Laminated iron core manufacturing equipment
The laminated iron core manufacturing apparatus addresses adhesive application accuracy by controlling the timing of adhesive application, ensuring strong and reliable bonding in laminated iron cores.
Patent Information
- Application Number
- JP2024066957
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2025-09-09
- Estimated Expiration
- 2043-09-19
AI Technical Summary
Existing laminated iron core manufacturing processes face challenges in accurately applying adhesive to predetermined positions on metal plates, leading to potential bonding issues and reduced strength of the laminated iron core.
A laminated iron core manufacturing apparatus with a control device that adjusts the start and completion timings of adhesive application, using a movement control unit for the upper mold and an application control unit to ensure precise adhesive application on the underside of strip-shaped metal plates.
The apparatus enables accurate adhesive application to predetermined positions, enhancing the bonding strength and integrity of laminated iron cores.
Smart Images

Figure 0007736847000001 
Figure 0007736847000002 
Figure 0007736847000003
Abstract
Description
[Technical Field]
[0001] The present invention relates to a manufacturing apparatus for a laminated iron core. [Background technology]
[0002] Laminated cores used in motors and the like are formed by punching a strip-shaped metal plate (e.g., a strip-shaped steel plate) into a predetermined shape to form core members (cores), and then stacking and integrating the formed core members. For example, a laminated core is formed by stacking and integrating the core members by caulking, welding, or bonding. For example, Patent Document 1 discloses a manufacturing device that manufactures a laminated core by stacking multiple core members using an adhesive and bonding them together. In Patent Document 1, an adhesive application mechanism is provided in a lower mold having a die, and when the pressing timing reaches the bottom dead center position, adhesive is discharged from a discharge nozzle of the adhesive application mechanism and applied to a predetermined position on the underside of a thin steel plate. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Laid-Open No. 2001-321850 Summary of the Invention [Problem to be solved by the invention]
[0004] When applying the adhesive to the underside of the metal plate, the adhesive must be applied accurately to a predetermined position on the underside of the metal plate. If the adhesive is not applied accurately, the iron core members will not be bonded accurately to each other, which could result in a decrease in the strength of the laminated iron core.
[0005] The present invention has been made in consideration of the above points, and its object is to provide a laminated core manufacturing device that can accurately apply adhesive to predetermined positions on the underside of a metal plate. [Means for solving the problem]
[0006] The laminated iron core manufacturing apparatus of the present invention is an apparatus for manufacturing a laminated iron core in which a plurality of iron core components are stacked and bonded to each other, and comprises a lower mold having a die with a die hole formed therein, an upper mold having a punch corresponding to the die hole, an adhesive application device provided on the lower mold and applying adhesive to the underside of a strip-shaped metal plate, and a control device for controlling the upper mold and the adhesive application device, wherein the control device has a movement control unit that controls the vertical movement of the upper mold, and an application control unit configured to be able to change the start timing, which is the timing at which the adhesive application device starts applying the adhesive to the underside of the metal plate.
[0007] The laminated core manufacturing apparatus according to the present invention includes a control device that controls the upper die and the adhesive applicator. The application control unit of the control device is configured to change the start timing, which is the timing at which the adhesive applicator starts applying adhesive to the underside of the metal plate. According to the above aspect, the timing at which the adhesive application starts can be changed as needed, so that the adhesive can be applied more accurately to a predetermined position on the underside of the metal plate at a predetermined timing.
[0008] Another laminated iron core manufacturing apparatus according to the present invention is an apparatus for manufacturing a laminated iron core in which multiple iron core components are stacked and bonded to each other, and comprises a lower mold having a die with a die hole formed therein, an upper mold having a punch corresponding to the die hole, an adhesive application device provided on the lower mold and applying adhesive to the underside of a strip-shaped metal plate, and a control device for controlling the upper mold and the adhesive application device, wherein the control device has a movement control unit that controls the vertical movement of the upper mold, and an application control unit configured to be able to change the completion timing, which is the timing at which the application of the adhesive from the adhesive application device to the underside of the metal plate is completed.
[0009] Another laminated core manufacturing apparatus according to the present invention includes a control device that controls the upper die and the adhesive applicator. The application control unit of the control device is configured to be able to change the completion timing, which is the timing at which the adhesive applicator completes application of adhesive to the underside of the metal plate. According to this aspect, the timing at which the adhesive application is completed can be changed as needed, so that the adhesive can be applied more accurately to a predetermined position on the underside of the metal plate at a predetermined timing.
[0010] Another laminated iron core manufacturing apparatus according to the present invention is an apparatus for manufacturing a laminated iron core in which multiple iron core components are stacked and bonded to each other, and comprises a lower mold having a die with a die hole formed therein, an upper mold having a punch corresponding to the die hole, an adhesive application device provided on the lower mold and applying adhesive to the underside of a strip-shaped metal plate, and a control device for controlling the upper mold and the adhesive application device, wherein the control device has a movement control unit that controls the vertical movement of the upper mold, and an application control unit configured to be able to change the period from when the adhesive application device starts to apply the adhesive to the underside of the metal plate to when it is completed.
[0011] Another laminated core manufacturing apparatus according to the present invention includes a control device that controls the upper die and the adhesive applicator. The application control unit of the control device is configured to change the period from when the adhesive applicator starts to apply adhesive to the underside of the metal plate until it finishes. This aspect allows the adhesive application period to be changed as needed, making it possible to more accurately apply adhesive to a predetermined position on the underside of the metal plate at a predetermined timing. [Effects of the Invention]
[0012] According to the present invention, it is possible to provide a laminated core manufacturing device that can accurately apply adhesive to predetermined positions on the lower surface of a metal plate. [Brief explanation of the drawings]
[0013] [Figure 1] FIG. 1 is a side view showing a manufacturing apparatus for a laminated iron core according to one embodiment. [Figure 2] FIG. 2 is a perspective view showing a laminated core according to one embodiment. [Figure 3] FIG. 3 is a plan view showing a lower mold according to one embodiment. [Figure 4A] FIG. 4A is a cross-sectional view showing a lift member and its surrounding structure according to one embodiment. [Figure 4B] FIG. 4B is a cross-sectional view illustrating a state in which the stripper plate according to the embodiment presses the metal plate downward. [Figure 4C] FIG. 4C is a cross-sectional view showing a state in which a metal plate is sandwiched between a stripper plate and a die plate according to an embodiment. [Figure 5] FIG. 5 is a cross-sectional view showing a manufacturing apparatus for a laminated core according to one embodiment. [Figure 6A] FIG. 6A is a schematic diagram showing the positional relationship between a pilot pin and a pilot hole according to one embodiment. [Figure 6B] FIG. 6B is a schematic diagram showing a state in which a pilot pin according to one embodiment is inserted into a pilot hole. [Figure 6C] FIG. 6C is a schematic diagram showing a state in which half of the insertion portion of the pilot pin according to one embodiment is inserted into the pilot hole. [Figure 7A] FIG. 7A is a cross-sectional view showing an adhesive application device according to one embodiment in a normal state. [Figure 7B] FIG. 7B is a cross-sectional view showing a state in which adhesive is being supplied to an adhesive storage chamber of the adhesive dispensing device according to one embodiment. [Figure 7C] FIG. 7C is a cross-sectional view showing a state in which adhesive is discharged from a nozzle of the adhesive dispensing device according to the embodiment. [Figure 7D] FIG. 7D is a cross-sectional view showing a state in which adhesive ejected from a nozzle of the adhesive applicator according to the embodiment is attached to the lower surface of a strip-shaped metal plate. [Figure 8] FIG. 8 is a cross-sectional view showing a state in which the stripper plate according to the embodiment is at the lowest position and pressing the strip-shaped metal plate against the die plate. [Figure 9] FIG. 9 is an example of a graph showing the relationship between the vertical position of the upper mold and the state of each member according to one embodiment. [Figure 10] FIG. 10 is a flowchart of a method for manufacturing a laminated core according to one embodiment. DETAILED DESCRIPTION OF THE INVENTION
[0014] Hereinafter, an embodiment of a laminated iron core manufacturing apparatus according to the present invention will be described with reference to the drawings. It should be noted that the embodiment described here is not intended to limit the present invention in any particular way. Furthermore, the same reference numerals are used for members and parts that perform the same functions, and duplicated descriptions will be omitted or simplified as appropriate.
[0015] As shown in FIG. 1, a laminated iron core manufacturing apparatus 10 (hereinafter referred to as manufacturing apparatus 10) of this embodiment manufactures a laminated iron core 8 (see FIG. 2) in which a plurality of iron core members 5 (see FIG. 2) are stacked and bonded to one another. The manufacturing apparatus 10 is a progressive press die. In the manufacturing apparatus 10, a strip-shaped metal plate W is intermittently conveyed to a plurality of processing stages 25 (see FIG. 3), which will be described later. The strip-shaped metal plate W is, for example, a coil material (strip-shaped thin steel plate). The manufacturing apparatus 10 includes a lower die 20, an upper die 40, a pilot pin 50 (see FIG. 5), a stripper plate 60, an adhesive application device 70 (see FIG. 5), and a control device 90.
[0016] The lower mold 20 is fixed to the floor surface. As shown in FIG. 3, the lower mold 20 is provided with a plurality of processing stages 25. The processing stages 25 include a pilot hole punching stage 25X, an inner shape punching stage 25A, an adhesive application stage 25B, and an outer shape punching stage 25C. The pilot hole punching stage 25X, the inner shape punching stage 25A, the adhesive application stage 25B, and the outer shape punching stage 25C are arranged in this order in the forward feed direction D. The pilot hole punching stage 25X includes a pilot hole forming die plate 22X, a pilot hole forming die 23X, a pilot hole punching die hole 26X, and a pilot hole punching punch 45X (see FIG. 5), which will be described later. The inner shape punching stage 25A includes a first die plate 22A, a first die 23A, an inner shape punching die hole 26A, and an inner shape punching punch 45A (see FIG. 5), which will be described later. The outer shape punching stage 25C includes a second die plate 22C, a second die 23C, an outer shape punching die hole 26C, and an outer shape punching punch 45C (see FIG. 5), which will be described later.
[0017] The lower mold 20 has a lower mold body 21, a die plate 22, and a die 23. The die plate 22 and the die 23 are placed on the lower mold body 21. The die plate 22 holds the die 23. The die plate 22 includes a pilot hole forming die plate 22X that holds a pilot hole forming die 23X (described later), a first die plate 22A that holds a first die 23A (described later), and a second die plate 22C that holds a second die 23C (described later). The die 23 includes a pilot hole forming die 23X included in a pilot hole punching stage 25X, a first die 23A included in an inner shape punching stage 25A, and a second die 23C included in an outer shape punching stage 25C. A die hole 26 is formed in the die 23. A pilot hole punching die hole 26X is formed in the pilot hole forming die 23X as the die hole 26. The first die 23A has an inner shape punching die hole 26A formed therein as the die hole 26. The second die 23C has an outer shape punching die hole 26C formed therein as the die hole 26. The upper surface 22T of the die plate 22 and the upper surface 23T of the die 23 are located at the same height. More specifically, the upper surface 22T of the pilot hole forming die plate 22X and the upper surface 23T of the pilot hole forming die 23X are located at the same height as the upper surface 22T of the first die plate 22A and the upper surface 23T of the first die 23A, and the upper surface 22T of the second die plate 22C and the upper surface 23T of the second die 23C. The lower die body 21 includes an adhesive application stage 25B. The lower die body 21 has an adhesive application through hole 27 formed therein. Note that an adhesive application device 70 (see FIG. 5) is not shown in FIG. 3.
[0018] The strip-shaped metal sheet W is intermittently transported to the lower die 20 by a transport device (not shown) provided near the manufacturing apparatus 10. The strip-shaped metal sheet W is intermittently transported through the pilot hole punching stage 25X, the inner shape punching stage 25A, the adhesive application stage 25B, and the outer shape punching stage 25C in this order. The transport device holds the strip-shaped metal sheet W in a wound state. The strip-shaped metal sheet W is transported to the lower die 20 by an unwinding device (not shown) of the transport device, and scrap material of the pressed strip-shaped metal sheet W is transported from the lower die 20 by a winding device (not shown) of the transport device and wound onto the winding device. Note that instead of the unwinding device and winding device of the transport device, the strip-shaped metal sheet W may be sandwiched between a pair of upper and lower rotating rolls arranged respectively upstream and downstream of the manufacturing apparatus 10 and transported.
[0019] As shown in FIG. 3 , the die 23 of the lower mold 20 has multiple lift members 30. The lift members 30 urge the strip-shaped metal sheet W upward. The lift members 30 are configured to be able to push the strip-shaped metal sheet W upward. When the strip-shaped metal sheet W is intermittently conveyed over the die plate 22 and the die 23, the lift members 30 push the strip-shaped metal sheet W upward and hold the strip-shaped metal sheet W at a predetermined distance above the upper surface 22T of the die plate 22 and the upper surface 23T of the die 23. As shown in FIG. 4A , the lift members 30 are urged upward by biasing members 32 provided on the die 23. The biasing members 32 are, for example, coil springs. As shown in FIG. 4B , when the stripper plate 60 moves downward and presses the strip-shaped metal sheet W downward by the stripper plate 60, the lift members 30 move downward against the biasing force of the biasing members 32. As a result, the strip-shaped metal sheet W is pressed by the stripper plate 60 against the upper surface 22T of the die plate 22 of the lower mold 20 (more specifically, the upper surface 22T of the pilot hole forming die plate 22X, the upper surface 22T of the first die plate 22A, and the upper surface 22T of the second die plate 22C) and the upper surface 23T of the die 23 (more specifically, the upper surface 23T of the pilot hole forming die 23X, the upper surface 23T of the first die 23A, and the upper surface 23T of the second die 23C) (see FIG. 4C ). At this time, the stripper plate 60 is located at the lowest position LP. As shown in FIGS. 4A to 4C , the biasing member 32 is configured to allow a portion WC of the metal sheet W, which is located between the portion WA in contact with the lift member 30 and the portion WB in contact with the stripper plate 60, to move downward while maintaining a horizontal state, while the stripper plate 60 is pressing the metal sheet W downward against the biasing force of the biasing member 32. That is, the portions WA, WB, and WC move downward while maintaining a horizontal state. On the other hand, when the stripper plate 60 moves upward and the pressing force of the stripper plate 60 is no longer applied to the belt-shaped metal plate W, the lift member 30 moves upward due to the biasing force of the biasing member 32. That is, the lift member 30 is configured to be movable to the uppermost position PM (see FIG. 4A) when the stripper plate 60 is not pressing the belt-shaped metal plate W.As a result, the lift members 30 hold the strip-shaped metal sheet W a predetermined distance above the lower mold 20 (more specifically, the upper surface 22T of the die plate 22 and the upper surface 23T of the die 23). The strip-shaped metal sheet W moves above the upper surface 30A of the lift members 30 during the intermittent conveyance process. The die 23 of the lower mold 20 has a regulating member 28 that regulates the upward movement of the strip-shaped metal sheet W when the lift members 30 push the strip-shaped metal sheet W upward. The regulating member 28 regulates the gap between the strip-shaped metal sheet W and the lower mold 20 (more specifically, the upper surface 22T of the die plate 22 and the upper surface 23T of the die 23) from widening beyond a predetermined distance.
[0020] As shown in FIG. 5, the upper die 40 is disposed above the lower die 20. The upper die 40 is configured to be able to move toward and away from the lower die 20. The upper die 40 has a plurality of punches 45 corresponding to the die holes 26. The punches 45 include a pilot hole punching punch 45X, an inner shape punching punch 45A, and an outer shape punching punch 45C. The pilot hole punching punch 45X is located above the pilot hole punching die hole 26X. The pilot hole punching punch 45X is configured to be insertable into the pilot hole punching die hole 26X. Two pilot hole punching punches 45X are arranged at a predetermined interval in the width direction E (see FIG. 3), which is a direction perpendicular to the forward feed direction D. The inner shape punching punch 45A is located above the inner shape punching die hole 26A. The inner shape punching punch 45A is configured to be insertable into the inner shape punching die hole 26A. The outer shape punching punch 45C is positioned above the outer shape punching die hole 26C. The outer shape punching punch 45C is configured to be insertable into the outer shape punching die hole 26C. In the pilot hole punching stage 25X, after the upper mold 40 descends and approaches the lower mold 20, the pilot hole punching punch 45X and the pilot hole punching die hole 26X punch out the strip-shaped metal sheet W. As a result, pilot holes PH (see FIG. 3) are formed in the strip-shaped metal sheet W. As shown in FIG. 3, two pilot holes PH are formed in the width direction E. A pilot pin 50 is inserted into the formed pilot holes PH. As shown in FIG. 5, in the inner shape punching stage 25A (see FIG. 3), after the upper mold 40 descends and approaches the lower mold 20, the inner shape punching punch 45A and the inner shape punching die hole 26A punch out the strip-shaped metal sheet W. This forms the inner shape of the core member 5 in the strip-shaped metal plate W. In the outer shape punching stage 25C (see FIG. 3), after the upper die 40 descends and approaches the lower die 20, the strip-shaped metal plate W is punched out by the outer shape punching punch 45C and the outer shape punching die hole 26C. This forms the outer shape of the core member 5 in the strip-shaped metal plate W, completing the core member 5 (see also FIG. 2), and the core members 5 are stacked one after another in the outer shape punching die hole 26C.As will be described later, adhesive is applied to the underside of the completed core members 5, so that when the core members 5 are stacked, the core members 5 stacked in the vertical direction Z are adhered to each other.
[0021] As shown in FIG. 5, the pilot pin 50 is provided on the upper die 40. As shown in FIG. 6A, the pilot pin 50 is disposed at a position facing a pilot hole PH formed in the strip-shaped metal plate W. The pilot pin 50 is configured to be movable in the vertical direction Z together with the upper die 40. The pilot pin 50 is configured to be insertable into the pilot hole PH. As shown in FIG. 6B, the upper die 40 is lowered, and the pilot pin 50 is inserted into the pilot hole PH. The pilot pin 50 is inserted into the pilot hole PH, thereby positioning the strip-shaped metal plate W relative to the manufacturing apparatus 10 (e.g., the adhesive application apparatus 70). FIG. 6B shows a state in which the pilot pin 50 is positioned at the lowest position, i.e., a state in which the pilot pin 50 is positioned at the bottom dead center. When the upper die 40 is positioned at the bottom dead center, the pilot pin 50 is positioned at the bottom dead center. As shown in FIG. 6B, the pilot pin 50 has an insertion portion 50A that is inserted into the pilot hole PH. The insertion portion 50A is a portion of the pilot pin 50 that is located below the pilot hole PH when the pilot pin 50 is located at the bottom dead center. When the upper die 40 is raised while the pilot pin 50 is inserted into the pilot hole PH, the pilot pin 50 is removed from the pilot hole PH. FIG. 6C shows a state in which half of the length of the insertion portion 50A of the pilot pin 50 in the vertical direction Z is inserted into the pilot hole PH. For ease of explanation, the upper die 40 and other components are not shown in FIGS. 6A to 6C.
[0022] As shown in FIG. 5, the stripper plate 60 is provided on the upper mold 40. The stripper plate 60 is disposed at a position facing the die plate 22 of the lower mold 20. The stripper plate 60 is configured to be movable in the vertical direction together with the upper mold 40. The stripper plate 60 is configured to be movable downward to a lowest position, i.e., a lowest position LP (see FIG. 8). The stripper plate 60 restricts the vertical movement of the metal sheet W at the lowest position LP when the punch 45 punches out the strip-shaped metal sheet W. Note that the stripper plate 60 can restrict the movement of the metal sheet W in the vertical direction Z even when positioned slightly above the lowest position LP. When the stripper plate 60 moves to the lowest position LP, it is configured to press the intermittently conveyed strip-shaped metal sheet W against the lower mold 20 (here, the die plate 22 and the die 23) and clamp the strip-shaped metal sheet W together with the lower mold 20 (here, the die plate 22 and the die 23). The stripper plate 60 presses the band-shaped metal sheet W against the upper surface 22T of the die plate 22 and the upper surface 23T of the die 23. The stripper plate 60 is formed with a punch insertion hole 60X through which the pilot hole punching punch 45X is inserted, a punch insertion hole 60A through which the inner shape punching punch 45A is inserted, and a punch insertion hole 60C through which the outer shape punching punch 45C is inserted. When the upper die 40 is lowered and the stripper plate 60 presses the band-shaped metal sheet W against the die plate 22, and the upper die 40 is further lowered, the pilot hole punching punch 45X protrudes from the punch insertion hole 60X and is inserted into the pilot hole punching die hole 26X, the inner shape punching punch 45A protrudes from the punch insertion hole 60A and is inserted into the inner shape punching die hole 26A, and the outer shape punching punch 45C protrudes from the punch insertion hole 60C and is inserted into the outer shape punching die hole 26C.
[0023] As shown in FIG. 3, the adhesive application device 70 is provided on the lower die body 21 of the lower die 20. The adhesive application device 70 is arranged between the inner shape punching stage 25A and the outer shape punching stage 25C. In this embodiment, "the adhesive application device 70 is arranged between the inner shape punching stage 25A and the outer shape punching stage 25C" includes a case where the adhesive application device 70 is provided adjacent to the inner shape punching stage 25A (for example, when provided on the first die plate 22A) and a case where the adhesive application device 70 is provided adjacent to the outer shape punching stage 25C (for example, when provided on the second die plate 22C). Note that the adhesive application device 70 does not necessarily have to be provided between the inner shape punching stage 25A and the outer shape punching stage 25C. For example, the adhesive application device 70 may be provided adjacent to the pilot hole punching stage 25X. In the example shown in FIG. 3, the nozzles 72 of the multiple adhesive application devices 70 are illustrated. The nozzles 72 are arranged at approximately equal intervals in a double ring shape. The adhesive applicator 70 is provided on the adhesive application stage 25B (see also FIG. 5). More specifically, the adhesive applicator 70 is disposed within the adhesive application through-hole 27. The adhesive applicator 70 is located below the strip-shaped metal plate W. The adhesive applicator 70 applies adhesive to the lower surface WL of the strip-shaped metal plate W. The adhesive applicator 70 applies adhesive to the lower surface WL of the strip-shaped metal plate W while the strip-shaped metal plate W is being transported from the inner shape punching stage 25A to the outer shape punching stage 25C. The adhesive applicator 70 of this embodiment applies adhesive to the lower surface WL of the strip-shaped metal plate W by a non-contact application method (e.g., jet dispensing method or spray method). Examples of liquid adhesives used in the adhesive applicator 70 include epoxy-based adhesives, acrylic-based adhesives, silicone-based adhesives, and urethane-based adhesives, but are not particularly limited as long as sufficient adhesive strength is obtained to form the laminated iron core 8. The adhesive curing method is not particularly limited, and for example, a solvent volatilization type, a moisture curing type, a heat curing type, a curing agent mixed type, etc. can be used.
[0024] As shown in FIGS. 7A to 7D, the adhesive application device 70 includes a housing 71, a nozzle 72, a plunger 73, and a supply tube 74. The housing 71 includes an adhesive storage chamber 71A filled with adhesive. The housing 71 includes an insertion hole 71B through which the supply tube 74 is inserted. The adhesive storage chamber 71A and the insertion hole 71B are connected to each other. A nozzle 72 is formed in the housing 71. The nozzle 72 is connected to the adhesive storage chamber 71A. The nozzle 72 is located below the belt-shaped metal plate W. An outlet 72A of the nozzle 72 is located below the upper surface 22T of the die plate 22 and the upper surface 23T of the die 23, which are the uppermost surfaces of the lower mold 20 (see FIG. 5). The nozzle 72 sprays adhesive onto the lower surface WL of the belt-shaped metal plate W. The adhesive sprayed from the outlet 72A of the nozzle 72 forms droplets and is applied to the lower surface WL of the belt-shaped metal plate W. A portion of the plunger 73 is accommodated in the adhesive storage chamber 71A of the housing. The plunger 73 slides within the adhesive storage chamber 71A. The plunger 73 is configured to be able to open and close the insertion hole 71B. A supply tube 74 is inserted through the insertion hole 71B. The supply tube 74 is connected to an adhesive storage tank (not shown) that stores the adhesive. For example, an application control unit 94 (see FIG. 1 ), which will be described later, of the control device 90 drives a supply pump (not shown) to supply adhesive to the adhesive storage chamber 71A via the supply tube 74.
[0025] As shown in FIG. 7A, when the adhesive applicator 70 is not operating, most of the plunger 73 is housed in the adhesive storage chamber 71A. At this time, the plunger 73 closes the insertion hole 71B, preventing communication between the adhesive storage chamber 71A and the insertion hole 71B. Therefore, no adhesive is supplied to the adhesive storage chamber 71A. As shown in FIG. 7B, when a signal is supplied to the adhesive applicator 70, the plunger 73 moves downward, opening the insertion hole 71B and connecting the adhesive storage chamber 71A and the insertion hole 71B. This causes adhesive to be supplied to the adhesive storage chamber 71A via the supply tube 74, as indicated by arrow F1. As shown in FIG. 7C, when the adhesive storage chamber 71A is completely filled with adhesive, the plunger 73 moves upward. This causes the adhesive G filled in the adhesive storage chamber 71A to be discharged (sprayed) from the nozzle 72. At this time, the plunger 73 closes the insertion hole 71B. 7D, the adhesive G discharged (jetted) from the nozzle 72 is applied to the lower surface WL of the strip-shaped metal plate W, and the adhesive G adheres to the lower surface WL. Here, the adhesive G, which has been sprayed from the discharge port 72A of the nozzle 72 and has turned into droplets, spreads over a range with an area larger than the opening area of the discharge port 72A when it is applied (adheres) to the lower surface WL of the strip-shaped metal plate W.
[0026] Although the adhesive applicator 70 applies the adhesive to the underside WL of the strip-shaped metal plate W by a non-contact application method, the present invention is not limited to this. The adhesive applicator 70 may also apply the adhesive to the underside WL of the strip-shaped metal plate W by a contact application method. For example, the adhesive applicator 70 may transfer the adhesive to the underside WL by bringing a mound of adhesive from the discharge port 72A of the nozzle 72 into contact with the strip-shaped metal plate W.
[0027] Fig. 9 is an example of a graph showing the relationship between the position of upper die 40 in the vertical direction Z and the state of each member during one cycle from when upper die 40 is at the top dead center through to when it passes the bottom dead center and returns to the top dead center again. The relationship between the position of upper die 40 in the vertical direction Z and the state of each member is not limited to that shown in Fig. 9. Note that the vertical axis of Fig. 9 indicates the position of upper die 40 in the vertical direction Z, and the horizontal axis of Fig. 9 indicates the angle (crank angle) of upper die 40.
[0028] As shown in FIG. 9 , at time T0 when the upper die 40 is at the top dead center, the strip-shaped metal sheet W is being conveyed in the forward feed direction D. Then, when the upper die 40 moves downward and reaches time T1, the conveyance of the strip-shaped metal sheet W is completed. That is, the conveyance of the strip-shaped metal sheet W is stopped from time T1 to time T13 (described later). When the upper die 40 moves further downward and reaches time T2, the pilot pins 50 begin to be inserted into the pilot holes PH formed in the metal sheet W. That is, the pilot pins 50 are not inserted into the pilot holes PH before time T2. When the upper die 40 moves further downward and reaches time T3, the stripper plate 60 comes into contact with the metal sheet W. At time T3, the stripper plate 60 begins to press the lifting member 30 downward via the metal sheet W, causing the lifting member 30 to begin moving downward. Furthermore, when time T3 is reached, the adhesive applicator 70 may begin applying adhesive to the underside WL of the metal sheet W. When the upper die 40 moves further downward and reaches timing T4, the stripper plate 60 moves to the lowest position LP and presses the metal sheet W against the lower die 20. At this time, the lifting member 30 completes its descent and is also positioned at its lowest position. When the upper die 40 moves further downward and reaches timing T5, the adhesive applicator 70 may begin applying adhesive to the underside WL of the metal sheet W. When the upper die 40 moves further downward and reaches timing T6, the pilot hole punching punch 45X, the inner shape punching punch 45A, and the outer shape punching punch 45C begin punching out the metal sheet W. When the upper die 40 moves further downward and reaches timing T7, the pilot hole punching punch 45X, the inner shape punching punch 45A, and the outer shape punching punch 45C complete punching out the metal sheet W. Then, the upper die 40 passes the bottom dead center at timing T8 and begins moving upward.
[0029] As shown in FIG. 9 , when the upper die 40 moves upward from the bottom dead center and reaches timing T9, if the adhesive applicator 70 has started applying adhesive to the underside WL of the metal sheet W using a non-contact application method at timing T3 or T5, the application of adhesive may be completed. When the upper die 40 continues moving upward and reaches timing T10, the stripper plate 60 completes pressing down on the metal sheet W, and the lift member 30 begins to rise due to the biasing member 32. When the upper die 40 continues moving upward and reaches timing T11, the stripper plate 60 completely separates from the metal sheet W, and the lift member 30 moves to the uppermost position PM (see FIG. 4A ). Note that if the adhesive applicator 70 has started applying adhesive to the underside WL of the metal sheet W at timing T3 or T5 and the application of adhesive has not been completed at timing T9, the application of adhesive is completed. Thus, if the adhesive is applied using a non-contact application method, the application of adhesive is completed at timing T9 or T11. On the other hand, when adhesive is applied by the contact application method, application of the adhesive is completed at timing T11. When the upper die 40 moves further upward and reaches timing T12, the pilot pin 50 inserted in the pilot hole PH is completely removed from the pilot hole PH. Between timing T2 and timing T12, at least a portion of the pilot pin 50 is inserted in the pilot hole PH. When the upper die 40 moves further upward and reaches timing T13, transportation of the strip-shaped metal sheet W begins. That is, between timing T13 and timing T1, the strip-shaped metal sheet W is transported in the forward feed direction D. Then, the upper die 40 passes the top dead center at timing T0 and begins moving downward.
[0030] As shown in FIG. 1, the control device 90 controls the upper mold 40 and the adhesive application device 70. The control device 90 includes, for example, a central processing unit (CPU) that executes instructions of a control program, a ROM that stores the program executed by the CPU, a RAM used as a working area for expanding the program, and a storage device such as a memory that stores the program and various data. The control device 90 includes a movement control unit 92 and an application control unit 94. The functions of each unit of the control device 90 are realized by a program. This program is downloaded, for example, via the Internet. Note that this program may also be read from a recording medium such as a CD or DVD. The functions of each unit of the control device 90 may also be realized by a processor and / or circuit, etc.
[0031] The movement control unit 92 controls the movement of the stripper plate 60 in the vertical direction Z. In this embodiment, the movement control unit 92 controls the movement of the pilot pin 50 and the stripper plate 60 in the vertical direction Z by moving the upper mold 40 in the vertical direction Z. The movement control unit 92 controls the approach of the upper mold 40 to the lower mold 20 and the separation of the upper mold 40 from the lower mold 20. The movement control unit 92 may be configured to change the ascending speed and descending speed of the upper mold 40. The movement control unit 92 may be configured to change the lowest position LP in accordance with the thickness of the metal sheet W. In other words, the movement control unit 92 may be configured to adjust the distance between the lower surface 60B of the stripper plate 60 located at the lowest position LP and the upper surface 22T of the die plate 22 in accordance with the thickness of the metal sheet W.
[0032] The application control unit 94 controls the adhesive application device 70. The application control unit 94 controls the movement of the plunger 73. The application control unit 94 starts application of adhesive from the adhesive application device 70 to the underside WL of the metal sheet W after the pilot pin 50 is inserted into the pilot hole PH (for example, after timing T2 in FIG. 9). The application control unit 94 may start application of adhesive from the adhesive application device 70 to the underside WL of the metal sheet W only when at least a portion of the pilot pin 50 is inserted into the pilot hole PH (for example, timing T2 to timing T5 in FIG. 9). The application control unit 94 completes application of adhesive from the adhesive application device 70 to the underside WL of the metal sheet W before the pilot pin 50 is removed from the pilot hole PH (for example, before timing T12 in FIG. 9). The application control unit 94 may complete application of adhesive from the adhesive application device 70 to the underside WL of the metal sheet W between when the pilot pin 50 is located at the bottom dead center (i.e., when the upper die 40 is located at the bottom dead center; see FIG. 6B ) and when the pilot pin 50 moves upward from the bottom dead center and before it leaves the pilot hole PH (e.g., between timing T8 and timing 12 in FIG. 9 ). The application control unit 94 may complete application of adhesive from the adhesive application device 70 to the underside WL of the metal sheet W between when half the length in the vertical direction Z of the insertion portion 50A of the pilot pin 50 leaves the pilot hole PH (see FIG. 6C ) and when the entire insertion portion 50A leaves the pilot hole PH (e.g., before timing T12 in FIG. 9 ). The application control unit 94 may complete application of adhesive from the adhesive application device 70 to the underside WL of the metal sheet W before the lift member 30 moves to the uppermost position PM (see FIG. 4A ) (e.g., before timing T11 in FIG. 9 ). The application control unit 94 may cause the adhesive application device 70 to apply adhesive to the underside WL of the metal plate W only when the transport of the metal plate W is stopped (for example, from timing T1 to timing T13 in FIG. 9). The application control unit 94 may cause the adhesive application device 70 to apply adhesive to the underside WL of the metal plate W only when at least a portion of the pilot pin 50 is inserted into the pilot hole PH and the transport of the metal plate W is stopped (for example, from timing T2 to timing T12 in FIG. 9).
[0033] The application control unit 94 may be configured to change the start timing (timing T3 and timing T5 in the example shown in FIG. 9 ) at which the adhesive application device 70 starts applying adhesive to the underside WL of the metal plate W. The timing includes both timing based on the crank angle and timing based on elapsed time. The application control unit 94 may be configured to change the start timing depending on the amount of adhesive to be applied per application portion on the underside WL of the metal plate W (the amount of adhesive to be applied to bond the iron core members 5 to each other). The application control unit 94 may be configured to delay the start timing as the amount of adhesive to be applied per application portion decreases. Note that clogging of the nozzle 72 or the like can cause a discrepancy between the amount of adhesive to be applied (i.e., the amount of adhesive applied) and the amount of adhesive actually applied. That is, the amount of adhesive actually applied may be less than the amount of adhesive applied. By providing a sensor that measures the amount of adhesive actually applied, the application control unit 94 may be configured to change the start timing depending on the amount of adhesive actually applied per application portion on the underside WL of the metal plate W. The application control unit 94 may be configured to change the start timing depending on the viscosity of the adhesive (including the temperature of the apparatus itself and the ambient temperature, which affect the viscosity of the adhesive). For example, the manufacturing apparatus 10 may be equipped with a sensor that measures the viscosity of the adhesive, and the application control unit 94 may be configured to change the start timing based on the viscosity of the adhesive measured by the sensor. The application control unit 94 may be configured to make the start timing earlier as the viscosity of the adhesive increases. The start timing may be the timing at which an adhesive spray start signal is sent to the nozzle 72. The start timing may also be the timing at which the nozzle 72 starts spraying the adhesive. The start timing may also be the timing at which the adhesive application device 70 starts transferring the adhesive to the lower surface WL of the metal sheet W. The start timing may also be the timing at which the adhesive sprayed upward from the discharge port 72A of the nozzle 72 (e.g., the adhesive mounding upward from the discharge port 72A) starts contacting the lower surface WL of the metal sheet W.
[0034] The application control unit 94 may be configured to change the completion timing (timing T9 and timing T11 in the example shown in FIG. 9 ), which is the timing at which application of adhesive from the adhesive application device 70 to the underside WL of the metal plate W is completed. The application control unit 94 may be configured to change the completion timing depending on the amount of adhesive applied per application portion on the underside WL of the metal plate W. The application control unit 94 may be configured to make the completion timing earlier as the amount of adhesive applied per application portion decreases. The application control unit 94 may be configured to change the completion timing depending on the viscosity of the adhesive. The application control unit 94 may be configured to make the completion timing later as the viscosity of the adhesive increases. The completion timing may be the timing at which an adhesive spray completion signal is sent to the nozzle 72. Alternatively, the completion timing may be the timing at which spraying of adhesive from the nozzle 72 is completed. Alternatively, the completion timing may be the timing at which transfer of adhesive from the adhesive application device 70 to the underside WL of the metal plate W is completed. Furthermore, the completion timing may be the timing when the adhesive discharged upward from the discharge port 72A of the nozzle 72 is transferred to the lower surface WL of the metal plate W and leaves the discharge port 72A. At this timing, the adhesive may be swelling upward from the discharge port 72A.
[0035] The application control unit 94 may be configured to change the period from when the adhesive application device 70 starts to when the application of adhesive to the underside WL of the metal sheet W is completed (timings T3 to T11 in the example shown in FIG. 9 ). Changing the period includes both changing the crank angle from when the adhesive application starts to when the application is completed and changing the elapsed time from when the adhesive application starts to when the application is completed. For example, even if the crank angle at the start and end of the adhesive application is constant, the period from when the adhesive application starts to when the application is completed may be changed by changing the lifting speed (i.e., the press speed) of the upper mold 40. The application control unit 94 may be configured to change the period from when the adhesive application device 70 finishes applying the adhesive to when the pilot pin 50 inserted in the pilot hole PH is removed. Changing the period includes both changing the crank angle from when the adhesive application is completed to when the pilot pin 50 is removed from the pilot hole PH and changing the elapsed time from when the adhesive application is completed to when the pilot pin 50 is removed from the pilot hole PH.
[0036] Next, an example of a method for manufacturing the laminated core 8 will be described. Here, a method for manufacturing the laminated core 8 will be described, focusing on one core member 5 that constitutes the laminated core 8. FIG. 10 is a flowchart showing the method for manufacturing the laminated core 8. As shown in FIG. 10, the method for manufacturing the laminated core 8 includes a pilot hole punching step (step S10), an inner shape punching step (step S20), an adhesive application step (step S30), and an outer shape punching step (step S40). Note that for the strip-shaped metal plate W, the pilot hole punching step (step S10), inner shape punching step (step S20), and outer shape punching step (step S40) are performed simultaneously.
[0037] In the pilot hole punching process (step S10), when the stripper plate 60 is located at the lowest position LP (see FIG. 8 ), the pilot hole punching punch 45X punches the strip-shaped metal sheet W to form a pilot hole PH in the metal sheet W. More specifically, as the upper mold 40 moves further downward, the pilot hole punching punch 45X and the pilot hole punching die hole 26X punch out the strip-shaped metal sheet W pressed against the upper surface 22T of the die plate 22 and the upper surface 23T of the die 23, to form the pilot hole PH in the strip-shaped metal sheet W. In the pilot hole punching process (step S10), the strip-shaped metal sheet W is clamped between the stripper plate 60, the die plate 22, and the die 23.
[0038] In the inner shape punching process (step S20), when the stripper plate 60 is located at the lowest position LP, the band-shaped metal plate W is punched out by the inner shape punching punch 45A to form the inner shape of the iron core member 5. More specifically, as the upper die 40 moves further downward, the inner shape punching punch 45A and the inner shape punching die hole 26A punch out the band-shaped metal plate W pressed against the upper surface 22T of the die plate 22 and the upper surface 23T of the die 23, and the inner shape of the iron core member 5 is formed in the band-shaped metal plate W. In the inner shape punching process (step S20), the band-shaped metal plate W is clamped between the stripper plate 60, the die plate 22, and the die 23.
[0039] In the adhesive application process (step S30), adhesive is applied (e.g., sprayed) from the adhesive application device 70 to the lower surface WL of the strip-shaped metal plate W. The adhesive application device 70 is controlled by the application control unit 94, and starts applying the adhesive at the timing described above and completes the application of the adhesive.
[0040] In the outline punching process (step S40), when the stripper plate 60 is located at the lowest position LP, the strip-shaped metal plate W is punched out by the outline punching punch 45C to form the outline of the core member 5. More specifically, as the upper mold 40 moves further downward, the outline punching punch 45C and the outline punching die hole 26C punch out the strip-shaped metal plate W pressed against the upper surface 22T of the die plate 22 and the upper surface 23T of the die 23, thereby forming the outline of the core member 5 in the strip-shaped metal plate W. The formed core members 5 are pressed by the outline punching punch 45C and stacked one after another in the outline punching die hole 26C. Because an adhesive is applied to the underside of the formed core members 5, the iron core members 5 are stacked one after another on top of the iron core members 5 already stacked in the outline punching die hole 26C, thereby producing a laminated core 8 including a plurality of iron core members 5 stacked vertically and bonded to one another. In step S40, the strip-shaped metal plate W is clamped between the stripper plate 60, the die plate 22, and the die 23.
[0041] As described above, the laminated iron core manufacturing apparatus 10 of this embodiment includes a control device 90 that controls the upper die 40 and the adhesive applicator 70. The application control unit 94 of the control device 90 is configured to be able to change the start timing, which is the timing at which the adhesive applicator 70 starts applying adhesive to the underside WL of the metal sheet W. According to the above aspect, the timing at which the adhesive application starts can be changed as appropriate, so that the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal sheet W at a predetermined timing.
[0042] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to be able to change the start timing depending on the amount of adhesive applied per application portion on the lower surface WL of the metal plate W. According to the above aspect, the start timing can be set more accurately.
[0043] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to delay the start timing as the amount of adhesive applied per application portion decreases. According to the above aspect, the adhesive can be applied more accurately to a predetermined position on the lower surface WL of the metal plate W.
[0044] According to the above aspect, the laminated iron core manufacturing apparatus 10 of this embodiment can set the start timing more accurately.
[0045] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to start the application earlier as the viscosity of the adhesive increases. According to the above aspect, the adhesive can be applied more accurately to a predetermined position on the lower surface WL of the metal plate W.
[0046] In the laminated iron core manufacturing apparatus 10 of this embodiment, the start timing may be the timing at which an adhesive ejection start signal is sent to the nozzle 72. According to the above aspect, the start timing can be set more accurately.
[0047] In the laminated iron core manufacturing apparatus 10 of this embodiment, the start timing may be the timing at which the adhesive starts to be sprayed from the nozzle 72. According to the above aspect, the start timing can be set more accurately.
[0048] In the laminated iron core manufacturing apparatus 10 of this embodiment, the start timing may be the timing when the adhesive applicator 70 starts transferring the adhesive to the lower surface WL of the metal plate W. According to the above aspect, the start timing can be set more accurately.
[0049] In the laminated iron core manufacturing apparatus 10 of this embodiment, the start timing may be the timing when the adhesive discharged upward from the discharge port 72A starts to contact the lower surface WL of the metal plate W. According to the above aspect, the start timing can be set more accurately.
[0050] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to be able to change the period from when the adhesive application device 70 starts to when it finishes applying the adhesive to the underside WL of the metal plate W. According to the above aspect, the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal plate W at a predetermined timing.
[0051] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to be able to change the completion timing, which is the timing at which the adhesive application device 70 completes application of the adhesive to the underside WL of the metal plate W. According to the above aspect, the timing at which the adhesive application is completed can be changed as appropriate, so that the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal plate W at a predetermined timing.
[0052] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to be able to change the completion timing depending on the amount of adhesive applied per application portion on the lower surface WL of the metal plate W. According to the above aspect, the completion timing can be set more accurately.
[0053] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to complete the process earlier as the amount of adhesive applied per application portion decreases. According to the above-described aspect, the adhesive can be applied more accurately to a predetermined position on the lower surface WL of the metal plate W.
[0054] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to be able to change the completion timing depending on the viscosity of the adhesive. According to this aspect, the completion timing can be set more accurately.
[0055] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to delay the completion timing as the viscosity of the adhesive increases. According to the above aspect, the adhesive can be applied more accurately to a predetermined position on the lower surface WL of the metal plate W.
[0056] In the laminated iron core manufacturing apparatus 10 of this embodiment, the completion timing may be the timing at which an adhesive spray completion signal is sent to the nozzle 72. According to the above aspect, the completion timing can be set more accurately.
[0057] In the laminated iron core manufacturing apparatus 10 of this embodiment, the completion timing may be the timing at which the spraying of adhesive from the nozzle 72 is completed. According to the above aspect, the completion timing can be set more accurately.
[0058] In the laminated core manufacturing apparatus 10 of this embodiment, the completion timing may be the timing at which the adhesive application device 70 completes transferring the adhesive to the lower surface WL of the metal plate W. According to the above aspect, the completion timing can be set more accurately.
[0059] In the laminated iron core manufacturing apparatus 10 of this embodiment, the completion timing may be the timing when the adhesive discharged upward from the discharge port 72A is transferred to the lower surface WL of the metal plate W and leaves the discharge port 72A. According to the above aspect, the completion timing can be set more accurately.
[0060] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may be configured to be able to change the period from when the adhesive application device 70 completes application of adhesive to the underside WL of the metal plate W until the pilot pin 50 inserted into the pilot hole PH is removed. According to the above aspect, the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal plate W.
[0061] In the laminated core manufacturing apparatus 10 of this embodiment, the biasing member 32 may be configured to allow a portion WC of the metal plate W located between the portion WA in contact with the lift member 30 and the portion WB in contact with the stripper plate 60 to move downward while maintaining a horizontal state during the period in which the stripper plate 60 presses the metal plate W downward against the biasing force of the biasing member 32. According to the above aspect, bending of the metal plate W is suppressed, and therefore the iron core member 5 can be formed more accurately.
[0062] In the laminated core manufacturing apparatus 10 of this embodiment, the movement control unit 92 may be configured to be able to change the ascending speed and descending speed of the upper die 40. According to the above aspect, bending of the metal plate W is suppressed, and therefore the iron core member 5 can be formed more accurately.
[0063] In the laminated core manufacturing apparatus 10 of the present embodiment, the movement control unit 92 may be configured to be able to change the lowest position LP in accordance with the thickness of the metal plate W. According to the above-described aspect, the metal plate W is prevented from being pressed downward excessively by the stripper plate 60.
[0064] The laminated core manufacturing apparatus 10 of this embodiment includes a pilot pin 50 that is provided in the upper mold 40 and that is inserted into a pilot hole PH formed in the strip-shaped metal plate W to position the metal plate W relative to the adhesive applicator 70. The application control unit 94 of the control device 90 may then cause the adhesive applicator 70 to start applying adhesive to the underside WL of the metal plate W after the pilot pin 50 is inserted into the pilot hole PH. According to the above aspect, the adhesive applicator 70 starts applying adhesive to the underside WL of the metal plate W after the metal plate W is positioned relative to the adhesive applicator 70 by inserting the pilot pin 50 into the pilot hole PH. This allows the adhesive to be applied more accurately to a predetermined position on the underside WL of the metal plate W.
[0065] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may complete application of adhesive from the adhesive applicator 70 to the underside WL of the metal plate W before the pilot pin 50 is removed from the pilot hole PH. According to the above aspect, application of adhesive to the underside WL of the metal plate W is completed in a state in which the metal plate W is positioned relative to the adhesive applicator 70 by the pilot pin 50, so that the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal plate W.
[0066] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may complete application of adhesive from the adhesive applicator 70 to the underside WL of the metal sheet W during the period from when the pilot pin 50 is located at the bottom dead center to when the pilot pin 50 moves upward from the bottom dead center and before it comes out of the pilot hole PH. According to the above aspect, application of adhesive to the underside WL of the metal sheet W is completed in a state in which the pilot pin 50 has positioned the metal sheet W relative to the adhesive applicator 70, so that the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal sheet W.
[0067] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may complete application of adhesive from the adhesive applicator 70 to the underside WL of the metal sheet W after half of the length of the insertion portion 50A in the up-down direction Z has come out of the pilot hole PH and before the entire insertion portion 50A has come out of the pilot hole PH. According to the above aspect, application of adhesive to the underside WL of the metal sheet W is completed with the metal sheet W positioned relative to the adhesive applicator 70 by the pilot pin 50, so that the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal sheet W.
[0068] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may cause the adhesive application device 70 to apply adhesive to the lower surface WL of the metal plate W only when the transport of the metal plate W is stopped. According to the above aspect, the adhesive can be applied more reliably to a predetermined position on the lower surface WL of the metal plate W.
[0069] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may complete application of adhesive from the adhesive application device 70 to the underside WL of the metal plate W before the lift member 30 moves to the uppermost position PM. According to the above-described embodiment, adhesive can be accurately applied to a predetermined position on the underside WL of the metal plate W while maintaining an appropriate distance in the vertical direction Z between the underside WL of the metal plate W and the adhesive application device 70.
[0070] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may apply adhesive from the adhesive application device 70 to the underside WL of the metal sheet W only when at least a portion of the pilot pin 50 is inserted into the pilot hole PH. According to the above aspect, the adhesive application device 70 starts applying adhesive to the underside WL of the metal sheet W in a state in which the metal sheet W is positioned relative to the adhesive application device 70 by inserting at least a portion of the pilot pin 50 into the pilot hole PH, so that the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal sheet W.
[0071] In the laminated core manufacturing apparatus 10 of this embodiment, the application control unit 94 may apply adhesive from the adhesive application device 70 to the underside WL of the metal sheet W only when at least a portion of the pilot pin 50 is inserted into the pilot hole PH and the transport of the metal sheet W is stopped. According to the above aspect, the adhesive application device 70 applies adhesive to the underside WL of the metal sheet W while the metal sheet W is positioned relative to the adhesive application device 70 by inserting at least a portion of the pilot pin 50 into the pilot hole PH and the transport of the metal sheet W is stopped. Therefore, the adhesive can be applied more accurately to a predetermined position on the underside WL of the metal sheet W.
[0072] Although the preferred embodiments of the present invention have been described above, the above-described embodiments are merely examples, and the present invention can be embodied in various other forms.
[0073] In the above-described embodiment, the lower mold body 21, the die plate 22, and the die 23 of the lower mold 20 are configured as separate bodies, but they may be configured as an integral body as appropriate. For example, the die plate 22 and the die 23 may be configured as an integral body, or the die plate 22, the die 23, and the lower mold body 21 may be configured as an integral body.
[0074] In the above-described embodiment, the upper surface 23T of the die 23 and the upper surface 22T of the die plate 22 are located at the same height, but this is not limiting. For example, the upper surface 23T of the die 23 may be located lower than the upper surface 22T of the die plate 22. In this case, the stripper plate 60 presses the belt-shaped metal sheet W against the upper surface 22T of the die plate 22.
[0075] In the above-described embodiment, the die plate 22 and the die 23 are placed on the lower mold body 21, but this is not limiting. For example, the die plate 22 and the die 23 may be fitted into a recess formed in a downward recess from the upper surface 21T of the lower mold body 21 so that the upper surface 21T of the lower mold body 21, the upper surface 22T of the die plate 22, and the upper surface 23T of the die 23 are positioned at the same height. In this case, the stripper plate 60 presses the band-shaped metal sheet W against the upper surface 21T of the lower mold body 21, the upper surface 22T of the die plate 22, and the upper surface 23T of the die 23.
[0076] In the above-described embodiment, the manufacturing apparatus 10 includes the control device 90 including the movement control unit 92 and the coating control unit 94, but is not limited to this. The manufacturing apparatus 10 may include a control device including the movement control unit 92 and another control device including the coating control unit 94. In other words, the manufacturing apparatus 10 may include multiple control devices. [Explanation of symbols]
[0077] 5 Core material 8 Laminated core 10 Manufacturing equipment (laminated iron core manufacturing equipment) 20 Lower mold 21 Lower die body 22 Die Plate 22A No. 1 die plate 22C No. 2 die plate 22X Pilot hole forming die plate 22T top surface 23 Die 23A First Die 23C 2nd die 23X Pilot hole forming die 23T top surface 26 die holes 26A Inner punching die hole 27 Through hole for adhesive application 26C Outer shape punching die hole 26X Pilot hole punching die hole 40 Upper mold 45 Punch 45A Inner shape punching punch 45C Outline punching punch 45X Pilot hole punch 50 pilot pin 50A insertion part 60 Stripper plate 70 Adhesive application device 72 nozzles 90 Control device 92 Movement control section 94 Coating control unit G. Adhesive PH pilot hole W: Metal strip WL bottom surface
Claims
1. A manufacturing apparatus for a laminated core in which a plurality of core members are stacked and bonded to each other, a lower mold having a die with a die hole formed therein; an upper die having a punch corresponding to the die hole; an adhesive application device provided in the lower mold and configured to apply an adhesive to the lower surface of the belt-shaped metal plate by a contact application method; a supply pump for supplying adhesive to the adhesive application device; a control device for controlling the upper mold and the adhesive application device, The control device a movement control unit that controls the vertical movement of the upper mold; an application control unit configured to change a start timing, which is a timing at which the adhesive application device starts applying the adhesive to the lower surface of the metal plate, The manufacturing apparatus is configured such that the application control unit delays the start timing as the amount of adhesive applied per application portion on the lower surface of the metal plate decreases.
2. A manufacturing apparatus for a laminated core in which a plurality of core members are stacked and bonded to each other, a lower mold having a die with a die hole formed therein; an upper die having a punch corresponding to the die hole; an adhesive application device provided in the lower mold and configured to apply an adhesive to the lower surface of the belt-shaped metal plate by a contact application method; a supply pump for supplying adhesive to the adhesive application device; a control device for controlling the upper mold and the adhesive application device, The control device a movement control unit that controls the vertical movement of the upper mold; an application control unit configured to change a start timing, which is a timing at which the adhesive application device starts applying the adhesive to the lower surface of the metal plate, The manufacturing apparatus, wherein the application control unit is configured to advance the start timing as the viscosity of the adhesive increases.
3. A manufacturing apparatus for a laminated core in which a plurality of core members are stacked and bonded to each other, a lower mold having a die with a die hole formed therein; an upper die having a punch corresponding to the die hole; an adhesive application device provided in the lower mold and configured to apply an adhesive to the lower surface of the belt-shaped metal plate by a contact application method; a supply pump for supplying adhesive to the adhesive application device; a control device for controlling the upper mold and the adhesive application device, The control device a movement control unit that controls the vertical movement of the upper mold; an application control unit configured to change a completion timing, which is a timing at which the application of the adhesive from the adhesive application device to the lower surface of the metal plate is completed; The application control unit is configured to make the completion timing earlier as the amount of adhesive applied per application portion on the lower surface of the metal plate decreases.
4. A manufacturing apparatus for a laminated core in which a plurality of core members are stacked and bonded to each other, a lower mold having a die with a die hole formed therein; an upper die having a punch corresponding to the die hole; an adhesive application device provided in the lower mold and configured to apply an adhesive to the lower surface of the belt-shaped metal plate by a contact application method; a supply pump for supplying adhesive to the adhesive application device; a control device for controlling the upper mold and the adhesive application device, The control device a movement control unit that controls the vertical movement of the upper mold; an application control unit configured to change a completion timing, which is a timing at which the application of the adhesive from the adhesive application device to the lower surface of the metal plate is completed; The manufacturing apparatus, wherein the application control unit is configured to delay the completion timing as the viscosity of the adhesive increases.
5. A manufacturing apparatus for a laminated core in which a plurality of core members are stacked and bonded to each other, a lower mold having a die with a die hole formed therein; an upper die having a punch corresponding to the die hole; an adhesive application device provided in the lower mold and configured to apply an adhesive to the lower surface of the belt-shaped metal plate by a contact application method; a control device for controlling the upper mold and the adhesive applying device; a pilot pin that is provided in the upper die and that is inserted into a pilot hole formed in the metal plate to position the metal plate relative to the adhesive applying device; The control device a movement control unit that controls the vertical movement of the upper mold; an application control unit configured to change a period from when application of the adhesive from the adhesive application device to the lower surface of the metal plate starts to when application of the adhesive is completed, the pilot pin has an insertion portion that is inserted into the pilot hole, The application control unit completes application of the adhesive from the adhesive application device to the underside of the metal plate between the time when half of the vertical length of the insertion portion has come out of the pilot hole and before the entire insertion portion has come out of the pilot hole.
Citation Information
Patent Citations
Method and apparatus for manufacturing laminated core
JP2001321850A
Layered plate packet and method for manufacturing the same
JP2015519721A
Laminated steel plate manufacturing apparatus
JP2022128616A
Laminate unit for manufacturing bonded-type laminated core member and apparatus having the same for manufacturing laminated core member
US20170201163A1
Laminated iron core production device and production method
WO2018127983A1