstream belt conveyor so that, for the fine aggregate and coarse aggregate that are added first, the amount supplied is equal to at least the remaining amount on the downstream belt conveyor subtracted from the calculated supply amount.

4. In the on-site kneading production unit according to claim 3, Further comprising an auxiliary unit shared with the on-site kneading manufacturing unit, The auxiliary unit includes: A frame that can be loaded onto a truck bed and transported on roads and tracks; a first aggregate hopper and a second aggregate hopper supported by the frame and into which fine aggregate and coarse aggregate are respectively introduced; a pair of aggregate belt conveyors for transporting the fine aggregate and the coarse aggregate charged into the first aggregate hopper and the second aggregate hopper, respectively; having The pair of aggregate belt conveyors are arranged close to each other in parallel with a vertical offset in position, forming an on-site mixing production unit.

5. A track construction method comprising the steps of: A positioning step of transporting the on-site mixing manufacturing unit according to any one of claims 1 to 3 to a work site by a railroad car and positioning the unit table so as to face the adjacent pouring site next to the track; an installation step of moving the upstream belt conveyor placed on the conveyor placement table to place an upstream end of the upstream belt conveyor beside the track and a downstream end of the upstream belt conveyor above the relay hopper; a manufacturing step of supplying a predetermined amount of cement to the mixer using the cement hopper, supplying a predetermined amount of aggregate to the mixer using the upstream belt conveyor, the relay hopper, and the downstream belt conveyor, supplying a predetermined amount of water using the water supply device, and then kneading concrete in the mixer; A casting step of discharging the produced concrete from the mixer and pouring it into the casting site; A track construction method comprising:

6. A track construction method comprising the steps of: A positioning step of transporting each of the on-site mixing production unit and the auxiliary unit described in claim 4 to a work site by a rail-road car and arranging the unit table so as to face the adjacent pouring site next to the track; an installation step of disposing the auxiliary unit so that each end of the pair of aggregate belt conveyors is located above the relay hopper; a manufacturing step of supplying a predetermined amount of cement to the mixer using the cement hopper, supplying a predetermined amount of aggregate to the mixer using the auxiliary unit, the relay hopper, and the downstream belt conveyor, and then mixing concrete with the mixer after supplying a predetermined amount of water with the water supply device; A casting step of discharging the produced concrete from the mixer and pouring it into the casting site; A track construction method comprising:

7. The track construction method according to claim 5 or 6, A track construction method in which the road-rail vehicle moves along a track and performs construction in multiple locations continuously by repeating each of the positioning step, the installation step, the manufacturing step, and the casting step.

Citation Information

Patent Citations

  • Construction in track

    JP1984150803A

  • Concrete mixer truck for railway

    JP1987152963A

  • Method and device for manufacturing concrete in tunnel

    JP1988295212A

  • Moving type ready-mixed concrete producing apparatus and equipment loading vehicle used therein

    JP1995052141A

  • On-site concrete milling manufacturing unit

    JP2016159474A