Uninterruptible power supply control method, device and uninterruptible power supply
By performing status detection and prediction on multiple UPS systems, implementing precise power distribution and current suppression schemes, and combining voltage waveform diagnosis, the problems of uneven power distribution and insufficient fault prediction in the parallel operation of multiple UPS systems are solved, thereby achieving efficient and stable system operation and reducing faults.
Patent Information
- Application Number
- CN202410472374.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-04-19
AI Technical Summary
When multiple UPS systems are running in parallel, uneven power supply can occur due to manufacturing errors, inconsistent aging levels, and differences in maintenance conditions, reducing system efficiency. Traditional condition monitoring methods cannot accurately predict power demand fluctuations and potential faults, affecting system reliability and security.
By performing status detection and prediction on multiple UPS systems, historical and forecast datasets are obtained, power demand is predicted, power allocation and circulating current suppression schemes are implemented, and multi-objective optimization is carried out in conjunction with voltage waveform detection and load anomaly diagnosis to dynamically adjust system operation.
It improves the efficiency of electricity use, reduces energy waste, ensures the continuity and stability of power supply, reduces the risk of system failure, and improves system reliability and security.
Smart Images

Figure CN118336893B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power supply control, and in particular to a control method and device for an uninterruptible power supply and an uninterruptible power supply. Background Art
[0002] As a key power protection equipment, the stable and efficient operation of the uninterruptible power supply (UPS) system is crucial to ensure the power supply of key facilities. With the improvement of information and automation levels, multiple UPS systems often adopt parallel working mode to enhance the reliability and power supply capacity of the system. However, this parallel mode introduces new technical challenges, especially in power distribution, current suppression and system status monitoring.
[0003] The parallel operation of multiple UPS systems complicates the management and control of the system. In actual operation, each UPS unit may exhibit different power response characteristics due to manufacturing errors, different degrees of aging, or differences in maintenance conditions. If this difference is not properly managed and adjusted, it may lead to uneven power supply, increase system wear and reduce overall efficiency. Secondly, with the development of technology, the amount of data and processing speed requirements required by the UPS system have increased, which puts higher requirements on status detection and prediction technology. Traditional status detection methods may not be able to accurately predict the power demand fluctuations and potential failure problems that each UPS unit may encounter in the future, thereby affecting the reliability and safety of the entire system. Summary of the invention
[0004] The present application provides a control method and device for an uninterruptible power supply and an uninterruptible power supply, which are used to improve the control accuracy of the uninterruptible power supply.
[0005] In a first aspect, the present application provides a method for controlling an uninterruptible power supply, the method comprising:
[0006] Perform status detection and status prediction on multiple UPS systems configured in parallel to obtain a historical status data set and a status prediction data set for each UPS system;
[0007] Performing power demand forecasting on the historical status data set and the status forecast data set to obtain power demand data of each UPS system;
[0008] Allocate power to the multiple UPS systems according to the power demand data to obtain a first power allocation scheme and a first circulating current suppression scheme;
[0009] Performing voltage waveform detection on the plurality of UPS systems based on the first power allocation scheme and the first circulating current suppression scheme to obtain voltage waveform data of each UPS system;
[0010] Performing load abnormality diagnosis on the voltage waveform data to obtain load abnormality diagnosis results for each UPS system;
[0011] The first power allocation scheme and the first circulating current suppression scheme are optimized by multiple objectives according to the load abnormality diagnosis result to obtain a second power allocation scheme and a second circulating current suppression scheme.
[0012] In a second aspect, the present application provides a control device for an uninterruptible power supply, the control device for an uninterruptible power supply comprising:
[0013] A detection module, used to perform status detection and status prediction on multiple UPS systems configured in parallel, and obtain a historical status data set and a status prediction data set for each UPS system;
[0014] A prediction module, used to perform power demand prediction on the historical status data set and the status prediction data set to obtain power demand data of each UPS system;
[0015] an allocation module, configured to allocate power to the plurality of UPS systems according to the power demand data, and obtain a first power allocation scheme and a first circulating current suppression scheme;
[0016] a processing module, configured to perform voltage waveform detection on the plurality of UPS systems based on the first power allocation scheme and the first circulating current suppression scheme to obtain voltage waveform data of each UPS system;
[0017] A diagnosis module, used to perform load abnormality diagnosis on the voltage waveform data to obtain load abnormality diagnosis results for each UPS system;
[0018] An optimization module is used to perform multi-objective optimization on the first power allocation scheme and the first circulating current suppression scheme according to the load abnormality diagnosis result to obtain a second power allocation scheme and a second circulating current suppression scheme.
[0019] A third aspect of the present application provides an uninterruptible power supply, which is used to execute the above-mentioned uninterruptible power supply control method.
[0020] A fourth aspect of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores instructions, which, when executed on a computer, enable the computer to execute the above-mentioned uninterruptible power supply control method.
[0021] In the technical solution provided by the present application, by performing state detection and state prediction on multiple UPS systems, the control method can obtain the historical state data set and the predicted state data set of each UPS system. This prediction function enables the system to pre-identify potential changes in power demand and possible system failures, so as to make adjustments in advance to ensure the stable operation of the UPS system. The collected historical and predicted data sets are used to predict power demand, and accurate power allocation is performed on multiple UPS systems based on the prediction results. This not only improves the efficiency of power use, but also helps to reduce energy waste and optimize power allocation, thereby reducing operating costs and increasing economic benefits. By implementing the first power allocation scheme and the first circulating current suppression scheme, the control method can effectively manage the circulating current between parallel UPS systems, reduce current conflicts and imbalances, and thus improve the quality of the voltage waveform and the overall power quality of the system. Load abnormality diagnosis of voltage waveform data helps to timely discover and diagnose potential abnormal conditions of the system, such as overload or equipment failure. This timely diagnosis can reduce the risk of system failure and improve the reliability and safety of the system. According to the load abnormality diagnosis results, the control method can also perform multi-objective optimization on the existing power allocation scheme and circulating current suppression scheme. This dynamic optimization enables the system to automatically adjust according to actual operating conditions, maintain optimal operating conditions, ensure the continuity and stability of power supply, and thus improve the control accuracy of the uninterruptible power supply. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0023] Figure 1 A schematic diagram of an embodiment of a method for controlling an uninterruptible power supply in an embodiment of the present application;
[0024] Figure 2 Schematic diagram of an embodiment of a control device for an uninterruptible power supply in an embodiment of the present application. DETAILED DESCRIPTION
[0025] The embodiments of the present application provide a control method, device and uninterruptible power supply of an uninterruptible power supply. The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments described herein can be implemented in an order other than that illustrated or described herein. In addition, the terms "including" or "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0026] For ease of understanding, the specific process of the embodiment of the present application is described below. Figure 1 , an embodiment of the control method of the uninterruptible power supply in the embodiment of the present application includes:
[0027] Step S101, performing status detection and status prediction on multiple UPS systems configured in parallel to obtain a historical status data set and a status prediction data set for each UPS system;
[0028] It is understandable that the execution subject of the present application may be a control device of an uninterruptible power supply, or a terminal or a server, which is not limited here. The present application embodiment is described by taking a server as the execution subject as an example.
[0029] Specifically, multiple UPS systems configured in parallel are tested for parallel connection to obtain connection status verification results to ensure that the connection between all UPS systems is correct and stable. Based on the connection status verification results, multiple UPS systems are tested for battery status. The health of the battery directly affects the reliability and efficiency of the UPS system. The detection includes the remaining battery power, battery charging status, and battery health. The input voltage and output voltage of each system are tested, which helps to evaluate the voltage stability and regulation capability of the UPS system under normal and abnormal conditions. Load interface detection is performed on multiple UPS systems to obtain interface status data to confirm that all interfaces are under normal working conditions and there are no physical or electrical faults. At the same time, communication status detection is performed to ensure that all UPS systems can effectively exchange information in a network. The battery status data, voltage status data, interface status data, and communication status data are scaled and transformed. The normalization process is to eliminate the impact of different measurement standards and ensure the comparability of various data in subsequent analysis. The set transformation is to integrate these normalized data into a unified data set to obtain a historical status data set for each UPS system. Based on the historical data set, the time series analysis method is used to predict the status of each UPS system. Time series analysis helps predict the future status by analyzing the time-dependent patterns in the data set, and obtains the status prediction data set of each UPS system.
[0030] Step S102: Perform power demand forecasting on the historical status data set and the status forecast data set to obtain power demand data of each UPS system;
[0031] Specifically, key historical state features are extracted from the historical state data set, and future state prediction features are extracted from the state prediction data set. These features include voltage level, current intensity, load fluctuation, and battery health status. The most influential factors for power demand forecasting are screened out through data analysis techniques such as principal component analysis (PCA) or automatic feature engineering tools. Feature mapping and matrix conversion are performed on multiple historical state features and multiple state prediction features to obtain a target state feature matrix. The target state feature matrix is input into a preset autoencoder, and the autoencoder configuration includes a two-layer long short-term memory network (LSTM) to process time series data. Through this structure, the autoencoder can effectively learn and extract time-dependent features, convert them into a time series state feature matrix, and strengthen the expression of time-related dynamic characteristics in the data. The power demand is predicted for the time series state feature matrix through a single-layer long short-term memory network in the autoencoder. The power demand of each UPS system is predicted based on the extracted time series features.
[0032] Step S103: Allocate power to multiple UPS systems according to the power demand data to obtain a first power allocation scheme and a first circulating current suppression scheme;
[0033] Specifically, the finite control set model predictive control algorithm is used to perform initial power allocation based on the power demand data of each UPS system, and a preliminary power allocation plan is generated by optimizing the control actions in the current and future series of prediction steps. By taking advantage of the model predictive control, the future power demand changes are anticipated, so that the output power of each system can be more accurately allocated to ensure the continuity and stability of power supply. The efficiency of the preliminary power allocation plan is evaluated, and the operating efficiency of the system under different power allocation conditions is analyzed, including energy consumption, power loss and its impact on the overall performance of the system. The plan is optimized based on the power allocation efficiency data, and the optimal power allocation plan is found using algorithms such as genetic algorithms or gradient descent methods, which helps to improve the energy efficiency and operating cost-effectiveness of the entire UPS system group. A load balancing analysis is performed to ensure that the loads between all UPS systems can be as even as possible to avoid overload or underload. According to the obtained load balancing data, the power allocation is adjusted to obtain the first power allocation plan. After the power allocation is completed, the circulating current is predicted for the first power allocation plan to prevent and reduce the circulating current generated by uneven power distribution, which may cause equipment efficiency to decrease and shorten life. Use current prediction models, such as prediction based on physical models or machine learning prediction methods, to generate predicted circulating current data and perform suppression processing accordingly. Use current regulation techniques such as phase angle adjustment or frequency tuning to reduce circulating current through preliminary circulating current suppression schemes. Field verify and adjust the preliminary circulating current suppression scheme to ensure its effectiveness and form the final first circulating current suppression scheme.
[0034] Step S104: performing voltage waveform detection on multiple UPS systems based on the first power allocation scheme and the first circulating current suppression scheme to obtain voltage waveform data of each UPS system;
[0035] Specifically, based on the first power allocation scheme and the first circulating current suppression scheme, voltages of multiple UPS systems are collected in real time to obtain raw voltage data, which reflects the actual working state of the UPS system under the current load and configuration. In order to improve data quality and ensure the accuracy of analysis, the collected raw voltage data is subjected to noise filtering, and a digital filter such as a low-pass filter or a band-pass filter is used to remove electrical interference and random noise in the data to obtain standard voltage data. Time series analysis is performed on the standard voltage data, and various statistical methods such as autoregressive models or sliding average models are used to understand the voltage change trend and periodic behavior from the time dimension to generate time series voltage data. Frequency analysis is performed on the time series voltage data, and the main frequency components in the voltage signal are identified using Fourier transform or wavelet transform technology. Frequency analysis data can reveal the frequency stability and harmonic interference of the UPS output voltage, which is helpful for evaluating the power quality. Waveform distortion detection is performed based on the obtained frequency analysis data, and the quality and stability of the voltage waveform are evaluated by calculating the total harmonic distortion (THD) and other related indicators to generate waveform distortion data. According to the waveform distortion data, voltage waveform distortion analysis and waveform feature calculation are performed on the standard voltage data. This includes analyzing the symmetry of the voltage waveform, peak deviation and waveform distortion, as well as calculating voltage stability indicators such as deviation rate and waveform asymmetry index. Through comprehensive analysis and calculation, detailed voltage waveform data for each UPS system is ultimately generated.
[0036] Step S105, performing load abnormality diagnosis on the voltage waveform data to obtain load abnormality diagnosis results for each UPS system;
[0037] Specifically, the waveform curve feature point analysis is performed on the voltage waveform data to identify the key feature points of the waveform, such as the peak value, valley value and zero crossing point. The mean and standard deviation of the voltage waveform data are calculated. These two statistical parameters are important indicators for measuring the stability and variability of the waveform. Based on the statistical data, the initial waveform curve feature points are screened, and those feature points that best represent the voltage waveform behavior are selected as the target waveform curve feature points. The selected target waveform curve feature points are converted into vector form, and vector mapping is performed to form a target voltage waveform vector, so that the characteristics of the voltage waveform can be more effectively processed and analyzed by the machine learning model. The target voltage waveform vector is input into a preset load anomaly detection model, which includes multiple backstepping control and fuzzy neural networks. Backstepping control is a control strategy that is usually used to solve the control problems of nonlinear systems, while fuzzy neural networks combine the advantages of fuzzy logic and neural networks, can handle uncertainty and nonlinear problems, and are suitable for complex voltage waveform analysis. Each backstepping control and fuzzy neural network performs independent load anomaly diagnosis on the input target voltage waveform vector to generate an initial anomaly diagnosis result. Different diagnosis results contain abnormal state information analyzed from their respective perspectives. The initial diagnosis results are weighted fused. The outputs of different models are weighted according to their performance and appearance in historical data, which enhances the reliability of the diagnosis results, reduces the deviation that may be caused by a single model, and ultimately obtains the comprehensive load anomaly diagnosis results for each UPS system.
[0038] Step S106: performing multi-objective optimization on the first power allocation scheme and the first circulating current suppression scheme according to the load abnormality diagnosis result to obtain a second power allocation scheme and a second circulating current suppression scheme.
[0039] Specifically, the optimization objectives and constraints of the whale optimization algorithm are defined based on the load anomaly diagnosis results. The optimization objectives usually include minimizing energy consumption, balancing loads, optimizing current distribution, and reducing the operating cost of the overall system, while the constraints ensure that all operations are carried out within the framework of safety and technical specifications. A multi-objective function is created based on the objectives and constraints, which is used to quantify the performance of different schemes and guide the search process towards the optimal solution. The first power allocation scheme and the first circulating current suppression scheme are initialized by the whale optimization algorithm to generate multiple candidate power allocation schemes and multiple candidate circulating current suppression schemes, which reflect various possible improvement directions from the current solution. The initialization process includes randomly generating an initial population of solutions and evaluating the quality of these solutions according to the multi-objective function to provide a starting point for algorithm iteration. The candidate power allocation scheme and candidate circulating current suppression scheme are optimized and solved by the multi-objective function. The whale optimization algorithm explores the solution space and utilizes the known best solutions by imitating the social behavior and hunting skills of humpback whales, such as spiral updating positions and circling prey. This strategy aims to find the best balance point through gradual exploration and utilization, and finally determine the best performing scheme as the second power allocation scheme and the second circulating current suppression scheme.
[0040] In the embodiment of the present application, by performing state detection and state prediction on multiple UPS systems, the control method can obtain a historical state data set and a predicted state data set for each UPS system. This prediction function enables the system to pre-identify potential power demand changes and possible system failures, so as to make adjustments in advance to ensure the stable operation of the UPS system. The collected historical and predicted data sets are used to predict power demand, and accurate power allocation is performed for multiple UPS systems based on the prediction results. This not only improves the efficiency of power use, but also helps to reduce energy waste and optimize power allocation, thereby reducing operating costs and increasing economic benefits. By implementing the first power allocation scheme and the first circulating current suppression scheme, the control method can effectively manage the circulating current between parallel UPS systems, reduce current conflicts and imbalances, and thus improve the quality of the voltage waveform and the overall power quality of the system. Load abnormality diagnosis of voltage waveform data helps to timely discover and diagnose potential abnormal conditions of the system, such as overload or equipment failure. This timely diagnosis can reduce the risk of system failure and improve the reliability and safety of the system. According to the load abnormality diagnosis results, the control method can also perform multi-objective optimization on the existing power allocation scheme and circulating current suppression scheme. This dynamic optimization enables the system to automatically adjust according to actual operating conditions, maintain optimal operating conditions, ensure the continuity and stability of power supply, and thus improve the control accuracy of the uninterruptible power supply.
[0041] In a specific embodiment, the process of executing step S101 may specifically include the following steps:
[0042] (1) Perform parallel connection test on multiple UPS systems configured in parallel to obtain connection status verification results;
[0043] (2) Based on the connection status verification results, perform battery status detection on multiple UPS systems to obtain battery status data;
[0044] (3) Detect input voltage and output voltage of multiple UPS systems to obtain voltage status data;
[0045] (4) Perform load interface detection on multiple UPS systems to obtain interface status data, and perform communication status detection on multiple UPS systems to obtain communication status data;
[0046] (5) Normalize and transform the battery status data, voltage status data, interface status data, and communication status data to obtain a historical status data set for each UPS system;
[0047] (6) Using the time series analysis method, the status of multiple UPS systems is predicted based on the historical status data set to obtain the status prediction data set for each UPS system.
[0048] Specifically, multiple UPS systems configured in parallel are tested for parallel connection to ensure that all systems can be properly connected together, effectively share the load and improve the reliability of the overall system. The connection status verification results obtained reflect connection problems, such as poor contact or configuration errors. According to the connection status verification results, the battery status of each UPS system is tested. The health of the battery directly affects the backup time and efficiency of the UPS system. Battery testing usually includes measuring the voltage, current, temperature and charging status of the battery. Through measurement, the battery that needs maintenance or replacement is identified to ensure that the system can provide sufficient support when the power is off. At the same time, the input voltage and output voltage of each UPS system are tested. Ensuring that the voltage is within a safe and effective range and checking the voltage fluctuation and stability at the same time help protect sensitive equipment connected to the UPS. The voltage detection results help evaluate the voltage regulation performance and load adaptability of the UPS. Load interface detection and communication status detection are performed. Load interface detection ensures that all output interfaces can correctly distribute power to the connected devices, while communication status detection ensures that data communication between UPS systems and between UPS systems and monitoring systems is barrier-free. Battery status data, voltage status data, interface status data and communication status data are scaled and normalized and aggregated. Scale normalization is a common method for processing output data from different devices and sensors. It can eliminate the impact of dimensions so that data from different sources can be compared at the same scale. Set transformation integrates these normalized data into a unified data set. Use time series analysis methods to analyze the integrated historical status data set to predict the future status of each UPS system. Time series analysis can help identify patterns and trends in the data and predict possible future problems such as battery performance degradation and voltage fluctuations.
[0049] In a specific embodiment, the process of executing step S102 may specifically include the following steps:
[0050] (1) Extracting features from the historical state data set to obtain multiple historical state features, and extracting features from the state prediction data set to obtain multiple state prediction features;
[0051] (2) Perform feature mapping and matrix conversion on multiple historical state features and multiple state prediction features to obtain the target state feature matrix;
[0052] (3) Input the target state feature matrix into the preset autoencoder, extract the time series features of the target state feature matrix through the double-layer long short-term memory network in the autoencoder, and obtain the time series state feature matrix;
[0053] (4) The power demand data of each UPS system is obtained by predicting the power demand of the time series state feature matrix through the single-layer long short-term memory network in the autoencoder.
[0054] Specifically, feature extraction is performed on the historical state data set, including various parameters collected from each UPS system, such as battery voltage, load current, temperature readings, and operating time, and each feature can fully reflect the operating status of the UPS system. For example, the average value and fluctuation range of the battery voltage can show the health status of the battery, while the change trend of the load current helps to understand the power consumption pattern. At the same time, feature extraction is performed on the state prediction data set, by simulating data in future scenarios, such as using a prediction model to estimate future battery performance and possible load changes based on historical and current data. Feature mapping and matrix conversion are performed on multiple historical state features and multiple state prediction features, and different feature values are integrated into a unified format to obtain the target state feature matrix. The target state feature matrix is input into a preset autoencoder, which contains a two-layer long short-term memory network (LSTM). LSTM is a neural network used to process and predict long-term dependencies in time series data, which is suitable for processing UPS system state data because these data usually contain time-related patterns and dynamic changes. Through the processing of the two-layer LSTM, the autoencoder can extract deeper time series features from the target state feature matrix. These features reflect the deep trend and periodic changes of the data over time, and obtain the time series state feature matrix. Through the single-layer long short-term memory network in the autoencoder, the power demand is predicted for the time series state feature matrix. This layer of LSTM network is specially optimized for prediction tasks, estimating future power demand based on the extracted and encoded time series features.
[0055] In a specific embodiment, the process of executing step S103 may specifically include the following steps:
[0056] (1) Using the finite control set model predictive control algorithm, the initial power allocation is performed according to the power demand data of each UPS system to obtain a preliminary power allocation plan;
[0057] (2) Evaluate the efficiency of the preliminary power allocation plan to obtain power allocation efficiency data, and optimize the power allocation efficiency data to obtain an optimized power allocation plan;
[0058] (3) performing load balancing analysis on the optimized power allocation scheme to obtain load balancing data, and adjusting the power allocation according to the load balancing data to obtain a first power allocation scheme;
[0059] (4) predicting circulating current for the first power allocation scheme to obtain predicted circulating current data;
[0060] (5) Suppression processing is performed on the predicted circulating current data to obtain a preliminary circulating current suppression scheme, and the preliminary circulating current suppression scheme is verified and adjusted to obtain a first circulating current suppression scheme.
[0061] Specifically, the finite control set model predictive control algorithm is used to perform initial power allocation based on the real-time and predicted power demand data of each UPS system, and the optimal power allocation scheme is calculated to reduce total energy consumption and improve system efficiency. For example, if the forecast shows that a UPS system will have a low load in the next few hours, while another system will face a high load, the MPC will adjust the power output of the two systems accordingly to balance the load and reduce overall energy waste. The preliminary power allocation scheme is evaluated for efficiency, including calculating the energy consumption, expected equipment life and potential maintenance costs under different power allocation schemes, and obtaining power allocation efficiency data. Using this data, the power allocation efficiency data is optimized, including algorithm adjustment or parameter fine-tuning, to find a solution that maximizes energy efficiency and system response while meeting the needs of all equipment. The optimized power allocation scheme is subjected to load balancing analysis to check whether the load distribution of all UPS systems is balanced, to ensure that no system is overloaded or the download is too large, thereby avoiding equipment overheating or insufficient power. Based on the load balancing data, the power allocation is adjusted as necessary to ensure that each UPS system can operate safely within its capacity, and the first power allocation scheme obtained is designed to achieve the best global energy efficiency and equipment protection. Circulating current prediction is performed based on the first power allocation scheme. Circulating current is a common problem in UPS systems operating in parallel, which may lead to reduced energy efficiency and shortened equipment life. By simulating the current flow under the current power allocation scheme, potential circulating current problems are predicted and their possible impacts are analyzed. Based on the predicted circulating current data, corresponding suppression treatment is carried out, such as adjusting the phase angle between each UPS or using suppression circuits to reduce circulating flow. Field verification and adjustment of the preliminary circulating current suppression scheme. This includes testing the effectiveness of the scheme in the actual operating environment, making necessary modifications based on the test results, optimizing the current adjustment strategy or adding additional control components. Finally, the first circulating current suppression scheme is determined and implemented to ensure that all UPS systems can operate in the best condition, thereby improving the reliability and efficiency of the entire system.
[0062] In a specific embodiment, the process of executing step S104 may specifically include the following steps:
[0063] (1) Based on the first power allocation scheme and the first circulating current suppression scheme, voltages of multiple UPS systems are collected in real time to obtain original voltage data;
[0064] (2) Perform noise filtering on the original voltage data to obtain standard voltage data, and perform time series analysis on the standard voltage data to obtain time series voltage data;
[0065] (3) Performing frequency analysis on the time series voltage data to obtain frequency analysis data, and performing waveform distortion detection on the frequency analysis data to obtain waveform distortion data;
[0066] (4) Perform voltage waveform distortion analysis and waveform feature calculation on the standard voltage data based on the waveform distortion data to generate voltage waveform data for each UPS system.
[0067] Specifically, based on the first power allocation scheme and the first circulating current suppression scheme, voltages of multiple UPS systems are collected in real time, the voltage performance of each UPS system is monitored, and the effects of power allocation and current suppression measures are evaluated. When collecting voltage data in real time, the voltage output of the UPS system is recorded, and the raw voltage data provides instant information on the voltage level and fluctuation of each system at a specific time point. The collected raw voltage data usually contains various noises and interferences, which may be caused by power grid fluctuations, equipment operation or external environmental factors. The raw voltage data is subjected to noise filtering. By using digital filters, such as low-pass or band-pass filters, high-frequency noise and interference are effectively removed to obtain clearer and more accurate standard voltage data. These data are closer to the actual performance of the UPS system in an interference-free state. Time series analysis is performed on the standard voltage data. By using statistical and machine learning techniques, such as moving average or exponential smoothing methods, trends and periodic patterns in the data are identified. Time series analysis helps understand how voltage data changes over time, which helps predict future voltage performance and identify potential voltage problems. For example, if the analysis shows that the voltage of a UPS system has a periodic drop, this may indicate that the battery performance of the system is declining. Frequency analysis is performed on the time series voltage data, and the time series data is converted into frequency domain data using Fourier transform. Frequency analysis reveals the main frequency components in the voltage waveform, which helps to identify harmonics or other frequency-related problems caused by the UPS system. Frequency analysis data can significantly reflect the overall quality and stability of the voltage waveform. Waveform distortion detection is performed on the frequency analysis data to evaluate the quality of the voltage waveform by calculating indicators such as total harmonic distortion. Waveform distortion data provides direct information on whether the voltage waveform is operating within an acceptable range, or whether there is voltage distortion that may affect the performance of the equipment. Based on the waveform distortion data, voltage waveform distortion analysis and waveform feature calculation are performed on the standard voltage data. This includes evaluating the peak, steady-state and dynamic response characteristics of the voltage waveform to generate voltage waveform data for each UPS system.
[0068] In a specific embodiment, the process of executing step S105 may specifically include the following steps:
[0069] (1) Analyze the characteristic points of the waveform curve of the voltage waveform data to obtain multiple initial waveform curve characteristic points;
[0070] (2) Calculating the mean and standard deviation of the voltage waveform data, and screening the characteristic points of multiple initial waveform curves according to the mean and standard deviation to obtain multiple target waveform curve characteristic points;
[0071] (3) Performing vector mapping on multiple target waveform curve feature points to obtain a target voltage waveform vector;
[0072] (4) inputting the target voltage waveform vector into a preset load anomaly detection model, where the load anomaly detection model includes multiple backstepping controls and a fuzzy neural network;
[0073] (5) performing load abnormality diagnosis on the target voltage waveform vector through multiple backstepping controls and fuzzy neural networks respectively, and obtaining initial abnormality diagnosis results of each backstepping control and fuzzy neural network;
[0074] (6) The initial abnormality diagnosis results of each backstepping control and fuzzy neural network are weighted fused to obtain the load abnormality diagnosis results of each UPS system.
[0075] Specifically, the voltage waveform data is analyzed for waveform feature points. Multiple initial waveform feature points are extracted from the original voltage waveform data by using data analysis techniques such as peak detection algorithms (e.g., finding local maximum and minimum values) and zero crossing detection. In order to accurately analyze and reduce the interference caused by random fluctuations or noise in the data, statistical indicators of the voltage waveform data, such as mean and standard deviation, are calculated. The extracted initial waveform feature points are screened by statistical indicators, and only those feature points that truly represent the essence of voltage behavior are retained. Multiple target waveform feature points are vector mapped to obtain a target voltage waveform vector. The attributes such as the position and amplitude of the feature points are converted into a standardized numerical vector format so that they can be processed by the machine learning model. The target voltage waveform vector is input into a preset load anomaly detection model. The model includes multiple backstepping control and fuzzy neural networks, each of which is trained to identify possible abnormal patterns in the voltage waveform. Backstepping control is a control technology that can provide stable output in a changing environment, while fuzzy neural networks combine the advantages of fuzzy logic and neural networks and are suitable for processing noisy data and fuzzy classification boundaries. Through these networks, the target voltage waveform vector is analyzed independently, and each network provides an initial abnormal diagnosis result. These results reflect the perspective of analyzing the voltage waveform from different angles and using different methods, which helps to fully understand the voltage status. The initial abnormal diagnosis results of each backstepping control and fuzzy neural network are weighted and fused. According to the performance and reliability of each network on historical data, appropriate weights are assigned to them, and then the individual results are combined into a single comprehensive diagnosis result.
[0076] In a specific embodiment, the process of executing step S106 may specifically include the following steps:
[0077] (1) Define the optimization objectives and constraints of the whale optimization algorithm based on the load anomaly diagnosis results, and create a multi-objective function of the whale optimization algorithm;
[0078] (2) Initializing the first power allocation scheme and the first circulating current suppression scheme by using the whale optimization algorithm to generate multiple candidate power allocation schemes and multiple candidate circulating current suppression schemes;
[0079] (3) A plurality of candidate power allocation schemes and a plurality of candidate circulating current suppression schemes are optimized and solved by a multi-objective function to obtain a second power allocation scheme and a second circulating current suppression scheme.
[0080] Specifically, the optimization objectives and constraints of the whale optimization algorithm are defined according to the load anomaly diagnosis results. The diagnosis results reveal possible problems with the existing power allocation schemes and circulating current suppression measures, such as some UPS systems may have load anomalies due to insufficient power, or the presence of circulating current may affect system efficiency. Therefore, the optimization objectives are defined as minimizing energy consumption, balancing loads, reducing circulating currents, and improving overall system reliability. At the same time, the constraints include not exceeding the maximum load capacity of each UPS, complying with safety standards, and maintaining the basic needs of system operation. A multi-objective function of the whale optimization algorithm is created, which needs to consider multiple optimization objectives at the same time, such as energy efficiency, cost, system stability, etc. A weighted function is constructed, in which each objective has a corresponding weight, and these weights reflect the importance of different objectives relative to the overall strategy. For example, if the system faces high energy costs, the objective of improving energy efficiency may have a higher weight than other objectives. The first power allocation scheme and the first circulating current suppression scheme are initialized using the whale optimization algorithm. Multiple candidate schemes are generated, each of which is generated based on random mutations of the current scheme. The best scheme is found by random search and using information in the current environment. The initialization process ensures that the algorithm starts from a broad search space, increasing the possibility of finding the global optimal solution. Multiple candidate power allocation schemes and circulating current suppression schemes are optimized and solved. The algorithm gradually approaches the optimal solution by simulating the whale's strategy of surrounding prey. The whale optimization algorithm updates the candidate solution according to the distance and direction between the current best solution and the candidate solution by adjusting the search direction and step size. It ensures that the algorithm can not only explore a broad search space, but also use the known best solution to effectively move closer to the global optimal solution. Finally, the algorithm converges to the optimal candidate solution and forms a second power allocation scheme and a second circulating current suppression scheme. These schemes are optimized based on a fully considered multi-objective function to ensure that all set optimization goals are achieved or exceeded while meeting all constraints.
[0081] The control method of the uninterruptible power supply in the embodiment of the present application is described above. The control device of the uninterruptible power supply in the embodiment of the present application is described below. Figure 2 , an embodiment of the control device of the uninterruptible power supply in the embodiment of the present application includes:
[0082] The detection module 201 is used to perform status detection and status prediction on multiple UPS systems configured in parallel, and obtain a historical status data set and a status prediction data set for each UPS system;
[0083] A prediction module 202 is used to perform power demand prediction on the historical state data set and the state prediction data set to obtain power demand data of each UPS system;
[0084] The allocation module 203 is used to allocate power to multiple UPS systems according to the power demand data to obtain a first power allocation scheme and a first circulating current suppression scheme;
[0085] The processing module 204 is used to perform voltage waveform detection on multiple UPS systems based on the first power allocation scheme and the first circulating current suppression scheme to obtain voltage waveform data of each UPS system;
[0086] The diagnosis module 205 is used to perform load abnormality diagnosis on the voltage waveform data to obtain load abnormality diagnosis results for each UPS system;
[0087] The optimization module 206 is used to perform multi-objective optimization on the first power allocation scheme and the first circulating current suppression scheme according to the load abnormality diagnosis result to obtain a second power allocation scheme and a second circulating current suppression scheme.
[0088] Through the cooperation of the above-mentioned components, the control method can obtain the historical state data set and the predicted state data set of each UPS system by performing state detection and state prediction on multiple UPS systems. This prediction function enables the system to pre-identify potential changes in power demand and possible system failures, so as to make adjustments in advance to ensure the stable operation of the UPS system. The collected historical and predicted data sets are used to predict power demand, and accurate power allocation is performed for multiple UPS systems based on the prediction results. This not only improves the efficiency of power use, but also helps to reduce energy waste and optimize power allocation, thereby reducing operating costs and increasing economic benefits. By implementing the first power allocation scheme and the first circulating current suppression scheme, the control method can effectively manage the circulating current between parallel UPS systems, reduce current conflicts and imbalances, and thus improve the quality of the voltage waveform and the overall power quality of the system. Load abnormality diagnosis of voltage waveform data helps to timely discover and diagnose potential abnormal conditions of the system, such as overload or equipment failure. This timely diagnosis can reduce the risk of system failure and improve the reliability and safety of the system. According to the load abnormality diagnosis results, the control method can also perform multi-objective optimization on the existing power allocation scheme and circulating current suppression scheme. This dynamic optimization enables the system to automatically adjust according to actual operating conditions, maintain optimal operating conditions, ensure the continuity and stability of power supply, and thus improve the control accuracy of the uninterruptible power supply.
[0089] The present application also provides an uninterruptible power supply, which is used to execute the steps of the uninterruptible power supply control method in the above embodiments.
[0090] The present application also provides a computer-readable storage medium, which may be a non-volatile computer-readable storage medium or a volatile computer-readable storage medium, wherein instructions are stored in the computer, and when the instructions are executed on a computer, the computer executes the steps of the control method of the uninterruptible power supply.
[0091] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described systems, systems and units can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0092] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program codes.
[0093] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A method for controlling an uninterruptible power supply, characterized in that: The control method of the uninterruptible power supply comprises: Performing status detection and status prediction on multiple UPS systems configured in parallel to obtain a historical status data set and a status prediction data set for each UPS system; specifically comprising: performing a parallel connection test on multiple UPS systems configured in parallel to obtain a connection status verification result; performing battery status detection on the multiple UPS systems according to the connection status verification result to obtain battery status data; performing input voltage and output voltage detection on the multiple UPS systems to obtain voltage status data; performing load interface detection on the multiple UPS systems to obtain interface status data, and performing communication status detection on the multiple UPS systems to obtain communication status data; performing scale normalization and set conversion on the battery status data, the voltage status data, the interface status data and the communication status data to obtain a historical status data set for each UPS system; using a time series analysis method to perform status prediction on the multiple UPS systems according to the historical status data set to obtain a status prediction data set for each UPS system; Performing power demand forecasting on the historical state data set and the state prediction data set to obtain power demand data of each UPS system; specifically comprising: performing feature extraction on the historical state data set to obtain multiple historical state features, and performing feature extraction on the state prediction data set to obtain multiple state prediction features; performing feature mapping and matrix conversion on the multiple historical state features and the multiple state prediction features to obtain a target state feature matrix; inputting the target state feature matrix into a preset autoencoder, performing time series feature extraction on the target state feature matrix through a double-layer long short-term memory network in the autoencoder to obtain a time series state feature matrix; performing power demand forecasting on the time series state feature matrix through a single-layer long short-term memory network in the autoencoder to obtain power demand data of each UPS system; The power distribution is performed on the multiple UPS systems according to the power demand data to obtain a first power distribution scheme and a first circulating current suppression scheme; specifically comprising: performing initial power distribution according to the power demand data of each UPS system through a finite control set model predictive control algorithm to obtain a preliminary power distribution scheme; performing efficiency evaluation on the preliminary power distribution scheme to obtain power distribution efficiency data, and optimizing the power distribution efficiency data to obtain an optimized power distribution scheme; performing load balancing analysis on the optimized power distribution scheme to obtain load balancing data, and adjusting the power distribution according to the load balancing data to obtain a first power distribution scheme; performing circulating current prediction on the first power distribution scheme to obtain predicted circulating current data; suppressing the predicted circulating current data to obtain a preliminary circulating current suppression scheme, and verifying and adjusting the preliminary circulating current suppression scheme to obtain a first circulating current suppression scheme; Based on the first power allocation scheme and the first circulating current suppression scheme, voltage waveform detection is performed on the multiple UPS systems to obtain voltage waveform data of each UPS system; specifically comprising: based on the first power allocation scheme and the first circulating current suppression scheme, voltage real-time acquisition is performed on the multiple UPS systems to obtain original voltage data; noise filtering is performed on the original voltage data to obtain standard voltage data, and time series analysis is performed on the standard voltage data to obtain time series voltage data; frequency analysis is performed on the time series voltage data to obtain frequency analysis data, and waveform distortion detection is performed on the frequency analysis data to obtain waveform distortion data; voltage waveform distortion analysis and waveform feature calculation are performed on the standard voltage data according to the waveform distortion data to generate voltage waveform data of each UPS system; Perform load anomaly diagnosis on the voltage waveform data to obtain load anomaly diagnosis results for each UPS system; specifically including: performing waveform curve feature point analysis on the voltage waveform data to obtain multiple initial waveform curve feature points; calculating the mean and standard deviation of the voltage waveform data, and screening the multiple initial waveform curve feature points according to the mean and the standard deviation to obtain multiple target waveform curve feature points; performing vector mapping on the multiple target waveform curve feature points to obtain a target voltage waveform vector; inputting the target voltage waveform vector into a preset load anomaly detection model, the load anomaly detection model including multiple backstepping controls and fuzzy neural networks; performing load anomaly diagnosis on the target voltage waveform vector respectively through the multiple backstepping controls and fuzzy neural networks to obtain initial anomaly diagnosis results of each backstepping control and fuzzy neural network; performing weighted fusion on the initial anomaly diagnosis results of each backstepping control and fuzzy neural network to obtain load anomaly diagnosis results for each UPS system; The first power allocation scheme and the first circulating current suppression scheme are optimized by multi-objective according to the load abnormality diagnosis result to obtain a second power allocation scheme and a second circulating current suppression scheme; specifically comprising: defining the optimization objectives and constraints of the whale optimization algorithm according to the load abnormality diagnosis result, and creating a multi-objective function of the whale optimization algorithm; initializing the first power allocation scheme and the first circulating current suppression scheme by the whale optimization algorithm to generate a plurality of candidate power allocation schemes and a plurality of candidate circulating current suppression schemes; optimizing and solving the plurality of candidate power allocation schemes and the plurality of candidate circulating current suppression schemes by the multi-objective function to obtain a second power allocation scheme and a second circulating current suppression scheme.
2. A control device for an uninterruptible power supply, characterized in that: Used to execute the control method of the uninterruptible power supply according to claim 1, the control device of the uninterruptible power supply comprises: A detection module, used to perform status detection and status prediction on multiple UPS systems configured in parallel, and obtain a historical status data set and a status prediction data set for each UPS system; A prediction module, used to perform power demand prediction on the historical status data set and the status prediction data set to obtain power demand data of each UPS system; an allocation module, configured to allocate power to the plurality of UPS systems according to the power demand data, and obtain a first power allocation scheme and a first circulating current suppression scheme; a processing module, configured to perform voltage waveform detection on the plurality of UPS systems based on the first power allocation scheme and the first circulating current suppression scheme to obtain voltage waveform data of each UPS system; A diagnosis module, used to perform load abnormality diagnosis on the voltage waveform data to obtain load abnormality diagnosis results for each UPS system; An optimization module is used to perform multi-objective optimization on the first power allocation scheme and the first circulating current suppression scheme according to the load abnormality diagnosis result to obtain a second power allocation scheme and a second circulating current suppression scheme.
3. An uninterruptible power supply, characterized in that: The uninterruptible power supply is used to execute the uninterruptible power supply control method as claimed in claim 1.
4. A computer-readable storage medium having instructions stored thereon, characterized in that: When the instructions are executed by the processor, the control method of the uninterruptible power supply as claimed in claim 1 is implemented.