A coal loading system and a coal loading method

By designing a coal loading system including guide roller mounting plate, cylinder and linkage components, the problems of low efficiency and labor intensity of traditional loading methods are solved, the automation and efficient loading of coal loading are realized, and the coal mines in the mine are improved Loading security.

CN111747141BActive Publication Date: 2025-02-11HUAINAN MINING IND GRP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010741469.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-29
Publication Date
2025-02-11
Estimated Expiration
2040-07-29

AI Technical Summary

Technical Problem

The traditional coal loading method is inefficient and labor-intensive, and the delivery of local coal sales is affected due to the reduction of labor.

Method used

A coal loading system was designed, including guide roller mounting plate, guide roller, support table, cylinder, knife switch, linkage components, funnel and belt. Through the cooperation of cylinder and linkage components, automatic loading of coal is achieved and manual operation is reduced. .

Benefits of technology

The automation of coal loading is achieved, which reduces the large amount of labor required by traditional loading methods, improves loading efficiency, and accurately controls the amount of coal through belt electronic scales, improving loading safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111747141B_ABST
    Figure CN111747141B_ABST
Patent Text Reader

Abstract

The invention discloses a coal loading system and a loading method thereof, comprising a support platform, a cylinder and a hopper; the top of the support platform is movably connected with a guide roller mounting plate through a hinge rod; a plurality of guide rollers arranged along the forward direction of the coal are mounted on the inner side of the guide roller mounting plate; a belt is arranged above the guide roller; a knife gate is arranged above the belt to guide the coal into the hopper on the side of the guide roller mounting plate; there is a gap between the lower mouth of the knife gate and the upper end surface of the belt; the cylinder is mounted above the belt; the output end of the cylinder is connected to a linkage component; the linkage component has two output ends; one output end of the linkage component is connected to the knife gate and drives the knife gate to rise and fall; the other output end of the linkage component is connected to the guide roller mounting plate below the belt, and drives the hinge rod on the guide roller mounting plate to make an upward circular motion around the hinge point on the support plate; the invention reduces a lot of labor and improves loading efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal loading, in particular to a coal loading system and a loading method thereof. Background Art

[0002] With the increase in mine production and the strengthening of safety and security management, the efficiency of local sales shipments has become one of the factors restricting mine production. The traditional form of local sales coal transportation is loaded by engineering vehicles, which is not only inefficient and labor-intensive, but also poses a great hidden danger to the safety management of coal yards, which brings limitations and bottlenecks to the shipment of local sales coal, seriously restricting the shipment of local sales coal in mines.

[0003] At present, most mines have seen a significant reduction in labor force due to objective factors such as retirement of employees, internal retirement, lack of new employees and increasing age "aging". However, the shipment of local coal requires more manpower, and the two are in conflict, resulting in the impact on the shipment of local coal.

[0004] The comparative document publication number CN201510284735.6 discloses a coal distribution device; the coal is separated into fine clean coal, lump clean coal and coking coal through an outside loading chute, a coal feeder and a coal jig sorter, and the three types of coal are transported by a first belt, a second belt and a third belt respectively, and the items transported by the first belt and the second belt are directly loaded and transported at the end of the belt; the comparative document does not disclose how the coal is transported to the loading vehicle by the belt, and only uses the traditional loading method, which requires a lot of labor. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a coal loading system which saves labor.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a coal loading system, comprising a guide roller mounting plate, a guide roller, a support platform, a cylinder, a knife gate, a linkage assembly, a funnel and a belt; the top of the support platform is movably connected with the guide roller mounting plate through a hinge rod; the hinge rod performs a circular motion with the hinge point on the support platform as the center; the other hinge point of the hinge rod is installed on the side wall of the guide roller mounting plate; a plurality of guide rollers arranged along the forward direction of the coal are installed on the inner side of the guide roller mounting plate; a belt is arranged above the guide roller; A knife gate is arranged above the belt to guide the coal into the hopper on the side of the guide roller mounting plate; there is a gap between the lower end of the knife gate and the upper end surface of the belt; the cylinder is mounted above the belt; the output end of the cylinder is connected to a linkage assembly; the linkage assembly has two output ends; one output end of the linkage assembly is connected to the knife gate and drives the knife gate to rise and fall; the other output end of the linkage assembly is connected to the guide roller mounting plate below the belt, and drives the hinge rod on the guide roller mounting plate to make an upward circular motion around the hinge point on the support plate.

[0007] Personnel only need to operate the loading car and control the start and close of the cylinder to load the coal through the coordination of knife switches and belt transportation, which reduces the large amount of manpower required for traditional loading methods and improves loading efficiency.

[0008] Preferably, the linkage assembly includes a 7-shaped linkage rod, a connecting rod, and a linkage plate; the 7-shaped linkage rod includes a cross bar at the top and a vertical bar at the bottom; the vertical bar is fixed to the bottom of one end of the cross bar away from the knife switch; the knife switch is fixed to the other end of the cross bar; the cylinder is fixed to the cylinder bracket; the cylinder bracket is fixed to the ground; the output end of the cylinder is movably connected to the end of the cross bar facing the knife switch through a hinge seat; a connecting rod extending toward the guide roller mounting plate is fixed to one end of the cylinder bracket; the rod body of the vertical rod is rotatably connected to the connecting rod through a hinge shaft; the bottom end of the vertical rod is rotatably connected to the linkage plate through a hinge shaft; the other end of the linkage plate is rotatably connected to the guide roller mounting plate through a hinge shaft.

[0009] Preferably, a belt electronic scale installed under the belt is also provided in front of the support platform; the belt electronic scale is fixed on an electronic scale bracket; and the electronic scale bracket is fixed on the ground.

[0010] Preferably, after the guide roller mounting plate is lowered to the lowest position, the cross-section of the belt is U-shaped.

[0011] Preferably, the output end of the cylinder is arranged obliquely toward the belt.

[0012] Preferably, with the belt advancing direction as the normal direction, the knife gate and the belt are arranged at an angle of 5-15 degrees in the transverse direction, and the funnel is arranged below the side where the knife gate body forms an obtuse angle with the normal.

[0013] Preferably, there are two hinge rods, which are respectively arranged at two ends of the support platform.

[0014] Preferably, the guide roller mounting plate is fixed on a mounting plate bracket; and the mounting plate bracket is fixed on the ground.

[0015] Preferably, the guide roller is rotatably mounted on the guide roller mounting plate via a roller shaft.

[0016] A loading method of a coal loading system comprises the following steps:

[0017] S1 starts the cylinder to drive the linkage components to work;

[0018] One output end of the S2 linkage assembly drives the knife gate to descend, and the other output end pulls the guide roller mounting plate to rotate around the hinge point on the support seat. The guide roller mounting plate rises, driving the guide roller to rise, and the belt on the guide roller rises until the belt surface fits the knife gate;

[0019] The S3 belt transports coal, which is intercepted by the knife gate and directed into a hopper on one side, and then flows from the hopper into the loading vehicle.

[0020] Start the cylinder, which pushes one end of the horizontal bar fixing the knife gate to move, and makes the vertical bar at the other end of the horizontal bar rotate around the end of the connecting rod. One end of the horizontal bar fixing the knife gate also rotates around the end of the connecting rod. The knife gate position at the end of the horizontal bar drops, and at the same time, the bottom end of the vertical bar rotates around the end of the connecting rod, that is, it moves in the direction away from the knife gate, and then the guide roller mounting plate is pulled by the linkage plate to move in the direction away from the knife gate. Under the limiting action of the hinge rod, the guide roller mounting plate makes an arc motion upward and toward the vertical bar at the hinge point between the hinge rod and the support platform, that is, the guide roller mounting plate is raised, and the guide roller is driven up to lift the belt on the guide roller until it fits tightly with the knife gate. The coal transported on the belt is intercepted by the knife gate at the knife gate position and directed to a pre-prepared funnel on one side, and then led from the funnel to the loading car; the personnel only need to operate the loading car and control the start and close of the cylinder, and realize the loading of coal through the coordination of the knife gate and the belt transportation, which reduces the large amount of manpower required for traditional loading methods and improves the loading efficiency; during the time period of opening and closing the cylinder, the personnel can control the amount of loaded coal by observing the weight displayed on the belt electronic scale, reduce the errors caused by manual loading, and avoid overloading or underloading of the loading car; finally, the whole process requires very few operators, which greatly improves the safety of coal loading in the mine.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] A. Personnel only need to operate the loading car and control the start and close of the cylinder to load coal through the cooperation of knife switch and belt transportation, which reduces the large amount of labor required by traditional loading methods and improves loading efficiency;

[0023] B. Personnel can control the amount of coal loaded by observing the weight displayed on the belt electronic scale, reduce the errors caused by manual loading, and avoid overloading or underloading the loading vehicle. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a front view of the overall structure of the coal loading system of the present invention;

[0025] Figure 2 This is a state diagram of the guide roller mounting plate when it is lowered in the present invention.

[0026] Figure numbers: 1. Guide roller mounting plate; 11. Guide roller; 2. Hinge rod; 3. Support platform; 4. Cylinder; 41. Cylinder bracket; 5. Knife switch; 6. Linkage assembly; 61. 7-shaped linkage rod; 63. Connecting rod; 64. Linkage plate; 7. Funnel; 8. Belt electronic scale; 81. Electronic scale bracket; 9. Belt. DETAILED DESCRIPTION

[0027] In order to facilitate those skilled in the art to understand the technical solution of the present invention, the technical solution of the present invention is further described in conjunction with the accompanying drawings of the specification.

[0028] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0029] See also Figure 1 and Figure 2 , this embodiment discloses a coal loading system, including a guide roller mounting plate 1, a guide roller 11, a support platform 3, a cylinder 4, a knife gate 5, a linkage assembly 6, a funnel 7 and a belt 9. The top of the support platform 3 is movably connected to the guide roller mounting plate 1 through two symmetrical hinge rods 2. The hinge rod 2 performs circular motion with the hinge point on the support platform 3 as the center. The other hinge point of the hinge rod 2 is installed on the side wall of the guide roller mounting plate 1. A plurality of guide rollers 11 arranged along the forward direction of the coal are installed on the inner side of the guide roller mounting plate 1. The guide roller 11 is rotatably mounted on the guide roller mounting plate 1 through the roller shaft. The guide roller mounting plate 1 is fixed to the mounting plate bracket by bolts. The mounting plate bracket is fixed to the ground by bolts.

[0030] A belt 9 is arranged above the guide roller 11. A knife gate 5 is arranged above the belt 9 to guide the coal into the funnel 7 arranged on the side of the guide roller mounting plate 1. The cross section of the belt 9 is U-shaped. There is a gap between the lower end of the knife gate 5 and the upper end surface of the belt 9. With the forward direction of the belt 9 as the normal direction, the knife gate 5 and the belt 9 are arranged at an angle of 5-15 degrees in the transverse direction, and the funnel 7 is arranged below the side where the knife gate 5 body forms an obtuse angle with the normal.

[0031] The linkage assembly 6 includes a 7-shaped linkage rod 61, a connecting rod 63, and a linkage plate 64. The 7-shaped linkage rod 61 includes a crossbar at the top and a vertical rod at the bottom. The vertical rod is fixed to the bottom of one end of the crossbar away from the knife gate 5. The knife gate 5 is fixed to the other end of the crossbar. The cylinder 4 is fixed to the cylinder bracket 41 by bolts. The cylinder bracket 41 is fixed to the ground by rivets. The output end of the cylinder 4 is tilted toward the belt 9. The output end of the cylinder 4 is movably connected to the end of the crossbar facing the knife gate 5 through a hinge seat. One end of the cylinder bracket 41 is fixed with a connecting rod 63 extending toward the guide roller mounting plate 1 by bolts. The rod body of the vertical rod is rotatably connected to the connecting rod 63 through a hinge shaft. The bottom end of the vertical rod is rotatably connected to the linkage plate 64 through a hinge shaft. The other end of the linkage plate 64 is rotatably connected to the guide roller mounting plate 1 through a hinge shaft.

[0032] A belt electronic scale 8 installed below the belt 9 is also provided in front of the support platform 3. The belt electronic scale 8 is fixed on an electronic scale bracket 81. The electronic scale bracket 81 is fixed on the ground.

[0033] A loading method of a coal loading system, comprising:

[0034] S1 starts the cylinder to drive the linkage assembly to work; specifically, cylinder 4 pushes the 7-shaped linkage rod to move;

[0035] The S2 cylinder 4 pushes one end of the crossbar fixing the knife gate 5 to move, and makes the vertical rod at the other end of the crossbar rotate around the rod end of the connecting rod 63, and one end of the crossbar fixing the knife gate 5 also rotates around the rod end of the connecting rod 63, and the position of the knife gate 5 at the end of the crossbar drops, and at the same time, the bottom end of the vertical rod rotates around the rod end of the connecting rod 63, that is, it moves in the direction away from the knife gate 5, and then pulls the guide roller mounting plate 1 to move away from the knife gate 5 through the linkage plate 64. Under the limiting action of the hinge rod 2, the guide roller mounting plate 1 makes an arc movement upward and toward the vertical rod at the hinge point between the hinge rod 2 and the support platform 3, that is, the position of the guide roller mounting plate 1 rises, and drives the guide roller 11 to rise, and lifts up the belt 9 on the guide roller 11 until it is tightly fitted with the knife gate 5;

[0036] The coal transported on the S3 belt 9 is intercepted by the knife gate 5 at the knife gate 5 position, and is guided to a funnel 7 prepared in advance on one side, and then led from the funnel 7 to the loading vehicle.

[0037] The personnel only need to operate the loading vehicle and control the start and close of the cylinder 4, and realize the loading of coal through the cooperation of the knife switch 5 and the belt 9 transportation, which reduces the large amount of labor required for the traditional loading method and improves the loading efficiency; during the time period of opening and closing the cylinder 4, the personnel can control the amount of loaded coal by observing the weight displayed on the belt electronic scale 8, reduce the error caused by manual loading, and avoid overloading or underloading of the loading vehicle; finally, the whole process requires very few operators, which greatly improves the safety of coal loading in the mine.

[0038] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-limiting from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any reference numerals in the claims should not be regarded as limiting the claims involved.

[0039] The above-described embodiments merely represent implementation methods of the invention. The protection scope of the present invention is not limited to the above-described embodiments. For those skilled in the art, several modifications and improvements may be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A coal loading system, characterized in that: It includes a guide roller mounting plate, a guide roller, a support platform, a cylinder, a knife gate, a linkage assembly, a funnel and a belt; the top of the support platform is movably connected to the guide roller mounting plate through a hinge rod; the hinge rod performs a circular motion with the hinge point on the support platform as the center; the other hinge point of the hinge rod is installed on the side wall of the guide roller mounting plate; a plurality of guide rollers arranged along the forward direction of the coal are installed on the inner side of the guide roller mounting plate; a belt is arranged above the guide roller; a knife gate is arranged above the belt to guide the coal into the hopper on the side of the guide roller mounting plate; there is a gap between the lower mouth of the knife gate and the upper end surface of the belt; the cylinder is mounted above the belt; the output end of the cylinder is connected to the linkage assembly; the linkage assembly has two output ends; one output end of the linkage assembly is connected to the knife gate and drives the knife gate to rise and fall; the other output end of the linkage assembly is connected to the guide roller mounting plate below the belt, and drives the hinge rod on the guide roller mounting plate to perform an upward circular motion around the hinge point on the support platform; The linkage assembly includes a 7-shaped linkage rod, a connecting rod, and a linkage plate; the 7-shaped linkage rod includes a cross bar at the top and a vertical bar at the bottom; the vertical bar is fixed to the bottom of one end of the cross bar away from the knife switch; the knife switch is fixed to the other end of the cross bar; the cylinder is fixed to the cylinder bracket; the cylinder bracket is fixed to the ground; the output end of the cylinder is movably connected to the end of the cross bar facing the knife switch through a hinge seat; a connecting rod extending toward the guide roller mounting plate is fixed to one end of the cylinder bracket; the rod body of the vertical rod is rotatably connected to the connecting rod through a hinge shaft; the bottom end of the vertical rod is rotatably connected to the linkage plate through a hinge shaft; the other end of the linkage plate is rotatably connected to the guide roller mounting plate through a hinge shaft.

2. A coal loading system according to claim 1, characterized in that: A belt electronic scale installed below the belt is also provided in front of the support platform; the belt electronic scale is fixed on an electronic scale bracket; and the electronic scale bracket is fixed on the ground.

3. A coal loading system according to claim 1, characterized in that: After the guide roller mounting plate is lowered to the lowest position, the cross section of the belt is U-shaped.

4. A coal loading system according to claim 1, characterized in that: The output end of the cylinder is arranged obliquely toward the belt.

5. A coal loading system according to claim 1, characterized in that: Taking the belt forward direction as the normal direction, the knife gate and the belt are arranged at an angle of 5-15 degrees in the transverse direction, and the funnel is arranged below the side where the knife gate body forms an obtuse angle with the normal line.

6. A coal loading system according to claim 1, characterized in that: There are two hinge rods, which are respectively arranged at two ends of the support platform.

7. A coal loading system according to claim 1, characterized in that: The guide roller mounting plate is fixed on the mounting plate bracket; the mounting plate bracket is fixed on the ground.

8. A coal loading system according to claim 1, characterized in that: The guide roller is rotatably mounted on the guide roller mounting plate through a roller shaft.

9. A coal loading method for a coal loading system according to claim 1, characterized in that: The following steps are involved: S1 starts the cylinder to drive the linkage components to work; One output end of the S2 linkage assembly drives the knife gate to descend, and the other output end pulls the guide roller mounting plate to make an arc motion upward and toward the vertical rod at the hinge point between the hinge rod and the support platform. The guide roller mounting plate rises, driving the guide roller to rise, and the belt on the guide roller rises until the belt surface fits the knife gate; The S3 belt transports coal, which is intercepted by a knife gate and directed into a hopper on one side, and then flows from the hopper into the loading truck.

Citation Information

Patent Citations

  • A coal distribution and collection device

    CN105016091B

  • Dual-gate guide speed control flow-limiting lightering bunker device

    CN102897542A

  • Coal loading system

    CN212402752U