Work machine

The hydraulic drive device in hydraulic excavators addresses the issue of operational shock and throttling loss by controlling the merging valve to minimize state switching between hydraulic pumps, resulting in improved operational stability and efficiency.

WO2024202253A1PCT designated stage expired Publication Date: 2024-10-03HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/043266
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-29
Filing Date
2023-12-04
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Hydraulic excavators experience operational shock and control instability due to frequent switching between merging and non-merging states of pressure oil from two hydraulic pumps, leading to discomfort and unnecessary throttling loss.

Method used

A hydraulic drive device with a merging valve that controls pressure oil supply from both pumps based on the operation amount, ensuring that pressure oil from the first hydraulic pump is supplied until the actuator reaches a certain position, and then merges with pressure oil from the second pump to increase operation amount, and releases when the operation decreases, thereby minimizing state switching.

Benefits of technology

This solution effectively suppresses operational shock and reduces branch throttling loss by optimizing the flow restriction, enhancing operational stability and fuel efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023043266_03102024_PF_FP_ABST
    Figure JP2023043266_03102024_PF_FP_ABST
Patent Text Reader

Abstract

In the present invention, shock caused by frequent switching between a non-merging state and a merging state of pressure oil from two hydraulic pumps is suppressed. This work machine comprises: a hydraulic drive device that includes a first hydraulic pump, a second hydraulic pump, a first hydraulic actuator, and a merging valve that merges pressure oil and causes communication with the first hydraulic actuator; an operation member; and a controller. The controller controls the merging valve so as to supply pressure oil from the first hydraulic pump to the first hydraulic actuator until the operation member reaches the first position from the initial position, controls the merging valve so as to supply the merged pressure oil to the first hydraulic actuator when the operation member is operated past the first position in a direction in which the operation amount increases, and controls the merging valve so as to supply pressure oil from the first hydraulic pump to the first hydraulic actuator when the operation member reaches a second position closer to the initial position than the first position from any position past the first position.
Need to check novelty before this filing date? Find Prior Art

Description

Work machinery

[0001] The present invention relates to a work machine such as a hydraulic excavator.

[0002] In general, in hydraulic systems used in work machines such as hydraulic excavators, there are actuators that use one of two hydraulic pumps as a supply source, and actuators that use both pumps as supply sources. In actuators that use both pumps as supply sources, the priority of the two hydraulic pumps for each actuator is often determined in advance from the perspective of reducing branch throttling loss.

[0003] In this type of hydraulic system, for example, the hydraulic pump assigned the first priority is predetermined as the primary pump, and the hydraulic pump assigned the second priority as the secondary pump. When the target flow rate is within the range of the flow rate that can be supplied by the primary pump, pressurized oil is supplied to the actuator from only the primary pump, and only when the target flow rate exceeds the flow rate that can be supplied by the primary pump is pressurized oil supplied to the actuator from the secondary pump.

[0004] In this case, if the pressure of the actuator to be merged is higher than the pressure of the other actuators, the discharge pressure of the secondary pump will fluctuate depending on whether or not the actuators are merged. Therefore, if the target flow rate increases or decreases near the upper limit of the flow rate that the primary pump can supply, there is a concern that the repeated fluctuations in discharge pressure associated with switching between merged and non-merged states may cause operational shock, an uncomfortable feeling in operation, or unstable control.

[0005] Therefore, in Patent Document 1, when the driving pressure, which is the difference between the rod side pressure and the cap side pressure of the hydraulic cylinder (actuator), is below a specified value, the first hydraulic pump and the second hydraulic pump are controlled to be in a connected state, thereby suppressing the occurrence of operational shock caused by switching between a connected state (confluent state) and a non-connected state (non-confluent state).

[0006] Patent No. 6145229

[0007] However, in Patent Document 1, the controller controls the pump connection state depending on whether the required flow rate is equal to or greater than a certain threshold value or whether the drive pressure is equal to or greater than a certain threshold value. Therefore, when the required flow rate or drive pressure increases or decreases near the threshold value, switching between the confluent state and the non-confluent state may be repeated. Therefore, when the drive pressure is high, repeated switching between the confluent state and the non-confluent state may cause a sense of discomfort in operation and destabilization of control. Furthermore, even under flow rate conditions where confluent flow is not required, the confluent state is maintained as long as the drive pressure is equal to or less than a specified value. This may result in unnecessary throttling loss during combined operations while the work machine is operating in the air (for example, when the boom and arm are operated simultaneously in the air), which may lead to a deterioration in fuel efficiency.

[0008] An object of the present invention is to provide a work machine that can suppress shocks caused by frequent switching between a non-merged state and a merged state of pressurized oil from two hydraulic pumps while reducing flow division throttling loss.

[0009] In order to achieve the above object, one aspect of the present invention provides a work machine including a hydraulic drive unit including a first hydraulic pump, a second hydraulic pump, a first hydraulic actuator driven by pressure oil supplied from the first hydraulic pump, and a merging valve that merges pressure oil supplied from the first hydraulic pump and the second hydraulic pump and communicates the merged pressure oil to the first hydraulic actuator, an operating member operated by an operator, and a controller that controls the hydraulic drive unit based on an operating amount of the operating member, wherein, when the operating member is operated in a direction that increases the operating amount, the controller controls the merging valve to supply pressure oil from the first hydraulic pump to the first hydraulic actuator during the period until the operating member reaches a first position from an initial position. and when the operating member is operated beyond the first position in a direction in which the operation amount increases, the confluence valve is controlled to merge pressure oil from the first hydraulic pump with pressure oil from the second hydraulic pump, and supply the merged pressure oil to the first hydraulic actuator in accordance with the increase in the operation amount (confluence state). When the operating member is operated from an arbitrary position beyond the first position in a direction in which the operation amount decreases, and reaches a second position which is closer to the initial position than the first position, the confluence of pressure oil from the first hydraulic pump and pressure oil from the second hydraulic pump is released, and the confluence valve is controlled to supply pressure oil from the first hydraulic pump to the first hydraulic actuator in accordance with the decrease in the operation amount (non-confluence state).

[0010] The working machine according to the present invention can reduce flow division throttling loss while suppressing shocks caused by frequent switching between a non-combined state and a combined state of pressure oil from two hydraulic pumps. Problems, configurations, and effects other than those described above will become clear from the description of the following embodiments.

[0011] FIG. 1 is a side view showing the appearance of a hydraulic excavator. FIG. 2 is a hydraulic circuit diagram showing a hydraulic system. FIG. 3 is a functional block diagram of a controller. FIG. 4 is a diagram showing changes in flow rate, pressure, and branch throttling loss relative to a boom operation amount in the prior art. FIG. 5 is a diagram showing changes in flow rate relative to a boom operation amount in the first embodiment. FIG. 6 is a flowchart showing the control processing procedure of a controller. FIG. 7 is a diagram showing changes in flow rate relative to a boom operation amount in a modified example. FIG. 8 is a flowchart showing the control processing procedure of a controller according to a second embodiment. FIG. 9 is a flowchart showing the control processing procedure of a controller according to a third embodiment.

[0012] First Embodiment Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

[0013] Fig. 1 is a side view showing the appearance of a hydraulic excavator, which is an example of a work machine according to the present invention. In Fig. 1, the hydraulic excavator 1 comprises a lower traveling structure 3, an upper rotating structure 2 rotatably mounted on the lower traveling structure 3, and a cab 10. A boom 4, an arm 6, and a bucket 8, which constitute a front working implement, are mounted on the upper rotating structure 2 and are driven by a boom cylinder 5, an arm cylinder 7, and a bucket cylinder 9, which are hydraulic actuators, respectively. Attachments (not shown) can be attached to the hydraulic excavator 1.

[0014] Here, the boom cylinder 5 corresponds to a first hydraulic actuator of the present invention, and the arm cylinder 7 corresponds to a second hydraulic actuator of the present invention.

[0015] 2 is a hydraulic circuit diagram of the hydraulic drive unit HD mounted on the hydraulic excavator 1. Here, the circuit of the hydraulic system that drives the boom cylinder 5, the arm cylinder 7, the attachment 1 cylinder 24, and the attachment 2 cylinder 25 will be described.

[0016] The hydraulic drive unit HD is composed of a controller 20 that controls the operation of the hydraulic actuators 5, 7, 24, and 25, an operating lever 21 that sends electrical signals to the controller 20, a first hydraulic pump 17 that supplies hydraulic oil to the hydraulic actuators 5, 7, 24, and 25, a second hydraulic pump 18, a pilot pump 19 that supplies hydraulic oil to drive each switching valve, an engine 52 that drives the first hydraulic pump 17, the second hydraulic pump 18, and the pilot pump 19, a control valve 16 that controls the flow rate and direction of the hydraulic oil supplied to the hydraulic actuators 5, 7, 24, and 25, and a hydraulic oil tank 26 that stores the hydraulic oil.

[0017] The control lever (operating member) 21 is mounted in the cab 10 in which the operator sits, and includes a control lever that can be tilted forward, backward, left, and right, and a detection device that electrically detects an operation signal corresponding to the tilt amount of this control lever (lever operation amount), and the lever operation amount detected by this detection device is output to the controller 20 via electrical wiring. In other words, the operation of each hydraulic actuator 5, 7, 24, 25 is assigned to the forward, backward, or left and right direction of each control lever of the control lever 21.

[0018] The first hydraulic pump 17 and the second hydraulic pump 18 are driven by the engine 52 and discharge hydraulic oil stored in the hydraulic oil tank 26 as pressurized oil toward the hydraulic actuators 5 , 7 , 24 , and 25 .

[0019] The pilot pump 19 is driven by the engine 52 together with the first hydraulic pump 17 and the second hydraulic pump 18 , and discharges the hydraulic oil stored in the hydraulic oil tank 26 as pressurized oil toward the switching valves 41 , 42 , 43 .

[0020] In this embodiment, electromagnetic proportional valves are used as the switching valves 41, 42, and 43, but other types of valves may also be used. Although not shown, the switching valves and bleed-off valves of hydraulic actuators other than the boom cylinder 5, i.e., the arm cylinder 7, attachment 1 cylinder 24, and attachment 2 cylinder 25, are also switched by electromagnetic proportional valves.

[0021] The control valve 16 is provided between the first hydraulic pump 17 and the second hydraulic pump 18 and the boom cylinder 5, the arm cylinder 7, the attachment 1 cylinder 24, and the attachment 2 cylinder 25. The control valve 16 receives a command signal from the controller 20 according to the operation lever 21 and controls the supply and discharge of pressure oil to and from the boom cylinder 5, the arm cylinder 7, the attachment 1 cylinder 24, and the attachment 2 cylinder 25.

[0022] The control valve 16 is composed of pump junction valves 28, 29, 31, 32, 34, 35, 37, and 38 that control the supply flow rates from the hydraulic pumps 17, 18, direction switching valves 27, 30, 33, and 36 that switch the direction of the pressurized oil supplied from the pump junction valves 28, 29, 31, 32, 34, 35, 37, and 38 to the cylinders 5, 7, 24, and 25 and the pressurized oil discharged from the cylinders 5, 7, 24, and 25 to the hydraulic oil tank 26, and bleed-off valves 39 and 40 that control the flow rates discharged from the hydraulic pumps 17 and 18 to the hydraulic oil tank 26.

[0023] The control valve 16 is formed with a first pump line 53 connected to the first hydraulic pump 17 and a second pump line 54 connected to the second hydraulic pump 18. Connected in parallel from the first pump line 53 are a boom pump 1 junction valve 28, an arm pump 1 junction valve 31, an attachment 1 pump 1 junction valve 34, and an attachment 2 pump 2 junction valve 37. Similarly, connected in parallel from the second pump line 54 are a boom pump 2 junction valve 29, an arm pump 2 junction valve 32, an attachment 1 pump 2 junction valve 35, and an attachment 2 pump 2 junction valve 38.

[0024] Since the operation of each of the cylinders 5, 7, 24, and 25 is basically the same, the operation of the boom cylinder 5 will be described below.

[0025] The boom pump 1 junction valve 28 is pilot operated by an electromagnetic proportional valve 42, and controls the supply flow rate from the first hydraulic pump 17 to allow pressure oil to flow to the downstream directional control valve 27. The boom pump 2 junction valve 29 is pilot operated by an electromagnetic proportional valve 43, and controls the supply flow rate from the second hydraulic pump 18 to allow pressure oil to flow to the downstream directional control valve 27. By controlling the flow rates passing through each pump junction valve 28, 29, the controller 20 can control whether pressure oil is supplied to the boom cylinder 5 only from the first hydraulic pump 17, only from the second hydraulic pump 18, or whether pressure oil from the first hydraulic pump 17 and the second hydraulic pump 18 is supplied in a joined state (switching control between a joined state and a non-joined state).

[0026] Pressurized oil supplied from hydraulic pumps 17, 18 through pump junction valves 28, 29 is supplied to the bottom side and rod side of boom cylinder 5 through boom direction switching valve 27. In addition, pressurized oil discharged from the bottom side and pressurized oil discharged from the rod side are discharged to hydraulic oil tank 22 through boom direction switching valve 27. This causes boom cylinder 5 to extend and retract.

[0027] The electromagnetic proportional valve 41 is connected to the pilot pump 19 by a pilot primary pressure line 55. The electromagnetic proportional valve 41 is also connected to a pilot oil chamber provided on one end of the boom direction switching valve 27 via a pilot secondary pressure line 56. Similarly, the electromagnetic proportional valve 42 is connected to a pilot oil chamber provided on one end of the boom pump 1 junction valve 28, and the electromagnetic proportional valve 43 is connected to a pilot oil chamber provided on one end of the boom pump 2 junction valve 29.

[0028] When the operator tilts the operating lever 21 from the initial position (neutral position) to the operating position, the controller 20 outputs a command signal corresponding to the amount of operation to the electromagnetic proportional valve 41 via the electromagnetic proportional valve command circuit 57. The electromagnetic proportional valve 41 then controls the pressure of the pilot pressure oil supplied from the pilot primary pressure line 55 in response to the command signal. Furthermore, the pilot pressure oil whose pressure is controlled by the electromagnetic proportional valve 41 is supplied to and discharged from the pilot oil chamber of the boom directional control valve 27 via a pilot secondary pressure line 56. Similarly, the pilot pressure oil is also supplied to and discharged from the pilot oil chambers of the boom pump 1 junction valve 28 and the boom pump 2 junction valve 29.

[0029] As a result, the boom pump 1 junction valve 28, the boom pump 2 junction valve 29, and the boom direction switching valve 27 are driven, and pressure oil is supplied to and discharged from the boom cylinder 5.

[0030] Next, a description will be given of the functions of the controller 20. Fig. 3 is a functional block diagram of the controller 20. As shown in Fig. 3, the controller 20 includes a required flow rate calculation unit 61, a pump dischargeable flow rate calculation unit 63, and a valve control unit 60.

[0031] The required flow rate calculation unit 61 calculates the actuator required flow rate using the lever operation amount of the operating lever 21 as an input, and outputs the actuator required flow rate to the valve control unit 60. Specifically, the required flow rate calculation unit 61 calculates the actuator required speed from the lever operation amount, and calculates the actuator required flow rate from the actuator required speed.

[0032] The pump dischargeable flow rate calculation unit 63 calculates the pump dischargeable flow rate using the pump pressure from the pump pressure sensors 49, 50 as input, and outputs the pump dischargeable flow rate to the valve control unit 60. Specifically, the pump dischargeable flow rate calculation unit 63 calculates the maximum flow rate that the hydraulic pump can discharge within a range that does not exceed a torque limit value that is determined based on the pump pressure.

[0033] The valve control unit 60 receives as input the actuator required flow rate, the pump dischargeable flow rate, and the boom pressure (actuator load pressure) from the boom pressure sensors 44A, 44B, calculates a command current to be sent to each electromagnetic proportional valve for each spool valve, and outputs the command current to each electromagnetic proportional valve.

[0034] The valve control unit 60 is composed of a priority pump recording unit 64 , a directional control valve control unit 66 , a pump merging valve control unit 67 , and a bleed-off valve control unit 68 .

[0035] The priority pump recording unit 64 is set with the primary pump (first priority pump) for each of the actuators 5, 7, 24, and 25. The primary pump is set so that it does not seem strange when standard usage is assumed. For example, it is as follows. (1) Two actuators that are used frequently have separate primary pumps. (Example: The primary pump for the boom cylinder 5 is the first hydraulic pump 17, and the primary pump for the arm cylinder 7 is the second hydraulic pump 18) (2) Two actuators that are used frequently have separate primary pumps. (Example: The primary pump for the bucket cylinder 9 is the first hydraulic pump 17, and the primary pump for the arm cylinder 7 is the second hydraulic pump 18) (3) An actuator that tends to have a high load pressure band when combined is not connected to the primary pump side of an actuator that is used frequently with a high flow rate. (Example: The same hydraulic pump is not used for boom raising and swinging.) (4) Actuators with similar load pressure bands use the same hydraulic pump. (Example: The first hydraulic pump 17 is used for boom lowering and bucket dumping)

[0036] The directional control valve control unit 66 determines whether the bottom side or the rod side of the cylinder should be connected to the pump line based on the detection result of the lever operation amount, and outputs a command signal to the electromagnetic proportional valve for the directional control valve.

[0037] The pump junction valve control unit 67 calculates the actuator target flow rate and, as a breakdown thereof, the pump 1 junction valve target flow rate and the pump 2 junction valve target flow rate based on the actuator required flow rate, the priority pump data, and the pump dischargeable flow rate. Then, it outputs a command signal to the junction valve electromagnetic proportional valve so as to open according to the target flow rate.

[0038] When a pump flow rate in excess of the actuator target flow rate occurs, the bleed-off valve control unit 68 outputs a command signal to the electromagnetic proportional valve for the bleed-off valve so as to discharge the excess flow rate.

[0039] Next, the control in actual operation will be described.

[0040] When the control lever 21 is operated in the boom operation direction, the required flow rate calculation unit 61 calculates the required boom flow rate (required flow rate of the actuator) and outputs the required boom flow rate to the valve control unit 60 .

[0041] The pump dischargeable flow rate calculation unit 63 calculates the pump dischargeable flow rate of the first hydraulic pump 17 from the value of the pump pressure sensor 49 and the pump dischargeable flow rate of the second hydraulic pump 18 from the value of the pump pressure sensor 50, and outputs these pump dischargeable flow rates to the valve control unit 60.

[0042] The pump junction valve control unit 67 calculates the target flow rate of the actuators by the following methods: (1) Calculates the total value of the actuator required flow rates for which operation command signals are received. (2) Calculates the total value of the pump dischargeable flow rate of the first hydraulic pump 17 and the pump dischargeable flow rate of the second hydraulic pump 18. (3) Divides the total value of the pump dischargeable flow rate by the total value of the actuator required flow rate to calculate a flow rate reduction ratio. (4) Calculates the actuator target flow rate by multiplying the actuator required flow rate by the flow rate reduction ratio.

[0043] Next, the pump junction valve control unit 67 calls up the record of the boom primary pump from the priority pump recording unit 64. Because the recorded primary pump of the boom cylinder 5 is the first hydraulic pump 17, the pump junction valve control unit 67 first assigns the boom target flow rate to the boom pump 1 junction valve 28.

[0044] When the operating lever 21 is also operated in the arm operation direction, the pump junction valve control unit 67 calculates the target flow rate for the arm cylinder 7 in the same manner as for the boom cylinder 5 .

[0045] The pump junction valve control unit 67 calls up the record of the arm primary pump from the priority pump recording unit 64. Since the recorded primary pump of the arm cylinder 7 is the second hydraulic pump 18, the pump junction valve control unit 67 first allocates the arm target flow rate to the arm pump 2 junction valve 32.

[0046] Next, the pump junction valve control unit 67 calculates the primary pump supplyable flow rate for each of the boom cylinder 5 and the arm cylinder 7. Here, the boom primary pump supplyable flow rate is equal to the pump dischargeable flow rate of the first hydraulic pump 17, and the arm primary pump supplyable flow rate is equal to the pump dischargeable flow rate of the second hydraulic pump 18. When actuators with overlapping primary pump records are operated simultaneously, the primary pump supplyable flow rate for each actuator is calculated by sequentially subtracting the target flow rate of the actuator with the highest priority from the pump dischargeable flow rate in accordance with a predetermined priority order between the actuators.

[0047] Next, the changes in flow rate, pressure, and branch throttling loss relative to the amount of boom operation in the present invention will be described in comparison with the prior art.

[0048] First, the case of the conventional technology will be described. Figure 4 is a diagram showing the changes in flow rate, pressure, and branch flow throttling loss relative to the amount of boom operation in the conventional technology. The explanation will be given assuming that the amount of operation of the arm 6 is constant and the target flow rate of the arm cylinder 7 is also constant.

[0049] FIG. 4A shows the boom target flow rate relative to the boom operation amount, the supply flow rate of the primary pump P1 (the supply flow rate of the first hydraulic pump 17), and the supply flow rate of the secondary pump P2 (the supply flow rate of the second hydraulic pump 18). When considering the direction in which the boom operation amount is increased, the boom target flow rate is zero until a certain operation amount is reached. In other words, no flow rate is supplied to the boom cylinder 5 from either the first hydraulic pump 17 or the second hydraulic pump 18. When the boom operation amount reaches a certain operation amount (B1), the boom target flow rate increases. At this point, the boom target flow rate is smaller than the flow rate that can be supplied by the primary pump, so the entire boom target flow rate can be supplied from the first hydraulic pump 17, which is the primary pump. Therefore, the target flow rate of the boom pump 1 junction valve 28 becomes equal to the boom target flow rate, and the target flow rate of the boom pump 2 junction valve 29 is set to zero. As a result, the boom pump 1 junction valve 28 opens in accordance with the target flow rate, and pressure oil is supplied to the boom cylinder 5 through the boom direction control valve 27.

[0050] 4(b) shows the arm target flow rate and the arm supply flow rate of the second hydraulic pump 18 relative to the boom operation amount. Since the arm target flow rate is smaller than the flow rate that the primary pump can supply to the arm cylinder 7 (not shown), the arm target flow rate can be supplied entirely from the second hydraulic pump 18, which is the primary pump. Therefore, the target flow rate of the arm pump 2 junction valve 32 becomes equal to the arm target flow rate, and the target flow rate of the arm pump 1 junction valve 31 is set to zero. As a result, the arm pump 2 junction valve 32 opens in accordance with the target flow rate, and pressure oil is supplied to the arm cylinder 7 through the arm direction switching valve 30.

[0051] 4(c) shows the pump 1 pressure (pressure of the first hydraulic pump 17), pump 2 pressure (pressure of the second hydraulic pump 18), boom pressure (pressure of the boom cylinder 5), and arm pressure (pressure of the arm cylinder 7) relative to the boom operation amount. In this example, the boom pressure and arm pressure are constant. In a state where pressure oil is supplied to the boom cylinder 5 from the first hydraulic pump 17 and to the arm cylinder 7 from the second hydraulic pump 18, i.e., in a non-merging state, the pump 1 pressure is approximately equal to the boom pressure, and the pump 2 pressure is approximately equal to the arm pressure.

[0052] 4(d) shows the flow division throttling loss versus the boom operation amount. In the non-merged state described above, no flow division occurs in each pump line, so the flow division throttling loss is zero.

[0053] When the boom operation amount increases to operation amount B2, a shortage occurs in the supply flow rate from the first hydraulic pump 17, and therefore a target flow rate to cover the shortage is set in the boom pump 2 junction valve 29. As a result, the boom pump 2 junction valve 29 opens in accordance with the target flow rate, and the pressure oil is merged with the pressure oil that has passed through the boom pump 1 junction valve 28, and pressure oil is supplied to the boom cylinder 5. At this time, as shown in FIG. 4( c), the pump 2 pressure rises to be equal to the pump 1 pressure in order to supply pressure oil to the boom cylinder 5. Also, in order to divide the flow in the second pump line 54 to the boom cylinder 5 and the arm cylinder 7, the opening of the arm pump 2 junction valve 32 is throttled. As a result, as shown in FIG. 4( d), a throttling loss occurs when the boom operation amount is B2.

[0054] As described above, when switching from a non-combined state to a combined state, or from a combined state to a non-combined state, fluctuations in the pump discharge pressure and control of the merging valve opening may occur, which may cause fluctuations in the actual flow rate supplied to the actuator. For example, if an operation is performed in which the lever operation amount is increased or decreased in small increments and the target flow rate at that time is close to the flow rate that the primary pump can supply, the non-combined state and the combined state will be switched frequently, and there is a concern that repeated fluctuations in the pump discharge pressure may cause operational shock, a strange feeling in operation, or control instability. Note that an operation in which the lever operation amount is increased or decreased in small increments corresponds to, for example, an operation in which sand is filled in a bucket 8 and sieved.

[0055] Next, a first embodiment of the present invention will be described with reference to Figures 5 and 6. Figure 5 shows changes in the boom target flow rate, the supply flow rate of the primary pump P1 (first hydraulic pump 17), and the supply flow rate of the secondary pump P2 (second hydraulic pump 18) relative to the amount of boom operation. Note that changes in the arm flow rate, pressure, and throttling loss (not shown) will be described in the same manner as in Figures 4(b), (c), and (d), where the arm flow rate, pump 1 pressure, boom pressure, and arm pressure are constant, and the pump 2 pressure and throttling loss change in accordance with switching between the non-confluence state and the confluence state.

[0056] 6 is a flowchart showing the procedure of the control process by the controller 20. The process shown in FIG. 6 is initiated, for example, when the engine is started, and is repeatedly executed at predetermined intervals (for example, every 1 millisecond). In FIG. 6, the process (S1 to S5) of sequentially calculating the required flow rate, the target flow rate, and the primary pump supplyable flow rate based on the actuator (Act) operation amount is as described above, so a detailed description will be omitted. The process from S6 onwards, which is a feature of the present invention, will be described in detail below.

[0057] In S6, the pump merging valve control unit 67 determines whether a primary pump dischargeable flow rate correction flag is ON or OFF. The state of the correction flag is determined in S13 and S14, which will be described later. The correction flag is initially set to OFF. If the correction flag is OFF, the primary pump supplyable flow rate is not corrected (S8). If the correction flag is ON, the primary pump supplyable flow rate is corrected to decrease by a certain fixed amount (predetermined amount) (S7 / flow rate adjustment control).

[0058] In S9, the pump junction valve control unit 67 determines whether the target flow rate exceeds the primary pump's supplyable flow rate. If it does not exceed the target flow rate, the non-junction state is established, i.e., the pump junction valve on the secondary pump side is closed (S11). If it exceeds the target flow rate, the junction state is established, i.e., the pump junction valve on the secondary pump side is opened (S10). Here, the case where S9 is Yes is when the boom operation amount in FIG. 5(a) exceeds X1.

[0059] In the case of a confluence state, it is determined in S12 whether the primary pump insufficient flow rate is within the range of the secondary pump's supplyable flow rate. If it is within the range, the correction flag is set to ON in S13. If it is not within the range or if the confluence state is not present, the correction flag is set to OFF.

[0060] The change in flow rate relative to the amount of boom operation when the above control flow is applied is explained using Figure 5. Figure 5(a) shows the case where the amount of boom operation increases, and Figure 5(b) shows the case where the amount of boom operation decreases. Q1 is the primary pump supplyable flow rate, and Q0 is the corrected primary pump supplyable flow rate.

[0061] In FIG. 5A, as the boom operation amount increases from zero (the initial position of the control lever 21) until it reaches X1 (the first position of the control lever 21), the boom target flow rate does not exceed the primary pump supplyable flow rate Q1, so the determination in control flow S9 is No, resulting in a non-confluence state. When the boom operation amount exceeds X1, the boom target flow rate exceeds the primary pump supplyable flow rate Q1 (the maximum flow rate of the primary pump), so the determination in control flow S9 is Yes, resulting in a switch to a confluence state. Furthermore, the correction flag is turned ON, and the primary pump supplyable flow rate is apparently reduced to Q0. As a result, when the boom operation amount exceeds X1, the pump 1 supply flow rate (the supply flow rate of the first hydraulic pump 17) temporarily decreases and becomes constant, and the pump 2 supply flow rate (the supply flow rate of the second hydraulic pump 18) increases as the target flow rate increases. Note that the value of Q1 - Q0 (= ΔQ) in FIG. 5A is the "predetermined amount" in this invention.

[0062] By apparently lowering the primary pump supplyable flow rate, the primary pump shortage flow rate appears to increase. The correction flag remains ON as long as the shortage flow rate is within the range of the secondary pump supplyable flow rate. However, when the boom operation amount reaches X2, the shortage flow rate exceeds the range of the secondary pump supplyable flow rate. Therefore, the determination in control flow S12 becomes No, and the correction flag turns OFF. As a result, the primary pump supplyable flow rate returns to Q1. As the pump 1 supply flow rate increases and the shortage flow rate decreases, the pump 2 supply flow rate decreases. At this point, a margin exists in the secondary pump supplyable flow rate. Therefore, if the boom operation amount is further increased, the pump 2 supply flow rate increases. In this way, even if a correction is made to lower the primary pump supplyable flow rate, the correction is canceled when the target flow rate approaches the limit of the total pump supplyable flow rate. Therefore, the total flow rate that can be supplied to the boom cylinder 5 can be reliably supplied by the first hydraulic pump 17 and the second hydraulic pump 18.

[0063] Next, a case where the boom operation amount decreases, as shown in Figure 5(b), will be described. When the boom operation amount decreases from its maximum state (when the control lever 21 is at any position beyond the first position X1) and reaches X2, the shortage flow rate falls within the range of the secondary pump supplyable flow rate, and the correction flag is turned ON. The confluence state is maintained even if the boom operation amount further decreases and falls below X1 (the first position). When the boom operation amount further decreases and reaches X0 (when the control lever 21 is at a second position closer to the initial position than the first position) and falls below X0, the boom target flow rate falls below the corrected primary pump supplyable flow rate Q0, so the determination in control flow S9 becomes No and the system switches to the non-confluence state. At the same time, the correction flag is turned OFF.

[0064] In this way, when the boom operation amount increases, the non-junction state and the junction state switch at the boom operation amount X1, but when it decreases, the switch occurs at the boom operation amount X0. For example, even if an operation is performed in which the boom operation amount is increased or decreased in small increments around X1, the junction state will be maintained as long as the boom operation amount does not return to X0, and there will be no switching between the non-junction state and the junction state, making it possible to prevent operational shock, discomfort in operation, and control instability caused by repeated fluctuations in the pump discharge pressure.

[0065] The correction amount (predetermined amount) of the primary supplyable flow rate is set within a range that does not exceed the secondary supplyable flow rate. The smaller the correction amount, the more frequently the switching between the non-merged state and the merged state occurs, thereby reducing branch throttling loss. The larger the correction amount, the less frequently the switching between the non-merged state and the merged state occurs, thereby achieving better operability. For example, it is preferable that the correction amount be arbitrarily set within a range of approximately ¼ to ½ of the secondary supplyable flow rate (the maximum flow rate that can be supplied by the second hydraulic pump 18).

[0066] (Modification) FIG. 7 is a diagram showing the relationship between the boom operation amount and the flow rate according to a modification. As shown in FIG. 7, in this modification, the correction amount for the boom operation amount is not constant but is varied. Specifically, the supply flow rate of Pump 1 gradually decreases after exceeding the boom operation amount X1, while the supply flow rate of Pump 2 gradually increases. When the boom operation amount reaches X2, the shortage flow rate becomes equal to the supplyable flow rate of the secondary pump. Thereafter, the correction amount gradually decreases so that the shortage flow rate does not increase even when the target flow rate increases. As a result, both the supply flow rates of Pump 1 and Pump 2 increase. This allows for smooth changes in the supply flow rates from each pump, resulting in better operability. It goes without saying that the correction amount is varied within a range in which the calculated shortage flow rate of the primary pump does not exceed the supplyable flow rate of the secondary pump.

[0067] Second Embodiment Next, a second embodiment of the present invention will be described with reference to Fig. 8. Fig. 8 is a flowchart showing the processing procedure of a controller according to the second embodiment. Note that in Fig. 8, the processing of S102 to S108 is the same as S2 to S8 in Fig. 6, and therefore the details shown in the figures are omitted.

[0068] In the second embodiment, in S110, it is determined whether the load pressure of the target actuator (Act) is greater than that of all other actuators (Act) to which flow is supplied from the secondary pump of the target actuator. Taking the first embodiment as an example, when the target actuator is the boom cylinder 5, the other actuator to which flow is supplied from the second hydraulic pump 18 (pump 2), which is the secondary pump of the boom cylinder 5, is the arm cylinder 7, and since the load pressure of the boom cylinder 5 is greater than that of the arm cylinder 7, S110 is determined as Yes. In this case, the processing from S111 onwards is the same as the processing of S10 → S12 → S13 in the first embodiment. That is, the primary pump supplyable flow rate is corrected so as to be reduced by a certain amount (predetermined amount) (flow rate adjustment control).

[0069] On the other hand, if the determination in S110 is No, that is, if the load pressure of the boom cylinder 5 is lower than the load pressure of the arm cylinder 7, the discharge pressure of the second hydraulic pump 18 (pump 2) does not change even if the boom cylinder 5 is in the confluent state. In such a case, by turning OFF the correction flag for the primary pump supplyable flow rate (S116), it is possible to actively switch between the non-confluent state and the confluent state, and it is possible to reduce the branch throttling loss.

[0070] Third Embodiment Next, a third embodiment of the present invention will be described with reference to Fig. 9. Fig. 9 is a flowchart showing the processing procedure of a controller according to the third embodiment. Note that in Fig. 9, the processing of S202 to S208 is the same as S2 to S8 in Fig. 6, and therefore the details shown in the figures are omitted.

[0071] In the third embodiment, if it is determined in S210 that the load pressure of the target actuator (Act) is greater than that of all other actuators (Act) to which flow is supplied from the secondary pump of the target actuator, then in S211 it is determined whether the load pressure of the target actuator (here, boom cylinder 5) is equal to or less than a certain threshold. This threshold (limit value) is a value at which the pump displacement is reduced by horsepower control when the first hydraulic pump 17 (pump 1) and the second hydraulic pump 18 (pump 2) are at the same pressure, and in this embodiment, it is set to, for example, 15 MPa. In other words, if the flow is confluent in a state exceeding this threshold and pump 1 and pump 2 are at the same pressure, the pump dischargeable flow rate decreases, and the flow rate supplied to the actuators decreases.

[0072] If the load pressure of the boom cylinder 5 is equal to or less than this threshold, S211 is judged as Yes, and the processing from S212 onwards is the same as in the first embodiment. If the load pressure exceeds this threshold, S211 is judged as No, and the booms do not enter a joining state (S212). By adopting this configuration, it is possible to prevent the supply flow rate to the actuator from being increased, which in turn reduces the supply flow rate and causes an uncomfortable feeling in operation.

[0073] In this embodiment, the pump junction valve is provided separately from the directional control valve, but a configuration may also be adopted in which a directional control valve is provided in each of multiple pump lines (which serve as the pump junction valves of the present invention) to control the supply flow rates from the pumps and join the flows downstream of the directional control valve. In other words, the junction valves 28 and 29 may be directional control valves, and the directional control valve 27 may be omitted.

[0074] In this embodiment, the case where the target flow rate changes according to the manipulated variable has been described, but the present invention is also effective in cases where the target flow rate changes in other ways. For example, in automatic control, the required flow rate is calculated directly from the required speed of the actuator, rather than from the manipulated variable, and the target flow rate is calculated from the required flow rate. Even if the required flow rate does not change, the target flow rate may change due to a change in the total value of the pump's dischargeable flow rate.

[0075] In addition, although the present embodiment has been described as a case of combined operation in which multiple actuators are operated, the present invention is also effective in the case of single operation in which a single actuator is operated. In particular, regardless of the single-actuator combined operation, the present invention can be effective in situations where half-lever operation is required, such as in finishing work.

[0076] It should be noted that the above-described embodiments are merely examples for explaining the present invention, and are not intended to limit the scope of the present invention to these embodiments. Those skilled in the art can implement the present invention in various other forms without departing from the gist of the present invention.

[0077] DESCRIPTION OF SYMBOLS 1...Construction machine (work machine) 2...Upper rotating body 3...Lower traveling body 4...Boom 5...Boom cylinder (first hydraulic actuator) 6...Arm 7...Arm cylinder (second hydraulic actuator) 8...Bucket 9...Bucket cylinder 10...Operator's cab 16...Control valve 17...First hydraulic pump 18...Second hydraulic pump 19...Pilot pump 20...Controller 21...Operating lever (operating member) 24...Attachment 1 cylinder 25...Attachment 2 cylinder 26...Hydraulic oil tank 27...Boom direction switching valve 28...Boom pump 1 merging valve (merging valve) 29...Boom pump 2 merging valve (merging valve) 30...Arm direction switching valve 31...Arm pump 1 merging valve 32...Arm pump 2 merging valve 33...Attachment 1 direction switching valve 34...Attachment 1 pump 1 merging valve 35...Attachment 1 pump 2 merging valve 36...Direction switching valve for attachment 2 37...Pump 1 merging valve for attachment 2 38...Pump 2 merging valve for attachment 2 39...Pump 1 bleed-off valve 40...Pump 2 bleed-off valve 41...Electromagnetic proportional valve for boom directional switching valve 42...Electromagnetic proportional valve for boom pump 1 merging valve 43...Electromagnetic proportional valve for boom pump 2 merging valve 44A...Boom rod pressure sensor 44B...Boom bottom pressure sensor 45A...Arm rod pressure sensor 45B...Arm bottom pressure sensor 46A...Attachment 1 rod pressure sensor 46B...Attachment 1 bottom pressure sensor 47A...Attachment 2 rod pressure sensor 47B...Attachment 2 bottom pressure sensor 48...Mode selection dial 49...First pump pressure sensor 50...Second pump pressure sensor 52...Engine 53...First pump line 54...Second pump line 55...Pilot primary pressure line 56... Pilot secondary pressure line 57... Electromagnetic proportional valve command circuit 60... Valve control unit 61... Required flow rate calculation unit 63... Pump dischargeable flow rate calculation unit 64... Priority pump recording unit 66... ​​Directional switching valve control unit 67... Pump junction valve control unit 68... Bleed-off valve control unit HD... Hydraulic drive unit

Claims

1. A work machine equipped with a hydraulic drive device including a first hydraulic pump, a second hydraulic pump, a first hydraulic actuator driven by pressure oil supplied from the first hydraulic pump, and a merging valve that merges pressure oil supplied from each of the first hydraulic pump and the second hydraulic pump and communicates it to the first hydraulic actuator, an operating member operated by an operator, and a controller that controls the hydraulic drive device based on an operating amount of the operating member, wherein the controller: when the operating member is operated in a direction in which the operating amount increases, controls the merging valve to supply pressure oil from the first hydraulic pump to the first hydraulic actuator until the operating member reaches a first position from an initial position, when the operating member is operated in a direction in which the operating amount increases beyond the first position, controls the merging valve to merge pressure oil from the second hydraulic pump with pressure oil from the first hydraulic pump, and controls the merging valve to supply the merged pressure oil to the first hydraulic actuator in accordance with the increase in the operating amount, when the operating member is operated from an arbitrary position beyond the first position in a direction in which the operation amount decreases, and reaches a second position which is closer to the initial position than the first position, the junction valve is controlled to cancel the junction of pressure oil from the first hydraulic pump and the second hydraulic pump, and to supply pressure oil from the first hydraulic pump to the first hydraulic actuator in response to the decrease in the operation amount.

2. A work machine as claimed in claim 1, characterized in that the first position is set to an operating position of the operating member which corresponds to a maximum flow rate which can be supplied by the first hydraulic pump.

3. A work machine as claimed in claim 2, characterized in that the controller performs flow rate adjustment control to reduce the flow rate of pressurized oil supplied from the first hydraulic pump to the first hydraulic actuator by a predetermined amount when the pressurized oil from the second hydraulic pump is joined to the pressurized oil from the first hydraulic pump, and to increase the flow rate of pressurized oil supplied from the second hydraulic pump to the first hydraulic actuator by the predetermined amount.

4. A work machine as claimed in claim 3, characterized in that the predetermined amount is determined in advance within a range of flow rates that can be supplied by the second hydraulic pump.

5. A work machine as claimed in claim 3, further comprising a second hydraulic actuator driven by pressurised oil supplied from the second hydraulic pump, and wherein the controller performs the flow rate adjustment control when the pressure of the first hydraulic actuator is higher than the pressure of the second hydraulic actuator when the pressurised oil from the first hydraulic pump is joined with the pressurised oil from the second hydraulic pump.

6. A work machine as claimed in claim 5, characterized in that, when merging the pressurized oil from the second hydraulic pump with the pressurized oil from the first hydraulic pump, the controller controls the merging valve so as not to merge the pressurized oil from the second hydraulic pump with the pressurized oil from the first hydraulic pump if the pressure of the first hydraulic actuator exceeds a limit value for the discharge pressure of the first hydraulic pump, even if the pressure of the first hydraulic actuator is higher than the pressure of the second hydraulic actuator.

Citation Information

Patent Citations

  • Hydraulic driving device

    JP2004036681A

  • Hydraulic drive control device

    JP2009150553A