Maintenance and reinforcement method for underwater bridge pier in tidal zone

By using bottomless steel box cofferdams and sacrificial anode protection systems on the water piers of bridges in the tidal area, combined with GINA waterstops and RPC concrete reinforcement technology, the problems of corrosion and concrete disease of the water piers of cross-sea bridges in the tidal area have been solved. It provides low-cost and safe maintenance and reinforcement, extending the service life of the bridge pier.

WO2024222286A1PCT designated stage expired Publication Date: 2024-10-31CCCC THIRD HARBOR ENGINEERING CO LTD +1

Patent Information

Application Number
PCT/CN2024/081611
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-26
Filing Date
2024-03-14
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

The underwater piers of cross-sea bridges are affected by factors such as seawater erosion and ship collisions in tidal areas, resulting in serious diseases such as rust and concrete defects. This increases the construction difficulty and safety risks of repair and reinforcement, and it is difficult to effectively mitigate them with existing technology.

Method used

The bottomless steel box cofferdam is used for water enclosure construction, including the repair of the underwater cap platform, the installation of the steel box cofferdam, the water stop, the installation of the sacrificial anode protection system, the concrete reinforcement of the piers and the dismantling of the steel box cofferdam, which is stopped by GINA. Technologies such as water hoses, hydraulic jacks and RPC concrete were used to establish a dry working environment and protection system to reduce interference from steel supports, and add fiberglass formwork to strengthen the concrete.

Benefits of technology

It realizes low-cost, safe maintenance and reinforcement of underwater piers of bridges in tidal areas, effectively alleviates the corrosion of steel bars, extends the service life of bridge piers, and reduces the impact of seawater erosion on underwater piers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024081611_31102024_PF_FP_ABST
    Figure CN2024081611_31102024_PF_FP_ABST
Patent Text Reader

Abstract

A maintenance and reinforcement method for an underwater bridge pier in a tidal zone, comprising the following steps: renovating an underwater pile cap (301), mounting a steel boxed cofferdam (100), mounting waterstops to the steel boxed cofferdam (100), mounting a sacrificial anode protective system, concrete-reinforcing a pier column (302), and dismantling the steel boxed cofferdam (100). The step of mounting the steel boxed cofferdam (100) comprises: first implanting anchor bolts (10B) to fix a lower internal brace (101) to the top surface of the pile cap (301); then connecting a side plate (10) of the steel boxed cofferdam (100) to the lower internal brace (101); and then using a hydraulic jack (30) to push a waterstop working platform (200) until a GINA waterstop (20) is closely attached to the side surface of the pile cap (301). The step of mounting the sacrificial anode protective system comprises: providing as a sacrificial anode zinc blocks (42) having a preceding galvanic series on rusted steel bars of the pier column (302), so as to protect iron steel bars (40) having a following galvanic series. The step of concrete-reinforcing the pier column (302) comprises: providing pad blocks (51) between the inner side surface of a glass fiber reinforced plastic formwork (50) and the outer surface of the pier column (302); using mortar to seal the outer edge of a bottom opening of the glass fiber reinforced plastic formwork (50); and, after the mortar reaches a certain strength, pouring RPC concrete. The maintenance and reinforcement method has the characteristics of being low-cost and safe, and can effectively alleviate the rusting of steel bars on underwater piers, thereby prolonging service lives of bridge pier structures.
Need to check novelty before this filing date? Find Prior Art

Description

A method for repairing and reinforcing underwater piers of bridges in tidal areas Technical Field

[0001] The invention relates to a method for repairing and reinforcing an underwater pier of a tidal zone bridge. Background Art

[0002] With the rapid development of modern highways, urban expressways and other large-scale transportation, more and more cross-river, cross-river and cross-sea bridges have emerged. While these bridges facilitate people's transportation, the loads borne by the bridge piers are also increasing year by year. The foundations of the bridge piers have already shown signs of disease. This is especially true for cross-sea bridges with navigation requirements. The piers are subject to the combined effects of adverse factors such as seawater erosion in tidal areas, ship collisions or scrapes, and the disease is particularly serious. These include rust expansion, concrete defects, ship collision marks, and the connection between the abutment and the pier. These pose a significant safety hazard, so repair and reinforcement measures are needed for the bridge piers. The underwater piers of the substructure of cross-sea bridges include pile foundations, abutments and pier columns. The repair and reinforcement of the substructure is different from the construction of the substructure of a new bridge. The repair and reinforcement construction is limited by factors such as the clearance under the bridge, existing structures, seawater tides and navigation requirements, which increases the construction difficulty of the repair and reinforcement work.

[0003] Summary of the Invention

[0004] The purpose of the present invention is to overcome the defects of the prior art and provide a method for repairing and reinforcing underwater piers of tidal zone bridges, which has the characteristics of low cost and safety, can effectively alleviate the corrosion of steel bars on the underwater piers, and improve the service life of the bridge pier structure.

[0005] The object of the present invention is achieved by providing a method for repairing and reinforcing underwater piers of bridges in tidal areas, which uses a bottomless steel cofferdam for water enclosure construction and includes the following steps: underwater pier repair, steel cofferdam installation, steel cofferdam waterstop, sacrificial anode protection system installation, pier column concrete reinforcement, and steel cofferdam removal;

[0006] During the underwater foundation repair process, divers are used with high-pressure water guns to clean the top and sides of the foundation to ensure that the foundation surface is flat and there is no silt accumulation on the sides.

[0007] During the installation steps of the steel casing cofferdam, the plane of the steel casing cofferdam is rectangular and is a bottomless steel casing, and the inner wall of the steel casing cofferdam is provided with a lower inner support, a middle purlin and an upper purlin in sequence from bottom to top; the inner bottom surface of the lower inner support is connected with an anchoring steel plate; the outer end of the lower inner support is connected to a corbel fixed on the side plate of the steel casing cofferdam, and the corbel and the lower inner support are connected by a flange; a waterstop working platform is provided at the bottom of each of the four side plates of the steel casing cofferdam, and the waterstop working platform is provided in a guide groove formed by a pressure plate and a bottom plate, and an installation groove for embedding the GINA waterstop is provided at the inner end of the waterstop working platform, and a plurality of hydraulic jacks are provided at intervals between the outer end of the waterstop working platform in the guide groove and the side wall of the steel casing cofferdam; when installing the steel casing cofferdam, the surveyor first measures and lays out the top surface of the pedestal in combination with the tidal difference. The position of the lower inner support of the steel casing cofferdam is then determined, and then anchor holes are opened on the top surface of the pedestal according to the layout, and epoxy resin anchor glue is filled in the anchor holes. The anchor bolts connected to the anchor steel plates of the lower inner support are then inserted into the anchor holes. After the epoxy resin anchor glue is cured, the lower inner support is fixed to the top surface of the pedestal. The corbels on the side panels of the steel casing cofferdam are then connected to the corresponding lower inner supports through flange bolts. Finally, the hydraulic jack on the outside of the waterstop working platform is used to simultaneously pressurize the waterstop working platform, and the waterstop working platform is pushed along the guide groove toward the pedestal until the GINA waterstop fits tightly against the side of the pedestal.

[0008] When performing the water-stopping step, first seal the connecting holes on the steel casing cofferdam, then pump out the water to create a dry working environment;

[0009] During the installation of the sacrificial anode protection system, a zinc block with a potential sequence at the front is set on the rusted steel bars of the pier column as a sacrificial anode to protect the iron steel bars at the back. The sacrificial anode protection system is established, including the following steps:

[0010] ① Chisel away the concrete at the rust-swelled and peeled areas on the pier to expose the steel bars, and then perform rust removal and anti-rust treatment on the exposed steel bars;

[0011] ② Electrically connect several galvanized flat irons to the exposed steel bars at intervals, with the ends of the galvanized flat irons extending below the designed low water level. Then, install zinc blocks at the ends of each galvanized flat iron with bolts, and then electrically connect the zinc blocks together in series;

[0012] The steps for reinforcing the pier column concrete include the following:

[0013] ①In the steel box cofferdam, remove the loose mortar on the concrete surface of the pier column, remove loose attachments and harmful pollutants, and use a chiseling machine or manual chiseling to roughen the surface of the reinforced part. The chiseling depth should be at least 10mm.

[0014] ② The permanent FRP formwork is hoisted in sections by manual labor and crawler cranes. The cross-section of the FRP formwork is larger than that of the pier column. Pads are placed between the inner side of the FRP formwork and the outer surface of the pier column. After the FRP formwork is fixed, the outer edge of the bottom of the FRP formwork is sealed with mortar. After the mortar reaches a certain strength, RPC concrete is poured.

[0015] ③RPC concrete is made of silica fume, cement, RPC special admixture, water and admixtures. The RPC concrete is poured within 30 minutes after mixing. The components are poured continuously with a maximum interval of no more than 6 minutes. After the concrete is poured, it is covered and watered for curing for no less than 7 days.

[0016] When dismantling the steel box cofferdam, first release the pressure applied to the waterstop working platform to allow seawater to enter the steel box cofferdam. Then use a crawler crane to cooperate with divers to remove the bolt connections between the four side panels of the steel box cofferdam underwater, and remove the unit side panels piece by piece.

[0017] The above-mentioned method for repairing and reinforcing underwater piers of bridges in tidal areas, wherein, during the step of installing the steel-cased cofferdam, the four side panels of the steel-cased cofferdam all adopt a double-wall structure, and each side panel is composed of two unit side panels spliced ​​together by high-strength bolts, and a rubber waterstop plate is provided on the splicing surface of each two unit side panels; each unit side panel includes an inner steel plate, an outer steel plate and a transverse stiffening plate and a vertical bulkhead plate connected between the inner steel plate and the outer steel plate; an operating platform is provided in a circumferential manner on the top of the steel-cased cofferdam, and a ladder is provided for construction personnel to enter and exit.

[0018] In the above-mentioned method for repairing and reinforcing underwater piers of bridges in tidal areas, when performing the steel box cofferdam installation step, the waterstop working platform is made of stainless steel, and polytetrafluoroethylene plates are provided between the top surface of the waterstop working platform and the pressure plate of the guide groove, as well as between the bottom surface of the waterstop working platform and the bottom plate of the guide groove.

[0019] The above-mentioned method for repairing and reinforcing underwater piers of bridges in tidal areas, wherein, during the step of installing the steel-cased cofferdam, the position of the side panels of the steel-cased cofferdam is fine-tuned by a hand winch, and the side panels are precisely positioned through guide holes and frustum-shaped guide rods pre-arranged on the flange joint surface connecting the corbel and the lower inner support, and then the flange bolts are tightened; and the top of the side panels is fixed to the clamps pre-installed on the piers with temporary channel steel.

[0020] In the above-mentioned method for repairing and reinforcing underwater piers of bridges in tidal areas, during the pier concrete reinforcement step, RPC concrete is poured by grouting, and a grouting pipe is arranged on each of the four sides of the pier, and the concrete is poured in a symmetrical order to ensure pressure balance around the fiberglass reinforced plastic formwork.

[0021] The repair and reinforcement method for underwater piers of tidal zone bridges of the present invention has the following characteristics:

[0022] 1) A retractable waterstop working platform consisting of GINA waterstop and hydraulic jacks was used. The jacks applied pressure to the waterstop working platform to achieve a sealed effect between the steel-cased cofferdam and the cap, preventing seawater from entering the steel-cased cofferdam. This provided a dry working environment for pier column repairs and utilized the original cap as a construction working platform, eliminating the need for a steel-cased cofferdam bottom plate and reducing costs.

[0023] 2) The lower internal support of the double-walled steel casing is fixed to the cap by embedding anchor bolts on the top surface of the cap. The anchor bolts are embedded in the anchor holes filled with epoxy resin anchoring glue. The upper side panels of the steel casing cofferdam use two purlins as internal supports to prevent the bottom of the steel casing cofferdam from falling on the seabed, providing a full-section construction environment for the pier columns, reducing interference from the steel supports attached to the pier columns, and facilitating construction.

[0024] 3) A sacrificial anode (zinc) with a higher potential sequence is installed on the original corroded steel bars of the bridge pier to protect the steel bars (iron) at the rear. This establishes a sacrificial anode protection system, effectively alleviating the corrosion of the steel bars and extending the service life of the pier columns.

[0025] 4) Adding a layer of RPC concrete to the outer surface of the original pier effectively repaired the damage on the pier in the tidal zone, effectively reduced the erosion of seawater on the steel bars of the pier, and extended the service life of the pier. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] FIG1 is a longitudinal elevation view of a steel box cofferdam used in a method for repairing and reinforcing underwater piers of tidal zone bridges according to the present invention;

[0027] FIG2 is a transverse elevation view of a steel-cased cofferdam used in the method for repairing and reinforcing underwater piers of tidal bridges of the present invention;

[0028] FIG2a is an AA view in FIG2;

[0029] FIG2 b is a BB view in FIG2 ;

[0030] FIG2c is a CC view in FIG2;

[0031] FIG2 d is a DD view in FIG2 ;

[0032] FIG3 is an enlarged view of the P portion in FIG2 ;

[0033] FIG4 is a schematic structural diagram of the steel casing cofferdam installation step of the method of the present invention;

[0034] 5 is another structural schematic diagram of the steel casing cofferdam installation step of the method of the present invention;

[0035] Figure 5a is a top view of Figure 5;

[0036] 6 is a schematic structural diagram of the sacrificial anode protection system installation step of the method of the present invention;

[0037] 7 is a schematic structural diagram of the pier column concrete reinforcement step of the method of the present invention;

[0038] FIG. 7 a is a view taken along arrow EE in FIG. 7 . DETAILED DESCRIPTION

[0039] The present invention will be further described below with reference to the accompanying drawings.

[0040] Please refer to Figures 1 to 7a. The method for repairing and reinforcing underwater piers of tidal zone bridges of the present invention adopts a bottomless steel box cofferdam for water enclosure construction, and includes the following steps: underwater pedestal trimming, steel box cofferdam installation, steel box cofferdam water stopping, sacrificial anode protection system installation, pier column concrete reinforcement and steel box cofferdam removal.

[0041] During the underwater foundation repair process, divers are used with high-pressure water guns to clean the top and sides of the foundation to ensure that the foundation surface is flat and there is no silt accumulation on the sides.

[0042] During the installation of the steel casing cofferdam, the plane of the steel casing cofferdam 100 corresponds to the plane structure of the platform 301 and is rectangular and bottomless; the four side panels 10 of the steel casing cofferdam 100 all adopt a double-wall structure, and each side panel 10 is composed of two unit side panels spliced ​​together by M20 high-strength bolts, and a 1cm thick rubber water stop plate is set on the splicing surface of each two unit side panels; each unit side panel includes an inner steel plate, an outer steel plate and a connection between the inner and outer steel plates. The transverse stiffeners and vertical bulkheads between the side steel plates and the outer steel plates; an operating platform is provided on the top of the steel box cofferdam 100, and a ladder is provided for construction workers to enter and exit; the inner wall of the steel box cofferdam 100 is provided with a lower inner support 101, a middle purlin 102 and an upper purlin 103 from bottom to top; wherein, the inner bottom surface of the lower inner support 101 is connected to the anchor steel plate 10A, and the rear end of the lower inner support 101 is connected to the bulldozer fixed on the side plate 10 The legs 11 are connected, and the brackets 11 are connected to the lower inner support 101 by flanges 12; the bottoms of the four side plates 10 of the steel casing cofferdam are provided with waterstop working platforms 200, and the waterstop working platforms 200 are arranged in the guide groove, which is composed of a pressure plate 201 and a bottom plate 202 fixed on the inner side of the side plate 10 of the steel casing cofferdam, and the inner end of the waterstop working platform 200 is provided with a mounting groove for embedding the GINA waterstop 20; the waterstop working platform 200 is made of stainless steel, and in order to facilitate the waterstop working platform 200 to slide smoothly in the guide groove, a polytetrafluoroethylene plate is provided between the top surface of the waterstop working platform 200 and the pressure plate 201 of the guide groove, and between the bottom surface of the waterstop working platform 200 and the bottom plate 202 of the guide groove; a plurality of hydraulic jacks 30 are arranged at intervals between the outer end of the waterstop working platform 200 in the guide groove and the side wall 101 of the steel casing cofferdam;

[0043] When installing the steel casing cofferdam, the surveyor first measures and lays out the position of the lower inner support 101 of the steel casing cofferdam 100 on the top surface of the pedestal 301 based on the tidal difference, then opens the anchor hole on the top surface of the pedestal 301 according to the layout, fills the anchor hole with epoxy resin anchor glue, and then inserts the φ20 anchor bolt 10B connected to the anchor steel plate 10A of the lower inner support 101 into the anchor hole. After the epoxy resin anchor glue is cured, the lower inner support 101 is fixed on the top surface of the pedestal 301, and then the bracket 11 on the side plate 10 of the steel casing cofferdam 100 is connected to the corresponding lower inner support 101 through flange bolts. Finally, the hydraulic jack 30 on the outside of the waterstop working platform 200 is used to simultaneously apply pressure to the waterstop working platform 200 to move the waterstop working platform 200 along the guide The trough is pushed toward the pedestal 301 until the GINA waterstop 20 fits tightly against the side of the pedestal 301, and the joints between every two GINA waterstops 20 are filled with rubber blocks; two φ32 fine-rolled threaded steel bars 104 are symmetrically tensioned at the bottom of the four side panels 10 of the steel casing cofferdam 100 to enhance the bottom connection performance of the steel casing cofferdam 100; when installing the side panels 10 of the steel casing cofferdam, the position of the side panels 10 is fine-tuned with a hand winch, and the side panels 10 are accurately positioned through the guide holes 13 and truncated cone-shaped guide rods 14 pre-set on the flange joint surface where the corbel 11 is connected to the lower inner support 101, and then the flange bolts are tightened; to prevent the side panels 10 from overturning, a temporary channel steel 15 is used to fix the top of the side panels 10 to the clamps 16 pre-installed on the pier 302;

[0044] When performing the water-stopping step of the steel-casing cofferdam, first seal the connecting holes on the steel-casing cofferdam 100, then pump out the water to create a dry working environment;

[0045] During the installation of the sacrificial anode protection system, a zinc block 42 at the front of the potential sequence is installed on the corroded steel bars of the pier 302 as a sacrificial anode to protect the iron steel bars 40 at the back of the potential sequence. This sacrificial anode protection system effectively alleviates steel bar corrosion and increases the service life of the structure. The process includes the following steps:

[0046] ① Chisel away the concrete at the rust-expanded and peeled areas on the pier 302 to expose the steel bars 40, and perform rust removal and anti-rust treatment on the exposed steel bars 40;

[0047] ② Electrically connect several galvanized flat irons 41 to the exposed steel bars 40 at intervals, with the ends of the galvanized flat irons 41 extending below the designed low water level. Then, bolt zinc blocks 42 to the ends of each galvanized flat iron 41, and then electrically connect the zinc blocks 42 together in series.

[0048] The pier column concrete reinforcement process includes the following steps:

[0049] ① In the steel box cofferdam 100, remove the loose mortar on the concrete surface of the pier 302, remove loose attachments and harmful pollutants, and use a chiseling machine or manual chiseling to roughen the surface of the reinforced part. The chiseling depth should be at least 10mm to ensure effective bonding between the RPC concrete and the structural base surface.

[0050] ② The permanent FRP formwork 50 is hoisted in sections using manual labor and a crawler crane. The cross-section of the FRP formwork 50 is 10 cm larger than that of the pier 302. A spacer 51 is placed between the inner side of the FRP formwork 50 and the outer surface of the pier 302. The spacer 51 is 5 cm thick. The FRP formwork 50 is secured by two U-shaped formwork members, which are then locked with bolts 52. After the FRP formwork 50 is secured, the outer edge of the bottom opening of the FRP formwork 50 is sealed with mortar. After the mortar reaches a certain strength, RPC concrete is poured to prevent leakage from the bottom.

[0051] ③RPC concrete is made of silica fume, cement, RPC special admixture, water and admixtures. The RPC concrete is poured within 30 minutes after mixing. The components are poured continuously with a maximum interval of no more than 6 minutes. After the concrete is poured, it is covered and watered for curing for no less than 7 days.

[0052] RPC concrete is grouted using grouting equipment. Since RPC concrete is poured in a viscous cement slurry and the planar structure of the pier 302 is rectangular, the fluidity of RPC concrete at the corners of the pier 302 is poor. Therefore, a grouting pipe is arranged on each of the four sides of the pier 302, and grouting is carried out in a symmetrical order to ensure pressure balance around the fiberglass reinforced plastic formwork 50.

[0053] When dismantling the steel-cased cofferdam, first release the pressure on the waterstop working platform 200 to allow seawater to enter the steel-cased cofferdam 100 to balance the internal and external pressures. Then use a 50T crawler crane in conjunction with divers to remove the bolt connections between the four side panels 10 of the steel-cased cofferdam 100 underwater in pieces, and remove the unit side panels piece by piece.

[0054] The above embodiments are only used to illustrate the present invention, rather than to limit the present invention. Those skilled in the art may make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also fall within the scope of the present invention and should be defined by the claims.

Claims

1. A method for repairing and reinforcing underwater piers of bridges in tidal areas, using bottomless steel box cofferdams for water enclosure construction, and The following steps are involved: Underwater foundation repair, steel box cofferdam installation, steel box cofferdam water stop, sacrificial anode protection system installation, pier column concrete reinforcement and steel box cofferdam removal; characterized by: When performing the underwater foundation repair step, divers are used with high-pressure water guns to clean the top and sides of the foundation to ensure that the surface of the foundation is flat and there is no silt accumulation on the sides; During the installation steps of the steel casing cofferdam, the plane of the steel casing cofferdam is rectangular and is a bottomless steel casing, and the inner wall of the steel casing cofferdam is provided with a lower inner support, a middle purlin and an upper purlin in sequence from bottom to top; the inner bottom surface of the lower inner support is connected with an anchoring steel plate; the outer end of the lower inner support is connected to a corbel fixed on the side plate of the steel casing cofferdam, and the corbel and the lower inner support are connected by a flange; a waterstop working platform is provided at the bottom of the four side plates of the steel casing cofferdam, and the waterstop working platform is provided in a guide groove formed by a pressure plate and a bottom plate, and an installation groove for embedding the GINA waterstop is provided at the inner end of the waterstop working platform, and a plurality of hydraulic jacks are provided at intervals between the outer end of the waterstop working platform in the guide groove and the side wall of the steel casing cofferdam; When installing the steel casing cofferdam, the surveyor first measures and lays out the position of the lower inner support of the steel casing cofferdam on the top surface of the cap according to the tidal difference, then opens a reinforcement hole on the top surface of the cap according to the layout, fills the reinforcement hole with epoxy resin reinforcement glue, and then inserts the anchor bolt connected to the anchor steel plate of the lower inner support into the reinforcement hole. After the epoxy resin reinforcement glue is cured, the lower inner support is fixed on the top surface of the cap, and then the corbels on the side plates of the steel casing cofferdam are connected to the corresponding lower inner support through flange bolts. Finally, the hydraulic jack on the outside of the waterstop working platform is used to simultaneously pressurize the waterstop working platform, and the waterstop working platform is pushed along the guide groove toward the cap until the GINA waterstop fits tightly with the side of the cap. When performing the water-stopping step, first seal the connecting holes on the steel casing cofferdam, then pump out the water to create a dry working environment; When installing the sacrificial anode protection system, a zinc block with a potential sequence in the front is set on the rusted steel bars of the pier column as a sacrificial anode to protect the iron steel bars with a potential sequence in the back. The sacrificial anode protection system is established, including the following procedures: ① Chisel away the concrete at the rusted and peeled parts of the pier to expose the steel bars, and then perform rust removal and rust prevention treatment on the exposed steel bars; ② Electrically connect several galvanized flat irons at intervals on the exposed steel bars, with the ends of the galvanized flat irons extending below the designed low water level. Then, a zinc block is installed at the end of each galvanized flat iron with bolts, and then several zinc blocks are electrically connected in series; The steps for strengthening the pier column concrete include the following: ①In the steel box cofferdam, remove the loose mortar on the concrete surface of the pier, remove the loose attachments and harmful pollutants, and use a chiseling machine or manual chiseling to roughen the surface of the reinforced part, and the chiseling depth must be at least 10mm; ②Use manual labor and crawler crane to hoist the permanent FRP formwork in blocks. The cross-sectional size of the FRP formwork is larger than that of the pier column. A pad is set between the inner side of the FRP formwork and the outer surface of the pier column. After the FRP formwork is fixed, the outer edge of the bottom of the FRP formwork is sealed with mortar. After the mortar reaches a certain strength, RPC concrete is poured. ③RPC concrete is made of silica fume, cement, RPC special admixture, water and admixture. The RPC concrete after mixing is poured within 30 minutes; the components are poured continuously, and the maximum interval time does not exceed 6 minutes; after the concrete is poured, it is covered and watered for curing for no less than 7 days; When dismantling the steel box cofferdam, first release the pressure on the waterstop working platform to allow seawater to enter the steel box cofferdam, then use a crawler crane to cooperate with divers to remove the bolt connections between the four side panels of the steel box cofferdam underwater, and remove the unit side panels piece by piece.

2. The method for repairing and reinforcing underwater piers of tidal area bridges according to claim 1, It is characterized in that During the installation steps of the steel box cofferdam, the four side panels of the steel box cofferdam all adopt a double-wall structure, and each side panel is composed of two unit side panels spliced ​​together by high-strength bolts, and a rubber water stop plate is arranged on the splicing surface of each two unit side panels; each unit side panel includes an inner steel plate, an outer steel plate and a transverse stiffening plate and a vertical bulkhead plate connected between the inner steel plate and the outer steel plate; an operating platform is arranged in a ring shape on the top of the steel box cofferdam, and a ladder is arranged for construction personnel to enter and exit.

3. The method for repairing and reinforcing underwater piers of tidal zone bridges according to claim 1, It is characterized in that When performing the steel box cofferdam installation steps, the waterstop working platform is made of stainless steel, and polytetrafluoroethylene plates are provided between the top surface of the waterstop working platform and the pressure plate of the guide groove, and between the bottom surface of the waterstop working platform and the bottom plate of the guide groove.

4. The method for repairing and reinforcing underwater piers of tidal area bridges according to claim 1, It is characterized in that During the installation steps of the steel box cofferdam, the position of the side plate of the steel box cofferdam is fine-tuned by a hand winch, and the side plate is accurately positioned through the guide holes and truncated cone guide rods pre-arranged on the flange joint surface where the corbel is connected to the lower inner support, and then the flange bolts are tightened; and the top of the side plate is fixed to the clamp pre-installed on the pier with a temporary channel steel.

5. The method for repairing and reinforcing underwater piers of tidal area bridges according to claim 1, It is characterized in that During the pier column concrete reinforcement step, the RPC concrete is poured by grouting, and a grouting pipe is arranged on each of the four sides of the pier column, and the pouring is performed in a symmetrical order to ensure the pressure balance around the fiberglass reinforced plastic formwork.

Citation Information

Patent Citations

  • Anodic sacrifice protection method of steel reinforced concrete bridge pier

    CN101109087A

  • Steel reinforced concrete sacrificial anode cathodic protection devices in atmospheric environment and method thereof

    CN101244926A

  • Deep-water bridge pier reinforcement structure and reinforcement methods

    CN102286941A

  • Large-span prestress concrete continuous beam deepwater pier construction process

    CN102720140A

  • Technology for reinforcing underwater pier column through combination of ultra-high performance concrete formwork and steel-fiber composite bars

    CN114808763A

Cited By

  • Management method for preventing cracking of plateau alpine high-speed railway bridge pier column

    CN120889208A

  • Steel hanging box construction method

    WO2026067876A1