Pile-driving guide frame and construction method therefor
By designing retractable cylinder modules and pile legs with built-in leveling functions, combined with guide rings and push components, the problems of difficult operation, high cost, and low efficiency in the construction of offshore wind power guide frames are solved, and the guide frame is realized Stable placement and adaptability on the seabed reduce construction costs and increase efficiency.
Patent Information
- Application Number
- PCT/CN2023/099563
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-14
- Filing Date
- 2023-06-10
- Publication Date
- 2024-10-17
AI Technical Summary
During the construction process of the existing offshore wind power guide frame, small piles need to be driven first, and then the fixed piles are connected to the guide frame, which results in difficult operation, high cost, and low construction efficiency. Moreover, due to the size differences of different engineering projects, the guide frame is difficult to reuse. , increasing construction costs.
A piling guide frame is designed, which includes a retractable cylinder module, a connecting frame and a pile leg. The guide ring and push assembly assist the small piles in driving into the seabed. The pile legs have their own leveling function to avoid the need for positioning piles. , with simple structure, light weight and low cost, and can be adapted to jackets of different sizes through combined connecting frames.
It is possible to place the guide frame horizontally on the seabed without the need for positioning piles. It is easy to operate and has a simple structure, which reduces construction costs, improves construction efficiency, adapts to different engineering requirements, and avoids settlement problems affected by changes in water depth.
Smart Images

Figure CN2023099563_17102024_PF_FP_ABST
Abstract
Description
Pile driving guide frame and construction method thereof Technical Field
[0001] The present invention relates to the technical field of offshore wind power engineering equipment, and in particular to a piling guide frame and a construction method thereof. Background Art
[0002] The guide frame foundation of offshore wind power requires driving several small piles into the seabed. Each small pile is tens of meters long. In order to coordinate with the subsequent conductor frame, the position of each small pile needs to be precisely controlled. The conventional method is to use a guide frame for auxiliary positioning during the pile driving process.
[0003] This traditional guide frame is similar to a single-body frame structure. During construction, it needs to be hoisted onto the seabed. Due to the uneven seabed, several positioning piles need to be fixed on the seabed, and the guide frame and the positioning piles need to be connected together with steel wire ropes. After the small piles are driven, the positioning piles are pulled out one by one, and the guide frame is hoisted to the next machine position.
[0004] In other words, traditionally, the installation of offshore wind turbine jackets requires driving small piles first, which requires the use of guide frames. To ensure the guide frames are stably placed on the seabed, several positioning piles must be fixed. As can be seen from the above, the above-mentioned traditional guide frames have the following drawbacks:
[0005] The base of the guide frame must be firmly planted on the seabed, and the top platform must be higher than the sea surface for easy connection and operation. That is, its total height must be greater than the water depth. Therefore, it is very large, with a height of about 50m to 60m, a total weight of hundreds of tons, inconvenient to use, and high production cost.
[0006] For different engineering projects, the sizes of the conductor frames vary, and the spacing between the small piles is also different. Different guide frames need to be made, which are difficult to reuse, further increasing construction costs.
[0007] The positioning piles used to additionally fix the guide frames are also large steel structures, with a single length of about 60m to 70m. They have to be inserted and pulled out one by one on the choppy sea surface, and then turned over and placed back on the deck. This requires a lot of complex lifting and piling work, which seriously slows down the progress of the work.
[0008] As can be seen from the above, inventing a pile driving guide frame and a construction method thereof that can solve the above problems is a technical problem that those skilled in the art need to solve urgently. Summary of the Invention
[0009] In view of the shortcomings of the prior art described above, the object of the present invention is to provide a piling guide frame and a construction method thereof, which are used to solve the technical problems of difficult operation, high cost and low construction efficiency caused by the prior art construction method of installing the jacket, which requires first setting fixed piles, then connecting the fixed piles and the guide frame together, and then driving several small piles through the guide frame, and then relying on the several small piles to set the jacket.
[0010] To achieve the above-mentioned and other related purposes, the present invention provides a pile driving guide frame, comprising a plurality of cylinder modules, a connecting frame, and pile legs, wherein the cylinder modules comprise a main cylinder and a guide ring, wherein the guide ring is connected to the outer periphery of the main cylinder; the pile legs are telescopically installed in the main cylinder, and the plurality of cylinder modules are connected by a connecting frame; the guide ring is used to assist in driving small piles into the seabed; the guide ring is provided with a plurality of pushing assemblies, and the pushing assemblies are used to adjust the verticality of the small piles.
[0011] Preferably, the main cylinder includes an ear plate and a leveling cylinder, the ear plate is arranged on the inner top surface of the main cylinder, one end of the leveling cylinder is arranged on the ear plate, and the other end is fixedly connected to the top end of the pile leg; a plurality of connecting guide rods are arranged on the outer periphery of the main cylinder, a main cylinder flange is arranged on the end of the connecting guide rod away from the main cylinder, a connecting frame flange is arranged on the connecting frame, and the main cylinder and the connecting frame are connected by the main cylinder flange, the connecting frame flange, and a connecting piece arranged therebetween.
[0012] Preferably, the connecting frame includes an intermediate frame and a side frame, the number of the cylinder modules is four, the two adjacent main cylinders are connected by the side frame, and the two diagonal main cylinders are connected by the intermediate frame. An intermediate tube is also provided vertically upward at the intersection of the intermediate frames, and a lifting eye plate is provided on the top of the intermediate tube.
[0013] Preferably, the middle frame and the side frames are both assemblies, and the lengths of the middle frame and the side frames can be adjusted by increasing or decreasing the number of assemblies in the middle frame and the side frames.
[0014] Preferably, the bottom end of the pile leg is provided with a shoe surface, and the shoe surface prevents the pile leg from sinking too deep into the seabed; the bottom surface of the shoe surface is provided with a shoe tip, and the shoe tip enables the pile leg to be inserted into the seabed.
[0015] Preferably, the guide ring body includes an upper guide ring and a lower guide ring, the upper guide ring is arranged at the upper end of the outer periphery of the main cylinder, and the lower guide ring is arranged at the lower end of the outer periphery of the main cylinder, and the centers of the upper guide ring and the lower guide ring are located on the same axis in the vertical direction.
[0016] Preferably, the upper guide ring is configured as an arm-type structure, the upper guide ring is hinged to the outer periphery of the main cylinder, and an opening and closing cylinder is further provided between the outer periphery of the upper guide ring and the outer periphery of the main cylinder, and the opening and closing cylinder is used to open and close the upper guide ring.
[0017] Preferably, the upper end surface of the upper guide ring is further provided with a bell mouth, and the bell mouth is used to guide the small pile.
[0018] Preferably, the pushing assembly includes several telescopic cylinders, which are evenly distributed on the outer circumference of the upper guide ring and the lower guide ring along the circumferential direction. The telescopic cylinders penetrate the outer circumference of the upper guide ring and the lower guide ring and are used to adjust the verticality of the small pile passing through the upper guide ring and the lower guide ring.
[0019] To achieve the above purpose or other purposes, the present invention further discloses a construction method of a pile driving guide frame, which uses the above pile driving guide frame and comprises the following steps:
[0020] S1: Connect the shell module, connecting frame and pile legs into a whole and place them on the deck of the crane vessel; the pushing assembly is in the initial state;
[0021] S2: After arriving at the designated sea area, the crane on the crane vessel hoists the pile driving guide frame to the designated position on the seabed;
[0022] S3: Adjust the telescopic length of the pile legs in the main cylinder to make the pile driving guide frame in a horizontal state;
[0023] S4: The crane on the crane vessel lifts the small pile, and the small pile passes through the guide ring from top to bottom, and the verticality of the small pile in the guide ring is controlled by the jacking assembly to make the small pile reach the specified vertical state;
[0024] S5: Continue lowering the pile until it is inserted into the seabed. The crane is separated from the pile and the pile top is hammered with a pile hammer until the pile reaches the specified height.
[0025] S6: Repeat the operations of S4 and S5 to complete the piling operation of all small piles;
[0026] S7: After all the small piles are driven, the crane hoists the pile driving guide frame back onto the deck and transports it to the next construction site via a crane ship to repeat the operation steps S2-S6.
[0027] As described above, the piling guide frame and construction method thereof of the present invention have the following beneficial effects:
[0028] 1. The present invention relates to a piling guide frame and a construction method thereof. The bottom ends of the pile legs are provided with boot tips, which enable the piling guide frame to be inserted into the seabed to a certain depth, thereby preventing the piling guide frame from moving due to external loads during the piling process.
[0029] 2. The pile driving guide frame and the construction method thereof disclosed in the present invention have a shoe surface provided above the shoe tip, which can form an effective load-bearing surface, thereby preventing a single pile leg from sinking too deep into the seabed and making leveling more effective.
[0030] 3. The pile driving guide frame and the construction method thereof involved in the present invention have pile legs with self-leveling function, do not require the assistance and connection of positioning piles, are easy to operate, have a simple structure, are light in weight and have a low cost.
[0031] 4. The piling guide frame and construction method thereof involved in the present invention connect several cylindrical modules through a connecting frame. The connecting frame is an assembly. The operator can change the pile spacing according to the specifications of the jacket, thereby being able to quickly adapt to different engineering requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] FIG1 is a front view of a pile driving guide frame according to the present invention;
[0033] FIG2 is a top view of the piling guide frame of the present invention;
[0034] FIG3 is a schematic diagram of the structure between the main cylinder and the pile legs in the pile driving guide frame of the present invention.
[0035] Description of reference numerals:
[0036] 1. Cylinder module; 101. Main cylinder; 1010. Leveling cylinder; 102. Guide ring body; 1020. Upper guide ring; 1021. Lower guide ring; 103. Bell mouth; 104. Push assembly; 105. Opening and closing cylinder; 2. Connecting frame; 201. Middle frame; 202. Side frame; 203. Lifting eye plate; 204. Middle pipe; 3. Pile leg; 301. Boot tip; 302. Boot surface. Implementation Method
[0037] The following describes the implementation of the present invention through specific embodiments. People skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0038] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention. Therefore, they have no substantial technical significance. Any modification of the structure, change in the proportional relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the efficacy and purpose that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and are not used to limit the scope of the implementation of the present invention. Changes or adjustments in their relative relationships should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.
[0039] As shown in Figures 1 to 3, the present invention provides a pile driving guide frame, including several cylinder modules 1, a connecting frame 2, and pile legs 3. The cylinder module 1 includes a main cylinder 101 and a guide ring 102, and the guide ring 102 is connected to the outer periphery of the main cylinder 101; the pile legs 3 are telescopically installed in the main cylinder 101, and several cylinder modules 1 are connected by a connecting frame 2; the guide ring 102 is used to assist small piles in being driven into the seabed; a plurality of jacking assemblies 104 are provided on the guide ring 102, and the jacking assemblies 104 are used to adjust the verticality of the small piles.
[0040] The pile driving guide frame of the present invention connects several cylinder modules 1 through a connecting frame 2. The pile legs 3 are retractably mounted in the main cylinder 101, so that the pile driving guide frame can be placed horizontally on the seabed, eliminating the need to drive positioning piles into the seabed in advance for assistance. It is easy to operate and has a simple structure. A guide ring 102 is provided on the outer periphery of the main cylinder 101. The guide ring 102 is used to assist in driving small piles into the seabed. The guide ring 102 is also provided with several jacking assemblies 104. The jacking assemblies 104 can be used to adjust the verticality of the small piles, ensuring that the small piles are in a vertical state in the seabed and ensuring the quality of subsequent jacket installation. The connecting frame 2 can be adjusted in length according to the size specifications of the jacket, so that the position of the small piles driven into the seabed is suitable for jackets of different sizes.
[0041] Furthermore, in this embodiment, the central axis of the main cylinder 101 is parallel to the central axis of the guide ring 102; the main cylinder 101 is preferably a perfect circular cylinder. The cylinder module 1 is made of steel.
[0042] Preferably, as shown in FIG3 , the main cylinder 101 includes an ear plate and a leveling cylinder 1010 . The ear plate is provided on the inner top surface of the main cylinder 101 . The top end of the leveling cylinder 1010 is fixed to the ear plate by bolts, and the bottom end of the leveling cylinder 1010 is fixedly connected to the top end of the pile leg 3 by bolts. A plurality of connecting guide rods are provided on the outer periphery of the main cylinder 101 . A main cylinder flange is provided at one end of the connecting guide rod away from the main cylinder 101 . A connecting frame flange is provided on the connecting frame 2 . The main cylinder 101 and the connecting frame 2 are connected via the main cylinder flange, the connecting frame flange, and a connecting piece provided therebetween. Furthermore, in this embodiment, the connecting piece between the main cylinder flange and the connecting frame flange is fastened with bolts and nuts (the connecting guide rods, the main cylinder flange, and the connecting frame flange are not shown) to facilitate assembly and disassembly.
[0043] Preferably, as shown in Figures 1 and 2, the connecting frame 2 includes an intermediate frame 201 and a side frame 202. The number of cylinder modules 1 is four. Two adjacent main cylinders 101 are connected by the side frames 202, and two diagonal main cylinders 101 are connected by the intermediate frame 201. An intermediate tube 204 is vertically provided at the intersection of the intermediate frames 201, and a lifting eye plate 203 is provided on the top of the intermediate tube 204. Further, when the number of cylinder modules 1 is four, as shown in Figure 3, the four main cylinders 101 form a rectangle, the number of side frames 202 is four, and the four side frames 202 connect the two adjacent main cylinders 101; the number of intermediate frames 201 is two, and the two intermediate frames 201 connect the two main cylinders 101 at opposite corners. In this embodiment, the connecting frame 2 has great rigidity and can withstand the vertical and horizontal loads on a single cylinder module 1 during the piling process, ensuring that the overall frame does not deform.
[0044] In another embodiment, the number of cylinder modules 1 is three, and the three cylinder modules 1 are distributed in a triangle. The number of side frames 202 is three, and the three side frames 202 connect two adjacent main cylinders 101; the number of intermediate frames 201 is three, and the intermediate frames 201 are the center lines of each side of the triangle, and the intermediate tube 204 is set at the intersection of the three center lines.
[0045] In the above embodiment, the middle pipe 204 extends vertically upward, and the height of the middle pipe 204 extends above the sea surface.
[0046] Preferably, the middle frame 201 and the side frame 202 are both assemblies, and the number of assemblies in the middle frame 201 and the side frame 202 can be increased or decreased to adjust the length of the middle frame 201 and the side frame 202, so that the positions between the guide ring bodies 102 on several cylinder modules 1 just correspond to the positions where small piles need to be driven in, that is, the corresponding small piles are driven in according to the size specifications of the conductor frame.
[0047] Preferably, as shown in FIG3 , a shoe surface 302 is provided at the bottom end of the pile leg 3 to prevent the pile leg 3 from sinking too deep into the seabed; a shoe tip 301 is provided on the bottom surface of the shoe surface 302 to enable the pile leg 3 to be inserted into the seabed.
[0048] Preferably, as shown in FIG1 , the guide ring body 102 includes an upper guide ring 1020 and a lower guide ring 1021. The upper guide ring 1020 is disposed at the upper end of the outer periphery of the main cylinder body 101, and the lower guide ring 1021 is disposed at the lower end of the outer periphery of the main cylinder body 101. The centers of the upper guide ring 1020 and the lower guide ring 1021 are located on the same axis in the vertical direction. The upper guide ring 1020 and the lower guide ring 1021 are short cylindrical bodies, and the inner diameters of the upper guide ring 1020 and the lower guide ring 1021 are slightly larger than the outer diameters of the small pile.
[0049] Furthermore, in this embodiment, the upper guide ring 1020 is configured as an arm-type structure, the upper guide ring 1020 is hinged to the outer periphery of the main cylinder 101, and an opening and closing oil cylinder 105 is further provided between the outer periphery of the upper guide ring 1020 and the outer periphery of the main cylinder 101, and the opening and closing oil cylinder 105 is used to open and close the upper guide ring 1020. Specifically, the upper guide ring 1020 is divided into two semicircular rings, one end of each semicircular ring is hinged to the outer periphery of the main cylinder 101, and an opening and closing oil cylinder 105 is provided between the outer periphery of the two semicircular rings and the periphery of the main cylinder 101. When the opening and closing oil cylinder 105 is extended, the two semicircular rings are closed, and when the opening and closing oil cylinder 105 is shortened, the two semicircular rings are opened. The purpose of the upper guide ring 1020 being configured as an arm-type structure is that when the pile hammer drives the small pile into the seabed, the upper guide ring 1020 may affect the stroke of the pile hammer. Therefore, the upper guide ring 1020 is configured as an arm-type structure to facilitate the passage of the pile hammer. Alternatively, the upper guide ring 1020 can be configured as a fixed structure, in which case the pile hammer can be extended to drive the small pile into the seabed.
[0050] Furthermore, as shown in FIG1 , in order to ensure that the upper guide ring 1020 can guide the small pile when it is driven into the seabed, a bell mouth 103 is further provided on the upper end surface of the upper guide ring 1020 .
[0051] Preferably, as shown in Figures 1 and 2, the push assembly 104 includes a plurality of telescopic cylinders, which are evenly distributed along the circumference of the outer surfaces of the upper guide ring 1020 and the lower guide ring 1021. The telescopic cylinders penetrate the outer circumferences of the upper guide ring 1020 and the lower guide ring 1021 and are used to adjust the verticality of the small pile passing through the upper guide ring 1020 and the lower guide ring 1021. Furthermore, in this embodiment, the piston ends of the telescopic cylinders penetrate the annular walls of the upper guide ring 1020 and the lower guide ring 1021. When the telescopic cylinders are extended, the ends of the pistons extend into the inner sides of the inner walls of the upper guide ring 1020 and the lower guide ring 1021, thereby adjusting the verticality of the small pile. When the telescopic cylinders are shortened, the ends of the pistons retract into the telescopic cylinders, without blocking the small pile from passing through the upper guide ring 1020 and the lower guide ring 1021. Furthermore, in order to reduce the friction between the piston end of the telescopic cylinder and the outer peripheral surface of the small pile, a roller or other components may be provided at the end of the piston end of the telescopic cylinder to reduce the friction.
[0052] Furthermore, in this embodiment, the hydraulic oil used in the telescopic cylinder, the opening and closing cylinder 105, and the leveling cylinder 1010, as well as the container storing the hydraulic oil, can all be provided on the connecting frame 2. In this embodiment, a level gauge can also be provided on the connecting frame 2 to detect whether the piling guide frame is in a horizontal state on the seabed.
[0053] To achieve the above purpose or other purposes, the present invention further discloses a construction method of a pile driving guide frame, using the above pile driving guide frame, wherein the number of the cylindrical modules 1 in the above pile driving guide frame is three or four. The present invention is now described with respect to an embodiment in which the number of the cylindrical modules 1 is four, and the steps are as follows:
[0054] A1: Connect four cylinder modules 1, several intermediate frames 201, several side frames 202, and pile legs 3 to form a whole. The four cylinder modules 1 form a quadrilateral. Adjacent cylinder modules 1 are connected by the intermediate frames 201, and diagonal cylinder modules 1 are connected by the side frames 202. A vertically extending intermediate tube 204 is installed at the intersection of the two side frames 202. The pile legs 3 are installed inside the main cylinder 101 via leveling cylinders 1010. The operator places the assembled pile driving guide frame on the deck of the crane vessel and sets the leveling cylinders 1010 and the jacking assembly 104 to their initial positions (i.e., the piston ends of the leveling cylinders 1010 and the jacking assembly 104 are retracted).
[0055] A2: After arriving at the designated sea area, the crane on the crane vessel is hooked onto the lifting eye plate 203 on the top of the intermediate tube 204 and the pile driving guide frame is lowered to the designated position on the seabed. After the pile driving guide frame is lowered to the seabed, the shoe tip 301 is inserted into the seabed, and the shoe surface 302 prevents the pile leg 3 from sinking too deep into the seabed.
[0056] A3: After the piling guide frame contacts the seabed in step A2, the two diagonal legs 3 are first extended. At this point, the majority of the piling guide frame's deadweight is borne by the seabed beneath the boots 302 of these two legs 3, further compacting the seabed beneath these boots 302. These two legs 3 are then retracted and the remaining two legs 3 are extended, similarly completing the compaction of the seabed beneath these boots 302. The lengths of all four legs 3 are then uniformly adjusted to ensure that the piling guide frame is horizontal (i.e., the spirit level on the connecting frame 2 is in a horizontal position).
[0057] A4: The crane on the crane vessel lifts the small pile, and the small pile passes through the upper guide ring 1020 and the lower guide ring 1021 from top to bottom. The verticality of the small pile in the guide ring body 102 is controlled by the pushing assembly 104 on the outer circumference of the upper guide ring 1020 and the lower guide ring 1021, so that the small pile reaches the specified vertical state;
[0058] A5: Use a crane to lower the pile until the bottom end of the pile is inserted into the seabed, then detach the crane from the pile. Connect the pile hammer to the crane and hammer the top of the pile until the pile reaches the specified depth.
[0059] A6: Repeat steps A4-A5 to hoist the remaining three small piles into the corresponding upper guide ring 1020 and lower guide ring 1021, and hammer them into the seabed to the specified depth;
[0060] A7: The pile driving guide frame is hoisted back onto the deck by a crane and transported to the next construction area by a crane ship. The operation steps A2-A6 are repeated until all the small piles in the construction area are driven into the seabed.
[0061] Preferably, in step A1, the middle frame 201 and the side frame 202 are both assembled parts, and the lengths of the middle frame 201 and the side frame 202 are adjusted according to the spacing between the small piles to accommodate small piles with different spacings.
[0062] Preferably, the purpose of setting up step A3 is to first compact the seabed beneath the two diagonal pile legs 3, and then compact the seabed beneath the remaining two pile legs 3; when two of the pile legs 3 contact the seabed, the seabed beneath these two pile legs 3 has a potential high bearing capacity, and this bearing capacity is close to 1 times the margin. Then, the seabed beneath the remaining two pile legs 3 also has a bearing capacity close to 1 times the margin (that is, when the four pile legs 3 are evenly in contact with the seabed, the bearing capacity of the seabed beneath each pile leg 3 is 1 / 4 of its own weight; when two pile legs 3 first contact the seabed and are compacted, the bearing capacity of the seabed beneath these two pile legs 3 is 1 / 2 of their own weight; correspondingly, the bearing capacity of the seabed beneath the other two pile legs 3 is also 1 / 2 of their own weight. In this way, the bearing capacity beneath all four pile legs 3 is 1 / 2 of their own weight, leaving a bearing margin of 1 times). In this way, during the piling process, the piling guide frame is not prone to sinking, overcoming the problem of the friction and vibration between the small pile and the upper guide ring 1020 and the lower guide ring 1021 causing the sinking and resulting in the change of the horizontality of the piling guide frame, thereby reliably ensuring the continuity and construction efficiency of the construction process.
[0063] Preferably, in step A4, in order to facilitate the small pile to be quickly inserted into the upper guide ring 1020, the bell mouth 103 on the top surface of the upper guide ring 1020 plays a guiding role in the lowering process of the small pile.
[0064] Preferably, in step A5, when the pile driver hammer strikes the top of the small pile, the operator can control the opening and closing cylinder 105 to open the upper guide ring 1020 so that the pile driver hammer can pass through the upper guide ring 1020, thereby facilitating the pile driver hammer to drive the small pile to the predetermined depth in the seabed. In other embodiments, an extension pile can be provided below the pile driver hammer to drive the small pile to the predetermined depth in the seabed.
[0065] When there are three barrel modules 1 , the operating steps of the embodiment with three barrel modules 1 differ from those of the embodiment with four barrel modules 1 only in that step A3 in the embodiment with three barrel modules 1 can be omitted, and the other steps are the same and will not be repeated here.
[0066] The piling guide frame and construction method thereof according to the present invention have the following beneficial effects:
[0067] The present invention can adjust the length of the connecting frame 2, and thus the spacing between the cylindrical modules 1, to accommodate different small pile spacings. The bottom of the pile legs 3 is provided with a shoe tip 301 and a shoe surface 302, which not only prevents movement due to external loads during piling, but also prevents individual pile legs 3 from sinking too deep into the seabed, compensating for seabed settlement while making leveling faster and more effective.
[0068] The present invention relates to a pile driving guide frame and a construction method thereof. The pile legs 3 have a self-leveling function and do not require the assistance and connection of positioning piles, so the operation is convenient. The pile driving guide frame can be completely submerged in water, and the overall design is not affected by changes in water depth. It has a simple structure, light weight and low cost.
[0069] 3. The present invention uses retractable legs (3) to adjust the horizontality of the piling guide frame and compensate for seabed settlement, effectively ensuring the accuracy of the piling process. The entire process does not require the assistance of positioning piles, simplifying the operation. By changing the length of the connecting frame (2), different pile spacings can be accommodated, and the number of small piles can be switched, making it more flexible.
[0070] 4. The present invention solves the technical problems of difficult operation, high cost and low construction efficiency caused by the existing construction method of installing the conductor frame, which requires first setting fixed piles, then connecting the fixed piles and the guide frame together, and then driving several small piles through the guide frame, and then relying on the several small piles to set the conductor frame.
[0071] Therefore, the present invention effectively overcomes various shortcomings of the prior art and has high industrial utilization value.
[0072] The above embodiments are merely illustrative of the principles and effects of the present invention and are not intended to limit the present invention. Anyone skilled in the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by one of ordinary skill in the art without departing from the spirit and technical principles disclosed herein are intended to be covered by the claims of the present invention.
Claims
1. A pile driving guide frame, Features: The invention comprises a plurality of cylinder modules (1), a connecting frame (2), and pile legs (3), wherein the cylinder module (1) comprises a main cylinder (101) and a guide ring (102), wherein the guide ring (102) is connected to the outer periphery of the main cylinder (101); the pile legs (3) are telescopically mounted in the main cylinder (101), and the plurality of cylinder modules (1) are connected via the connecting frame (2); the guide ring (102) is used to assist small piles in being driven into the sea; and a plurality of jacking assemblies (104) are arranged on the guide ring (102), wherein the jacking assemblies (104) are used to adjust the verticality of the small piles.
2. The piling guide frame according to claim 1, Features: The main cylinder (101) comprises an ear plate and a leveling cylinder (1010), wherein the ear plate is arranged on the inner top surface of the main cylinder (101), one end of the leveling cylinder (1010) is arranged on the ear plate, and the other end is fixedly connected to the top end of the pile leg (3); a plurality of connecting guide rods are arranged on the outer periphery of the main cylinder (101), a main cylinder flange is arranged at one end of the connecting guide rod away from the main cylinder (101), a connecting frame flange is arranged on the connecting frame (2), and the main cylinder (101) and the connecting frame (2) are connected via the main cylinder flange, the connecting frame flange, and a connecting piece arranged therebetween.
3. The piling guide frame according to claim 2, Features: The connecting frame (2) comprises an intermediate frame (201) and a side frame (202). The number of the barrel modules (1) is four. Two adjacent main barrels (101) are connected via the side frame (202), and two diagonal main barrels (101) are connected via the intermediate frame (201). An intermediate tube (204) is vertically arranged at the intersection of the intermediate frames (201), and a lifting eye plate (203) is arranged at the top of the intermediate tube (204).
4. The piling guide frame according to claim 3, Features: The middle frame (201) and the side frame (202) are both assemblies, and the lengths of the middle frame (201) and the side frame (202) can be adjusted by increasing or decreasing the number of assemblies in the middle frame (201) and the side frame (202).
5. The piling guide frame according to claim 1, Features: The bottom end of the pile leg (3) is provided with a shoe surface (302), and the shoe surface (302) prevents the pile leg (3) from sinking too deep into the seabed; the bottom surface of the shoe surface (302) is provided with a shoe tip (301), and the shoe tip (301) enables the pile leg (3) to be inserted into the seabed.
6. The piling guide frame according to claim 1, Features: The guide ring body (102) comprises an upper guide ring (1020) and a lower guide ring (1021); the upper guide ring (1020) is arranged at the upper end of the outer circumference of the main cylinder (101); the lower guide ring (1021) is arranged at the lower end of the outer circumference of the main cylinder (101); the centers of the upper guide ring (1020) and the lower guide ring (1021) are located on the same axis in the vertical direction.
7. The piling guide frame according to claim 6, Features: The upper guide ring (1020) is configured as an arm-holding structure. The upper guide ring (1020) is hinged to the outer periphery of the main cylinder (101). An opening and closing oil cylinder (105) is further provided between the outer periphery of the upper guide ring (1020) and the outer periphery of the main cylinder (101). The opening and closing oil cylinder (105) is used to open and close the upper guide ring (1020).
8. The piling guide frame according to claim 7, Features: The upper end surface of the upper guide ring (1020) is also provided with a bell mouth (103), and the bell mouth (103) is used to guide the small pile.
9. The piling guide frame according to claim 6, Features: The pushing assembly (104) comprises a plurality of telescopic cylinders, which are evenly distributed along the circumferential direction on the outer circumferences of the upper guide ring (1020) and the lower guide ring (1021). The telescopic cylinders penetrate the outer circumferences of the upper guide ring (1020) and the lower guide ring (1021) and are used to adjust the verticality of the small pile passing through the upper guide ring (1020) and the lower guide ring (1021).
10. A construction method of a pile driving guide frame, using the pile driving guide frame according to any one of claims 1 to 9, Features: Here are the steps: S1: connecting the barrel module (1), the connecting frame (2), and the pile legs (3) into a whole, and placing them on the deck of a crane vessel; the thrust assembly (104) is in an initial state; S2: After arriving at the designated sea area, the crane on the crane ship hoists the pile driving guide frame to the designated position on the seabed; S3: adjusting the telescopic length of the pile legs (3) in the main cylinder (101) so that the pile driving guide frame is in a horizontal state; S4: The crane on the crane ship lifts the small pile, and the small pile passes through the guide ring body (102) from top to bottom, and the verticality of the small pile in the guide ring body (102) is controlled by the jacking assembly (104) so that the small pile reaches a specified vertical state; S5: Continue to lower the small pile until it is inserted into the seabed. The crane is separated from the small pile, and the pile hammer is used to hammer the top of the small pile until the small pile reaches the specified height. S6: Repeat the operations of S4 and S5 to complete the piling operation of all small piles; S7: After all the small piles are driven, the crane lifts the pile driving guide frame back to the deck and transports it to the next construction site by the crane ship to repeat the operation steps S2-S6.
Citation Information
Patent Citations
Guide pipe rack and installation method thereof
CN107700453A
Pile-holding guiding pipe rack and construction method thereof
CN111501756A
Negative pressure barrel type guide frame platform for pile sinking construction and construction method of negative pressure barrel type guide frame platform
CN112942343A
Offshore wind power guide frame device capable of automatically leveling
CN216339648U
Construction device and method for offshore wind turbine foundation with piling performed later
US20180223497A1
Cited By
Method for vertically constructing three-pile guide frame
CN119640800A
Construction method for offshore hoisting, positioning and mounting of large guide pipe supporting frame
CN119663862A
Automatic hooking and unhooking lifting appliance and method for ultrahigh jacket
CN122646734A