The goods logistics system addresses the inflexibility of existing systems by using a master computer and input units to dynamically adjust transport orders and loading aid station statuses, enabling flexible adaptation to changing requirements and optimizing logistics operations.

WO2024223333A1PCT designated stage expired Publication Date: 2024-10-31JUNGHEINRICH AG
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
PCT/EP2024/059978
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-24
Filing Date
2024-04-12
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

Existing goods logistics systems lack flexibility to adapt to changing requirements within a logistics facility, as they are typically designed as island systems with limited central control, making it difficult to adjust behavior patterns of driverless industrial trucks and loading aid stations in response to dynamic conditions.

Method used

A goods logistics system comprising a master computer, driverless industrial trucks, and input units that generate trigger signals to modify transport orders and status changes of loading aid stations, allowing for flexible configuration and adaptation through a parameterized transport order definition and status change definition stored in a non-volatile data memory, enabling real-time adjustments and optimizations.

Benefits of technology

This approach provides unprecedented flexibility and adaptability, allowing the system to respond dynamically to changing circumstances and customer requirements without requiring different operations, ensuring efficient and optimized logistics operations within the facility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure EP2024059978_31102024_PF_FP_ABST
    Figure EP2024059978_31102024_PF_FP_ABST
Patent Text Reader

Abstract

The invention relates to a goods logistics system (30) and to a method for operating same. The goods logistics system (30) comprises a master computer (20), at least one automated guided industrial truck (22) designed for operation in a transport area (8), and at least one input unit (24). The input unit (24) is designed to generate a trigger signal and to transmit it to the master computer (20). The master computer (20) is designed to a) generate, change or delete, on the basis of the trigger signal and applying a stored transport order definition, a transport order to be carried out by the automated guided industrial truck (22) in the transport area (8), and to transmit a transport order signal associated with this transport order to the industrial truck (22), wherein the transport order signal causes the industrial truck (22) to carry out the transport order, and / or to b) change, on the basis of the trigger signal and applying a stored status-change definition, a status of at least one loading-aid station (18) assigned to the input unit (24), in particular to activate or deactivate this loading-aid station, wherein the transport order definition stored in the master computer (20) and / or the status-change definition stored in the master computer (20) are / is variable.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Goods logistics system and method for operating a goods logistics system

[0002] Description

[0003] The invention relates to a goods logistics system comprising a master computer, at least one driverless industrial truck configured for operation in a transport area, and at least one input unit, wherein the input unit is configured to generate a trigger signal and transmit it to the master computer. Furthermore, the invention relates to a method for operating a goods logistics system.

[0004] A goods logistics system is an intralogistics system used to handle materials and goods within a spatially limited area, such as a company premises or a factory. A goods logistics system does not serve the transport of goods outside of this enclosed area, which is typically handled by a freight forwarder, and is therefore also referred to as an intralogistics system.

[0005] Driverless industrial trucks are often used as transport systems in goods logistics systems. Driverless industrial trucks, which are also referred to as AGVs (Automated Guided Vehicles) or AMRs (Autonomous Mobile Robots) depending on their level of autonomy, move within a transport area of ​​a goods logistics facility and carry out transport orders. For this purpose, the driverless industrial trucks are controlled by a master computer, which can not only coordinate transport orders but also manage the traffic of the driverless industrial trucks.

[0006] A transport order typically consists of picking up or collecting a loading device, such as a pallet or the like, on which goods are arranged, from a loading device station and transporting or delivering it to another loading device station. The loading device can be loaded or empty. Various approaches are known for initiating such a transport.

[0007] EP 3 268 827 B1 shows a decentralized system in which transport orders are initiated without a central control of the driverless industrial trucks. A transport order to be carried out by the driverless industrial truck is initiated, for example, by operating a handheld control unit. It is also provided that an occupancy sensor is present at a goods station, which detects the presence of a corresponding object, for example, a product or a corresponding loading aid, and initiates the transport order. The known system is an island system used in comparatively small goods logistics facilities.

[0008] It is an object of the invention to provide a goods logistics system and a method for operating a goods logistics system, wherein the goods logistics system and the method are to be flexibly adaptable to changing requirements of a logistics facility in which such a goods logistics system is implemented or in which such a method is carried out, in particular with regard to changes in the goods logistics facility.

[0009] The object is achieved by a goods logistics system comprising a master computer, at least one driverless industrial truck configured for operation in a transport area, and at least one input unit, wherein the input unit is configured to generate a trigger signal and transmit it to the master computer, wherein the master computer is configured to a) generate, modify, or delete a transport order to be carried out by the driverless industrial truck in the transport area from the trigger signal using a stored transport order definition, and to transmit a transport order signal linked to this transport order to the industrial truck, wherein the transport order signal causes the industrial truck to carry out the transport order,and / or b) to change a status of at least one loading aid station assigned to the input unit from the trigger signal using a stored status change definition, in particular to activate or deactivate the loading aid station, wherein the transport order definition stored in the master computer and / or the status change definition stored in the master computer are / is changeable.

[0010] Advantageously, such a system allows the possible behavior patterns of the driverless industrial truck or the change in the status of the load-assisted transport station to be flexibly adapted by changing the transport order definition. The system's response to a corresponding trigger signal generated by the input unit is therefore not fixed; however, it can be flexibly modified. The behavior of the goods logistics system can be flexibly adapted to customer requirements and even changed during ongoing operation. This enables unprecedented flexibility and adaptability of the goods logistics system to different specifications and changing requirements. The transport order definition and the status change definition, for example, are stored in a file stored in a non-volatile data memory of the host computer.The definitions are defined in an adaptable parameter space, from which the system's behavior can be flexibly adapted. A specific system behavior can be defined for each input unit and each generated trigger signal. Unlike conventional systems, this definition—for example, the specific transport order generated in response to a specific trigger signal from a specific input unit—can be flexibly defined on the master computer or at a configuration unit.

[0011] The input unit is configured to generate a trigger signal. This is transmitted to the master computer by the master computer querying the corresponding state of the input unit, particularly cyclically.

[0012] According to one embodiment, the goods logistics system is further developed in that it comprises a configuration unit, wherein the master computer is configured to allow the configuration unit access to the transport order definition and / or the status change definition.

[0013] The goods logistics system is implemented, for example, in a goods logistics facility. The configuration unit can be located within the goods logistics facility or be part of it. Alternatively, it can be an external unit located outside the goods logistics facility. The configuration unit is, for example, a computer. With the help of the configuration unit, the transport order definition and / or the status change definition can be changed and adapted. This can also be done by a third party, such as a service provider or manufacturer of the goods logistics facility. The goods logistics system can be adapted or optimized in this way by utilizing external services. The transport order definition and / or the status change definition can be changed on the host computer itself or on the configuration unit.

[0014] The input unit can be assigned to one or more of the load aid stations, in particular permanently. This assignment is functional and defined in particular by the transport order. A spatial assignment between the input unit and the load aid stations can be provided, but is by no means mandatory. The input unit can be assigned to a single, specific load aid station. If this input unit generates a trigger signal, which the master computer queries, the master computer generates, for example, a transport order that includes this load aid station as the starting point. The trigger signal can be generated by a manual operation of the input unit, or a trigger signal can be generated by a sensor. For example, the input unit can be an occupancy sensor.As soon as the presence of a loading aid in the loading aid station has been detected, a corresponding trigger signal is generated so that the master computer creates a transport order in which this loading aid station is specified as the starting point.

[0015] If the input unit is functionally assigned to several load support stations, it can serve as a transport trigger for a list of sensor-managed start load support stations. The input unit first generates a trigger signal, for example in response to a manual operation. This combination of input unit and trigger signal, stored in the master computer, causes a status change, such as occupancy, to be queried for the load support stations in the list. For example, the occupancy sensors present at the load support stations and designed as input units, which indicate whether the load support station is full or empty, are queried. Subsequently, a transport order can be generated for the load support station for which occupancy is indicated, in accordance with the configuration stored in the master computer.

[0016] The trigger signal is queried by the master computer, particularly cyclically. A change in the status of the load-assisted station or a manually triggered command is transmitted by the input unit to the master computer via the trigger signal. The master computer then preferably creates, modifies, or deletes a transport order from or to the load-assisted station. The corresponding behavior of the goods logistics system is determined by the transport order definition in the master computer.

[0017] According to a further advantageous embodiment, it is provided that the input unit is a manually operated button or an occupancy sensor which is designed to generate the trigger signal in response to a manual actuation or a detection of the presence of a loading aid.

[0018] The input unit could be a push button or an illuminated push button, for example. An operator can press such a button to manually create, change, or delete a transport order, for example. The specific transport order, which is generated in response to the trigger signal from an input unit assigned to a specific load-assisted equipment station, is stored in the transport order definition and can be flexibly modified. This allows the behavior of the goods logistics system to be adapted to changing circumstances without requiring any different operation. The occupancy sensor, for example, is a contactless sensor that detects the presence of a load-assisted equipment at a station, e.g., using a light barrier.The occupancy sensor can also operate non-contact and be designed accordingly, for example, as a weight sensor or as a touch or contact sensor. A trigger signal can also be generated based on the data from such sensors and transmitted to the master computer. This computer generates, for example, a transport order according to which a load carrier is picked up at the load carrier station. If a load carrier is detected at a different station, for example based on its weight, a different transport order is generated. The specific transport order is again generated based on the transport order definition, which can be flexibly adapted to the respective needs.

[0019] An input unit, for example a button, can also be provided and configured to generate a trigger signal which causes a status change of the load support station linked to the input unit, in accordance with the status change definition. For example, by operating the corresponding input unit, the associated load support station can be activated or deactivated. Active load support stations can be accessed in the system. Deactivated load support stations cannot be accessed, for example because no operating personnel are available at them. Deactivation of the load support station means that it can no longer be accessed in the goods logistics system, for example because it no longer exists as such in the system.This could mean, for example, that the input unit detects the occupancy of a loading aid station with a loading aid, such as a pallet, and then triggers a signal, which is then queried by the master computer and converted into a transport order signal. As long as the occupancy of the loading aid station has not been removed by the removal of the loading aid using an industrial truck, the loading aid station cannot be occupied by another loading aid and is therefore deactivated, for example, for the delivery of pallets, but released for removal.

[0020] According to a further embodiment, the goods logistics system is further developed in that at least one first loading aid station and one second loading aid station, which are connected to one another by a transport path, are present in the transport area, wherein the transport order consists in transporting loading aids from the first loading aid station to the second loading aid station.

[0021] Such a transport order represents the simplest but also the most frequently implemented type of transport order.

[0022] According to a further advantageous embodiment, the goods logistics system is further developed in that the master computer is configured to provide a sequence control of the transport orders and / or a traffic control of the driverless industrial trucks in the transport area and to generate the transport order intended for transmission to the industrial truck, taking into account the parameters of the sequence control and / or traffic control. For example, the available or free industrial truck that is spatially closest to the loading equipment station can receive the transport order.

[0023] When processing transport orders generated by manual or automatic operation of the input unit (using the trigger signal), the general process control of the goods logistics system can be taken into account so that the generated transport orders can be integrated into ongoing operations as best as possible.

[0024] According to a further advantageous embodiment, the goods logistics system is further developed in that it is implemented in a goods logistics facility, wherein the goods logistics facility is realized on the basis of a planning model and using data stored in a logistics facility project file, and wherein the logistics facility project file comprises data that describe properties of at least one of the following components of the goods logistics facility: structural properties of a structure of the goods logistics facility, geometric and / or functional properties of the transport area and / or the transport route, geometric and / or functional properties of logistics infrastructure elements, in particular the first and second loading equipment station, geometric and / or functional properties of the driverless industrial truck,The logistics facility project file also contains parameters for the transport order definition.

[0025] According to a further embodiment, the goods logistics system is further developed in that the changeable transport order definition is defined in a causally linked parameter space and can be changed on the host computer or the configuration unit. The parameter space comprises as parameters: a) input units present in the goods logistics system, in particular all existing input units; b) for each input unit included, one or more possible types of trigger signals that can be generated by it; and c) for each trigger signal of each input unit, one or more status change requests for a transport order, in particular for creating, changing, or deleting the transport order.

[0026] As stated above, the parameter space includes the input units present in the goods logistics system, such as buttons, illuminated buttons, or occupancy sensors. The corresponding parameter can also specify which loading equipment station the corresponding input units are assigned to. One or more input units can be provided per loading equipment station.

[0027] Furthermore, for each individual input unit it is specified which trigger signals the corresponding input units can generate. The different trigger signals should be referred to as different types of trigger signals. One type of trigger signal is, for example, pressing a button for approximately 1 second. Another type of trigger signal would be, for example, pressing the button for approximately 3 seconds. Another type of trigger signal would be the signal from an occupancy sensor, which indicates that a loading aid is located in the loading aid station. In such a case, a distinction can again be made between a trigger signal which indicates that the loading aid station is occupant and a trigger signal which indicates that the loading aid station is unoccupied.

[0028] For each of the trigger signals of each input unit, a status change request of a transport order can be configured, in particular to create, change or delete this transport order.

[0029] For example, for a specific input unit, it can be configured that, upon a trigger signal indicating the pressing of the push button for approximately 3 seconds, the last transport order originating from the load-assisted transport station to which this input unit is assigned is deleted. Another example would be an input unit configured as an occupancy sensor. If a load-assisted transport device is present at the associated load-assisted transport station and this input unit detects the load-assisted transport device, a transport order is automatically triggered, which transports the load-assisted transport device from the respective load-assisted transport station to a desired destination station configured in the master computer.

[0030] This example leads directly to the next embodiment, according to which it is specifically provided that the parameter space further includes as parameters: for each transport order, provided the status change request specifies that it be created or changed, d) a starting load-assistance station or a group of starting load-assistance stations, and e) a destination load-assistance station or a group of destination load-assistance stations. These additional parameters apply to each transport order, provided it is created or changed.

[0031] As an alternative to a starting loading aid station that can be configured in the master computer and a destination loading aid station that can be configured for the transport order in the master computer, groups of starting loading aid stations and destination loading aid stations can be defined. These groups can be combined with additional information.

[0032] Following on from the example mentioned above, when a loading aid is detected at the loading aid station, a transport order is generated which has a group of loading aid stations rather than a single loading aid station as its target loading aid station. If, for example, corresponding occupancy sensors at the target loading aid stations indicate that a loading aid station in the group of target loading aid stations is fully occupied, the master computer can automatically change the transport order and redirect the transport order to a less occupied target loading aid station instead of the fully occupied target loading aid station. This target loading aid station is selected from the group of target loading aid stations. It is also intended that the transport order is not changed but is created directly with another free target loading aid station from the possible target loading aid stations.

[0033] This example also leads to a further embodiment, according to which the goods logistics system is further developed in that the parameters d) and / or e) are / are additionally causally linked to: i) a sensor signal of an occupancy sensor of the starting load-aid station or sensor signals from occupancy sensors of the group of starting load-aid stations, which indicates whether the load-aid station(s) is / are free or occupied, and / or ii) a parameter of a sequence control of the transport orders and / or a traffic control of the driverless industrial trucks in the transport area, which indicates whether the load-aid station is free or occupied, wherein the transport order is only generated if the starting load-aid station is occupied and the destination load-aid station is free.

[0034] Furthermore, it is specifically provided that, if there are several possible destination loading aid stations in the group of destination loading aid stations, the destination loading aid station to be reached is determined based on additional criteria that take into account the process control and / or traffic control in the goods logistics system. For example, stored priorities of the destination loading aid stations or the spatial proximity to the starting loading aid station can be taken into account.

[0035] According to a further embodiment, it is provided that the target loading aid station is determined by a user input on the industrial truck or the target selection is made manually on a client (application on a PC), for example on the host computer.

[0036] The process control or traffic control can be taken into account in such a way that, for example, in an application in which an industrial truck is required for a transport order, the industrial truck that is spatially closest to the starting loading aid station is used for this purpose.

[0037] The logistics facility project file contains the aforementioned components of the goods logistics facility stored in digital form. The goods logistics facility project file thus partially fulfills the function of a digital twin of the goods logistics facility. At the very least, however, the goods logistics facility project file flexibly provides the information required for modification, expansion, or maintenance of the goods logistics facility, so that corresponding changes to the goods logistics facility can be made easily. The transport order definition and the status change definition are also integrated into this digital image of the goods logistics facility. Thus, the functionality of the goods logistics system can be integrated into the digital image stored in the logistics facility project file.

[0038] The object is further achieved by a method for operating a goods logistics system, which comprises a master computer, at least one driverless industrial truck configured for operation in a transport area, and at least one input unit. The method comprises the following steps:

[0039] Generating a trigger signal at the input unit and transmitting the trigger signal to the master computer, wherein the master computer a) creates, changes or deletes a transport order to be carried out in the transport area by the driverless industrial truck from the trigger signal using a stored transport order definition and transmits a transport order signal linked to this transport order to the industrial truck, wherein the industrial truck carries out the transport order in response to the transport order signal, and / or b) changes a status of at least one load aid station assigned to the input unit from the trigger signal using a stored status change definition, in particular activating or deactivating the load aid station, wherein the transport order definition stored in the master computer and / or the status change definition stored in the master computer are / is changeable.

[0040] The procedure for carrying out a transport order has the same or similar advantages as those already mentioned with regard to the goods logistics system itself, so that repetition will be avoided.

[0041] The method is advantageously further developed in that the goods logistics system further comprises a configuration unit, wherein the master computer of the configuration unit allows access to the transport order definition and / or the status change definition and the configuration unit changes the transport order definition and / or the status change definition.

[0042] According to a further advantageous embodiment, it is provided that the input unit is a manually operated button or an occupancy sensor, wherein the trigger signal is generated in response to a manual actuation of the button or in response to a detection of the presence of a loading aid.

[0043] The method is further developed in particular in that at least one first loading aid station and a second loading aid station, which are connected to one another by a transport path, are present in the transport area, wherein, when the transport order is executed, at least one loading aid is transported from the first loading aid station to the second loading aid station.

[0044] According to a further embodiment, the method is characterized in that the master computer provides a sequence control of the transport orders and / or a traffic control of the driverless industrial trucks in the transport area and generates the transport order taking into account the parameters of the sequence control and / or the traffic control.

[0045] According to a further advantageous embodiment, the method is further developed in that the goods logistics system is implemented in a goods logistics facility, wherein the goods logistics facility is realized on the basis of a planning model and using data stored in a logistics facility project file, and wherein the logistics facility project file comprises data that describe properties of at least one of the following components of the goods logistics facility: structural properties of a structure of the goods logistics facility, geometric and / or functional properties of the transport area and / or the transport route, geometric and / or functional properties of logistics infrastructure elements, in particular the first and second loading equipment station, geometric and / or functional properties of the driverless industrial truck,The logistics facility project file also contains parameters for the transport order definition.

[0046] According to a further advantageous embodiment, the method is further developed in that the changeable transport order definition is defined in a causally linked parameter space and can be changed by the master computer or the configuration unit, and the parameter space comprises as parameters: a) input units present in the goods logistics system, in particular all existing input units, b) for each input unit included, one or more possible types of trigger signals that can be generated by it, and c) for each trigger signal of each input unit, one or more status change request(s) of a transport order, in particular to create, change or delete this, for each transport order, provided that the status change request specifies to create or change this: d) a starting loading aid station or a group of starting loading aid stations,and e) a destination loading aid station or a group of destination loading aid stations, wherein in particular the parameters d) and / or e) are / are additionally causally linked to: i) a sensor signal from an occupancy sensor of the starting loading aid station or sensor signals from occupancy sensors of the group of starting loading aid stations, which indicates whether the loading aid station(s) is / are free or occupied, and / or ii) a parameter of a sequence control of the transport orders and / or a traffic control of the driverless industrial trucks in the transport area, which indicates whether the loading aid station is free or occupied, wherein the transport order is only generated if the starting loading aid station is occupied and the destination loading aid station is free.

[0047] Furthermore, it is specifically provided that, if there are several possible destination loading aid stations in the group of destination loading aid stations, the destination loading aid station to be approached is determined based on further criteria specified by the process control and / or traffic control, for example, according to the stored priorities of the destination loading aid stations or the spatial proximity to the starting loading aid station. The described goods logistics system and the described method are used in the field of automated guided vehicle systems (AGVs). Automated guided vehicles (AGVs) in such an AGV must be supplied with transport orders in order to be able to transport goods and loading aids accordingly within a goods logistics facility.Such transport orders relate, for example, to the collection of goods and / or loading equipment from a first loading equipment station and the delivery of the goods and loading equipment to a second loading equipment station. To initiate such a transport, a user can, for example, enter manual inputs at an input unit. Such an input unit can be, for example, a push button, an illuminated push button, or a digitally displayed touch-sensitive surface. Furthermore, automatic systems can be provided to initiate a transport, i.e., to generate a corresponding transport order. Occupancy sensors, for example, are provided for this purpose. These can check the presence of goods or loading equipment at a loading equipment station either cyclically or triggered by the master computer. If a loading equipment is detected, a corresponding transport order can be generated.

[0048] The goods logistics system, or the method for operating the goods logistics system, enables flexible and modifiable transport order definitions and status change definitions. These define the transport order or the status change of the load-assisted station, which are triggered by a corresponding input at the input unit. The system supports the user in configuring a process control system by providing a causally linked parameter space from which the transport order definition or status change definition is defined for each individual input unit of the goods logistics system and for each individual trigger signal generated by the corresponding input unit. This allows the behavior of the industrial trucks and load-assisted stations to be flexibly defined and configured.Such a configuration can be stored in a goods logistics facility project file together with further definitions, for example the structural properties of a structure of the goods logistics facility, the geometric and / or functional properties of the transport area, the geometric and / or functional properties of logistics infrastructure elements and / or geometric and / or functional properties of the driverless industrial truck.

[0049] When commissioning the goods logistics facility, the relevant information from the logistics facility project file can be transferred to the host computer. The desired behavior of the goods logistics system, which was previously configured and defined, is then established. This configuration can advantageously be changed and adapted at any time, which provides a goods logistics facility equipped with a goods logistics system according to aspects of the invention with unprecedented flexibility.

[0050] Further features of the invention will become apparent from the description of embodiments of the invention together with the claims and the accompanying drawings. Embodiments of the invention may incorporate individual features or a combination of several features.

[0051] Within the scope of the invention, features marked with "particularly" or "preferably" are to be understood as optional features. The invention is described below, without limiting the general inventive concept, using exemplary embodiments with reference to the drawings. For all details of the invention not explained in more detail in the text, express reference is made to the drawings. They show:

[0052] Fig. 1 is a schematic representation of a goods logistics facility in which a goods logistics system is implemented, and

[0053] Fig. 2 shows a schematic functional representation of a goods logistics system.

[0054] In the drawings, identical or similar elements and / or parts are provided with the same reference numbers, so that a repeated presentation is omitted.

[0055] The goods logistics facility 2 schematically illustrated in Fig. 1 comprises a structure 6, which is depicted in the form of a building outline in dashed lines. A transport area 8 and transport routes 10 are located within the goods logistics facility 2. The transport area 8 is depicted with a correspondingly labeled polygon. A further boundary of the transport area 8 is located centrally, defining a recess. The transport routes 10 are depicted with arrows. The goods logistics facility 2 comprises logistics infrastructure elements 12. Examples shown are roller shutters 14, a loading station 16, and several loading equipment stations 18. A goods logistics system is implemented in the goods logistics facility 2. This system comprises a master computer 20, in which a modifiable transport order definition and / or a modifiable status change definition are / are stored.For example, this information is stored in a logistics facility project file 4, which can be transferred to the master computer 20 when the goods logistics facility 2 is commissioned. Driverless industrial trucks 22 are operated in the transport area 8. The master computer 20 provides appropriate traffic control for the operation of the driverless industrial trucks 22. Furthermore, the goods logistics system includes an input unit 24 configured to generate a trigger signal in response to, for example, a manual actuation of one of its buttons.

[0056] The definition of which type of transport is generated from which trigger signal is defined in the transport order definition stored in the master computer 20. The transport order definition is stored, for example, in the logistics facility project file 4. The master computer 20 is technically connected to the input unit 24. The trigger signal generated in the input unit 24 is transmitted to the master computer 20. The master computer 20 is further configured to generate a transport order to be carried out within the transport area 8 by one of the driverless industrial trucks 22. This transport order, or a transport order signal comprising or characterizing the transport order, is transmitted accordingly to the industrial truck 22.

[0057] The transport order transmitted from the master computer 20 to the industrial truck 22 causes the industrial truck 22 to execute the corresponding transport order. Based on the trigger signal from the input unit 24, the master computer 20 can generate the transport order, modify the transport order, or delete the transport order. The master computer 20 can further be configured to change the status of a load-assisted station 18 linked to the input unit 24 based on the trigger signal. For example, the load-assisted station 18 can be activated or deactivated. The manner in which the master computer 20 reacts to receiving the trigger signal is stored in the transport order definition or the status change definition, which can be part of the logistics facility project file 4.

[0058] The goods logistics system may further comprise a configuration unit 26, wherein the master computer 20 is configured to allow the configuration unit 26 access to the transport order definition and / or the status change definition. For example, the master computer 20 is configured to allow the configuration unit 26 access to the logistics facility project file 4. The configuration unit 26 is illustrated by way of example as an internal unit, i.e., it is part of the goods logistics facility 2. The configuration unit 26 may also be an external computer, for example, the computer of an externally commissioned service provider or the manufacturer of the goods logistics system.

[0059] The input unit 24 is shown as a mobile unit by way of example. The input unit 24 is preferably functionally permanently assigned to a loading aid station 18. As a rule, the input unit 24 is a stationary unit which, for example, is spatially directly assigned to one of the loading aid stations 18. The input unit 24 is, for example, a manually operated input unit 24, for example a push button. A trigger signal is generated at the input unit 24 by, for example, pressing the push button for one second. The input unit 24 can also be an illuminated push button, which in turn generates a corresponding trigger signal when operated for one second. The trigger signal is transmitted from the input unit 24 to the master computer 20 or queried by the master computer 20. An alternative trigger signal is, for example, pressing an illuminated push button for five seconds.Different trigger signals can be generated by pressing a button for different lengths of time. The master computer 20 reacts to receiving the corresponding trigger signals with different actions, as defined in the transport order definition or the status change definition. For example, a brief operation of a button at a load support station 18 can generate a trigger signal that causes the master computer 20 to generate a transport order that initiates a load support transport from the respective load support station 18 to another load support station 18. By pressing the push button for a long time, the previously generated transport order can be deleted. It can also be provided that a brief operation of a button activates the associated load support station 18, while a long operation of the button deactivates the load support station 18.It is also conceivable that different transport orders to different destinations or with different priorities are generated using different buttons, i.e., different input units 24, or different buttons on an input unit 24. Likewise, different input units 24 can be used, for example, to generate a transport order on the one hand and to bring about a status change of the loading aid station 18 on the other. With regard to the transport orders, the master computer 20 can, in particular, specify the order of the transport orders to be processed, so that higher-priority transport orders are processed preferentially. Such prioritization can also be generated, for example, by pressing a corresponding button as an input unit.In other words, for example, an input unit 24 (for example a button) can be present at a loading aid station 18, which allows a generated transport order to be prioritized.

[0060] The input unit 24 can also be configured as an occupancy sensor 28. Such an occupancy sensor 28 is shown as an example for one of the loading aid stations 18. The occupancy sensor 28 can be configured to detect the presence of a loading aid in a loading aid station 18. If the presence of a loading aid is detected, a trigger signal can be generated that changes the state of the loading aid station 18 (full or empty). The trigger signal is transmitted from the input unit 24 configured as an occupancy sensor to the master computer 20, and the master computer 20 generates a corresponding transport order from this information. The occupancy sensor 28 can be a contactless sensor, but it can also be a non-contactless sensor, which is activated, for example, by the physical triggering of a contact or which reacts based on weight.

[0061] If an occupancy sensor 28 detects a load aid, a transport order can be automatically triggered, which defines the transport of the load aid in question from the associated or assigned load aid station 18 to a destination load aid station. For example, such a transport takes place between a first load aid station 18A and a second load aid station 18B. "Automatically" here means that the presence of a load aid in the load aid station 18A is detected by means of a suitable input unit 24, which in response transmits a trigger signal to the master computer 20. In response to the trigger signal, the master computer 20 generates the transport order according to the configured transport order definition. By transmitting a corresponding transport order signal to an industrial truck 22, the transport order is processed by the industrial truck 22.The transmission of a transport order and the transmission of a transport order signal should be used synonymously in the context of the following description. In fact, the transmission of a transport order occurs by transmitting a corresponding transport order signal. The two loading equipment stations 18A, 18B are connected to each other by a transport path 10. The transport path 10 extends within the transport area 8.

[0062] The master computer 20 is further configured to provide a sequence control of the transport orders and / or a traffic control of the driverless industrial trucks 22 in the transport area 8. Thus, the execution or implementation of the transport orders can be optimally integrated into the logistics control of the goods logistics facility 2. In other words, the sequence control parameters and / or the traffic control parameters are taken into account when transmitting the transport order signal from the master computer 20 to the industrial truck 22.

[0063] The goods logistics facility 2 can be implemented on the basis of a planning model using the logistics facility project file 4. The logistics facility project file 4 contains data that, for example, describe properties of at least one of the following components of the goods logistics facility 2: structural properties of the structure 6 of the goods logistics facility 2, geometric and / or functional properties of the transport area 8 and / or the transport routes 10, geometric and / or functional properties of logistics infrastructure elements 12, for example, roller shutters 14 and in particular of loading equipment stations 18, geometric and / or functional properties of the driverless industrial truck 22.In a planning model, which is stored in the logistics facility project file 4, the changeable transport order definition is also stored, which defines the transport order to be carried out by the driverless industrial truck 22.

[0064] Fig. 2 shows a schematic functional representation of the goods logistics system 30. This includes the configuration unit 26, in which, for example, the logistics facility project file 4 is generated. This file is transferred to the master computer 20. The master computer 20 includes an input / output unit 32, a process control unit 34, and a traffic control unit 36. All of these units 32, 34, and 36 are supplied with corresponding information from the logistics facility project file. For this purpose, the master computer 20 includes a corresponding distribution unit 38.

[0065] Various input / output systems 40A, 40B, 40C are communicatively coupled to the input / output unit 32. The first input / output system 40A is coupled to one or more push buttons 42 as input unit(s). The second input / output system 40B is coupled to one or more illuminated push buttons 44 as further exemplary input unit(s). Each of these input units (24) is functionally assigned to a loading aid station 18. The third input / output system 40C is coupled to a loading aid station 18 with sensor monitoring, specifically to the occupancy sensor 28 present there. This sensor detects, for example, that a corresponding loading aid is present at the first loading aid station 18A. This information is communicated along the described information chain to the master computer 20. A transport order is generated in the master computer 20 according to the transport order definition.This is communicated to the industrial truck 22 via the traffic control system 36. The industrial truck 22 then goes to the first loading equipment station 18A and, for example, carries out a transport to the second loading equipment station 18B in accordance with the received transport order.

[0066] The process control underlying the creation of a transport order can be defined, for example, on the master computer 20 or on the configuration unit 26. A definition, which is subsequently stored as a transport order definition in the master computer 20, can be made, for example, as follows:

[0067] In a first step, the peripheral unit, i.e., the input unit 24, is selected, which is preferably assigned to a loading device station 18. For example, a button, an illuminated pushbutton, or an occupancy sensor is selected.

[0068] In a second step, a trigger signal, which the master computer 20 receives from the input unit 24, is selected. The trigger signals available in the system for an input unit 24 depend on the type of input unit 24 used and installed in the goods logistics facility and are stored in the system with the installation. Thus, a possible trigger signal of an input unit 24 is selected for which the system behavior is to be configured. The input unit 24 can be configured to emit various trigger signals. These various trigger signals are generated, for example, by pressing a push button for different lengths of time. For example, a brief press of a push button as the input unit 24 can generate a transport order that includes the loading aid station 18 assigned to the input unit 24 as the starting loading aid station.A trigger signal, which is generated by a long actuation of a push button, for example the actuation of the push button for approximately 3 seconds, can cause the master computer 20 to delete the previously generated transport order.

[0069] In a third step, a status change request of a transport order, for example to create, change or delete a transport order, is selected for the corresponding trigger signal of the input unit 24 on the host computer 20 or the configuration unit 26.

[0070] In a fourth step, a starting and / or a destination load support station is preferably selected on the master computer 20 or the configuration unit 26 for the status change request of the trigger signal from the input unit 24. In particular, it is provided that one or more starting and / or destination load support stations are selectable. In particular, depending on whether it is a matter of creating or changing a transport order (transportation) of a load support from a starting load support station or creating or changing a transport order (delivery) to a destination load support station, in the first case it can be provided that only one starting load support station but several destination load support stations are selectable, and in the second case it can be provided that only one destination load support station but several possible starting load support stations are selectable.

[0071] Depending on the definition of the transport order, further causalities can be taken into account in the process control. For example, a sensor query of the selected load aid station can be provided for the destination load aid station, which determines whether the target load aid station in question is free or occupied. In such a case, the transport order would only be generated if the target load aid station is actually free and thus available for the transport order. Alternatively, the selection of the target load aid station can be defined such that it is selected via a user input on the vehicle display. The process control definition can also provide for the master computer 20 to check whether the capacity of the target load aid station is sufficient for the transport order in question. Such information can be available in the master computer 20 for the purpose of process control.It is also possible to specify that not a single loading aid station is defined as the target loading aid station, but rather a group of loading aid stations. The selection of which specific loading aid station is selected as the concrete target loading aid station can, for example, also be made by the system based on the occupancy of the loading aid stations. In such a case, the system selects the target loading aid station that still has sufficient capacity for the transport order in question. If several target loading aid stations are available, a selection can be made according to additional criteria, such as prioritizing the various target loading aid stations or proximity to the starting loading aid station.

[0072] In the same or similar way as described above for the destination load-assisted station, the transport order can also be flexibly defined with regard to the starting load-assisted station. For example, the starting load-assisted station can be the one for which an assigned occupancy sensor, acting as input unit 24, indicates that a load-assisted device is actually present in the respective starting load-assisted station. A corresponding transport order is only generated if this information is positively confirmed by a corresponding occupancy sensor. In a similar way, the master computer 20 can also select the starting load-assisted station for the transport order, provided that the starting load-assisted station is not defined as a specific load-assisted station, but rather as a group of load-assisted stations.For example, the master computer 20 can, taking into account the sequence control, select the loading aid station with the highest occupancy as the starting loading aid station, so that an overcrowding of the loading aid station in question that may occur in the near future can be avoided in advance.

[0073] Through the causally linked selection described above, the goods logistics system supports the user in configuring the process control for generating transport orders. In particular, the system allows only those combinations of peripheral units—i.e., input units 24 and load support stations 18—and trigger signals that are actually present in the system and can be logically processed by it to be combined into transport orders.

[0074] All mentioned features, including those revealed solely in the drawings as well as individual features disclosed in combination with other features, are considered essential to the invention, both individually and in combination. Embodiments according to the invention may be fulfilled by individual features or a combination of several features.

[0075] 2 Goods logistics facility

[0076] 4 Logistics facility project file

[0077] 6 Building

[0078] 8 Transport area

[0079] 10 Transport route

[0080] 12 Logistics infrastructure element

[0081] 14 roller shutter

[0082] 16 charging stations

[0083] 18 loading equipment station

[0084] 18A first loading equipment station

[0085] 18B second loading equipment station

[0086] 20 master computers

[0087] 22 industrial trucks

[0088] 24 input unit

[0089] 26 Configuration unit

[0090] 28 occupancy sensor

[0091] 30 Goods logistics system

[0092] 32 Input / output unit

[0093] 34 Sequence control

[0094] 36 Traffic control

[0095] 38 Distribution unit A, 40B, 40CFirst to third input / output system

[0096] 42 push buttons

[0097] 44 illuminated push buttons

Claims

Goods logistics system and method for operating a goods logistics system 1. Goods logistics system (30), comprising a master computer (20), at least one driverless industrial truck (22) configured for operation in a transport area (8), and at least one input unit (24), wherein the input unit (24) is configured to generate a trigger signal and transmit it to the master computer (20), wherein the master computer (20) is configured to a) generate, modify, or delete a transport order to be carried out by the driverless industrial truck (22) in the transport area (8) from the trigger signal using a stored transport order definition, and to transmit a transport order signal linked to this transport order to the industrial truck (22), wherein the transport order signal causes the industrial truck (22) to carry out the transport order, and / or b) to change a status of at least one loading aid station (18) assigned to the input unit (24) from the trigger signal using a stored status change definition, in particular to activate or deactivate the loading aid station (18), wherein the transport order definition stored in the master computer (20) and / or the status change definition stored in the master computer (20) are / is changeable.

2. Goods logistics system (30) according to claim 1, further comprising a configuration unit (26), wherein the host computer (20) is configured to allow the configuration unit (26) access to the transport order definition and / or the status change definition.

3. Goods logistics system (30) according to claim 1 or 2, wherein the input unit (24) is a manually operated button or an occupancy sensor (28) which is configured to generate the trigger signal in response to a manual actuation or a detection of the presence of a loading aid.

4. Goods logistics system (30) according to one of the preceding claims, in which at least one first loading aid station (18A) and one second loading aid station (18B), which are connected to one another by a transport path (10), are present in the transport area (8), wherein the transport order consists in transporting at least one loading aid from the first loading aid station (18A) to the second loading aid station (18B).

5. Goods logistics system (30) according to one of the preceding claims, in which the master computer (20) is set up to To provide a sequence control (34) of the transport orders and / or a traffic control (36) of the driverless industrial trucks (22) in the transport area (8) and to generate the transport order taking into account the parameters of the sequence control (34) and / or the traffic control (36).

6. Goods logistics system (30) according to one of the preceding claims, which is implemented in a goods logistics facility, wherein the goods logistics facility is realized on the basis of a planning model and using data stored in a logistics facility project file, and wherein the logistics facility project file comprises data that describe properties of at least one of the following components of the goods logistics facility: structural properties of a structure (6) of the goods logistics facility, geometric and / or functional properties of the transport area (8) and / or the transport route (10), geometric and / or functional properties of logistics infrastructure elements, in particular the first and second loading aid station (18A, 18B), geometric and / or functional properties of the driverless industrial truck (22),The logistics facility project file also contains parameters for the transport order definition.

7. Goods logistics system (30) according to one of the preceding claims, wherein the changeable transport order definition can be defined in a causally linked parameter space and can be changed on the master computer (20) or the configuration unit (26), and the parameter space comprises as parameters: a) input units (24) present in the goods logistics system (30), in particular all input units (24) present, b) for each input unit (24) included, one or more possible types of trigger signals that can be generated by it, and c) for each trigger signal of each input unit (24), one or more status change request(s) of a transport order, in particular to create, change or delete this.

8. Goods logistics system (30) according to claim 7, wherein the parameter space further comprises as parameters: for each transport order, if the status change request indicates to create or change it, d) a starting load-assistance station or a group of starting load-assistance stations, and e) a destination load-assistance station or a group of destination load-assistance stations.

9. Goods logistics system (30) according to claim 8, wherein the parameters d) and / or e) are / are additionally causally linked to: i) a sensor signal of an occupancy sensor of the starting loading aid station or sensor signals of occupancy sensors of the group of starting loading aid stations, which indicates whether the loading aid station(s) is / are free or occupied, and / or ii) a parameter of a sequence control (34) of the transport orders and / or a traffic control (36) of the driverless industrial trucks (22) in the transport area (8), which indicates whether the loading aid station is free or occupied, The transport order is only generated if the starting loading equipment station is occupied and the destination loading equipment station is free.

10. A method for operating a goods logistics system (30), which comprises: a master computer (20), at least one driverless industrial truck (22) configured for operation in a transport area (8) and at least one input unit (24), comprising the following steps: Generating a trigger signal at the input unit (24) and transmitting the trigger signal to the master computer (20), wherein the master computer (20), a) generates, changes, or deletes a transport order to be carried out by the driverless industrial truck (22) in the transport area (8) from the trigger signal using a stored transport order definition and transmits a transport order signal linked to this transport order to the industrial truck (22), wherein the industrial truck (22) carries out the transport order in response to the transport order signal, and / or b) changes a status of at least one loading aid station (18) assigned to the input unit (24) from the trigger signal using a stored status change definition, in particular activating or deactivating the loading aid station (18),wherein the transport order definition stored in the master computer (20) and / or the status change definition stored in the master computer (20) are / is changeable., 11. The method according to claim 10, wherein the goods logistics system (30) further comprises a configuration unit (26), wherein the master computer (20) of the configuration unit (26) has access to the Transport order definition and / or the status change definition is permitted and the configuration unit (26) changes the transport order definition and / or the status change definition.

12. The method according to claim 10 or 11, wherein at least a first loading aid station (18A) and a second loading aid station (18B), which are connected to one another by a transport path (10), are present in the transport area (8), wherein when the transport order is carried out, at least one loading aid is conveyed from the first loading aid station (18A) to the second loading aid station (18B).

13. Method according to one of claims 10 to 12, in which the master computer (20) provides a sequence control (34) of the transport orders and / or a traffic control (36) of the driverless industrial trucks (22) in the transport area (8) and generates the transport order taking into account the parameters of the sequence control (34) and / or the traffic control (36).

14. The method according to any one of claims 10 to 13, wherein the goods logistics system (30) is implemented in a goods logistics facility, wherein the goods logistics facility is realized on the basis of a planning model and using data stored in a logistics facility project file, and wherein the logistics facility project file comprises data describing properties of at least one of the following components of the goods logistics facility: structural properties of a building (6) of the goods logistics facility, geometric and / or functional properties of the transport area (8) and / or the transport route (10), geometric and / or functional properties of logistics infrastructure elements, in particular the first and second loading aid station (18A, 18B), geometric and / or functional properties of the driverless industrial truck (22), wherein parameters of the transport order definition are also stored in the logistics facility project file.

15. The method according to one of claims 10 to 14, wherein the changeable transport order definition is defined in a causally linked parameter space and is changeable on the master computer (20) or the configuration unit (26), and the parameter space comprises as parameters: a) input units (24) present in the goods logistics system (30), in particular all existing input units (24), b) for each input unit (24) included, one or more possible types of trigger signals that can be generated by it, and c) for each trigger signal of each input unit (24), one or more status change request(s) of a transport order, in particular to create, change or delete this, for each transport order, provided that the status change request specifies to create or change this: d) a starting loading aid station or a group of starting loading aid stations,and e) a destination loading aid station or a group of destination loading aid stations, wherein in particular the parameters d) and / or e) additionally, are / is causally linked to: i) a sensor signal of an occupancy sensor of the start loading aid station or sensor signals from occupancy sensors of the group of start loading aid stations, which indicates whether the loading aid station(s) is / are free or occupied, and / or ii) a parameter of a sequence control (34) of the transport orders and / or a traffic control (36) of the driverless industrial trucks (22) in the transport area (8), which indicates whether the loading aid station is free or occupied, wherein the transport order is only generated if the start loading aid station is occupied and the destination loading aid station is free.

Citation Information

Patent Citations

  • Automated guided vehicle system

    EP3268827B1

  • Method and apparatus for organizing a storage area of ​​a warehouse and for operating a warehouse