Method for transforming tangent tower of double-circuit double-bundle transmission lines by lifting in electrified mode in another place

The invention discloses a method for transforming a tangent tower of double-circuit double-bundle transmission lines by lifting in an electrified mode in another place, which belongs to the field of equipment installation. In the method, the current old tower and a common-tower double-circuit transmission lines thereon are involved. The method adopts a construction process of assembling a new tower in the electrified mode at a new tower position by using a landed derrick mast, transferring earth wires from the old tower to the new tower in the electrified state, and dismantling the old tower in the electrified mode in the longitudinal space between the common-tower double-circuit transmission lines, avoids the phenomenon that the two common-tower double-circuit lines have power failure atthe same time, improves the safety and the reliability of a power grid, overcomes the difficulty of an insufficient safe distance between a craning rope and electrified wires, and solves the problemsthat an cross arm member is overlarge, has the insufficient safe distance to the electrified wires, and is difficultly controlled by installation personnel. By slitting a tower body section member into 4 parts according to main materials and craning the 4 parts separately, the craning load of the derrick mast is lowered, and working safety is improved. The method can be widely applied to the fields of the displacement or transformation of the conventional overhead power transmission lines or iron towers.
Owner:SHANGHAI JIULONG ELECTRIC POWER GROUP +1

A large-scale nuclear power double-bundle steam-water separation reheating device

The invention relates to a steam-water separating and reheating device, in particular to a large nuclear power double-pipe bundle steam-water separating and reheating device. The invention aims to solve the problems of low efficiency and heat transfer property and complex structure of the traditional steam-water separating and reheating device of a nuclear power unit. The large nuclear power double-pipe bundle steam-water separating and reheating device comprises a shell, a two-stage reheater pipe bundle and a steam-water separation element, wherein the two-stage reheater pipe bundle comprises a group of U-shaped heat exchange pipes with fins and a group of supporting plates, the group of U-shaped heat exchange pipes with fins are coaxially arranged to form a pipe bundle, the pipe bundle sequentially passes through the group of supporting plates, the steam-water separation element comprises an upper baffle plate, a lower baffle plate, a plurality of corrugated plates and a plurality of water-drop gathering hooks, a plurality of wet steam inlets are arranged on the lower surface of the shell, a plurality of wet steam outlets are arranged on the upper surface of the shell, and a shell dewatering outlet is arranged on the lower surface of the shell. The large nuclear power double-pipe bundle steam-water separating and reheating device is used for dewetting and reheating wet steams discharged by a high pressure cylinder of a nuclear power turboset.
Owner:HARBIN TURBINE +1

Method for replacing ground potentials of tension insulator string in vertical dual-string arrangement

The invention discloses a method for replacing ground potentials of a tension insulator string in vertical dual-string arrangement, and the method comprises the following steps: setting a locking device on a front clamp in an unlocking state; installing the front clamp on an assigned position independently; using an operating arm to clamp insulated pulling plates or pulling rods into the front clamp by an operator and then adjusting the insulated pulling plates or pulling rods to the required length by the operator; locking the locking device on the front clamp to finish the installation of the left and right insulated pulling plates or pulling rods; installing a back clamp on a triangle connecting plate at a crosspiece side; connecting lead screws of the back clamp with the insulated pulling plates or pulling rods and then fastening the lead screws at the left and right sides, thus conductor insulators are not strained; then operating the insulation operating arm to stop the operation; and finally taking out the insulators so as to install new insulators at the assigned positions, and then loosening a fixture. The whole fixture is disassembled to be partially installed on electrically-operated double bundle conductors in a vertical arrangement mode, thus solving the problem that the ground potential hot line operation can not be realized by using the traditional construction technologies.
Owner:STATE GRID CORP OF CHINA +1

Double-bundle artificial ligament and manufacturing method, implanting device and implanting method thereof

The invention provides a double-bundle artificial ligament and a manufacturing method, an implanting device and an implanting method thereof. The double-bundle artificial ligament comprises a flexible long-strip-shaped body. The long-strip-shaped body comprises a first body segment, a second body segment and a third body segment. The manufacturing method includes the steps that a lateral plate is woven; the lateral plate is cut, and a fold line is set; a first pull wire and a second pull wire are threaded from one side of the fold line to the other side of the fold line; corners are cut; the lateral plate is wound to the fold line from the two sides to form a cylinder; the first pull wire and the second pull wire are tensioned; a wire is wound around the two ends of the long-strip-shaped body. The implanting device comprises a hanging assembly and a fixing assembly. The implanting method includes the steps that the third body segment is arranged on the hanging assembly in a penetrating mode; the hanging assembly is fixed; the first body segment and the second body segment are fixed. According to the double-bundle artificial ligament and the manufacturing method, the implanting device and the implanting method thereof, the problems that knee joint stability can not be recovered, and donor site insufficiency, donor site complications, allograft ligament formation time delay and immunological rejection occur in reconstruction of an anterior cruciate ligament are solved, the reconstruction effect is greatly improved, and the adaptability is high.
Owner:SHANGHAI KINETIC MEDICAL

Decomposition type tensioning resistant double string vertically-arranged insulator string ground potential replacing clamping apparatus

The invention discloses a decomposition type tensioning resistant double string vertically-arranged insulator string ground potential replacing clamping apparatus which comprises a front clamp, an insulating pull rod, a fastening screw rod and a rear clamp. The front clamp can achieve long-distance indirect installation and is blocked. The insulating pull rod is matched with the front clamp in use, a positioning pin is arranged on an end portion of the insulating pull rod and is perpendicular to a rod body of the insulating pull rod, and the front clamp is wing-shaped. Through holes matched with the insulating pull rod are formed in two ends of two side wings of the wing-shaped front clamp, and grooves extending along the axial direction of the through holes and enabling the positioning pin fixed on the insulating pull rod to penetrate through are formed in hole walls of the through holes. The decomposition type tensioning resistant double string vertically-arranged insulator string ground potential replacing clamping apparatus has the advantages that the whole set of the clamping apparatus is decentralized to elements in a decomposition type and is installed on vertically-arranged double bundled conductors which operate with electricity, and the problem that ground potential cannot operate with the electricity through construction process in the past is solved.
Owner:STATE GRID FUJIAN ELECTRIC POWER CO LTD +2

Vertical double-bundled line outgoing operation platform

The invention relates to an overhead power transmission line operation device, and particularly relates to a vertical double-bundled line outgoing operation platform. The vertical double-bundled line outgoing operation platform comprises a pulley capable of walking on a power transmission line, and is characterized in that the top part of the body of the pulley is further provided with a rotary man-carrying platform, and the rotary man-carrying platform is rotatably connected with the top part of the body of the pulley. The top part of the rotary man-carrying platform is further provided with a line hanging control device at the central position, wherein the line hanging control device is connected with an on-off mechanism of the pulley, and the front end and the rear end of the lower side of the rotary man-carrying platform are fixedly provided with two wheel axles. The line hanging control device comprises a control switch, a line hanging hook, a reset spring and a fuse protection device. The vertical double-bundled line outgoing operation platform is simple in structure, flexible in use, compact and portable, and convenience to assemble and disassemble, can be used in compact tower line live working, solves problems of traditional line outgoing operations, and completes shakeproof hammer reset line outgoing repair work, so that the work efficiency and quality are improved, the labor intensity is reduced, the operation time is shortened, and the operation safety is ensured.
Owner:HENGSHUI POWER SUPPLY BRANCH OF STATE GRID HEBEI ELECTRIC POWER +2

Double-bundled-conductor hoisting frame with idler wheels

The invention discloses a double-bundled-conductor hoisting frame with idler wheels and relates to the technical field of electric power circuit construction. The double-bundled-conductor hoisting frame comprises a hoisting frame body, hanging rings or hanging hooks are arranged on the hoisting frame body, the two idler wheels are arranged on the hoisting frame body, the two idler wheels are arranged in an up-and-down mode or a left-and-right mode, and the axes of the two idler wheels are both perpendicular to conductors. The pair of idler wheels which can revolve around the axes of the idler wheels are arranged on the double-bundled-conductor hoisting frame, therefore, the bundled conductors can slide along with the rotation of the idler wheels when the bundled conductors are placed on the idler wheels to be hoisted, the hard friction between an existing bundled conductor lifting machine and the bundled conductors is avoided, abrasion and breakage to conductor bodies of the bundled conductors in the hoisting process are reduced to the maximum degree, integrity of the conductors is powerfully protected, the work efficiency of electric power circuit remodeling is greatly improved, and the workload of secondary maintenance caused by damage to the conductors is avoided.
Owner:STATE GRID CORP OF CHINA +2

Maintenance tool special for dismounting and mounting double-bundle conductor clamp

The invention discloses a maintenance tool special for dismounting and mounting a double-bundle conductor clamp, and belongs to the technical field of electric system power transformation. The maintenance tool comprises a clamping element, a force applying element and an insurance element and is characterized in that the clamping element is composed of a clamping plate I (1) and a clamping plate II (2), the clamping plate II (2) is connected to the L-shaped clamping plate I (1) through a square concave opening (10), a nut (4) is welded above the clamping plate I (1), a screw rod sleeve (3) is welded to the clamping plate II (2), a screw rod (5) penetrates through the nut (4) of the clamping plate I (1) to be connected with the interior of the screw rod sleeve (3) of the clamping plate II (2), a thread is arranged on the portion, connected with the interior of the screw rod sleeve (3), of the screw rod (5), anti-falling screws (7) are arranged on the two sides of the screw rod sleeve (3), and a safety pin and a safety belt are mounted in two through holes (9) in the back of the clamping plate I (1) respectively. According to the maintenance tool, the work efficiency of dismounting and mounting back the double-bundle conductor clamp can be improved, the labor intensity of a maintainer can be lowered, and human-machine ergonomics is optimized.
Owner:DALI POWER SUPPLY BUREAU YUNNAN POWER GRID

Equipotential outlet trolley for double bundle conductor

Disclosed is an equipotential outlet trolley for a double bundle conductor. The trolley is characterized by comprising two sliding wheel groups with identical structures, each of the two sliding wheel groups comprises four sliding wheels installed between connection plates on two sides through sliding wheel shafts. A support shaft is installed on the connection plate on one side of one of the sliding wheel groups, and a locating rod is installed on the connection plate on the same side of the other sliding wheel group. One end of a movable insulating plate is hinged to the support shaft, and the other end of the movable insulating plate is matched with the locating rod. So as to facilitate the assembly, the two sliding wheels on the upper portion of a conductor and the two sliding wheels on the lower portion of the conductor are installed on two connection plates respectively and assembled at high altitudes. By means of the equipotential outlet trolley for the double bundle conductor, 220-KV double bundle conductors can be subjected to living outlet operation, so that living operation distances among phases can meet technical requirements, personnel and device securities are guaranteed, and the field operation security is improved.
Owner:PANJIN POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER SUPPLY +1

Special tool for wire routing inspection of double-bundled transmission lines

The invention discloses a special tool for wire routing inspection of the double-bundled transmission lines, comprises two wires, a carrying box, a first arc-shaped plate, a second arc-shaped plate, aconnecting column, a connecting groove, a fixing block, a supporting rod, a tool box, a cover plate, a U-shaped connecting rod and a threaded column. The two wires are arranged in parallel with eachother. The carrying box is arranged at the lower end of the two wires. A notch is formed on one side of the carrying box. An arc-shaped groove is formed in each of the two ports of the notch. The twoarc-shaped grooves are respectively in sliding connection with the first arc-shaped plate and the second arc-shaped plate. The invention relates to a special tool for wire routing inspection of the double-bundled transmission lines. When the sub-interval rod is encountered, the switching lock of one spindle can be opened first, and be relocked after crossing the sub-interval rod. Then a span of another spindle can be completed, the inspection is continued. According to the special tool for wire routing inspection of the double-bundled transmission lines, the invention is safe and labor-saving,and the overhead transmission line routing inspection work time is shortened from the original 2 hours to 30 minutes.
Owner:YANTAI POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER +1

Special conductor lifting device for double-bundled conductors

The invention belongs to the technical field of electric power operation and maintenance equipment, and particularly relates to a special conductor lifting device for double-bundled conductors. The special conductor lifting device comprises a conductor lifting device body adopting a bilaterally symmetrical structure, wherein conductor supporting hooks are arranged at ends of the conductor lifting device body, rubber pads are arranged on inner sides of the conductor supporting hooks, the middle of the conductor lifting device body is connected with a steering joint through connecting bolts, the conductor lifting device body is connected with connecting plate supporting frames through two triangular connecting frames, the two connecting frames are parallel to each other, each connecting frame is connected with one connecting plate supporting frame, each connecting plate supporting frame comprises an adjusting screw rod, one end of each adjusting screw rod is connected with the corresponding connecting frame, the other end of each adjusting screw rod is connected with a Y-shaped supporting plate, and a pulley is arranged on the outer side of the conductor lifting device body. The special conductor lifting device has the advantages that connecting plates can be supported, workers can use the device conveniently, and the conductors can be effectively protected.
Owner:STATE GRID SHANDONG ELECTRIC POWER +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products