A foundation bearing capacity detection device and detection method for highway construction

By designing a detection device that combines light-weight touch probe with movable mounting frame, using foldable triangle support frame and winch automatic lifting hammer, the problem of inconvenient transportation and low efficiency of existing equipment is solved, and rapid assembly and efficient inspection are achieved .

CN118621762BActive Publication Date: 2024-11-15TA CHEN CONSTR & ENG CORP +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411092704.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-15
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

The existing foundation bearing capacity testing equipment for highway construction is inconvenient, time-consuming and labor-intensive when transporting and using, and the equipment is not flexible enough to be folded and conveyed quickly. The fixed weight quality affects the use efficiency and requires multiple manual handling and operation.

Method used

A detection device including a light touch probe and a movable mounting frame is designed, using a foldable triangle support frame and a winch, and the automatic lifting and position fixing of the heavy hammer is achieved through the ranging sensor and the PLC controller, reducing manpower investment. Improve equipment flexibility and detection efficiency.

Benefits of technology

It realizes rapid assembly and movement of the equipment, improves detection efficiency, simplifies the operation process, enhances the stability and accuracy of the equipment, reduces the investment in manpower and material resources, and improves the efficiency and portability of on-site inspection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118621762B_ABST
    Figure CN118621762B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of roadbed bearing capacity detection, and specifically to a foundation bearing capacity detection device and detection method for highway construction, comprising a light-weight probe and a mobile installation frame for movably installing the light-weight probe. The light-weight probe comprises a probe rod, a probe threadedly installed at the bottom end of the probe rod, a hammer seat threadedly installed at the top of the probe rod, a guide rod screwedly installed on the upper side of the hammer seat, and a heavy hammer slidably sleeved on the guide rod. By using the light-weight probe in conjunction with the mobile installation frame and a foldable and retractable triangular support frame, rapid assembly of the equipment is achieved, the use process of the equipment is simplified, the detection efficiency is improved, and the entire device can be quickly moved to a designated detection position for detection without adding more manpower to carry accessories. A winch is designed as a power source to pull the heavy hammer up and down and cooperate with the use of a distance measurement sensor supporting a guide seat, which can greatly reduce the investment in manpower and material resources and improve their use efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of roadbed bearing capacity detection, and in particular to a roadbed bearing capacity detection device and a detection method for roadbed construction. Background Art

[0002] The foundation bearing capacity testing equipment for highway construction is an important tool for evaluating the bearing capacity of road base materials. Lightweight penetration tester is a commonly used testing equipment. This equipment can usually be tested on site without bringing samples back to the laboratory, thus saving time and reducing interference caused by transportation. Lightweight penetration tester is an in-situ testing tool for testing foundation bearing capacity. It uses a moderately heavy hammer to fall freely from a certain height to hit the conical probe at the top of the penetration rod, and drive the probe into the soil. After each certain depth (usually 30cm), the required number of hammer blows is recorded, and the corresponding bearing capacity and other engineering characteristics of the soil layer are evaluated by calculating these data. If the bearing capacity of the foundation inspection vehicle is lower than the required requirements, corresponding reinforcement measures need to be considered. Most of the existing testing equipment requires manual support of the entire probe rod or the extension rod to keep it vertical, and another worker lifts the hammer to a certain height to let it fall freely and hit the hammer seat, and repeat the operation in sequence. However, this testing method has many shortcomings:

[0003] Since the heavy hammer, hammer seat and corresponding connecting rod are all made of metal, they are heavy in weight and require a lot of manpower to carry and operate during transportation and use, which is inconvenient, time-consuming and labor-intensive to use, and has low work efficiency;

[0004] When the heavy hammer hits the hammer seat, the corresponding connecting rods do not have high stability and support effect. At the same time, the equipment cannot be folded quickly and transported to the designated location, and the overall flexibility of the equipment is not high.

[0005] Most weights are fixed in weight and cannot be increased or decreased according to usage requirements. Instead, they need to be replaced with weights of different weights, which affects the efficiency of use.

[0006] Therefore, it is urgent to propose a foundation bearing capacity detection device and detection method for highway construction to improve the existing technology. Summary of the invention

[0007] In view of the deficiencies in the prior art, the object of the present invention is to provide a foundation bearing capacity detection device for highway construction to solve the problems mentioned in the above background technology.

[0008] In order to achieve the above-mentioned purpose, the present invention is implemented through the following technical scheme: a foundation bearing capacity detection equipment for highway construction, including a light-weight probe and a mobile installation frame for movably installing the light-weight probe, the light-weight probe includes a probe rod, a probe threadedly installed at the bottom end of the probe rod, a hammer seat threadedly installed at the top of the probe rod, a guide rod screwedly installed on the upper side of the hammer seat, a heavy hammer slidably sleeved on the guide rod, and an extension rod screwedly connected to the top end of the guide rod, the bottom end of the extension rod is integrally provided with a connecting protrusion, the hammer seat and the heavy hammer are both arranged on the lower side of the inside of the mobile installation frame, the extension rod is movably penetrated by the middle of the mobile installation frame, and the mobile installation A plurality of movable wheels are installed at the bottom of the frame; a triangular support frame is foldably connected to the lower side of the mobile installation frame, and the triangular support frame is used to support and stabilize the mobile installation frame and is simultaneously connected to the sliding guide of the probe rod; a winch that uses a wire rope to pull a heavy hammer upward is installed on the top of the mobile installation frame; the triangular support frame includes three outer movable rods rotatably connected along the outer edge of the bottom of the mobile installation frame, and each of the outer movable rods is rotatably connected to a connecting rod on the opposite side of the middle part, and each of the outer movable rods can be rotated and folded upward, and a plurality of clamping members that can restrain and clamp the three outer movable rods and their connecting rods are respectively arranged on the outside of the mobile installation frame;

[0009] A support guide seat is hinged between the ends of each connecting rod, the support guide seat is a detachable structure, and a distance measuring sensor is installed on the upper side of the support guide seat. The probe rod is movably penetrated by the middle of the support guide seat, and a gripping plate is hinged at the end of the outer movable rod, and a ground nail nailed into the ground is penetrated in the middle of the gripping plate.

[0010] A better technical solution: the support guide seat includes a tube sleeved on the probe rod, the tube is composed of three arc-shaped plates bolted together, and a hinged plate is fixed to the outer side of each arc-shaped plate. The hinged plate is movably hinged to the end of the connecting rod, and the distance measuring sensor is embedded and installed on the upper side of the hinged plate and located below the weight.

[0011] A better technical solution: the clamping member includes two side connecting rods arranged at intervals, and the outer movable rod and the connecting rod are folded upward and located between the two side connecting rods. A magic tightening belt is provided at the outer end of the side connecting rod, and the outer movable rod and the connecting rod are tightened and clamped on the outside of the movable installation frame through the magic tightening belt.

[0012] A preferred technical solution: multiple screws are vertically installed on the upper side of the weight, and multiple weight-increasing plates can be threaded into each screw. Multiple hand levers are integrally fixed to the outer periphery of the weight, and each hand lever is provided with a connecting hole for fixed connection with a steel wire rope.

[0013] A preferred technical solution: A wire hole for the steel wire rope to pass through is provided on the upper side of the movable installation frame, and a guide wire wheel for rolling the steel wire rope is provided above the wire hole, and the guide wire wheel is elastically installed on the top of the movable installation frame.

[0014] A better technical solution: the two axial ends of the guide wheel are respectively axially connected to an inverted L-shaped rod, a pressure plate is integrally provided in the middle of the inverted L-shaped rod, and the lower side of the inverted L-shaped rod passes through the top of the movable installation frame, and a return spring is sleeved on the inverted L-shaped rod on the lower side of the pressure plate. The return spring is installed on the upper side of the movable installation frame to elastically support the inverted L-shaped rod.

[0015] A preferred technical solution: the length of the outer movable rod corresponds to the height of the mobile installation frame. After the outer movable rod is folded upward, the gripping plate can be flipped over and fitted to the upper side of the mobile installation frame. The bottom surface of the gripping plate is provided with multiple anti-slip stripes to contact the bottom surface.

[0016] A better technical solution: the side surface of the mobile installation frame is provided with multiple connecting ports, and each of the connecting ports is adjacently located on the outer periphery of the heavy hammer; the top of the mobile installation frame is provided with multiple limiting holes that are compatible with the width of the ground nails; after the upper side of the mobile installation frame is attached to the mobile installation frame, the ground nails penetrate the limiting holes to limit the position; and an LED light is installed on the top of the inner side of the mobile installation frame.

[0017] A preferred technical solution: A PLC controller for controlling the connection winch and distance measuring sensor is installed on the outside of the mobile installation frame.

[0018] Also included is a method for detecting the bearing capacity of a foundation used in highway construction, comprising the following steps:

[0019] S1: When the tripod support frame is not unfolded, the movable wheels at the bottom of the mobile installation frame can be pushed to quickly move to the designated position to be tested. By opening the clamping parts and pulling out the ground nails inserted into the top of the mobile installation frame, the rotation restrictions of the outer movable rods and the connecting rods are released, and the three outer movable rods and the connecting rods are rotated downward. After the support guide seats are assembled and connected, the tripod support frame is in a triangular unfolded state to support the entire mobile installation frame, and the height of the entire mobile installation frame is increased to adapt to the height of the light probe, and the gripping plate at the bottom of the outer movable rod is pressed against the ground and inserted into the ground with ground nails for position fixing;

[0020] S2: When installing the light penetration instrument, disassemble the light penetration instrument from the upper side of the mobile installation frame, set the heavy hammer inside the mobile installation frame, and insert the extension rod upward through the corresponding guide hole from the inside of the mobile installation frame, and the probe rod is set through the middle of the above-assembled support guide seat, and then the probe is threaded and locked at the bottom of the probe rod, and the light penetration instrument can be quickly slid and installed between the mobile installation frame and the triangular support frame in the unfolded state;

[0021] S3: When the heavy hammer is working, the wire rope on the winch is locked and connected with the heavy hammer, so that the heavy hammer can be pulled upward when the winch is reeled in, and when the winch freely lowers the wire rope, the heavy hammer freely falls downward to hit the hammer seat. The rising height and falling height of the heavy hammer can be detected by the distance measuring sensor, so that the required height is reached during lifting and lowering, and when the heavy hammer hammers downward and is located at the preset distance of the support guide seat, the hammering can be stopped, and the heavy hammer can be counterweighted according to needs before hammering, so that the probe rod and the probe can be driven downward into the roadbed under the action of force. After each certain depth of driving into the ground, the required number of hammering is recorded, and the bearing capacity of the soil layer can be evaluated through these data;

[0022] S4: After the test is completed, the weight can be pulled up completely by the winch and pressed against the connecting protrusion at the bottom of the extension rod, so that the probe rod and the probe head driven into the roadbed can be pulled up and separated from the bottom surface. Then, the probe head, the probe rod and the extension rod of the light-duty penetration instrument can be threadedly disassembled in sequence, and the wire rope on the weight can be untied. When transporting later, these accessories can be re-placed on the upper side of the mobile installation frame, and the probe rod can be inserted into the corresponding guide hole for limiting.

[0023] S5: When the tripod support frame is finally folded and stored, the ground nails are pulled out of the ground and the support guide seat is disassembled, so that the outer movable rod and the connecting rod can be flipped upward, folded and re-tightened and clamped on the mobile installation frame, so that the movable wheels are in contact with the ground and quickly transported to the next position.

[0024] By adopting the above technical solution, the present invention has the following advantages compared with the existing technology:

[0025] The present invention uses a light-duty probe in conjunction with a mobile installation frame and a foldable triangular support frame, thereby realizing rapid assembly of the device, simplifying the use process of the device, improving detection efficiency, and enabling the entire device to be quickly moved to a designated detection position for detection without the need for additional manpower to carry accessories. A winch is designed as a power source to pull the weight up and down and cooperate with the use of a distance measurement sensor on a supporting guide seat, which can greatly reduce the use of manpower and material resources and improve their use efficiency.

[0026] Among them, through the unfolding and folding design of the triangular support frame, when in the unfolded state, the hinged plate hinged at the bottom end of the outer movable rod can better adapt to the ground and be fixed to the ground with the help of ground nails, ensuring the stability and accuracy during detection. It can not only adapt to the requirements of supporting different detection heights, but the design of the mobile installation frame and the support guide seat can also play a good double-guiding effect on the extension rods and probe rods on the upper and lower sides of the light probe, reducing the tilt deviation that may occur when the heavy hammer is hammering;

[0027] Among them, the support guide seat can also be quickly disassembled and assembled for use, so that after the inspection is completed, when the tripod support frame is in a folded and tightened state, the components of the lightweight probe can be quickly disassembled and replaced on the mobile installation frame. The folding design of the tripod support frame reduces the overall volume, facilitates the transportation of the installation frame, improves the work efficiency and the flexibility of equipment use, and when the tripod support frame is transported in a folded state, not only can the external movable rod and the connecting rod be tightened by the clamping parts, but the gripping plate and the external movable rod connected to it can also be limited to the installation frame by ground nails, so as to better prevent the external movable rod from falling off, thereby improving the versatility of the equipment; therefore, the design of the entire set of detection equipment fully considers the convenience of operation, detection accuracy and portability of the equipment, greatly improves the efficiency and accuracy of on-site detection, and also facilitates the maintenance and management of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0029] Figure 1 It is a structural schematic diagram of the present invention;

[0030] Figure 2 It is a structural schematic diagram of the triangular support frame of the present invention in a tightened and folded state;

[0031] Figure 3 It is a schematic diagram of the top view of the structure of the weight of the present invention;

[0032] Figure 4 It is a structural schematic diagram of the support guide seat of the present invention;

[0033] Figure 5 It is a schematic diagram of the exploded structure of the support guide seat of the present invention;

[0034] Figure 6 This is a schematic structural diagram of the tripod support frame of the present invention in a fully expanded state;

[0035] Figure 7 It is a schematic diagram of the top view of the structure of the clamping member and the movable installation frame of the present invention;

[0036] In the figure: a light-duty probe, a mobile installation frame 1, a triangular support frame, an outer movable rod 21, a connecting rod 22, a supporting guide seat 23, a bobbin 231, a hinged plate 232, an arc plate 233, a gripping plate 24, a ground nail 25, a winch 3, a wire hole 4, a guide wire wheel 5, an inverted L-shaped plug rod 51, a pressure plate 52, a rebound spring 53, a clamping piece 6, a magic tightening belt 61, a side connecting rod 62, a PLC controller 7, a movable wheel 8, a connecting port 9, an LED lamp 91, a limit hole 92, a probe rod 10, a probe 11, a hammer seat 12, a guide rod 13, a heavy hammer 14, a screw 141, a weight plate 142, a hand lever 143, a connecting hole 144, an extension rod 15, a connecting protrusion 151, and a distance measuring sensor 16. DETAILED DESCRIPTION

[0037] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0038] like Figure 1-7As shown, the present invention provides a technical solution for a foundation bearing capacity detection device for highway construction: a light-weight probe and a mobile installation frame 1 for movably installing the light-weight probe, the light-weight probe comprising a probe rod 10, a probe 11 threadedly installed at the bottom end of the probe rod 10, a hammer seat 12 threadedly installed at the top of the probe rod 10, a guide rod 13 screwed on the upper side of the hammer seat 12, a heavy hammer 14 slidably sleeved on the guide rod 13, and an extension rod 15 screwed and connected to the top end of the guide rod 13, and a connecting rod 15 is integrally provided at the bottom end of the extension rod 15. The protrusion 151 is connected to the protrusion 151, which are all prior arts, and the hammer seat 12 and the heavy hammer 14 of the present invention are both arranged on the lower side of the inside of the mobile installation frame 1, and the extension rod 15 is movably penetrated by the middle of the mobile installation frame 1, so that the extension rod 15 of the upper part of the light touch probe can slide and move along the wire hole, and the lower side of the mobile installation frame 1 is folded and connected with a triangular support frame, and the triangular support frame is used to support and stabilize the mobile installation frame 1 and is connected with the probe rod 10 for sliding guidance, and each outer movable rod 21 is rotatably connected to one side of the middle of the outer movable rod 21 The connecting rod 22 has a support guide seat 23 hinged between the ends of each connecting rod 22. The probe rod 10 is movably penetrated by the middle of the support guide seat 23, so that the probe rod 10 at the lower part of the light-weight probe slides along the middle of the support guide seat 23. Through the double sliding guide effect of the light-weight probe up and down, the stability and driving effect of the probe rod 10 and the probe head 11 of the light-weight probe into the foundation can be greatly improved; at the same time, a gripping plate 24 is hinged at the end of the outer movable rod 21, and a ground nail 25 nailed into the ground is penetrated in the middle of the gripping plate 24. The ground nail 25 is inserted into the ground to limit and fix the triangular support frame, and the design of the gripping plate 24 close to the ground not only enhances the stability of the equipment, but also improves the safety during operation. The bottom surface of the gripping plate 24 is provided with a plurality of anti-skid stripes in contact with the bottom surface, which increases the friction between the gripping plate and the ground, ensuring the stability and anti-skid performance of the equipment during operation, especially under wet or uneven ground conditions, the anti-skid stripes can provide sufficient grip to prevent the triangular support frame from sliding.

[0039] The triangular support frame includes three outer movable rods 21 rotatably connected along the outer edge of the bottom of the mobile installation frame 1. After the triangular support frame is unfolded, it is connected to form a whole through the support guide seat 23 to form a stable triangular support structure, which can significantly improve the stability of the entire mobile installation frame 1. This structure can effectively disperse and bear the force from above, ensuring that the equipment will not shake or tilt due to external force or uneven ground during detection, thereby ensuring the accuracy of detection, and the outer movable rods 21 can increase the height of the mobile installation frame 1 by adjusting the support angle with the ground, which can better adapt to the use requirements of lightweight probes in different scenarios, such as Figure 6As shown, for example, the greater the outward tilt angle of the three outer movable rods 21, the lower the support height of the movable mounting frame 1. However, when the three outer movable rods 21 are tilted outward to the maximum angle, they will be tightened by the support guide seats 23 connected by the connecting rods 22. The hinged plate 232 of the support guide seat 23 and the connecting rod 22 are now on the same horizontal line. This way, the support is the most stable and is less likely to tilt or shake during hammering.

[0040] The support guide seat 23 is a separately detachable structure, so it is easier and quicker to install or maintain without complicated assembly steps. If a part of the support guide seat 23 is damaged, it is allowed to replace the damaged part separately instead of replacing the entire support guide seat 23. This can extend the overall service life of the equipment and reduce labor intensity and maintenance costs. The assembled support guide seat 23 plays a role in tightening the three outer movable rods 21, which can effectively prevent the three outer movable rods 21 from rotating outward and causing the triangular support frame to collapse; the disassembled support guide seat 23 can make each outer movable rod 21 flip up and fold upward more quickly, and three clamping members 6 that can restrain and clamp the three outer movable rods 21 and the connecting rod 22 are respectively arranged on the outside of the movable installation frame 1 to form a tightened and folded state, so that four movable wheels 8 are installed at the bottom of the movable installation frame 1 to touch the ground, and the movable wheels 8 and the clamping members 6 can be tightened and clamped. The design of component 6 allows the entire device to be easily moved to a specified position when the triangular support frame is in a tightened and folded state. This design reduces the physical labor of the operator, improves the speed and convenience of equipment deployment, and enables rapid transfer. A winch 3 that uses a wire rope to pull the weight 14 up is installed on the top of the mobile installation frame 1. The winch 3 serves as a power source to pull the weight 14 up and down and cooperates with the supporting guide seat 23 to find the distance sensor 16. A PLC controller 7 for controlling the connection between the winch 3 and the distance sensor 16 is installed on the outside of the mobile installation frame 1. The distance sensor 16 feeds back the real-time detection data to the PLC controller 7. The PLC controller 7 calculates and controls the retraction and extension action of the winch 3, thereby pulling and releasing the weight 14 to achieve the lifting and lowering of the hammer seat 12, and driving the probe rod 10 and the probe 11 into the bottom surface. In this way, there is no need to lift and place the weight 14 manually, which greatly reduces manpower and material resources and improves work efficiency.

[0041] An LED lamp 91 is installed on the top of the inner side of the mobile installation frame 1. The LED lamp 91 is controlled by the PLC controller 7 and can work in a low-brightness environment to observe and maintain the use of the light penetration instrument inside the equipment;

[0042] In this embodiment, the support guide seat 23 includes a tube 231 sleeved on the probe rod 10, and the tube 231 is used to guide the support probe rod 10, reducing the deflection or shaking caused by external factors, and cooperates with the above-mentioned extension rod 15 to be movably penetrated by the middle of the mobile installation frame 1 to achieve a stable double guiding effect. The tube 231 is composed of three arc plates 233 bolted together, which is not only convenient for the assembly and disassembly of the support guide seat 23, but also allows local replacement or maintenance when necessary, thereby reducing maintenance costs and time; each arc plate 233 is respectively fixed with a hinge plate 232 on the outer side, and the hinge plate 232 is movably hinged to the end of the connecting rod 22. The distance sensor 16 is embedded and installed on the upper side of the hinge plate 232 and is located below the weight 14, which can accurately measure the distance between the weight 14 and the support guide seat 23. This position selection reduces the interference of other components on the distance measurement signal, ensures the accuracy and stability of the measurement result, and thus better feeds back the data to the PLC controller 7.

[0043] The clamping member 6 includes two side connecting rods 62 arranged at intervals. The outer movable rod 21 and the connecting rod 22 are folded upwards and are located between the two side connecting rods 62. A magic tightening belt 61 is provided at the outer end of the side connecting rod 62. The magic tightening belt 61 is used to tighten the outer movable rod 21 and the connecting rod 22 in the folded state of the triangular support frame and clamp them on the outside of the mobile installation frame 1, ensuring the stability and fixation of these components when not in use. This avoids loosening or shaking of components due to external forces or during transportation, improves the structural stability of the entire device, and the clamping member 6 also provides the convenience of quick assembly and disassembly, which is beneficial to improving the overall performance, safety of use and operating efficiency of the equipment.

[0044] It is further provided that a plurality of screw rods 141 are vertically installed on the upper side of the weight 14, and a plurality of weight-increasing plates 142 can be threaded into each screw rod 141, so that the operator can adjust the weight of the weight 14 by adding or removing the weight-increasing plates 142 according to different detection requirements or geological conditions. This weight adjustment function improves the adaptability of the equipment to different soil types or detection depths, ensures the accuracy and reliability of the detection results, and makes the use more flexible. Three connecting ports 9 are provided on the side surface of the movable installation frame 1, and each connecting port 9 is adjacently located on the outer periphery of the weight 14. The weight-increasing plates 142 on the weight 14 can be added or removed through the connecting ports 9, which is more convenient to use. A plurality of hand levers 143 are integrally fixed on the outer periphery of the weight 14, and each hand lever 143 is provided with a connecting hole 144 for fixed connection with the wire rope of the winch, so as to realize the lifting and lowering activities of the above-mentioned weight 14.

[0045] A wire hole 4 for the steel wire rope to pass through is provided on the upper side of the mobile installation frame 1, and a guide wire wheel 5 for rolling the steel wire rope is provided above the wire hole 4, which ensures smooth guidance of the steel wire rope during the lifting and lowering process, avoids friction and resistance between the steel wire rope and the mobile installation frame 1 or other components, thereby reducing the wear of the steel wire rope and extending the service life of the steel wire rope. The guide wire wheel 5 is elastically installed on the top of the mobile installation frame 1, so when the winch 3 retracts and releases the steel wire rope, it can absorb the vibration and impact generated by the steel wire rope during movement, and also avoids the wear of the winch 3 caused by the heavy hammer 14 being pulled upward excessively and against the upper side of the inside of the mobile installation frame 1; and it can automatically adjust the position according to the movement state of the steel wire rope, thereby improving the adaptability of the equipment to different operating conditions. The guide wheel 5 can maintain a good guiding effect, such as under the conditions of heavy hammers of different weights or lifting at different speeds. Specifically, the two axial ends of the guide wheel 5 are respectively axially connected with an inverted L-shaped rod 51, and a pressure plate 52 is integrally arranged in the middle of the inverted L-shaped rod 51, and the lower side of the inverted L-shaped rod 51 passes through the top of the movable installation frame 1, and a return spring 53 is sleeved on the inverted L-shaped rod 51 on the lower side of the pressure plate 52. The return spring 53 is installed on the upper side of the movable installation frame 1 to elastically support the inverted L-shaped rod 51. When the tension of the wire rope is too large and acts on the two L-shaped rods 51, the L-shaped rod 51 squeezes the return spring 53 downward through the pressure plate 52, and the rotation of the guide wheel 5 is elastically supported by the elastic force of the return spring 53, thereby achieving a good buffering and guiding effect.

[0046] The length of the outer movable rod 21 corresponds to the height of the mobile installation frame 1. After the outer movable rod 21 is folded upward, the gripping plate 24 can be flipped over and fit with the upper side of the mobile installation frame 1, making full use of the structural space. A plurality of limiting holes 92 that are adapted to the width of the ground nails 25 are provided on the top of the mobile installation frame 1. After the upper side of the mobile installation frame 1 fits with the mobile installation frame 1, the ground nails 25 pass through the limiting holes 92 to limit the position. In this way, when the gripping plate 24 fits with the mobile installation frame 1, the ground nails 25 can pass through the limiting holes 92, ensuring that the outer movable rod 21 of the equipment is stably fixed on the mobile installation frame 1 during transportation, and combined with the function of the clamping piece 6, a double clamping function is played to prevent the outer movable rod 21 from rotating and falling off.

[0047] The present invention also includes a method for detecting a foundation bearing capacity detection device for highway construction, comprising the following steps:

[0048] S1: When the tripod support frame is not in the unfolded state, the movable wheel 8 at the bottom of the movable installation frame 1 can be pushed to quickly move to the designated position to be detected, and the magic tightening belt 61 of the clamping piece 6 can be opened and the ground nail 25 inserted into the limit hole 92 at the top of the movable installation frame 1 can be pulled out, so that the rotation restriction of the outer movable rod 21 and the connecting rod 22 is released, and the three outer movable rods 21 and the connecting rod 22 are rotated downward and tilted and supported on the ground, and the arc plates 233 of the support guide seat 23 are assembled and connected by bolts to form a bobbin 231, so that the tripod support frame supports the entire movable installation frame 1 in a triangular unfolded state, and according to the required use height of the movable installation frame 1, the inclination angle of the three outer movable rods 21 and the ground is adjusted to adapt to the height of the light probe, and the gripping plate 24 at the bottom of the outer movable rod 21 is close to the ground and the ground nail 25 is inserted into the ground for limit fixing;

[0049] S2: When installing the light-duty probe, disassemble the light-duty probe from the upper side of the mobile installation frame 1, specifically set the weight 14 inside the mobile installation frame 1, and insert the extension rod 15 upward through the corresponding guide hole from the inner side of the mobile installation frame 1, and the probe rod 10 is set through the middle of the above-assembled support guide seat 23, and then the probe 11 is threadedly locked at the bottom of the probe rod 10, so that the light-duty probe can be quickly slidably installed between the mobile installation frame 1 and the triangular support frame in the unfolded state, and the extension rod 15 and the probe rod 10 on both sides of the sliding upper and lower sides of the light-duty probe can be guided to slide;

[0050] S3: When the weight 14 is working, the wire rope on the winch 3 is locked and connected with the weight 14, so that the winch 3 can pull the weight 14 upward when winding it up. Since a guide wire wheel 5 for rolling the wire rope is arranged above the wire hole 4, the wire rope can be smoothly guided when winding and lowering it, avoiding the friction and resistance between the wire rope and the mobile installation frame 1 or other parts, thereby reducing the wear of the wire rope. The guide wire wheel 5 is elastically installed on the top of the mobile installation frame 1, so the winch 3 has a good elastic buffering effect when winding and releasing the wire rope. When the winch 3 freely lowers the wire rope, the weight 14 falls freely downward to hit the hammer seat 12, and the rising height and falling height of the weight 14 can be detected by the distance sensor 16. Detect and feed back data to the PLC controller 7, so that the required height of the weight 14 can be achieved by controlling the retraction and extension of the winch 3 by the PLC controller 7, and when the weight 14 hammers downward and is located at a preset distance from the support guide seat 23, the hammering can be stopped, and the weight 14 can be counterweighted as needed before hammering, specifically by threading the weight-increasing sheet 142 on the screw 141 on the weight 14 through each connecting port 9 to meet the required weight hammering effect of the weight 14, so that the probe rod 10 and the probe head 11 can be driven downward into the roadbed under the action of force, and under the control and calculation of the PLC controller 7, after each certain depth of the ground is driven, the required number of hammering is recorded, and the bearing capacity of the soil layer can be evaluated through these data;

[0051] S4: After the detection is completed, the weight 14 can be pulled by the winch 3 to completely move upward and press against the connecting protrusion 151 at the bottom end of the extension rod 15, so that the probe rod 10 and the probe head 11 driven into the roadbed are pulled upward and separated from the bottom surface, and then the probe head 11, the probe rod 10 and the extension rod 15 of the light-duty probe are threadedly disassembled in sequence, and the wire rope on the weight 14 is untied. When transporting later, these accessories can be re-placed on the upper side of the mobile installation frame 1, and the probe rod 10 is inserted into the corresponding guide hole for limiting to prevent it from falling;

[0052] S5: When the tripod support frame is finally folded up, it is only necessary to pull the ground nail 25 out of the ground and disassemble the arc plate 233 of the support guide seat 23, so that the outer movable rod 21 and the connecting rod 22 can be flipped upward and folded again and tightened and clamped on the side of the movable installation frame 1 by the magic tightening belt 61 again, and then the ground nail 25 is used to pass through the gripping plate 24 and inserted into the limiting hole 92, so that the movable wheel 8 of the installation frame 1 can contact the ground and be quickly transported to the next detection position to realize the transfer.

[0053] It should be noted that the foundation bearing capacity detection equipment for highway construction of the present invention mainly improves the above-mentioned structure, and the functions, components and structures not mentioned therein can be implemented by using components and structures in the prior art that can realize the corresponding functions.

[0054] The present invention has been described in detail above through specific embodiments, but these do not constitute limitations of the present invention. Without departing from the principle of the present invention, those skilled in the art may also make many variations and improvements, which should also be considered as the protection scope of the present invention.

Claims

1. A foundation bearing capacity detection device for highway construction, comprising a light-weight penetration instrument and a mobile mounting frame (1) for movably mounting the light-weight penetration instrument, the light-weight penetration instrument comprising a probe rod (10), a probe (11) threadedly mounted on the bottom end of the probe rod (10), a hammer seat (12) threadedly mounted on the top of the probe rod (10), a guide rod (13) screwedly mounted on the upper side of the hammer seat (12), a heavy hammer (14) slidably sleeved on the guide rod (13), and an extension rod (15) screwedly connected to the top end of the guide rod (13), wherein a connecting protrusion (151) is integrally provided at the bottom end of the extension rod (15), characterized in that: The hammer seat (12) and the heavy hammer (14) are both arranged on the lower side of the movable installation frame (1); the extension rod (15) movably penetrates the middle of the movable installation frame (1); and a plurality of movable wheels (8) are installed at the bottom of the movable installation frame (1); The lower side of the mobile installation frame (1) is foldably connected to a triangular support frame, and the triangular support frame is used to support and stabilize the mobile installation frame (1) and is simultaneously connected to the probe rod (10) in a sliding guide manner; A winch (3) is installed on the top of the mobile installation frame (1) for pulling a weight (14) upward using a steel wire rope; The triangular support frame comprises three outer movable rods (21) rotatably connected along the outer edge of the bottom of the movable installation frame (1), each of the outer movable rods (21) is rotatably connected to a connecting rod (22) on one side opposite to the middle part, each of the outer movable rods (21) can be rotated and folded upwards, and a plurality of clamping members (6) capable of binding and clamping the three outer movable rods (21) and their connecting rods (22) are respectively arranged on the outer side of the movable installation frame (1); A support guide seat (23) is hinged between the ends of each of the connecting rods (22); the support guide seat (23) is a detachable structure, and a distance measuring sensor (16) is installed on the upper side of the support guide seat (23); The probe rod (10) is movably disposed through the middle of the support guide seat (23); a gripping plate (24) is hingedly connected to the end of the outer movable rod (21); and a ground nail (25) is disposed through the middle of the gripping plate (24) and is nailed into the ground.

2. The road construction foundation bearing capacity detection device according to claim 1, characterized in that: The support guide seat (23) comprises a tube (231) sleeved on the probe rod (10), the tube (231) being formed by three arc-shaped plates (233) bolted together, each arc-shaped plate (233) having a hinge plate (232) fixedly disposed on its outer side, the hinge plate (232) being movably hinged to the end of the connecting rod (22), the distance measuring sensor (16) being embedded and mounted on the upper side of the hinge plate (232) and located below the weight (14).

3. A road construction foundation bearing capacity detection device according to claim 1 or 2, characterized in that: The clamping member (6) comprises two side connecting rods (62) arranged at intervals, the outer movable rod (21) and the connecting rod (22) being folded upwards and being located between the two side connecting rods (62), the outer ends of the side connecting rods (62) being provided with magic tightening bands (61), and the outer movable rod (21) and the connecting rod (22) being tightened and clamped to the outside of the movable installation frame (1) by the magic tightening bands (61).

4. The road construction foundation bearing capacity detection device according to claim 1, characterized in that: A plurality of screw rods (141) are vertically mounted on the upper side of the weight (14), and a plurality of weight-increasing plates (142) can be screwed into each screw rod (141). A plurality of hand rods (143) are integrally fixedly mounted on the outer periphery of the weight (14), and each hand rod (143) is provided with a connection hole (144) for fixed connection with a steel wire rope.

5. The road construction foundation bearing capacity detection device according to claim 1, characterized in that: A wire hole (4) for the steel wire to be inserted and movably inserted is provided on the upper side of the movable installation frame (1), and a guide wire wheel (5) for rolling the steel wire is provided above the wire hole (4), and the guide wire wheel (5) is elastically mounted on the top of the movable installation frame (1).

6. The road construction foundation bearing capacity detection device according to claim 5, characterized in that: The two axial ends of the guide wire wheel (5) are respectively rotatably connected to an inverted L-shaped plug rod (51), a pressure plate (52) is integrally arranged in the middle of the inverted L-shaped plug rod (51), and the lower side of the inverted L-shaped plug rod (51) passes through the top of the movable installation frame (1), and a return spring (53) is sleeved on the inverted L-shaped plug rod (51) on the lower side of the pressure plate (52), and the return spring (53) is installed on the upper side of the movable installation frame (1) for elastically supporting the inverted L-shaped plug rod (51).

7. The road construction foundation bearing capacity detection device according to claim 1, characterized in that: The length of the outer movable rod (21) corresponds to the height of the movable installation frame (1); after the outer movable rod (21) is folded upward, the gripping plate (24) can be turned over and fitted to the upper side of the movable installation frame (1); the bottom surface of the gripping plate (24) is provided with a plurality of anti-slip stripes that contact the bottom surface.

8. A road construction foundation bearing capacity detection device according to claim 1 or 7, characterized in that: The side surface of the mobile installation frame (1) is provided with a plurality of communication openings (9), each of which is adjacently located on the periphery of the weight (14); the top of the mobile installation frame (1) is provided with a plurality of limiting holes (92) adapted to the width of the ground nail (25); after the upper side of the mobile installation frame (1) is attached to the mobile installation frame (1), the ground nail (25) passes through the limiting holes (92) to limit the position; and an LED lamp (91) is installed on the top of the inner side of the mobile installation frame (1).

9. The road construction foundation bearing capacity detection device according to claim 1, characterized in that: A PLC controller (7) for controlling the connection winch (3) and the distance measuring sensor (16) is installed on the outside of the mobile installation frame (1).

10. The detection method of the road construction foundation bearing capacity detection equipment according to claim 1, characterized in that: The usage steps include the following: S1: When the tripod support frame is not in the unfolded state, the movable wheels (8) at the bottom of the mobile installation frame (1) are pushed to quickly move to the designated position to be detected, and the outer movable rods (21) and the connecting rods (22) are unlocked by opening the clamping member (6) and pulling out the ground nail (25) inserted into the top of the mobile installation frame (1), and then the three outer movable rods (21) and the connecting rods (22) are rotated downward, and the support guide seat (23) is assembled and connected, so that the tripod support frame is in a triangular unfolded state to support the entire mobile installation frame (1), and the height of the entire mobile installation frame (1) is increased to adapt to the height of the light probe, and the gripping plate (24) at the bottom of the outer movable rod (21) is close to the ground and is inserted into the ground by the ground nail (25) for limit fixing; S2: When installing the light-weight penetration instrument, the light-weight penetration instrument is disassembled from the upper side of the mobile installation frame (1), the weight (14) is set inside the mobile installation frame (1), and the extension rod (15) is inserted upward from the inner side of the mobile installation frame (1) through the corresponding guide hole, and the probe rod (10) is set through the middle part of the above-assembled support guide seat (23), and then the probe (11) is threadedly locked at the bottom of the probe rod (10), and the light-weight penetration instrument can be quickly slid and installed between the mobile installation frame (1) and the triangular support frame in the unfolded state; S3: When the weight (14) is working, the steel wire rope on the winch (3) is locked and connected with the weight (14), so that the winch (3) can pull the weight (14) upward when winding, and when the winch (3) freely lowers the steel wire rope, the weight (14) freely falls downward to hit the hammer seat (12), and the lifting height and the falling height of the weight (14) can be detected by the distance measuring sensor (16), so that when the required height is reached during lifting and lowering, and the weight (14) hammers downward and is located at a preset distance from the support guide seat (23), the hammering can be stopped, and the weight (14) is counterweighted according to needs before hammering, so that the probe rod (10) and the probe (11) can be driven downward into the roadbed under the action of force, and the required number of hammering is recorded after each penetration into the ground. The bearing capacity of the soil layer can be evaluated through these data; S4: After the detection is completed, the weight (14) can be pulled by the winch (3) to completely move upward and press against the connecting protrusion (151) at the bottom end of the extension rod (15), so that the probe rod (10) and the probe head (11) driven into the roadbed are pulled upward and separated from the bottom surface, and then the probe head (11), the probe rod (10) and the extension rod (15) of the light-duty probe are threadedly disassembled in sequence, and the wire rope on the weight (14) is untied. When transporting later, these accessories are re-placed on the upper side of the mobile installation frame (1), and the probe rod (10) is inserted into the corresponding guide hole for limiting. S5: When the triangular support frame is finally folded and stowed, the ground nails (25) are pulled out of the ground and the support guide seat (23) is disassembled, so that the outer movable rod (21) and the connecting rod (22) can be flipped upward and folded and re-tightened and clamped on the mobile installation frame (1), so that the movable wheels (8) are in contact with the ground and quickly transported to the next position.

Citation Information

Cited By

  • Foundation bearing capacity detection equipment for highway construction

    CN119266191A