Visualization system and method for ground improvement work

By displaying a three-dimensional model of ground improvement work on the communication terminal, the problem of difficulty in real-time and accurate visualization of information and situations in the prior art is solved, and monitoring and workers' easy and accurate understanding of information and situations are achieved.

JP7628566B2Active Publication Date: 2025-02-10OKUMURA CORP
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023044781
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-03-20
Publication Date
2025-02-10
Estimated Expiration
2043-03-20

AI Technical Summary

Technical Problem

In the prior art, under real-time changing information and situations, it is difficult for monitoring and workers to accurately understand the visualized information and situations.

Method used

By displaying images of building ground improvement work on the communication terminal, combining design information and real-time construction information, a three-dimensional model, including the position, height and outer diameter of the ground improvement, is generated and displayed, and real-time visualization is used to use a transparent wearable terminal.

Benefits of technology

Real-time visualization of information and situations is achieved, allowing monitoring and workers to easily and accurately understand changing information and situations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007628566000001
    Figure 0007628566000001
  • Figure 0007628566000002
    Figure 0007628566000002
  • Figure 0007628566000003
    Figure 0007628566000003
Patent Text Reader

Abstract

To provide a visualizing system and a visualizing method for a ground improvement work, which allow a monitor and an operator to adequately understand information and situation by visualizing the information and the situation so as to be easily viewed while the information and the situation change in real time.SOLUTION: A communication terminal 8 comprises: a reception part to receive information from a design information storage part to store design information including a construction position A and construction height of a ground improvement body 4, and external diameter of the ground improvement body and a construction information storage part to store construction information including constructed construction height of the ground improvement body; a model storage part to represent the external diameter of the ground improvement body as a cylinder diameter and represent the constructed construction height as length of the cylinder, and store a three-dimensional cylinder construction model 12; a model generation part to read the cylinder construction model from the model storage part and generate the cylinder construction model in real time according to the constructed construction height; and a display processing part to display an image of the cylinder construction model on the display by corresponding to the construction position.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a visualization system and a visualization method for ground improvement work that can easily visualize information and situations that change in real time, allowing supervisors and workers to accurately understand the information and situations. [Background technology]

[0002] Patent Documents 1 to 4 are known as techniques for visualizing the construction status of civil engineering and construction work.

[0003] The "construction management device for civil engineering and construction works" of Patent Document 1 aims to reduce the burden on workers in civil engineering and construction works and to perform rapid construction management based on accurate and appropriate information, and is equipped with a design shape data storage means for storing design shape data of the construction surface to be constructed, a current shape data acquisition means for acquiring current shape data of the construction surface formed during the construction process, a construction status management information creation means for creating construction status management information consisting of the degree of agreement between the design shape data and the current shape data based on a comparison between the design shape data and the current shape data, and a display control means for displaying the construction status management information in association with the construction surface in the construction process using a transparent wearable terminal worn by the worker. The "tunnel face displacement monitoring device" of Patent Document 2 has the objective of quickly reporting face displacement based on accurate and appropriate information during tunnel excavation work, without relying on the senses of workers or supervisors, and is equipped with initial shape data acquisition means for acquiring initial shape data of the formed face, initial shape data storage means for storing the acquired initial shape data of the face, current shape data acquisition means for acquiring current shape data of the face, face displacement information creation means for creating face displacement information indicating the difference between the initial shape data and the current shape data based on a comparison between the stored initial shape data of the face and the acquired current shape data, and display control means for displaying the face displacement information in association with the face using a transparent wearable terminal worn by the worker.

[0004] The "tunnel face monitoring method" of Patent Document 3 has an objective of providing a tunnel face monitoring method that can constantly monitor the tunnel face to grasp the condition of the tunnel face in real time and prevent industrial accidents due to the tunnel face falling, collapse, or collapse. A face behavior grasping means using a laser rangefinder or the like monitors the amount of extrusion of the tunnel face based on changes in real time measurement data, and when a preset management standard value for the change in the measurement data is exceeded, a high-speed laser irradiation unit such as a green laser marks the area around the measurement point at the tunnel face where the management standard value is exceeded, and at the same time visualizes the real-time changes in the tunnel face on the wearable terminal, thereby constantly monitoring to predict the tunnel face falling, collapse, or collapse.

[0005] Patent Document 4, "Control method for a ground construction machine and a ground construction machine," is a control method for a ground construction machine for constructing a ground improvement body in the ground, which includes the steps of lowering a rod to the lower end position of the ground improvement body, sequentially raising the rod from the lower end position of the ground improvement body and stopping it at target positions at specified intervals, storing the distance traveled from the stop command to the actual stop of the rod as the previous braking distance when the rod stops at the target position, and outputting a stop command at a position the previous braking distance before the next target position when the rod stops at the next target position.In this case, the terminal for operating and monitoring the ground construction machine from outside the machine can be a mobile terminal such as a tablet terminal, a body-worn computer called smart glasses, an AR (augmented reality) monitor, etc. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2018-104933 A [Patent Document 2] JP 2018-104934 A [Patent Document 3] JP 2019-199708 A [Patent Document 4] JP 2020-084502 A Summary of the Invention [Problem to be solved by the invention]

[0007] The background technology visualizes and displays construction status management information, face displacement information, and changes in the face status on a wearable device or the like.

[0008] Although these background art techniques visualize various types of information and changing conditions, they are insufficient in terms of whether they are easy for supervisors and workers to view.

[0009] In particular, as information and situations change in real time, it is important that monitors and others can accurately grasp this visualized information and situation without misunderstanding it, and for this reason, there was a need to devise a way to visualize it in an easy-to-understand manner.

[0010] The present invention has been devised in consideration of the above-mentioned conventional problems, and aims to provide a visualization system and visualization method for ground improvement work that can easily visualize information and situations that change in real time, allowing supervisors and workers to accurately understand the information and situations. [Means for solving the problem]

[0011] The visualization system for ground improvement work according to the present invention is a visualization system for ground improvement work that displays an image of the construction status of a ground improvement work in which a ground improvement body is constructed by a ground improvement machine on the display of a communication terminal, and the communication terminal includes a receiving unit that receives information from a construction information storage unit that stores construction information input from the ground improvement machine, the construction information storage unit storing design information including the construction position of the ground improvement body, the construction height from the construction start position to the construction end position of the ground improvement body, and the outer diameter dimensions of the ground improvement body, and the construction height of the ground improvement body from the construction start position of the ground improvement body, which changes as the ground improvement work progresses, and a receiving unit that receives information from the construction information storage unit that stores construction information input from the ground improvement machine, the construction information including the construction height of the ground improvement body from the construction start position, which changes as the ground improvement work progresses, and the construction information of the ground improvement body from the design information storage unit received by the receiving unit. The present invention is characterized in that it includes a model memory unit that stores a three-dimensional cylinder construction model in which the outer diameter dimension is expressed as a cylinder diameter and the completed construction height is expressed as the length of the cylinder from the construction starting point position, a model generation unit that reads out the cylinder construction model from the model memory unit and generates a cylinder construction model of the outer diameter dimension of the ground improvement body and the completed construction height in real time according to the completed construction height from the construction information memory unit received by the receiving unit, and a display processing unit that displays an image of the cylinder construction model generated by the model generation unit on the display, corresponding to the construction position from the design information memory unit received by the receiving unit.

[0012] The communication terminal is equipped with a photographing means, and the display processing unit corresponds to the construction location, superimposes the cylinder construction model on an image of the construction location photographed by the photographing means, and displays the image on the display.

[0013] The construction information memory unit stores construction information including the completed depth and drilling diameter from the drilling start position of the hole that is formed in advance at the development position prior to the construction of the ground improvement body, and the model memory unit stores a three-dimensional skeleton cylinder drilling model in which the drilling diameter from the design information memory unit received by the receiving unit is expressed as a cylinder diameter and the completed depth is expressed as the cylinder length from the drilling start position, and the model generation unit reads out the skeleton cylinder drilling model from the model memory unit and generates a skeleton cylinder drilling model of the drilling diameter and the completed depth according to the completed depth from the construction information memory unit received by the receiving unit, and generates in real time a construction management model in which the skeleton cylinder drilling model is superimposed on the cylinder development model, and the display processing unit associates the construction management model generated by the model generation unit with the development position and displays it as an image on the display.

[0014] The method for visualizing ground improvement work according to the present invention is a method for visualizing ground improvement work in which the construction status of a ground improvement body created by a ground improvement machine is displayed as an image on the display of a communication terminal, and is characterized in that design information including the construction position of the ground improvement body, the construction height from the construction start position to the construction end position of the ground improvement body, and the outer diameter dimension of the ground improvement body are input into the communication terminal, construction information input from the ground improvement machine including the completed construction height from the construction start position of the ground improvement body which changes as the ground improvement work progresses is input into the communication terminal, a three-dimensional cylinder construction model is generated in real time by the communication terminal in which the outer diameter dimension of the ground improvement body is expressed as a cylinder diameter and the completed construction height is expressed as the cylinder length from the construction start position, and the cylinder construction model is displayed as an image on the display of the communication terminal in correspondence with the construction position.

[0015] The communication terminal is equipped with a photographing means, and the communication terminal causes the cylinder construction model to be displayed on the display in association with the construction location and superimposed on an image of the construction location photographed by the photographing means.

[0016] The communication terminal is input with design information including the completed depth from the drilling start position and the drilling diameter of the hole that is to be formed in advance at the construction position prior to the construction of the ground improvement body, and the communication terminal generates a three-dimensional skeleton cylinder drilling model in which the drilling diameter is expressed as a cylinder diameter and the completed depth is expressed as the cylinder length from the drilling start position, and a construction management model is generated in real time in which the skeleton cylinder drilling model is superimposed on the cylinder construction model, and the construction management model is displayed as an image on the display of the communication terminal in correspondence with the construction position. Effect of the Invention

[0017] The visualization system and visualization method for ground improvement work of the present invention makes it possible to visualize information and situations in an easy-to-read manner as they change in real time, allowing supervisors and workers to accurately grasp the information and situations. [Brief description of the drawings]

[0018] [Figure 1] FIG. 1 is an explanatory diagram showing an example of the implementation status of civil engineering and construction work to which a preferred embodiment of a visualization system and visualization method for ground improvement work according to the present invention is applied. [Diagram 2] FIG. 2 is an explanatory diagram showing an example of the implementation status of the civil engineering and construction work shown in FIG. 1 in a vertical cross section. [Diagram 3] FIG. 2 is an explanatory diagram showing an example of the implementation status of the civil engineering and construction work shown in FIG. 1 in plan view. [Figure 4] FIG. 1 is a configuration diagram of a visualization system for ground improvement work according to the present invention. [Diagram 5] FIG. 5 is an explanatory diagram of a vector model and a risk management model that are generated and displayed by the visualization system for ground improvement work shown in FIG. 4. [Figure 6] 5 is an explanatory diagram of a skeleton cylinder drilling model, a cylinder construction model, and a construction management model that are generated and displayed by the visualization system for ground improvement work shown in FIG. 4. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] Hereinafter, a preferred embodiment of the visualization system and visualization method for ground improvement work according to the present invention will be described in detail with reference to the accompanying drawings.

[0020] 1 to 3 show an example of civil engineering and construction work being carried out in the vicinity of an existing structure 1. In FIG.

[0021] The illustrated example shows a case where ground improvement work (also called ground improvement body construction work; the same applies below) is carried out in the void area R between adjacent existing structures 1 (the area extending from the ground surface S to the design depth of the ground (floor level L2 of the second basement floor)).

[0022] In the underground portion of each existing structure 1, there exists an underground space U such as an underground passage, a waterway, a railway track, etc., formed by box culverts or the like.

[0023] The ground improvement work in the illustrated example involves using a ground improvement machine 2 brought to the surface S of the void area R to drill holes 3 in the ground of the void area R sandwiched between underground space U, and creating a columnar ground improvement body 4 in the ground by mixing the soil from the original ground resulting from the drilling of the holes 3 with cement-based solidification material.

[0024] The ground improvement machine 2 also serves as a drilling machine for the drilling work carried out when constructing the ground improvement body 4.

[0025] In monitoring work for various behaviors that may occur in the existing structure 1 due to ground improvement work, a displacement meter 5 is used to monitor subsidence displacement and uplift displacement that occur in the existing structure 1.

[0026] In the illustrated example, the displacement meter 5 is installed at a plurality of measurement positions (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Yn ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 ,…) and are installed respectively.

[0027] Each displacement meter 5 is connected to each measurement position (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 , ...) is configured to measure the amount and direction of displacement occurring in each of the sensors.

[0028] 4, the visualization system for ground improvement work according to this embodiment includes various sensors provided on a ground improvement machine 2 to acquire information on the construction status of the ground improvement work, the displacement meter 5 described above, a server 6 such as a cloud server that includes at least a design information storage unit 6a that stores design information for the ground improvement work in advance and a construction information storage unit 6b that stores in real time construction information for the ground improvement work acquired by the various sensors of the ground improvement machine 2 and the displacement meter 5, and a communication terminal 8 that has a display 7 for displaying images and acquires information from the server 6 via a communication network such as Wi-Fi communication. A visualization method for ground improvement work is executed using this visualization system.

[0029] The design information storage unit 6a of the server 6 stores the measurement positions (..., X n-1 , X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2,…), risk level control value, construction position of drilling hole 3 (…,A n-1 ,A n ,A n+1 ,A n+2 , ...), the construction depth of the hole 3, the hole diameter, the construction position of the ground improvement body 4 (same as the construction position of the hole 3), the construction height of the ground improvement body 4 (also called the "construction height"; same below), and the outer diameter dimensions of the ground improvement body 4 are pre-stored.

[0030] The construction information memory unit 6b of the server 6 stores in real time the amount and direction of displacement of the existing structure 1 measured by the displacement meter 5, the completed depth of the drilled hole 3 detected by the amount of descent of the rotating rod of the ground improvement machine 2 (which may be the depth being constructed; same below), and the completed construction height of the ground improvement body 4, which are input from various sensors and the displacement meter 5 of the ground improvement machine 2.

[0031] Regarding the completed depth, the construction information storage unit 6b stores a flag indicating whether the work is "drilling" or "construction" (described later) and the number of rotations of the rotating rod for work provided on the ground improvement machine 2, and the calculation function of the communication terminal 8, which receives these data at the receiving unit 8a (described later), first determines the construction start depth from the number of rotations of the rotating rod in the initial state, and then calculates the completed depth from the difference between the number of rotations of the rotating rod received in real time and the number of rotations in the initial state. This is also the case when calculating the construction height (described later).

[0032] In this embodiment, a see-through wearable terminal is used as the communication terminal 8. See-through wearable terminals are well known, and are configured such that a display 7 is incorporated in see-through glasses, and an image displayed on the display 7 is superimposed on an area visible through the glasses, so that the image is visually recognized by the observer P.

[0033] The communication terminal 8 includes, in addition to the display 7, at least a receiving unit 8a, a model calculation unit 8b, a display processing unit 8c, and a display instruction unit 8d, as shown in FIG.

[0034] The receiving unit 8a is configured to receive the above-mentioned various pieces of information from the server 6, the design information storage unit 6a, and the construction information storage unit 6b.

[0035] The model calculation unit 8b is composed of a model storage unit 8e and a model generation unit 8f. As shown in Fig. 5 and Fig. 6, the model storage unit 8e stores in advance a three-dimensional vector model 9, a display color assigned to the vector model 9, a three-dimensional skeleton cylinder model 10, a three-dimensional skeleton cylinder drilling model 11, and a three-dimensional cylinder construction model 12.

[0036] The model generation unit 8f reads out various models from the model memory unit 8e, and generates a vector model 9, a colored vector model 9, a risk management model 13, a skeleton cylinder drilling model 11, a cylinder construction model 12, and a construction management model 14, all in three-dimensional form, according to the information from the design information memory unit 6a and the construction information memory unit 6b received by the receiving unit 8a.

[0037] The display processing unit 8c displays, as images on the display 7, the vector model 9, colored vector model 9, risk management model 13, skeleton cylinder drilling model 11, cylinder construction model 12, and construction management model 14 generated by the model generation unit 8f in accordance with instructions from the display instruction unit 8d operated by the manager P.

[0038] The image displayed on the display 7 of the communication terminal 8 is the measurement position (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 ,…) and drilling position (…,A n-1 ,A n ,A n+1 ,A n+2, ...) are displayed on the display 7 in correspondence with the construction position of the ground improvement body.

[0039] The displayed image is the measurement position (…,X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 , ...) is displayed on the display 7 in a manner that corresponds to the measured position (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 This means that images of various models generated by the model generating unit 8f can be visually recognized on the screen (eg, , . . . ).

[0040] For the correspondence, the position of the observer P and the measurement position (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 It is possible to take positional correlations such as the position of the target object and the position of the target object (e.g., ...), and to perform position analysis from position information obtained by having a supervisor P photograph a marker containing position information installed at the construction site, or from position information using GNSS.

[0041] <<Regarding monitoring work>> The operation of monitoring the behavior of the existing structure 1 will be described in detail. In the communication terminal 8, the receiving unit 8a accesses the server 6 and receives the measurement positions (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 , . . . ) and the measurement position (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 The construction information storage unit 6b is configured to receive information from the construction information storage unit 6b that stores construction information including the amount and direction of displacement occurring in the respective portions (i.e., . . . ).

[0042] For monitoring operations, the model storage unit 8e of the communication terminal 8 stores a three-dimensional vector model 9 in which the amount of displacement is represented by the change in length of the shaft 9a, and the direction of displacement is represented by the orientation of the pointed head 9b at the end of the shaft 9a, as shown in Fig. 5. This vector model 9 is formed and displayed as an opaque image.

[0043] The model generation unit 8f of the communication terminal 8 reads out the vector model 9 from the model storage unit 8e. The model generation unit 8f also generates the vector model 9 in real time according to the amount of displacement and the direction of displacement from the construction information storage unit 6b received by the receiving unit 8a.

[0044] That is, the amount of displacement measured by the displacement meter 5 is regarded as the length of the shaft portion 9a, and a vector model 9 in which the direction of the pointed portion 9b is aligned with the direction of the displacement is generated in real time.

[0045] In the vector models 9 shown in FIG. 5, the pointed portions 9b are all oriented upward, indicating that the displacement direction is upward, that is, the protruding direction.

[0046] When the displacement direction is a sinking direction, the displacement direction is a downward direction, and the pointed portion 9b faces downward.

[0047] In addition, the length of the shaft 9a is shorter in the vector model 9 on the left side, indicating a smaller amount of displacement, and the further to the right, the longer the shaft 9a of the vector model 9 is, indicating a larger amount of displacement.

[0048] In response to an instruction from the display instruction unit 8d, the display processing unit 8c displays the measurement positions (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 , Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 , . . . ) and the vector model 9 generated by the model generating unit 8f is displayed on the display 7 in real time.

[0049] As a result, as shown in FIG. 1, an observer P at a monitoring position can view the measurement positions (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 , …) and the measurement position (…,X n-1 ,Xn ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 , . . . ) and a vector model 9 displayed in correspondence with the vectors.

[0050] This allows the observer P to accurately grasp the location where the subsidence or uplift of the existing structure 1 is occurring, as well as the amount and direction of displacement.

[0051] The vector model 9 can be enlarged or reduced as desired for easy viewing by the observer P operating the display instruction unit 8d.

[0052] During monitoring work, as the subsidence and uplift displacements occurring in the existing structure 1 change in real time, the displacements can be easily visualized, allowing the monitor P to accurately grasp them.

[0053] The length of the shaft 9a and the direction of the pointed tip 9b of the vector model 9 can allow the monitor P to adequately visually recognize the behavior of the existing structure 1, but it is preferable to use a risk level control value to make it easier to visually confirm, at least the amount of displacement.

[0054] A plurality of risk level control values ​​relating to the amount of displacement are set at the design stage and stored in advance in the design information storage unit 6a.

[0055] These risk level management values ​​are received as design information by the receiver 8a of the communication terminal 8 from the design information storage unit 6a.

[0056] The risk level control value refers to a value that classifies the magnitude of the displacement into stages, as shown in Figure 5 in the longitudinal direction of the shaft portion 9a of the vector model 9 as a zero reference where the displacement amount is zero, a first control value which is a range in which the displacement amount is small, a second control value which is a range in which the displacement amount is relatively large, and a control limit value which indicates the safety management limit of the displacement amount.

[0057] In the model storage unit 8e, a different display color is set in advance for each risk level management value.

[0058] The model generating unit 8f reads out a display color from the model storing unit 8e according to the risk level management value from the design information storing unit 6a and the amount of displacement from the construction information storing unit 6b received by the receiving unit 8a.

[0059] Then, the model generating unit 8f generates a vector model 9 in real time using a display color of the risk level management value corresponding to the amount of displacement.

[0060] That is, the model generating unit 8f judges the amount of displacement with respect to the risk level control value, reads out the display color corresponding to the risk level control value from the model storage unit 8e, and generates a colored vector model 9.

[0061] For example, as shown in FIG. 5, vector model 9 is generated by displaying the amount of deviation up to the first control value in "blue (indicated by "·" in the figure)," the amount of deviation up to the second control value in "green (indicated by "○" in the figure)," and the amount of deviation up to the control limit value in "yellow (indicated by "△" in the figure)," and vector model 9 is generated by displaying the amount of deviation beyond the control limit value in "red (indicated by "×" in the figure)."

[0062] In this way, the supervisor P can visually identify the amount of displacement occurring in the existing structure 1 by distinguishing it by color of the vector model 9, and the amount of displacement can be visualized in an easy-to-see manner, allowing the supervisor P to accurately grasp it.

[0063] Furthermore, it is preferable that the model generation unit 8f is configured to output, to the display processing unit 8c, an instruction to display the vector model 9 in the display color of the shifted risk level control value on the display 7 for a predetermined period of time when the displacement amount shifts to the higher danger side of the risk level control value, thereby calling attention.

[0064] For example, in Figure 5, when the second control value is exceeded and the green vector model 9 changes to a yellow vector model 9, even if the displacement amount becomes smaller and falls below the second control value, the model generation unit 8f outputs an instruction to the display processing unit 8c to display the yellow vector model 9 on the display 7 for a predetermined time.

[0065] The same is true when the first control value is exceeded and the blue vector model 9 changes to the green vector model 9, and when the control limit value is exceeded and the yellow vector model 9 changes to the red vector model 9.

[0066] This allows the supervisor P to understand that the amount of displacement is tending to increase, and prevents the supervisor P from misunderstanding the displacement situation occurring in the existing structure 1.

[0067] Furthermore, in order to allow the supervisor P to easily visually recognize the risk level control value, it is preferable to display the risk level control value superimposed on the vector model 9.

[0068] In this case, the model storage unit 8e stores a three-dimensional skeleton cylinder model 10 which represents multiple hazard level control values, such as a first control value and a second control value, in stages, with the control limit value of the hazard level control value as the upper limit, as shown in FIG. 5.

[0069] As shown in the figure, the three-dimensional skeleton cylinder model 10 is configured by displaying a transparent cylinder with an outline line and by displaying graduated scale lines 10a along the circumferential direction of the skeleton cylinder model 10 at positions where the displacement amount is the zero reference, the first control value, the second control value, and the control limit value, taking the displacement amount in the height direction of the cylinder.

[0070] Then, the model generation unit 8f reads out the skeleton cylinder model 10 from the model memory unit 8e, and overlays the above-mentioned colored vector model 9 (which may be a simple vector model 9 without any display color) on the skeleton cylinder model 10 to generate a risk management model 13.

[0071] The risk management model 13 displays the vector model 9 superimposed on the skeleton cylinder model 10, and is configured, for example, by displaying the opaque vector model 9 inside the transparent cylinder of the skeleton cylinder model 10.

[0072] This risk management model 13 is also generated in real time according to the amount and direction of displacement from the construction information storage unit 6b received in real time by the receiving unit 8a.

[0073] The display processing unit 8c displays the risk management model 13 generated by the model generating unit 8f at the measurement positions (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 , . . . ) and display the image on the display 7.

[0074] In this way, by comparing the scale lines 10a on the skeleton cylinder model 10 with the vector model 9 without display color or the colored vectors 9, the supervisor P can grasp the amount of displacement occurring in the existing structure 1 in correlation with the hazard level control value, and can carry out the monitoring work properly and accurately without excessive burden.

[0075] Instead of the above-mentioned vector model 9, it is also possible to simply display the numerical value of the amount of displacement measured by the displacement meter 5. This display may also be intended for cases where the control limit value is exceeded, and an alarm may also be sounded.

[0076] <About drilling work> As shown in Figures 1 to 3, the visualization of drilling work in ground improvement work in void area R, which may cause displacement of nearby existing structures 1, will be described in detail.

[0077] Regarding this drilling work, the receiving unit 8a of the communication terminal 8 accesses the server 6 and transmits the construction position (..., A n-1 ,A n ,A n+1 ,A n+2 , ...), from a design information memory unit 6a which stores design information including the construction depth and drilling diameter from the drilling start position to the drilling end position, and a construction information memory unit 6b which stores construction information input from the ground improvement machine 2, including the constructed depth from the drilling start position of the hole 3, which changes as the drilling work progresses.

[0078] The starting point of drilling is usually on the ground surface S side, and the ending point of drilling is deep inside the ground, and the depth from the starting point of drilling to the ending point of drilling is the designed construction depth (also called the construction length or drilling length; the same applies below).

[0079] In addition, the completed construction depth is detected by the ground improvement machine 2 based on the depth reached from the starting point of the drilling screw.

[0080] For drilling work, the model memory unit 8e of the communication terminal 8 stores a three-dimensional skeleton cylinder drilling model 11, as shown in Figures 6(a) and (b), in which the drilling diameter, which is design information (which may be the diameter of the construction work related to ground improvement work; the same applies below), is represented by the diameter (diameter) of the cylinder, and the completed depth, which is construction information, is represented by the length of the cylinder from the starting point of drilling.

[0081] The three-dimensional skeleton cylinder drilling model 11 is constructed by displaying a transparent cylinder with an outline with vertical and horizontal grids 11a.

[0082] The model generating unit 8f of the communication terminal 8 reads out the skeleton cylinder drilling model 11 from the model storing unit 8e.

[0083] In addition, the model generating unit 8f generates the skeleton cylinder drilling model 11 in real time according to the completed construction depth from the construction information storage unit 6b received by the receiving unit 8a.

[0084] As can be seen from the changes shown in Figures 6(a) and (b), this skeleton cylinder drilling model 11 is displayed in real time from the drilling start position at the upper position to the drilling end position downward up to the completed depth.

[0085] The completed drilling 3 is displayed by a skeleton cylinder drilling model 11 with a drilling depth that is the depth from the drilling start position to the drilling end position.

[0086] The illustrated example shows a case where the designed construction depth of the drilling hole 3 is from the ground surface S to the floor level L2 of the second basement floor.

[0087] The display processing unit 8c, in response to an instruction from the display instruction unit 8d, displays the drilling positions (..., A n-1 ,A n ,A n+1 ,A n+2 The skeleton cylinder drilling model 11 generated by the model generating unit 8f is associated with the input data ( , . . . ) and is displayed as an image on the display 7 in real time.

[0088] As a result, as shown in FIG. 1, a monitor P at a monitoring position can view through the display 7 of a wearable terminal, which is a communication terminal 8, a wall surface UW of an underground space U, which is visually observed through the glasses, and can see a drilling position (..., A n-1 ,A n ,A n+1 ,An+2 The skeleton cylinder drilling model 11 can be used to visually confirm the hole 3 being drilled or the hole 3 that has been completed ( , . . . ).

[0089] In other words, by displaying the drilling 3 on the display 7 in real time using the skeleton cylinder drilling model 11, the construction status of the drilling 3 can be visualized, thereby allowing the supervisor P to accurately grasp the construction status of the drilling 3.

[0090] The skeleton cylinder drilling model 11 is displayed at actual size, but the monitor P may operate the display instruction unit 8d to enlarge or reduce the model to actual size as desired for easier viewing.

[0091] As described above, in this embodiment, while the drilling situation changes in real time as the construction work progresses, the skeleton cylinder drilling model 11 generated based on construction information such as the completed depth is displayed on the display 7 of the communication terminal 8, thereby making the drilling situation easily visible and allowing the supervisor P to accurately grasp it.

[0092] <About ground improvement work (ground improvement body construction work)> Next, a visualization system and a visualization method for ground improvement work according to the present embodiment will be described. As shown in Figs. 1 to 3, a detailed description will be given by taking as an example ground improvement work in a void region R, which may cause displacement of an existing nearby structure 1.

[0093] In the visualization system for ground improvement work according to this embodiment, the receiving unit 8a of the communication terminal 8 accesses the server 6 to receive the construction position (drilling position (..., A n-1 ,A n ,A n+1 ,A n+2, ...) and is configured to receive information from a design information memory unit 6a which stores design information including the construction height from the construction start point position to the construction end point position of the ground improvement body 4 and the outer diameter dimensions of the ground improvement body 4, and a construction information memory unit 6b which stores construction information input from the ground improvement machine 2, including the constructed construction height from the construction start point position of the ground improvement body 4, which changes as the ground improvement work progresses.

[0094] The construction position of the ground improvement body 4 is the construction position of the drilling hole 3 (..., A n-1 ,A n ,A n+1 ,A n+2 The construction start position is usually the drilling end position of drilling hole 3, the construction end position is closer to the ground surface S than the construction start position, and the height from the construction start position to the construction end position is the construction height in the design.

[0095] In addition, the completed construction height is detected by the ground improvement machine 2 based on the height reached by the mixing screw, which mixes and mixes the original ground soil and cement-based solidification material, from the starting point of construction.

[0096] In the visualization system for ground improvement work according to this embodiment, the model storage unit 8e of the communication terminal 8 stores a three-dimensional cylinder construction model 12 in which the outer diameter of the ground improvement body 4, which is design information, is represented by the diameter (diameter) of a cylinder, and the completed construction height, which is construction information, is represented by the length of the cylinder from the construction start point position, as shown in Fig. 6(d) and (e). The three-dimensional cylinder construction model 12 is formed and displayed as an opaque cylinder body.

[0097] The model generation unit 8f of the communication terminal 8 reads out the cylinder construction model 12 from the model storage unit 8e. The model generation unit 8f also generates the cylinder construction model 12 in real time according to the completed construction height from the construction information storage unit 6b received by the receiving unit 8a.

[0098] As described above, for the completed construction height, the construction information memory unit 6b can store a flag indicating whether it is "drilling" or "construction" (described later) and the number of rotations of the rotating rod for work provided on the ground improvement machine 2, and the calculation function of the communication terminal 8 can calculate the completed construction height by the difference between the number of rotations of the rotating rod received in real time by the receiving unit 8a and the number of rotations in the initial state.

[0099] As can be seen from the changes shown in Figures 6(d) and (e), this cylinder construction model 12 is displayed in real time up to the completed construction height, from the construction start position at the lower position toward the construction end position at the upper position.

[0100] The completed ground improvement body 4 is displayed by a cylindrical construction model 12 with the height from the construction start point to the construction end point (constructed construction height = construction height).

[0101] The illustrated example shows a case where the designed construction height of the ground improvement body 4 is from floor level L2 of the second basement floor to floor level L1 of the first basement floor.

[0102] In this embodiment, the model generating unit 8f is configured to generate a construction management model 14 by displaying the cylinder construction model 12 superimposed on the three-dimensional skeleton cylinder drilling model 11 in the above-mentioned drilling work.

[0103] The construction management model 14 displays a cylinder construction model 12 overlaid on a skeleton cylinder drilling model 11, and is constructed, for example, by displaying an opaque cylinder construction model 12 inside the transparent cylinder of the skeleton cylinder drilling model 11.

[0104] In this embodiment, as shown in Figure 6 (c), when moving from drilling work to construction work of the ground improvement body 4, when a signal indicating the start of construction of the ground improvement body 4 stored in the construction information memory unit 6b from the ground improvement machine 2 is input to the receiving unit 8a, the model generation unit 8f switches the height of the skeleton cylinder drilling model 11 to the construction height of the ground improvement body 4 from the designed construction start position (drilling end position).

[0105] Even in this construction management model 14, the model generating unit 8f generates it in real time according to the completed construction height from the construction information storage unit 6b received by the receiving unit 8a.

[0106] The display processing unit 8c, in response to an instruction from the display instruction unit 8d, displays the construction positions (..., A n-1 ,A n ,A n+1 ,A n+2 The construction management model 14 generated by the model generating unit 8f is associated with the construction management data 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36,

[0107] Of course, the display processing unit 8c may simply display the cylinder construction model 12 on the display as an image.

[0108] As a result, as shown in FIG. 1, a monitor P at a monitoring position can view, through a display 7 of a wearable terminal, which is a communication terminal 8, a wall surface UW, etc. of an underground space U, which is visually observed through the glasses, and can see a construction position (..., A n-1 ,A n ,A n+1 ,A n+2 The ground improvement body 4 under construction or the ground improvement body 4 whose construction has been completed can be visually confirmed by the construction management model 14 or the cylinder construction model 12 in correspondence with the above-mentioned three or four positions (...).

[0109] In other words, by displaying the ground improvement body 4 in real time on the display 7 using the construction management model 14 or the cylinder construction model 12, the construction status of the ground improvement body 4 can be visualized, thereby allowing the monitor P to accurately grasp the construction status of the ground improvement body 4.

[0110] According to the image display of the construction management model 14, the construction status of the ground improvement body 4 can be judged by comparing it with the skeleton cylinder drilling model 11 that displays the drilling 3.

[0111] Of course, even in the case of the cylinder construction model 12, the construction status of the ground improvement body 4 can be determined.

[0112] Both the cylinder construction model 12 and the construction management model 14 are displayed at life-size, but the supervisor P may operate the display instruction unit 8d to enlarge or reduce the model to life-size as desired for easier viewing.

[0113] As described above, in the visualization system and visualization method for ground improvement work of this embodiment, while the construction status of the ground improvement body 4 changes in real time as the construction work progresses, the cylinder construction model 12 or the construction management model 14 generated based on construction information such as the completed construction height is displayed on the display 7 of the communication terminal 8, thereby making it possible to easily visualize the construction status of the ground improvement body 4 and allowing the supervisor P to accurately grasp it.

[0114] In the above description, the communication terminal 8 is a see-through wearable terminal. However, the communication terminal 8 may be a tablet-type communication terminal 8x having a display and an imaging device.

[0115] In this case, the measurement position (...,X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Yn ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 ,…) and drilling position (…,A n-1 ,A n ,A n+1 ,A n+2 , ...), an image of the construction position is taken using a video or the like, and the display processing unit 8c displays the measurement position (..., X n-1 ,X n ,X n+1 ,X n+2 ,…,Y n-1 ,Y n ,Y n+1 ,Y n+2 ,…,Z n-1 ,Z n ,Z n+1 ,Z n+2 The above-mentioned vector model 9, colored vector model 9, risk management model 13, skeleton cylinder drilling model 11, cylinder construction model 12, and construction management model 14 generated by the model generation unit 8f can be displayed as images on the display 7 by corresponding them to the images (e.g., ...) and superimposing them on the image being captured.

[0116] In this way, even if the communication terminal 8x is a tablet type or the like with a display and an imaging device, it is possible to achieve the same effects as those of the above-described embodiment. [Explanation of symbols]

[0117] 2 Ground improvement machinery 3 Drilling 4. Ground improvement body 6a Design information storage section 6b Construction information storage section 7. Display 8. Communication terminals 8a Receiving section 8c Display processing section 8e Model storage section 8f Model generation section 8x Tablet-type and other communication devices 11 3D skeleton cylinder drilling model 12 3D cylinder construction model 14 Construction Management Model A. Location of ground improvement body

Claims

1. A visualization system for ground improvement work that displays an image of the construction status of a ground improvement work to create a ground improvement body by a ground improvement machine on a display of a communication terminal, The communication terminal is A location information acquisition means for acquiring location information of the communication terminal; a receiving unit that receives information from a design information storage unit that stores design information including the construction position of the ground improvement body, the construction height from the construction start position to the construction end position of the ground improvement body, and the outer diameter dimensions of the ground improvement body, and a construction information storage unit that stores construction information input from the ground improvement machine, including the completed construction height from the construction start position of the ground improvement body that changes as the ground improvement work progresses; A model storage unit that stores a three-dimensional cylinder construction model in which the outer diameter dimension of the ground improvement body from the design information storage unit received by the receiving unit is expressed as a cylinder diameter, and the completed construction height is expressed as the length of the cylinder from the construction start position; A model generation unit that reads out the cylinder construction model from the model storage unit and generates the cylinder construction model of the outer diameter dimension and the completed construction height of the ground improvement body in real time according to the completed construction height from the construction information storage unit received by the receiving unit; a display processing unit that displays the cylinder construction model generated by the model generation unit on the display in association with the construction position from the design information storage unit received by the receiving unit; the communication terminal is a see-through wearable terminal in which the display is incorporated in see-through glasses, The display processing unit displays the cylinder construction model associated with the construction position on the display by superimposing the cylinder construction model on an image of the construction position viewed through the glass based on the acquired position information and the construction position, The construction information storage unit stores construction information including a depth and a diameter of a hole formed in advance at the construction position from a drilling start position of the hole formed in advance at the construction position prior to the construction of the ground improvement body, The model storage unit stores a three-dimensional skeleton cylinder drilling model in which the drilling diameter from the design information storage unit received by the receiving unit is expressed as a cylinder diameter and the completed depth is expressed as a cylinder length from the drilling start position, The model generation unit reads out the skeleton cylinder drilling model from the model storage unit, and generates a skeleton cylinder drilling model of the drilling diameter and the completed depth according to the completed depth from the construction information storage unit received by the receiving unit, and generates a construction management model in real time that displays the skeleton cylinder drilling model superimposed on the cylinder construction model, The display processing unit displays the cylinder construction model generated by the model generation unit on the display in association with the construction position, The above-mentioned skeleton cylinder drilling model is a visualization system for ground improvement work, characterized in that it is constructed by displaying a transparent cylinder with an outline line with vertical and horizontal grids.

2. A visualization system for ground improvement work that displays an image of the construction status of a ground improvement work in which a ground improvement body is created by a ground improvement machine on a display of a communication terminal, The communication terminal is A location information acquisition means for acquiring location information of the communication terminal; a receiving unit that receives information from a design information storage unit that stores design information including the construction position of the ground improvement body, the construction height from the construction start position to the construction end position of the ground improvement body, and the outer diameter dimensions of the ground improvement body, and a construction information storage unit that stores construction information input from the ground improvement machine, including the completed construction height from the construction start position of the ground improvement body that changes as the ground improvement work progresses; A model storage unit that stores a three-dimensional cylinder construction model in which the outer diameter dimension of the ground improvement body from the design information storage unit received by the receiving unit is expressed as a cylinder diameter, and the completed construction height is expressed as the length of the cylinder from the construction start position; A model generation unit that reads out the cylinder construction model from the model storage unit and generates the cylinder construction model of the outer diameter dimension and the completed construction height of the ground improvement body in real time according to the completed construction height from the construction information storage unit received by the receiving unit; a display processing unit that displays the cylinder construction model generated by the model generation unit on the display in association with the construction position from the design information storage unit received by the receiving unit; The communication terminal includes an imaging means, The display processing unit displays the cylinder construction model associated with the construction position on the display by superimposing the cylinder construction model on the image of the construction position photographed by the photographing means based on the acquired position information and the construction position, The construction information storage unit stores construction information including a depth and a diameter of a hole formed in advance at the construction position from a drilling start position of the hole formed in advance at the construction position prior to the construction of the ground improvement body, The model storage unit stores a three-dimensional skeleton cylinder drilling model in which the drilling diameter from the design information storage unit received by the receiving unit is expressed as a cylinder diameter and the completed depth is expressed as a cylinder length from the drilling start position, The model generation unit reads out the skeleton cylinder drilling model from the model storage unit, and generates a skeleton cylinder drilling model of the drilling diameter and the completed depth according to the completed depth from the construction information storage unit received by the receiving unit, and generates a construction management model in real time that displays the skeleton cylinder drilling model superimposed on the cylinder construction model, The display processing unit displays the cylinder construction model generated by the model generation unit on the display in association with the construction position, The above-mentioned skeleton cylinder drilling model is a visualization system for ground improvement work, characterized in that it is constructed by displaying a transparent cylinder with an outline line with vertical and horizontal grids.

3. A method for visualizing a ground improvement work, which displays an image of a construction status of a ground improvement work for constructing a ground improvement body by a ground improvement machine on a display of a communication terminal, comprising: Acquire location information of the communication terminal; Design information including the construction position of the ground improvement body, the construction height from the construction start end position to the construction end position of the ground improvement body, and the outer diameter dimension of the ground improvement body is input into the communication terminal, Construction information input from the ground improvement machine, including the completed construction height from the construction start position of the ground improvement body, which changes as the ground improvement work progresses, is input to the communication terminal, and a three-dimensional cylindrical construction model is generated in real time by the communication terminal, in which the outer diameter dimension of the ground improvement body is expressed as a cylinder diameter and the completed construction height is expressed as the cylinder length from the construction start position; Displaying an image of the cylinder construction model on the display of the communication terminal in association with the construction position; the communication terminal is a see-through wearable terminal in which the display is incorporated in see-through glasses, The communication terminal displays the cylinder construction model associated with the construction position on the display by superimposing it on an image of the construction position viewed through the glass based on the acquired position information and the construction position, Input design information including a depth and a diameter of a hole to be drilled from a start point of drilling of a hole to be formed in advance at the development position prior to the construction of the ground improvement body into the communication terminal; The communication terminal generates a three-dimensional skeleton cylinder drilling model in which the drilling diameter is expressed by a cylinder diameter and the completed depth is expressed by the length of the cylinder from the drilling start position, and generates in real time a construction management model in which the skeleton cylinder drilling model is displayed superimposed on the cylinder construction model. Displaying an image of the cylinder construction model on the display of the communication terminal in association with the construction position; A method for visualizing ground improvement work, characterized in that the skeleton cylinder drilling model is constructed by displaying a transparent cylinder with an outer contour line with vertical and horizontal grids.

4. A method for visualizing a ground improvement work, comprising: displaying an image of a construction status of a ground improvement work in which a ground improvement body is created by a ground improvement machine on a display of a communication terminal, Acquire location information of the communication terminal; Design information including the construction position of the ground improvement body, the construction height from the construction start end position to the construction end position of the ground improvement body, and the outer diameter dimension of the ground improvement body is input into the communication terminal, Construction information input from the ground improvement machine, including the completed construction height from the construction start position of the ground improvement body, which changes as the ground improvement work progresses, is input to the communication terminal, and a three-dimensional cylindrical construction model is generated in real time by the communication terminal, in which the outer diameter dimension of the ground improvement body is expressed as a cylinder diameter and the completed construction height is expressed as the cylinder length from the construction start position; Displaying an image of the cylinder construction model on the display of the communication terminal in association with the construction position; The communication terminal includes an imaging means, The communication terminal displays the cylinder construction model corresponding to the construction position on the display by superimposing it on the image of the construction position photographed by the photographing means based on the acquired position information and the construction position, Input design information including a depth and a diameter of a hole to be drilled from a start point of drilling of a hole to be formed in advance at the development position prior to the construction of the ground improvement body into the communication terminal; The communication terminal generates a three-dimensional skeleton cylinder drilling model in which the drilling diameter is expressed by a cylinder diameter and the completed depth is expressed by the length of the cylinder from the drilling start position, and generates in real time a construction management model in which the skeleton cylinder drilling model is displayed superimposed on the cylinder construction model. Displaying an image of the cylinder construction model on the display of the communication terminal in association with the construction position; A method for visualizing ground improvement work, characterized in that the skeleton cylinder drilling model is constructed by displaying a transparent cylinder with an outer contour line with vertical and horizontal grids.

Citation Information

Patent Citations

  • Optimum arrangement method of measuring apparatus in measurement of earth retaining wall in excavation work

    JP2013242175A

  • Display control device

    JP2015011368A

  • Construction management device for civil engineering construction work

    JP2018104933A

  • Displacement monitoring system for tunnel working surface

    JP2018104934A

  • Construction management system for ground improvement

    JP2018111982A