[0023] A method for marking a line with a water gauge on an inclined berth, comprising the following steps:
[0024] S1. In real ship positioning, due to the bottom deflection caused by the large closing of the berth, the original theoretical baseline cannot be followed, and the revised baseline must be used. Usually, the mean value of the bottom deflection is used as the baseline, and a horizontal hose is used to adjust the bottom of the ship. Each measurement point of the deflection shall be measured and submitted to the shipowner and ship inspection for inspection to determine the baseline.
[0025] Beside the left side of the berth, at the intersection of bow water gauge rib level line 2 and straight section line 1, at the intersection of amidship water gauge rib level line 2 and straight section line 1, and at the intersection of stern water gauge r...