Supply-and-demand-end market day-ahead spot coordinated clearing method taking into account hydropower consumption

By constructing a clearing model with the minimum power purchase cost and a hydropower dispatching boundary update strategy, the problem of efficient consumption of hydropower resources in the inter-provincial power market is solved, and the connection between day-ahead spot clearing and DC transmission plans in the high-proportion hydropower market is achieved. It solves the problem of water abandonment and improves the utilization efficiency of hydropower resources.

WO2024212143A1PCT designated stage expired Publication Date: 2024-10-17DALIAN UNIV OF TECH
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/087945
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-13
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

In the cross-provincial power market, how to effectively connect the sending and receiving end markets and promote the efficient consumption of hydropower resources, especially in the high proportion of spot clearing of hydropower systems, to ensure the timeliness and accuracy of market connection and DC transmission plans Matching, existing technology is difficult to apply directly.

Method used

This paper proposes a collaborative clearing method for day-ahead spot prices in the sender-receiver market that considers hydropower consumption, constructs a clearing model with the goal of minimizing power purchase costs, introduces water abandonment processing constraints, and combines the hydropower dispatch boundary update strategy and DC plan update strategy to dynamically Adjust the external delivery output process to achieve coordinated clearing of the delivery and receiving end markets to ensure accurate matching of electricity and water volume.

Benefits of technology

The spot clearing of the high-proportion hydropower market at the 100-kilowatt level was completed within ten minutes, meeting the timeliness requirements of day-ahead market operation, realizing the effective connection between the market clearing results and the DC transmission plan, and maximizing the efficient utilization and abandonment of hydropower resources. Solution to water problem.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023087945_17102024_PF_FP_ABST
    Figure CN2023087945_17102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention belongs to the fields of power markets and hydropower dispatching operations. Disclosed is a supply-and-demand-end market day-ahead spot coordinated clearing method taking into account hydropower consumption. A trans-provincial direct-current link line is taken as a coordination factor, a supply-end market and a demand-end market are decoupled, and an iterative clearing framework is constructed; a direct-current delivery plan is taken into account to determine boundary conditions of power generation capacity, startup and shutdown, ramping, and upstream and downstream influence electric quantity of a supply-end giant hydropower station, nonlinear hydropower characteristics and water abandonment control requirements are coupled to construct a clearing model having the minimum electricity purchase cost, and the day-ahead spot output of a whole supply-end network is optimized; and a direct-current plan update policy is proposed, a delivery boundary is dynamically adjusted according to abandoned water of a power station and section control of a power grid, the delivery boundary is updated to a demand-end market clearing model, and iterative clearing is performed until convergence. By means of the present invention, billion-kilowatt-level high-proportion hydropower market spot clearing can be completed within about ten minutes, such that timeliness requirements of day-ahead market operation are met, a market clearing result and a direct-current transmission plan are effectively linked up, and cascade electric quantity and water volume of a drainage basin are accurately matched.
Need to check novelty before this filing date? Find Prior Art

Description

A collaborative clearing method for day-ahead spot prices in the sender-receiver market considering hydropower consumption Technical Field

[0001] The present invention relates to the fields of power market and hydropower dispatching and operation, and in particular to a day-ahead spot collaborative clearing method for the sending and receiving end markets taking into account hydropower consumption. Background Art

[0002] Southwestern provinces with high hydropower production, such as Yunnan and Sichuan, often need to transmit electricity across provinces and regions to the southern coastal areas and eastern China. This large-scale, wide-ranging transmission system has become an indispensable component for the consumption of hydropower at the sending end and the power supply at the receiving end. Interprovincial and interregional direct current hydropower is typically consumed through multi-party framework agreements. However, with the continuous improvement of the country's multi-tiered power market in recent years, this approach is gradually shifting towards market-based transactions and settlements. Southwestern hydropower will also shift from participating in a single power market at the sending end to participating in multiple power markets, including those at the sending end, receiving end, or region. Because market rules, mechanisms, and trading entities may vary significantly across provinces and regions, how to connect the sending and receiving markets, and provincial and regional markets, to promote the efficient consumption of hydropower has become a key issue that needs to be addressed in the current development of the electricity spot market.

[0003] Current research on interprovincial market interconnection methods can be broadly categorized into interprovincial spot market integration and coordinated coupled clearing of interprovincial and intraprovincial markets. The former supports cross-provincial resource sharing by introducing market integration mechanisms, but lacks the joint optimal allocation of resources in both interprovincial and intraprovincial markets. The latter, by constructing a coordinated coupled clearing method for interprovincial markets, achieves the wide-area, spatiotemporal optimal allocation of energy resources across provinces. Based on the characteristics of clearing, it can be further categorized into sequential clearing and joint clearing. Furthermore, because the modeling and solution of spot clearing for high-proportion hydropower systems require consideration of the nonlinear hydraulic characteristics of large-scale hydropower stations and units, as well as spatiotemporal hydraulic and power connections, while also ensuring accurate matching of cascade power and water volumes in the clearing results, existing conventional thermal power spot clearing models and solution methods are difficult to directly apply. Therefore, ensuring market integration and promoting hydropower consumption in interprovincial day-ahead spot market clearing becomes a key issue that must be addressed.

[0004] To address these issues, this paper, supported by the National Natural Science Foundation of China (52079014), proposes a collaborative day-ahead spot clearing method for the sending and receiving markets that takes into account hydropower consumption. This method was tested using an improved IEEE 300 node system and a real-world Yunnan power grid project. Results show that this method can complete spot clearing of a high-proportion hydropower market with a gigawatt capacity in approximately ten minutes, meeting the timeliness requirements of day-ahead market operations. It also effectively connects market clearing results with DC transmission plans, achieving precise matching of power and water volumes across river basins.

[0005] Summary of the Invention

[0006] The technical problem to be solved by the present invention is to provide a method for collaborative clearing of the day-ahead spot market in the sending and receiving end markets taking into account hydropower consumption, so as to achieve effective connection between the clearing results of the sending and receiving end markets and the DC transmission plan, and promote the efficient utilization of hydropower resources.

[0007] Technical solution of the present invention:

[0008] A method for collaborative clearing of day-ahead spot prices in the sender-receiver market taking into account hydropower consumption includes the following steps:

[0009] (1) A day-ahead spot clearing model for the sending and receiving markets is constructed with the goal of minimizing the electricity purchase cost, as shown in formula (1). At the same time, in order to solve the problem of water abandonment in the high-proportion hydropower market at the sending end to the greatest extent, a water abandonment treatment constraint set is introduced, as shown in formula (2).

[0010] Where: is the operating cost of power station i in period t, is the startup cost of power station i in period t, T is the calculation period set, I is the set of power stations in the provincial market, M is the penalty factor, S is the set of transmission channels, is the residual variable of the outgoing output of the outgoing channel s at time t, The slack variable of the outgoing output of the outgoing channel s at time t; are the first and second stage water abandonment status indicators, respectively. “true” indicates that there is water abandonment in period t of power station i, and “false” is the default value if there is no water abandonment. 1 The first stage waste water treatment status indicator. "true" indicates that the first stage waste water treatment strategy has been executed. The default value is false. To calculate the maximum output limit of the abandoned hydropower station at time t according to the abandoned water flow, E i is the total power generation of the power station on day i, is the discharge flow of the upstream power station i-1 period t, is the inflow flow of the power station during period i and interval t, △V i is the maximum available idle storage capacity of power station i, W i is the average daily water consumption rate of power station i, is the upper limit of the output control of the upstream cascade power station in period i, is the power output of power station i in the province at time t, P i,t is the total bid output of power station i at time t;

[0011] (2) Based on the clearing results of the receiving market and the relevant technical parameters of the exported hydropower, a hydropower dispatch boundary update strategy is constructed to update the spot trading boundary of the exported hydropower. The specific steps are as follows:

[0012] Step 1. Prepare the conditions for the bid output, start-up and shutdown sequence of the hydropower to be exported in the receiving market;

[0013] Step 2. Determine the on- and off-state conditions of the hydropower transmission during each trading period, and update the optimization boundary of the on- and off-state plan of the hydropower transmission in the sending end market according to formula (3):

[0014] Where: is the on / off status of power station i at time t in the receiving market, and x indicates that the on / off status of power station i at time t is unknown;

[0015] Step 3. Combined with the start-up and shutdown plan and output process of the hydropower transmission, update the hydropower transmission capacity and ramping capacity boundaries of the corresponding period according to formula (4) and formula (5):

[0016] Where: are the maximum and minimum output boundaries of power station i in the province at time t, are the maximum and minimum technical outputs of power station i at time t, N is the power output of power station i at time t, i is the installed capacity of power station i, RU i ' ,t , RD i ' ,t are the maximum up and down ramp rate boundaries of power station i at time t, RU i , RD i are the original maximum up and down climbing capabilities of power station i, respectively;

[0017] Step 4. Based on the inter-provincial hydropower transmission process, update the daily power boundary of the transmitted hydropower according to formula (6) to ensure that the power and water volume of each power station are accurately matched:

[0018] Where: is the amount of electricity that was awarded in the bid for power station i in the province, is the maximum daily power generation capacity of power station i, K is the daily power generation conversion coefficient of upstream and downstream of the cascade, ξ is the serial number set of the first-level power stations in the cascade, and λ is the conversion coefficient, which converts the 15-minute average output into hourly power generation;

[0019] Step 5. Update the boundaries of hydropower transmission in the day-ahead spot clearing model of the sending market and organize clearing.

[0020] (3) Taking the waste water treatment and cross-section power adjustment requirements of the sending-end market as input conditions, a DC plan update strategy is constructed to dynamically adjust the outbound power output process to achieve coordinated clearing of the sending and receiving markets. The specific steps are as follows:

[0021] Step 1. Input the delivery plan and delivery market clearing results, and conduct delivery process verification;

[0022] Step 2. In case the transmission plan cannot be completed as scheduled due to insufficient hydropower generation capacity, the transmission power boundary of the power station under transmission is updated according to formula (7):

[0023] Where: is the upper limit of power transmission from power station i, The planned outbound power transmission for power station i, is the power generation amount owed by power station i;

[0024] Step 3. In the case where the upstream power station is forced to reduce its transmission output during some periods due to abandoned water treatment, update the upstream power station's transmission plan boundary according to formula (8):

[0025] Where: is the upper limit of the external output of power station i at time t, For the unplanned power transmission of power station i at time t, is the output of power station i that is forced to be reduced due to water abandonment at time t; T is the set of calculation time periods.

[0026] Step 4. Based on the calculation results of the slack variables of the outbound transmission output in the sending-end market, update the transmission channel outbound transmission plan boundary according to formula (9):

[0027] Where: is the upper limit of the outgoing output of the outgoing channel s at time t, is the planned outbound output of outbound channel s at time t, is the residual variable of the outgoing output of the outgoing channel s at time t, The slack variable of the outgoing output of the outgoing channel s at time t;

[0028] Step 5. Update the outbound boundary in the day-ahead spot clearing model of the receiving market, reorganize the clearing, and return to step (2).

[0029] The beneficial effects of the present invention are as follows: the present invention combines the actual demand for large-scale cross-provincial hydropower consumption, proposes a collaborative clearing method for the day-ahead spot market of the sending and receiving ends that takes into account hydropower consumption, uses cross-provincial DC interconnection lines as coordination factors, realizes the decoupling of the sending and receiving end markets, and constructs an iterative clearing framework; considers the DC transmission plan to determine the boundary conditions of the power generation capacity, start-up and shutdown, ramp-up, and upstream and downstream influencing power consumption of the giant hydropower station at the sending end, and couples the nonlinear characteristics of hydropower and the requirements for water abandonment control to construct a minimum clearing model for electricity purchase costs, and optimizes the day-ahead spot output of the entire sending end network; proposes a DC plan update strategy, dynamically adjusts the transmission boundary according to the water abandonment of the power station and the section control of the power grid, and updates it to the clearing model of the receiving end market, and iterates the clearing until convergence.

[0030] Compared with previous methods, the present invention can efficiently handle the connection of cross-provincial day-ahead spot markets and the complex hydropower characteristics of high-proportion hydropower systems, greatly simplify the problem of cross-provincial day-ahead spot market coupling and clearing, promote the efficient consumption of cross-provincial hydropower to the greatest extent, and provide a practical method for the cross-provincial consumption of large-scale hydropower in Southwest my country. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] FIG1 is a diagram showing the overall solution framework of the method of the present invention;

[0032] Figure 2(a) is the load balance diagram of the sending-end power grid;

[0033] Figure 2(b) is the load balance diagram of the receiving-end power grid;

[0034] Figure 3(a) is a diagram showing the output and water level of the Ahai abandoned hydropower station during the first round of iterative calculation;

[0035] Figure 3(b) is the output and water level process diagram of the Jinanqiao abandoned hydropower station in the first round of iterative calculation;

[0036] Figure 4 (a) to Figure 4 (b) are schematic diagrams of the process of clearing the abandoned water flow of the Xia Ahai abandoned hydropower station at different stages;

[0037] Figure 5(a) is the output process diagram of the Liyuan Transmission Power Station obtained after the first stage of waste water treatment;

[0038] Figure 5(b) is the output process diagram of the Longkaikou Transmission Power Station obtained after the first stage of waste water treatment;

[0039] Figure 6(a) is the feasible output range and output process diagram of the Liyuan Transmission Power Station after the second stage of waste water treatment;

[0040] Figure 6(b) is the feasible output range and output process diagram of the Longkaikou Transmission Power Station obtained after the second stage of waste water treatment. DETAILED DESCRIPTION

[0041] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings and technical solutions.

[0042] The implementation process diagram of the present invention is shown in FIG1 , and the specific implementation steps are as follows:

[0043] The present invention uses the DC tie line as a coordination factor and combines the relevant characteristics of the sending and receiving markets to construct a day-ahead spot clearing model with the goal of minimizing the power purchase cost, as shown in formula (10). In order to solve the problem of water abandonment in the high-proportion hydropower market at the sending end to the greatest extent, a water abandonment processing constraint set is introduced, as shown in formula (11).

[0044] Where: are the first and second stage water abandonment status indicators respectively (“true” means there is water abandonment in period t of power station i, otherwise there is no water abandonment, and “false” is the default value). 1 The first stage waste water treatment status indicator ("true" indicates that the first stage waste water treatment strategy has been executed, and the default value is false). To calculate the maximum output limit of the abandoned hydropower station at time t according to the abandoned water flow, E i is the total power generation of the power station on day i, is the discharge flow of the upstream power station i-1 period t, is the inflow flow of the power station during period i and interval t, △V i is the maximum available idle storage capacity of power station i, W i is the average daily water consumption rate of power station i, is the upper limit of the output control of the upstream cascade power station in period i, is the power output of power station i in the province at time t, P i,t is the total bid output of power station i at time t.

[0045] The coordinated clearing of the sending and receiving markets is a two-level optimization problem. To ensure the effective connection between the clearing results of the two markets, this paper combines the characteristics of the sending-side high-proportion hydropower market and uses a hydropower scheduling boundary update strategy and a DC transmission plan update strategy to iteratively update the market boundary, effectively connecting the spot clearing results with the interprovincial DC transmission plan, and ensuring the rationality of the coordinated clearing of multiple markets.

[0046] To ensure the effective connection between the intra-provincial and extra-provincial output plans of hydropower transmission, this paper constructs a hydropower dispatch boundary update strategy. Based on the output, start-up and shutdown of inter-provincial hydropower stations in the receiving market, and in combination with their own relevant technical parameters, the spot trading boundaries of these stations are updated. Based on the start-up and shutdown status of hydropower transmission in each trading period during the day in the receiving market, the optimized boundary of the start-up and shutdown plan of hydropower transmission in the sending market is updated according to formula (12):

[0047] Where: is the on / off status of power station i in the receiving market at time t, and x indicates that the on / off status of power station i at time t is unknown.

[0048] Combined with the start-up and shutdown plan and output process of the hydropower transmission, the generation capacity and ramp capacity boundaries of the hydropower transmission in the corresponding period are updated according to formula (13) and formula (14):

[0049] Where: are the maximum and minimum output boundaries of power station i in the province at time t, are the maximum and minimum technical outputs of power station i at time t, For power station i sending power at time t, is the installed capacity of power station i, RU i ' ,t , RD i ' ,t are the maximum up and down ramp rate boundaries of power station i at time t, RU i , RD i are the original maximum up and down climbing capabilities of power station i, respectively.

[0050] According to the inter-provincial hydropower transmission process, the daily power boundary of the transmitted hydropower is updated according to formula (15) to ensure the accurate matching of power and water volume of each power station:

[0051] Where: is the amount of electricity that was awarded in the bid for power station i in the province, is the maximum daily power generation capacity of power station i, K is the daily power generation conversion coefficient of upstream and downstream cascades, ξ is the set of serial numbers of power stations in the first stage of the cascade, and λ is the conversion coefficient, which converts the 15-minute average output into hourly power generation.

[0052] Based on the above calculation results, the relevant boundaries of exported hydropower are updated to the day-ahead spot clearing model of the sending-end market, and the clearing is organized.

[0053] To ensure the smooth implementation of the DC transmission plan and coordinate the power purchase and sales demands of the sending and receiving markets, the present invention constructs a DC plan update strategy. Taking the demands of the sending market for abandoned water treatment and section power adjustment as input conditions, the strategy dynamically adjusts the external power transmission process to achieve coordinated clearing of the sending and receiving markets.

[0054] The transmission process is verified based on the transmission plan and the results of the transmission market clearing. In the case that the transmission plan cannot be completed as scheduled due to insufficient transmission hydropower generation capacity, the transmission power boundary of the power station under the supply is updated according to formula (16):

[0055] Where: is the upper limit of power transmission from power station i, The planned outbound power transmission for power station i, is the power generation underpaid by power station i.

[0056] In the case where the upstream power station is forced to reduce its transmission output during some periods due to abandoned water treatment, the transmission plan boundary of the upstream power station is updated according to formula (17):

[0057] Where: is the upper limit of the external output of power station i at time t, For the unplanned power transmission of power station i at time t, is the output of power station i that is forced to be reduced due to waste water treatment at time t.

[0058] According to the calculation results of the slack variables of the outbound transmission output in the sending-end market, the transmission channel outbound transmission plan boundary is updated according to formula (18):

[0059] Where: is the upper limit of the outgoing output of the outgoing channel s at time t, is the planned outbound output of outbound channel s at time t, is the residual variable of the outgoing output of the outgoing channel s at time t, The slack variable of the outgoing output of the outgoing channel s at time t.

[0060] Based on the above calculation results, the delivery boundary is updated to the day-ahead spot clearing model of the receiving market, and the clearing is reorganized.

[0061] After the receiving-end market is cleared, the cross-provincial power transmission process of other power stations may be affected. Therefore, the hydropower scheduling boundary update strategy is re-implemented, and the sending-end market is cleared until convergence.

[0062] This study uses the Yunnan power grid and a modified IEEE300 node test system as examples for the spot market for both the sending and receiving ends. The sending market considers 142 hydropower plants (some of which are virtual plants), of which hydropower accounts for approximately 85%. Fourteen hydropower plants, including Wunonglong, Lidi, Huangdeng, and Miaowei, are assumed to participate in both the sending and receiving end spot market transactions. The receiving market simulates a single thermal power system, comprising 64 thermal power plants with a total installed capacity of 15,240 MW, and accepting external hydropower. The trading cycle is 24 hours, with a 15-minute period. Actual load and water inflow data from Yunnan are used, with wind and solar power plant output as input and deducted from the overall grid curve. Node loads are determined using a typical day proportional allocation. 1,452 nodes above 220 kV and 149 typical sections are considered. A tiered pricing system is employed, with five tiers in total. The bids from external sending power plants participating in the sending and receiving end markets are shown in Table 1.

[0063] Table 1 Power generator quotation parameters

[0064] After optimization calculation, the clearing results were obtained, and a detailed analysis was conducted from three aspects: the load balance of the entire network, the utilization of hydropower resources, and the connection effect between the market clearing results and the DC transmission plan.

[0065] Grid-wide load balance: Figures 2(a) and 2(b) show the calculated load balance diagrams for the sending and receiving power grids. These diagrams clearly demonstrate that grid-wide power and electricity balance is achieved in both the sending and receiving markets at all times of the day. Furthermore, due to generally lower bids for exported hydropower, it consistently won a significant portion of the bids throughout the trading period, supplying approximately 50% of the electricity to the receiving market.

[0066] Utilization of hydropower resources: Table 2 shows the winning bids of the transmission power stations obtained in the first round of iterative calculations, and Figures 3(a) to 3(b) are the output and water level process diagrams of some abandoned hydropower stations calculated in the first round of iterative calculations. It can be clearly seen that the transmission ratios of various power stations vary, and the overall transmitted electricity accounts for about 56% of the total power generation of the transmission power stations. In addition, due to the introduction of daily power linkage control constraints of cascade power stations in the clearing model, the mismatch of the winning bids of upstream and downstream power stations in the cascade is effectively avoided, and the transmission output plans within the province and outside the province of the transmission power station are fully guaranteed to be implemented as scheduled. However, at this stage, the abandoned water treatment is not considered, and some power stations with poor regulation capabilities have competitive abandoned water problems, with a total abandoned water volume of about 148.486 million m 3 Of which, Ahai Hydropower Station abandoned 69.172 million m3 of water 3 , accounting for about half of the total water abandonment. Specifically, the Lidi Power Station is a daily regulation power station with poor regulation capacity, and because its bid is high and the number of successful bids is small, the reservoir water level continues to rise to the normal high water level, so water abandonment occurs in some periods. The downstream Ahai and Jinanqiao Power Stations, although their bids are low and the bids are successful, the upstream Liyuan Power Station has too much water discharged. In addition, the two have poor regulation capacity and the initial water level is close to the normal high water level, which causes the reservoir water level to quickly reach the upper limit and generate a large amount of water abandonment in subsequent periods. The Ludila Power Station has a low bid and has won bids close to the maximum output almost all the time. The downstream Guanyinyan Power Station has relatively few successful bids, and due to its limited regulation capacity, it cannot fully store the upstream water, so water abandonment occurs at the end of the trading period.

[0067] Table 2 The first round of iterative calculation of the winning bids for the transmission power stations

[0068] Since there is a water abandonment problem in the clearing results obtained by the first round of iterative calculation, the water abandonment treatment method of the present invention is implemented, and the first and second stage water abandonment treatment methods are performed in sequence. Figures 4(a) to 4(b) are schematic diagrams of the water abandonment flow process of some abandoned hydropower stations in different stages of clearing, and Table 3 shows the water abandonment treatment conditions in different stages. It can be seen that after the original quotation of the abandoned hydropower station is reduced by the first stage water abandonment treatment method and it is given priority clearing qualification, the water abandonment problem is greatly alleviated, and the total water abandonment volume of the cascade is reduced to 2.889 million m 3 The reduction rate reached 98%, among which the water abandonment problem of Ahai and Guanyinyan was completely solved. The second stage of water abandonment treatment method is to control the output of the upstream power station of the abandoned power station during the period, reduce the amount of water entering the reservoir of the abandoned power station during the corresponding period, and further deal with the water abandonment problem. The total amount of water abandoned in the cascade was reduced to 00,000 m 3 This shows that the present invention can alleviate or even avoid the competitive water abandonment problem caused by independent bidding of cascade hydropower stations to a large extent, and promote the efficient utilization of hydropower resources.

[0069] Table 3 Treatment of waste water at different stages

[0070] Market Clearing Results and the Effect of HVDC Transmission Plan Coordination: Figures 5(a) and 5(b) show the output process diagrams of some transmission power stations after the first stage of abandoned water treatment. To improve the utilization efficiency of hydropower resources and minimize the problem of abandoned water, the first stage of abandoned water treatment method gives abandoned water power priority for clearing, resulting in a large amount of low-priced abandoned water power entering the transmission market. At the same time, to ensure load balance, the output of other power stations will inevitably decrease to varying degrees. As can be seen, the output of the provincial bids of transmission power stations such as Liyuan and Longkaikou has decreased to varying degrees, but their transmission process has not been affected. Figures 6(a) and 6(b) show the feasible output range and output process diagrams of some transmission power stations after the second stage of abandoned water treatment. It can be seen that the overall output process of the transmission power stations is within the feasible range, and in some periods, it operates closely to the output boundary, but no over-limit situation occurs, effectively ensuring the smooth implementation of the output plan of the transmission and receiving ends of each power station. From the above analysis, it can be concluded that the present invention can achieve effective connection between spot clearing results and inter-provincial DC transmission plans, and ensure the rationality of multi-market coordinated clearing.

[0071] In summary, the present invention provides a practical method for the cross-provincial consumption of large-scale hydropower in Southwest my country. It can better handle the connection of cross-provincial day-ahead spot markets and the complex hydropower characteristics of high-proportion hydropower systems, greatly simplify the problem of cross-provincial day-ahead spot market coupling and clearing, and promote the efficient consumption of cross-provincial hydropower to the greatest extent.

Claims

1. A method for collaborative clearing of spot prices in the day-ahead market of the sender and receiver considering hydropower consumption. It is characterized in that The steps include: (1) A day-ahead spot clearing model for the transmission and receiving end markets is constructed with the goal of minimizing the power purchase cost, as shown in formula (1). At the same time, in order to solve the problem of water abandonment in the high-proportion hydropower market at the transmission end to the greatest extent, a water abandonment treatment constraint set is introduced, as shown in formula (2). Where: is the operating cost of power station i in period t, is the startup cost of power station i in time period t, T is the calculation time period set, I is the power station set in the province, M is the penalty factor, S is the transmission channel set, is the residual variable of the transmission output of the transmission channel s at time t, The slack variable of the outgoing power of the outgoing channel s at time t; are the first and second stage water abandonment status indicators, respectively. "true" means that there is water abandonment in the power station i period t, and "false" is the default value if there is no water abandonment; S 1 It is the indicator of the first-stage abandoned water treatment status. "true" means that the first-stage abandoned water treatment strategy has been executed. The default value is false. To calculate the maximum output limit of the abandoned hydropower station at time t based on the abandoned water flow, E i is the total power generation of the power station on day i, is the discharge flow of the upstream power station in period t i-1, is the inflow flow of the power station during period i and interval t, △V i is the maximum available idle storage capacity of power station i, W i is the average daily water consumption rate of power station i, is the upper limit of the output control of the upstream cascade power station in period i, is the winning bid output of power station i in the province at time t, P i,t is the total bid output of power station i at time t; (2) Based on the clearing results of the receiving market and combined with the relevant technical parameters of the exported hydropower, a hydropower dispatch boundary update strategy is constructed to update the spot trading boundary of the exported hydropower. The specific steps are as follows: Step 1. Prepare the winning bid output and start-up and shutdown sequence conditions of the hydropower to be transmitted in the receiving market; Step 2. Determine the start and stop status of the hydropower transmission in each trading period during the day, and update the optimization boundary of the hydropower transmission start and stop plan in the sending end market according to formula (3): Where: is the start / stop status of power station i at time t in the receiving market, and x indicates that the start / stop status of power station i at time t is unknown; Step 3. Combined with the start-up and shutdown plan and output process of the external hydropower, update the external hydropower generation capacity and ramp capacity boundaries of the corresponding period according to equations (4) and (5): Where: are the maximum and minimum output boundaries of power station i in the province at time t, are the maximum and minimum technical outputs of power station i at time t, For power station i to send out power at time t, is the installed capacity of power station i, RU′ i,t , RD′ i,t are the maximum up and down ramp rate boundaries of power station i at time t, RU i , RD i are the original maximum up and down climbing capacities of power station i, respectively; Step 4. According to the inter-provincial hydropower transmission process, update the daily power boundary of the transmitted hydropower according to formula (6) to ensure that the power and water volume of each power station are accurately matched: Where: is the amount of electricity that won the bid in the province of power station i, is the maximum daily power generation capacity of power station i, K is the daily power generation conversion coefficient of the upstream and downstream of the cascade, ξ is the sequence number set of the first-level power stations in the cascade, and λ is the conversion coefficient, which converts the 15-minute average output into hourly power generation; Step 5. Update the boundaries of hydropower transmission in the day-ahead spot clearing model of the sending market and organize clearing; (3) Taking the abandoned water treatment and cross-section power adjustment requirements of the sending end market as input conditions, a DC plan update strategy is constructed to dynamically adjust the external transmission output process to achieve coordinated clearing of the sending and receiving end markets. The specific steps are as follows: Step 1. Input the delivery plan and the delivery market clearing results, and conduct the delivery process verification; Step 2. In case the transmission plan cannot be completed as scheduled due to insufficient hydropower generation capacity, update the transmission power boundary of the power station under transmission according to formula (7): Where: is the upper limit of power transmission from power station i, The planned outbound power for power station i, is the power generation amount owed by power station i; Step 3. In case the upstream power station is forced to reduce its transmission output in some periods due to abandoned water treatment, update the transmission plan boundary of the upstream power station according to formula (8): Where: is the upper limit of the external output of power station i at time t, For the unplanned power transmission of power station i at time t, is the output of power station i that is forced to be reduced due to waste water treatment at time t; Step 4. Based on the calculation results of the slack variables of the transmission output in the sending end market, update the transmission channel transmission plan boundary according to formula (9): Where: is the upper limit of the outbound output of outbound channel s at time t, is the planned outbound output of outbound channel s at time t, is the residual variable of the transmission output of the transmission channel s at time t, The slack variable of the outgoing power of the outgoing channel s at time t; Step 5. Update the delivery boundary in the day-ahead spot clearing model of the receiving market, reorganize the clearing and return to step (2).

Citation Information

Patent Citations

  • High-proportion hydropower system day-ahead spot clearing method based on cascade electric quantity linkage control

    CN111861162A

  • Day-ahead spot market multi-stage clearing method coupled with hydropower abandoned energy consumption

    CN113869975A

  • Coupling and clustering analysis and decision-making tree based short-term power generation scheduling method for cascaded hydroelectric station group

    WO2019174040A1