Energy dynamic prediction and multi-energy flow coupling optimization method and energy management and control system

By using deep learning and data-driven methods in the energy dispatching system of steel enterprises, combined with the self-attention mechanism and gray wolf optimization algorithm, accurate prediction and optimal dispatch of energy media such as gas and steam are achieved, solving the problems in the existing system. The problem of low prediction accuracy and poor model stability improves the prediction accuracy and operational convenience of the system.

CN118798526AActive Publication Date: 2024-10-18NORTHEASTERN UNIV CHINA

Patent Information

Application Number
CN202410754541.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-18
Estimated Expiration
2044-06-12

AI Technical Summary

Technical Problem

The existing energy dispatching system of steel enterprises has shortcomings in prediction accuracy and optimal dispatching. It fails to effectively consider the complex working conditions and external uncertainties in equipment operation, resulting in low prediction accuracy and poor model stability, and system visualization and operation. The performance is not strong and it is difficult to meet actual production needs.

Method used

Using fusion data-driven and deep learning technology, we build a long-short-term memory neural network model that integrates self-attention mechanism, and combines it with the gray wolf optimization algorithm to perform energy dynamic prediction and multi-energy flow coupling optimization. Through the Gantt chart operating condition management module and The SCADA system collects real-time data to achieve accurate prediction and optimal dispatch of energy media such as gas and steam.

Benefits of technology

It improves the accuracy of energy dynamic prediction and the rationality of optimized dispatch. It can predict the working rhythm and gas and steam production and consumption in the future in advance, enhance the stability of the system and the rationality of instructions, and adapt to different production conditions. The actual operating conditions are lower, reducing energy dissipation and production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798526A_ABST
    Figure CN118798526A_ABST
Patent Text Reader

Abstract

The invention provides an energy dynamic prediction and multi-energy flow coupling optimization method and an energy management and control system. The energy dynamic prediction and multi-energy flow coupling optimization method comprises the following steps: S1, obtaining energy production and consumption historical data, a working condition type list and a future production and maintenance plan; s2, outputting a prediction result by using the optimized long-short-term memory neural network fused with the self-attention mechanism; s3, using a Gantt chart working condition management module to realize automatic calling of a working condition sample curve or a working condition instance along with the rhythm change of the working condition; s4, superposing the real-time data, the abnormal working condition information and the working condition sample curve, and correcting in combination with historical working condition information; and S5, establishing a multi-energy coupling optimization scheduling model, and scheduling the final dynamic prediction result in the step S4 by using the multi-energy coupling optimization scheduling model. The method provides a practical and effective decision scheme for production scheduling personnel, finally assists iron and steel enterprises in reducing energy emission, comprehensively improves the system energy efficiency and economic benefits, and reduces the production and operation cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of integrated energy dispatching of steel enterprises, and in particular to an energy dynamic prediction and multi-energy flow coupling optimization method and an energy management and control system. Background Art

[0002] In the process of steel production, not only a large amount of energy and resources are consumed, but also a large amount of secondary energy such as gas, steam and electricity is generated. These three types of energy are interrelated and coupled with each other, especially the production and consumption will change with the changes in working conditions and equipment operation status, which increases the difficulty of scheduling and management of energy systems. It is difficult to use them reasonably if they only rely on manual experience, resulting in waste of resources and environmental pollution. Therefore, steel companies not only need to establish optimization models to coordinate the management and optimize the allocation of gas, steam and electricity, but also need to predict the imbalance of supply and demand of energy media such as gas and steam in advance, and regulate them in advance, which will greatly reduce unnecessary energy release;

[0003] In the current social context of comprehensive digital transformation, data mining technology is increasingly used in various fields. As one of the key application areas, energy scheduling management of steel enterprises has been significantly developed with the support of data mining technology. With the continuous maturity of deep learning models and the continuous upgrading of intelligent optimization algorithms, this technology gradually helps actual production scheduling to make guidance based on more scientific and accurate data. Some scholars use scenario analysis to establish a real-time adjustment feedback model to cope with the adverse effects of differences in response time of different energy flows on system optimization scheduling; some scholars train LSSVM models based on historical data, and use the trained optimal prediction model to predict part of the historical data of gas production and consumption, thereby improving the accuracy of dynamic prediction. Other scholars have proposed an online Wang-Mendel fuzzy method to extract knowledge from historical data and realize online learning capabilities.

[0004] However, the above studies have ignored the influence of uncertainty factors in actual production, resulting in low prediction accuracy and unreasonable decision instructions. First, from the perspective of energy medium prediction, many composite prediction models only study the prediction problem in a single scenario, without considering the complex working conditions of the equipment during operation, and only analyze from a certain link in the energy system, considering less external factors (production plan, maintenance plan, process conditions, working condition information, etc.). Most of them are offline prediction modeling, which cannot be adjusted with the dynamic changes of production conditions. The corresponding prediction model does not consider the key information of relevant feature points when making time series predictions, and does not make corrections, resulting in low prediction accuracy and poor model stability; secondly, from the perspective of optimization scheduling models, most models do not consider the superposition of multiple production conditions from the whole plant level, and do not consider that there are many uncertain factors in the production process, such as intermittent fluctuations in production rhythm, demand forecast deviations of various loads on the load side, changes in production plan demand, etc., which will affect the normal operation of the energy system. There are many problems with the smart energy system currently used by steel enterprises. There are common problems such as visualization failing to fully meet the needs of information presentation, poor operability, inaccurate predictions, and frequent scheduling instructions, which lead to missing the best adjustment time. Summary of the invention

[0005] In view of this, the purpose of the present invention is to propose an energy dynamic prediction and multi-energy flow coupling optimization method and an energy management and control system, to establish an energy dynamic prediction and optimization scheduling intelligent energy management and control system that integrates data-driven and deep learning, and realizes visualization, multi-functions, and easy-to-operate, so as to achieve accurate prediction of future trends in the instantaneous energy production and consumption of each energy equipment, accurate prediction of future trends in the instantaneous production and consumption of all types of gas and steam in the entire steel enterprise, and emergency response prediction of energy production and consumption trends under sudden abnormal operating conditions.

[0006] The technical means adopted by the present invention are as follows:

[0007] A method for energy dynamic prediction and multi-energy flow coupling optimization includes the following steps:

[0008] S1. Obtain historical data on energy production and consumption, a list of operating conditions, and production and maintenance plans for future scheduling cycles;

[0009] S2. Preprocess the historical data to obtain the preprocessed historical data; use the template matching method to extract the periodic features in the preprocessed historical data; obtain the strongly correlated feature points based on the periodic features; construct and train the short prediction model of the long short-term memory neural network fused with the self-attention mechanism; use the gray wolf optimization algorithm to optimize the trained short prediction model of the long short-term memory neural network fused with the self-attention mechanism; use the optimized long short-term memory neural network fused with the self-attention mechanism to output the prediction results;

[0010] S3. Based on the prediction results of S2, a working condition sample library is established, and a Gantt chart working condition management module is established. In the Gantt chart working condition management module, the equipment working condition type is defined according to the energy equipment and its working condition type list, and the working condition sample curve is defined based on the equipment working condition type. The Gantt chart working condition management module is used to realize the automatic calling of the working condition sample curve or working condition instance as the working condition rhythm changes;

[0011] S4. Collect the real-time data of energy production and consumption of different equipment in the SCADA system, collect abnormal working condition information, superimpose the real-time data, abnormal working condition information, and working condition sample curves, and obtain the equipment energy production and consumption prediction curve under multiple working conditions and the future trend curve of total gas and steam production and consumption; find out the historical data sequence with the same working condition as the prediction day as the correction information of the prediction curve, and correct the production and consumption prediction curve and the future trend curve according to the correction information to obtain the energy production and consumption prediction curve of different equipment, the gas tank cabinet prediction curve, and the total gas and steam production and consumption prediction curve, and finally realize dynamic prediction;

[0012] S5. Determine the scheduling model variables and model constraints, determine the parameter selection method for the cost item and the penalty item in the scheduling function, use a data-driven approach to obtain the equipment's efficiency characteristic equation in combination with the equipment's historical production and consumption data, comprehensively optimize the objective function, and establish a multi-energy coupling optimization scheduling model. Based on the energy dynamic prediction curve in S4, the energy distribution of each device in the future and the overall energy change trend, that is, the future production and consumption of each device, are known. The multi-energy coupling optimization scheduling model is called to provide an energy optimization allocation plan based on the future production and consumption of each device.

[0013] Furthermore, S1 specifically includes:

[0014] Obtain the energy topology network structure and historical data of energy production and consumption of the enterprise through the server of the enterprise comprehensive data integration platform. Obtain the types and quantity of energy media generated and consumed under different working conditions and the changing rules over time through the server of the enterprise comprehensive data integration platform. Obtain the production plan and maintenance plan within the future scheduling cycle through the server of the enterprise comprehensive data integration platform.

[0015] The enterprise energy topology network structure and energy production and consumption history data include boiler gas consumption and steam generation, generator set steam intake and extraction as well as power generation, gas discharge tower discharge volume, and real-time gas tank position.

[0016] Furthermore, S2 specifically includes the following steps:

[0017] S201, preprocessing the historical data of the impact of different types of working conditions on the energy consumption of equipment to obtain preprocessed historical data; the preprocessing method includes time series stabilization, data patching, serialized data, normalization and data segmentation;

[0018] S202, determining the periodic features in the preprocessed historical data, constructing a periodic matching template, matching the periodic matching template with the preprocessed historical data, and extracting specific periodic features in the preprocessed historical data; measuring the matching degree between the template and the data by the Pearson correlation coefficient, and obtaining strongly correlated feature points; extracting key information of the strongly correlated feature points for time series prediction;

[0019] The calculation formula of the Pearson correlation coefficient is as follows:

[0020]

[0021] In the formula, r xy is the correlation coefficient, X is the independent variable, and Y is the dependent variable;

[0022] S203. Construct a short prediction model of a long short-term memory neural network integrating a self-attention mechanism to fully extract the dependencies between time series;

[0023] The self-attention mechanism algorithm process is as follows:

[0024]

[0025] In the formula, Tr, Tm, Tk are matrices composed of three vectors of length h that are converted into w sequences in the sample in parallel. The Softmax function is an important activation function in the field of deep learning. The Softmax function converts the original scores output by the neural network into the probability distribution of each category, so that the model can classify different categories in the form of probability;

[0026] S204, using the Gray Wolf Optimization Algorithm to optimize the parameters of the long short-term memory neural network short prediction model integrating the self-attention mechanism, training the long short-term memory neural network short prediction model integrating the self-attention mechanism with the best prediction ability and outputting the prediction results of the impact of different working conditions on the energy consumption of the equipment;

[0027] The specific formula of the gray wolf optimization algorithm is as follows:

[0028]

[0029] In the formula, Represents the predicted value of production and consumption, y i Indicates the true value of production and consumption.

[0030] Furthermore, S3 specifically includes the following steps:

[0031] S301, defining the working condition type according to the equipment type, and entering each working condition type into the Gantt chart management module;

[0032] Define the working condition types for the main gas production and consumption units, including blast furnace replacement, blast furnace wind stop, coke oven maintenance, converter furnace, converter maintenance, and steel rolling maintenance, for selection when entering working conditions;

[0033] S302, defining production and consumption curves of various media for various working conditions of energy equipment, and using the production and consumption curves as working condition sample curves of the type and quantity of energy media of the equipment changing over time;

[0034] S303, matching the duration of each working condition of each device with the working condition sample curve or working condition instance of the working condition one by one, so as to realize automatic calling of the working condition sample curve or working condition instance as the working condition rhythm changes;

[0035] When an abnormal operating condition occurs, a sample curve of a certain production and consumption medium is directly entered according to the operating condition, that is, the operating condition instance data. The operating condition instance data has a higher priority than the sample data.

[0036] Furthermore, S4 specifically includes the following steps:

[0037] S401, collecting real-time data in the SCADA system and preprocessing the real-time data;

[0038] S402, select the energy equipment and its working condition type that need to be automatically tracked, determine the working condition signal collection location in the steel plant; establish the working condition rhythm prediction logic based on the production / maintenance plan and the real-time working condition signal, and automatically track and correct the working condition rhythm;

[0039] S403. Drag the Gantt bar to introduce abnormal working conditions in the production / maintenance plan for a certain period of time in the future. The formula for the imbalance caused by the superposition of abnormal working conditions in a certain period of time is as follows:

[0040]

[0041] In the formula, i,m,z represents the i-th time point, the m-th energy medium, and the z-th working condition, (t i ,t i+1 ) is one of the h-1 time periods;

[0042] S404. Conduct in-depth mining of historical energy data in the system and use the K-nearest neighbor algorithm to find the historical data with the same operating conditions as the forecast day to correct the forecast curve of production and consumption changes. Correct the production and consumption forecast curve and future trend curve according to the correction information to finally achieve dynamic forecasting.

[0043] Further, S5 includes the following steps:

[0044] S501. Clarify the enterprise energy dispatching rules and safety supply requirements, including the safe operating pressure of the gas / steam network, the safe position of the gas tank, the safe pressure of the steam accumulator, the safe load of the hot blast furnace to ensure production, the safe load of the heating furnace to ensure production, the minimum load of the generator set, and the safe range of the demand for purchased electricity;

[0045] S502. Prepare a list of adjustable energy equipment, including gas / steam generator sets and gas cabinets, set adjustment priorities, establish an adjustable energy equipment performance database, and track the operating status of adjustable equipment in real time;

[0046] S503. According to the corresponding relationship between the energy conversion efficiency of each boiler and the boiler operating load in a certain period, the operating load of the energy conversion equipment and the energy conversion efficiency under the corresponding load are characterized as a quadratic function by a quadratic curve fitting method. And according to the test data and online production data of each steam turbine, the consumption characteristic equation of the steam turbine is established by using the principle of multivariate linear regression. The formulas are as follows:

[0047]

[0048] In the formula, represents the actual load of the energy conversion equipment during stable operation, and C1, C2, and C3 represent fitting parameters; They represent the steam intake, extraction and condensation of the steam turbine in the time period t respectively;

[0049] S504. According to the list of adjustable equipment, combined with energy dispatching rules and safety supply requirements, determine the dispatching model variables and model constraints, comprehensively optimize the objective function, and establish a multi-energy coupling optimization dispatching model;

[0050] S505. Based on the energy dynamic prediction curve in S4, the energy distribution of each device and the overall energy change trend in the future are known, and the multi-energy coupling optimization scheduling model is called to provide an energy optimization allocation plan.

[0051] Furthermore, the multi-energy coupling optimization scheduling model includes an objective function and constraints. Assuming that the scheduling period of the multi-energy coupling optimization scheduling model is T, a certain time period is recorded as t (1≤t≤T), D is the number of different devices, and N represents the number of different energy media, the objective function formula of the model is as follows:

[0052]

[0053] In the formula, C buy,j , E j,t represent the purchase price of fuel j and the purchase quantity of fuel j in period t respectively; C os,t , P tRespectively represent the electricity price and the purchased electricity quantity in peak, valley and normal periods; C adj,j , ΔF i,j,t They represent the adjustment penalty coefficient of fuel j and the adjustment amount of fuel j by equipment i in time period t respectively; C re,k , D k,t They represent the penalty coefficient of gas k and the amount of gas k released in time period t respectively; C st,i , L i,t They represent the downtime cost of device i and the downtime flag of device i, 0 means downtime and 1 means enabled; C de,k , H r,k,t , H g,k They represent the penalty coefficient for cabinet deviation, the cabinet height of gas k at time t, and the target cabinet height respectively;

[0054] The constraints include equipment range constraints, equipment node balance constraints, supply and demand balance constraints, and calorific value balance constraints;

[0055] Equipment scope constraints include upper and lower limits on equipment capacity and energy consumption, upper and lower limits on gas tank positions, and upper and lower limits on equipment climbing speed;

[0056] The upper and lower limits of equipment capacity and energy consumption are as follows:

[0057] G i,j,min ≤G i,j,t ≤G i,j,max

[0058] The upper and lower limits of gas tank positions are as follows:

[0059] H k,min ≤H k,t ≤H k,max

[0060] The upper and lower limits of the equipment climbing speed are as follows:

[0061] M i,speed,min ≤M i,speed,t ≤M i,speed,max

[0062] In the formula, G i,j,t represents the amount of energy generated or consumed by device i, H k,t Indicates the height of the gas cabinet k, M i,speed,t Indicates the climbing speed of device i;

[0063] Device node balance constraints:

[0064]

[0065] Where n ef,i,jrepresents the conversion coefficient of energy j into energy p in device i, m represents the number of energy types consumed by device i, E in,i,j represents the energy consumption of equipment i, h j represents the calorific value of energy j, F out,i,p represents the amount of energy p generated by device i, h p represents the calorific value of energy p;

[0066] Supply and demand balance constraints:

[0067]

[0068] In the formula, (ΔT i , ΔT i+1 ) is a period in ΔT, W j,Δt Indicates the unbalance introduced by the working conditions within ΔT, Indicates (ΔT i , ΔT i+1 ) The amount of energy generated during time period j, Indicates (ΔT i , ΔT i+1 ) is the change in the number of cabinets storing energy j during the period. If energy j is not gas, the value is 0. Respectively represent (ΔT i , ΔT i+1 ) The emission and consumption of energy j in time period;

[0069] Heat balance constraints:

[0070]

[0071] Where, X i , Y i They represent the minimum and maximum specific calorific values ​​of the total calorific value of the mixed energy consumed by equipment i, respectively;

[0072] Under different production conditions, various energy production / consumption equipment, energy conversion equipment, and gas tanks will make corresponding adjustments, and the penalty coefficient for adjusting each device is equivalent to providing a priority for the equipment adjustment order. That is, when other conditions are the same, the model will give priority to adjusting equipment with a small penalty coefficient. Deviation from the penalty coefficient can ensure that the gas tank position remains around the target position.

[0073] The present invention also provides an energy management and control system for energy dynamic prediction and multi-energy flow coupling optimization, which is used to implement any of the above energy dynamic prediction and multi-energy flow coupling optimization methods, including:

[0074] Data collection and cleaning module, energy management and diagnosis module, Gantt chart condition management module, energy online prediction and optimization scheduling module and energy scheduling decision push module;

[0075] The data collection and cleaning module is used to perform data collection steps and data cleaning steps:

[0076] The data collection steps are as follows:

[0077] Using advanced sensor technology and Internet of Things technology, the SCADA system collects real-time energy production and consumption data from various devices. By using ETL tools, data from different sources and in different formats are converted into a unified data type to ensure data consistency and compatibility, and perform preliminary processing and filtering to reduce the transmission of invalid data and improve data processing efficiency.

[0078] The data cleaning steps are as follows:

[0079] T1. Missing value processing: The system automatically detects missing values ​​in the data set. For completely random missing data and non-critical data, it deletes them according to the unified time granularity of the model to save data processing time. When processing random missing data and non-random missing data (MNAR), the random forest method is used to fill in the missing data, thereby fully restoring the true situation of the original data.

[0080] T2. Abnormal data identification and correction: Use KMeans clustering algorithm to cluster the data, count the number of data points in each cluster, set a threshold, and if the number of clusters is less than the threshold, the data point is considered to be an outlier and corrected by using the mean value interpolation method;

[0081] T3. Data deduplication: Identify and remove duplicate data through similarity matching technology to ensure the uniqueness and accuracy of the data set;

[0082] T4. Data standardization: The system standardizes the data, including unit conversion, dimension unification, etc., to ensure the consistency and comparability of the data;

[0083] The energy management and diagnosis module is used to perform energy management and diagnosis functions;

[0084] The energy management is as follows: establish a data dictionary to record the type, unit and other information of the data, and provide data query and use functions; record metadata information such as the source, collection time, and collection method of the data to ensure the transparency and traceability of the data. Through the metadata information, the source and collection process of the data can be traced. When data anomalies occur, the metadata can be traced back to the specific sensor device and collection time to find out the cause of the problem and solve the data anomaly problem. The distributed architecture of MySQL is used to realize the storage function, and the master-slave replication mechanism and asynchronous replication mode provided by MySQL are used;

[0085] The diagnostic functions are as follows: statistically analyzing the types and consumption of energy used by the enterprise, identifying the main energy consumption points and energy saving potential, evaluating the efficiency of the enterprise's main production equipment, and identifying problems of low equipment efficiency and energy waste;

[0086] The Gantt chart working condition management module has the following functions: the working condition samples are entered into the system through the Gantt chart working condition management module, the entered working condition sample information will be displayed through a movable Gantt chart, and the unbalanced amount is introduced by superimposing the working condition samples to simulate the change in equipment production and consumption under the actual production plan conditions;

[0087] The energy online prediction and optimization scheduling module displays the gas / steam production and consumption dynamic prediction curve through a visual chart. The production and consumption prediction curve includes various gas and steam production and consumption curves of various energy equipment, various gas and steam production and consumption curves of the whole plant, gas / steam pipeline pressure prediction curve, and blast furnace / coke oven / converter gas tank cabinet prediction curve; based on the energy dynamic prediction curve, the user calls the multi-energy coupling optimization scheduling model to give an energy optimization allocation plan. At this time, the visual chart shows the equipment energy production and consumption, total energy change trend and cabinet change trend in the future period after the implementation plan is implemented;

[0088] The energy scheduling decision push module, when the energy online prediction and optimization scheduling module generates a new scheduling decision, displays the scheduling decision and optimization suggestions in the form of charts and text through the system interface. For the scheduling decision confirmed by the user, the system automatically performs corresponding adjustment operations; saves all pushed scheduling decisions and their execution status to form historical records, analyzes the execution effects of historical decisions, evaluates the accuracy and effectiveness of optimization suggestions, and improves future scheduling models and algorithms.

[0089] The present invention also provides a storage medium, which includes a stored program, wherein when the program is run, any of the above-mentioned energy dynamic prediction and multi-energy flow coupling optimization methods is executed.

[0090] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes any one of the above-mentioned energy dynamic prediction and multi-energy flow coupling optimization methods through the operation of the computer program.

[0091] Compared with the prior art, the present invention has the following advantages:

[0092] The present invention explores the user load characteristics, equipment energy medium production and consumption characteristics and the influence of external factors on the change trends of the two based on big data analysis technology, and adaptively extracts specific periodic features based on data-driven and template matching methods to train the prediction model;

[0093] The present invention adopts a "double correction" method to improve the accuracy of the prediction model. The prediction model is corrected using the Gray Wolf optimization algorithm, and real-time data in the SCADA system is collected. Through advanced technologies such as big data mining and deep learning, the historical energy data in the system is deeply mined and the prediction curve is corrected using the K-nearest neighbor algorithm.

[0094] The stability of the energy optimization scheduling model and the rationality of the instructions depend critically on the accuracy of the prediction. The present invention uses advanced technologies such as big data technology, data mining and deep learning to establish a prediction model and perform secondary corrections, which greatly improves the accuracy of the prediction. By using the present invention, the operating rhythm and the production and consumption of gas and steam in the future can be accurately predicted in advance, leaving buffer time for dealing with emergencies, thereby improving the stability of the optimization scheduling model and the rationality of the instructions;

[0095] The present invention constructs the equipment production and consumption prediction curve under different production conditions based on the Self Attention-LSTM prediction model optimized by GWO, thereby establishing a working condition sample library. The working condition sample is not fixed, and the production condition production and consumption prediction curve can be corrected after the current production condition is identified as the system actually runs.

[0096] The present invention establishes a multi-energy coupling optimization scheduling model while taking into account the influencing factors of uncertainty, and introduces methods such as cabinet deviation penalty to better adapt to the actual operating conditions of equipment under different production conditions of the enterprise, and adopts an efficient algorithm to meet the needs of dynamic scheduling;

[0097] The present invention overcomes the defect of traditional research that only balances and dispatches a single energy medium and takes into account the uncertain factors under various production conditions, equipment operation characteristics and energy balance constraints, and introduces priority and penalty functions to effectively avoid frequent equipment adjustments under normal production conditions. The output of optimized dispatch instructions can meet the specific requirements of pipeline network operation safety, production supply guarantee and equipment use safety.

[0098] The Gantt chart working condition management control developed by the present invention can realize manual input and adjustment of working conditions, and the system has the functions of automatic data collection, automatic collection of working condition related signals, autonomous operation of scheduling model, and push of optimized scheduling instructions, making it more convenient for energy dispatchers to manage energy systems;

[0099] The present invention has developed a set of energy medium production and consumption prediction and intelligent scheduling systems that integrate data-driven, deep learning, intelligent scheduling and dynamic prediction methods to achieve intelligent control, monitoring and management of energy in steel enterprises. BRIEF DESCRIPTION OF THE DRAWINGS

[0100] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0101] Figure 1 It is a schematic diagram of the process of the present invention.

[0102] Figure 2 A flow chart for constructing the GWO optimized Self Attention-LSTM prediction model of the present invention.

[0103] Figure 3 A flow chart based on historical forecast data and a production rhythm condition sample library is established for the present invention.

[0104] Figure 4 It is a schematic diagram of the gas network operation structure of the present invention.

[0105] Figure 5 This is a flow chart of the energy dynamics prediction and multi-energy flow coupling optimization method of the present invention.

[0106] Figure 6 Schematic diagram of the structure of the energy management and control system integrated in the present invention. DETAILED DESCRIPTION

[0107] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0108] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0109] The purpose of the present invention is to invent a comprehensive energy management and control system that integrates data-driven, deep learning, intelligent scheduling, and energy dynamic prediction to achieve efficient and intelligent energy management. Consider the superposition of multiple production conditions from the whole plant level, consider the uncertain factors in the production process, and the interdependence between different time points to optimize the prediction model, improve the prediction accuracy, model stability, and the rationality of scheduling instructions. Based on big data analysis technology, the present invention explores the user load characteristics, the changing laws of energy medium production and consumption, and the influence of external factors on the changing trends of the two. It adopts the optimized LSTM neural network model (Self Attention-LSTM) that integrates the self-attention mechanism, which greatly improves the prediction accuracy. The present invention establishes a multi-energy flow coupling optimization model. Since the SCADA systems used by most steel mills have accumulated a large amount of real-time data, the present invention proposes a dynamic optimization scheduling scheme, and finally establishes a smart energy management and control system that integrates data-driven and deep learning to achieve visualization, multi-functions, and easy operation of energy dynamic prediction and optimization scheduling, so as to achieve accurate prediction of the future trend of the instantaneous energy production and consumption of each energy equipment, accurate prediction of the future trend of the total instantaneous production and consumption of various types of gas and steam in the entire steel enterprise, and emergency response prediction of the energy production and consumption trend of sudden abnormal working conditions, so as to provide production scheduling personnel with practical and effective decision-making plans, and finally assist steel enterprises to reduce energy emissions, comprehensively improve system energy efficiency and economic benefits, and reduce production and operation costs.

[0110] like Figure 1 As shown: This embodiment discloses an energy dynamic prediction and multi-energy flow coupling optimization method and an energy management and control system, including the following steps:

[0111] S1: Analyze the energy system layout of the steel enterprise, obtain historical data on energy production and consumption and a list of operating conditions, determine the energy medium production and consumption of each equipment under various operating conditions, and obtain production and maintenance plans for future scheduling cycles;

[0112] S101: Obtain the energy topology network structure and historical data of energy production and consumption of the enterprise through the server of the enterprise comprehensive data integration platform, including boiler gas consumption and steam generation, steam intake and extraction as well as power generation of generator sets, gas discharge volume of gas discharge tower, real-time position of gas tank, etc., and obtain the types and quantity of energy media generated and consumed under different working conditions and the change rules over time, and obtain the production plan and maintenance plan in the future scheduling cycle;

[0113] S2: Based on big data analysis technology, we explore the user load characteristics, equipment energy medium production and consumption characteristics, and the impact of external factors on the change trends of the two. We use a new template matching method to extract specific cycle features based on data-driven adaptiveness, train the Self Attention-LSTM neural network, and use the GWO algorithm to optimize the Self Attention-LSTM prediction model. This allows the model to output the prediction results of the impact of different types of working conditions on equipment energy production and consumption in the optimal state, such as Figure 2 The figure shows the flow chart of the Self Attention-LSTM prediction model optimized by GWO of the present invention;

[0114] S201: preprocess the historical data of the impact of different types of working conditions on the energy production and consumption of equipment by means of time series stabilization, data patching, serialized data, normalization, data segmentation, etc.;

[0115] S202: Determine the periodic features in the data, construct a periodic matching template, match the constructed template with the data, extract specific periodic features in the data, and adaptively adjust the template according to the changes in the actual data. The Pearson correlation coefficient is used to measure the degree of matching between the template and the data, and the key information of the strongly correlated feature points is extracted when performing time series prediction to make the prediction more accurate. The strongly correlated feature points are measured according to the Pearson correlation coefficient, with values ​​ranging from -1 to 1, 1 indicating positive correlation, and -1 indicating negative correlation. Strongly correlated feature points need to be analyzed based on specific data. For example, if the feature is between 0.6 and 0.8, then those between 0.7-0.8 are considered strongly correlated feature points.

[0116] The calculation formula of Pearson correlation coefficient is as follows:

[0117]

[0118] In formula (1), r xy is the correlation coefficient, X is the independent variable, and Y is the dependent variable;

[0119] S203: Based on the above analysis, a long short-term memory neural network short prediction model integrating the self-attention mechanism is constructed to fully extract the dependency relationship between time series;

[0120] The self-attention mechanism algorithm process is as follows:

[0121]

[0122] In formula (2), Tr, Tm, Tk are matrices formed by connecting three vectors of length h into which the w sequences in the sample are converted. The Softmax function is an important activation function in the field of deep learning. It can convert the original scores output by the neural network into the probability distribution of each category, so that the model can classify different categories in the form of probability.

[0123] S204: Optimizing the parameters of the prediction model using the grey wolf optimization algorithm, training a model with the best prediction capability to output prediction results of the impact of different working conditions on the energy production and consumption of the equipment;

[0124] Grey Wolf Optimizer (GWO) is an intelligent optimization algorithm with the advantages of no reliance on gradient information, strong global search capability, and fast convergence speed. Its optimization process is divided into social hierarchy stratification, surrounding prey, hunting, and attacking prey;

[0125] The model uses two methods, Mean Absolute Percentage Error (MAPE) and Root Mean Squared Error (RMSE) to evaluate the prediction results. The specific formula is as follows:

[0126]

[0127] In formulas (3) and (4), Represents the predicted value of production and consumption, y i Indicates the true value of production and consumption;

[0128] S3: Based on the above historical working condition prediction data, establish a working condition sample library, which includes settings such as working condition type, interval time, duration, working condition sample curve, etc.; develop a Gantt chart working condition management module; combine the gas and steam production and consumption process mechanism, define the equipment working condition type according to the energy equipment and its working condition type list in the working condition management module, define the type and quantity of energy media generated and consumed by the equipment under a certain working condition, and define the working condition combination of the equipment within a period of time; establish a working condition sample library process based on historical prediction data and production rhythm, such as Figure 3 As shown;

[0129] S301: Define the operating condition type according to the equipment type, such as normal operation, maintenance, wind break, shutdown, etc. Each operating condition type will be entered into the Gantt chart management module. The more operating condition types there are, the more detailed the management of the equipment operation mode will be;

[0130] Define working condition types for major gas production and consumption units such as coke ovens, blast furnaces, converters, and steel rolling mills, including blast furnace replacement, blast furnace wind stop, coke oven maintenance, converter heats, converter maintenance, steel rolling mill maintenance, etc. These working condition types can be selected when entering working conditions;

[0131] S302: defining production and consumption curves of various media for various working condition types of energy equipment, and using the production and consumption curve of working condition prediction data as a working condition sample curve of the type and quantity of energy media of the equipment changing over time;

[0132] S303: The duration of each working condition of each device is matched with the working condition sample curve or working condition instance of the working condition, so as to realize automatic calling of the working condition sample curve or working condition instance as the working condition rhythm changes;

[0133] For abnormal working conditions, a sample curve of a certain production and consumption medium can also be directly entered according to the working conditions, that is, working condition instance data. The working condition instance data has a higher priority than the sample data.

[0134] S4: Collect real-time data from the SCADA system, obtain abnormal operating information of the equipment through maintenance plans, and combine the operating condition sample curves entered in the operating condition sample library to obtain the equipment energy production and consumption prediction curves under multiple operating conditions and the future trend of total gas and steam production and consumption. Through advanced technologies such as data mining and deep learning, conduct in-depth mining of historical energy data in the system, and use the K-nearest neighbor algorithm to find the historical data sequence with the same operating conditions as the forecast day as the correction information of the forecast curve, and finally realize dynamic prediction;

[0135] S401: The real-time data collected by the SCADA site may be missing or redundant, so the data needs to be pre-processed to ensure the integrity and reliability of the data;

[0136] S402: Select the energy equipment and its working condition type that need to be automatically tracked, determine the working condition signal collection location in the steel plant; establish the working condition rhythm prediction logic based on the production / maintenance plan and the real-time working condition signal, and automatically track and correct the working condition rhythm;

[0137] S403: Drag the Gantt bar to introduce abnormal working conditions in the production / maintenance plan for a period of time in the future; the formula for the imbalance caused by the superposition of abnormal working conditions in a certain period of time is as follows:

[0138]

[0139] In formula (5), i,m,z represents the i-th time point, the m-th energy medium, and the z-th operating condition, (t i ,t i+1 ) is one of the h-1 time periods;

[0140] S404: Deeply mine the historical energy data in the system and use the K-nearest neighbor algorithm to find the historical data with the same operating conditions as the forecast day to correct the forecast curve of production and consumption changes, and finally achieve accurate forecasts of the future trends of the instantaneous production and consumption of gas / steam of each energy equipment, the future trends of the total instantaneous production and consumption of all types of gas and steam in the steel enterprise, and the future trends of the gas / steam network pressure, gas tank position, and steam accumulator pressure, and make emergency response forecasts for the gas / steam production and consumption trends of sudden abnormal working conditions;

[0141] S5: According to the list of adjustable equipment, combined with energy dispatching rules and safety supply requirements, determine the dispatching model variables and model constraints, and comprehensively consider factors such as peak and valley electricity prices, adjustable equipment adjustment costs, adjustable equipment start-up and shutdown costs, gas release costs, and over-limit maintenance costs of gas cabinets to determine the parameter value method of the cost item and penalty item in the dispatching function; combine the historical production and consumption data of the equipment to obtain the efficiency characteristic equation of the equipment in a data-driven manner, comprehensively optimize the objective function, and establish a multi-energy coupling optimization dispatching model;

[0142] S501: Clarify the enterprise energy dispatch rules and safety supply requirements, refer to Figure 4 The gas network operation structure of the present invention shown in the figure includes the gas / steam network operation safety pressure, gas tank safety cabinet position, steam accumulator safety pressure, hot blast furnace blast production safety load, heating furnace production safety load, generator set minimum load, external power demand safety range, etc.;

[0143] S502: Prepare a list of adjustable energy equipment, including gas / steam generator sets, gas cabinets, etc., set adjustment priorities, establish an adjustable energy equipment performance database, and track the operating status of adjustable equipment in real time;

[0144] S503: According to the corresponding relationship between the energy conversion efficiency of each boiler and the boiler operating load in a certain period, the operating load of the energy conversion equipment and the energy conversion efficiency under the corresponding load are characterized as a quadratic function by the quadratic curve fitting method, and according to the test data and online production data of each steam turbine, the consumption characteristic equation of the steam turbine is established by using the multivariate linear regression principle. The formulas are as follows:

[0145]

[0146] In formula (6), represents the actual load of the energy conversion equipment during stable operation, C1, C2, and C3 represent fitting parameters; in formula (7), They represent the steam intake, extraction and condensation of the steam turbine in the time period t respectively;

[0147] S504: According to the list of adjustable equipment, combined with energy dispatch rules and safety supply requirements, determine the dispatch model variables and model constraints, comprehensively optimize the objective function, and establish a multi-energy coupling optimization dispatch model; refer to Figure 5 The flow chart of energy dynamics prediction and multi-energy flow coupling optimization method shown;

[0148] The establishment of a multi-energy coupling optimization control model includes objective functions and constraints. Assume that the scheduling period of the model is T, a certain time period is t (1≤t≤T), D is the number of different devices, and N represents the number of different energy media. The objective function formula of the model is as follows:

[0149]

[0150] In formula (8), C buy,j , E j,t represent the purchase price of fuel j and the purchase quantity of fuel j in period t respectively; C os,t , P t Respectively represent the electricity price and the purchased electricity quantity in peak, valley and normal periods; C adj,j , ΔF i,j,t They represent the adjustment penalty coefficient of fuel j and the adjustment amount of fuel j by equipment i in time period t respectively; C re,k , D k,t They represent the penalty coefficient of gas k and the amount of gas k released in time period t respectively; C st,i , L i,t They represent the downtime cost of device i and the downtime flag of device i, 0 means downtime and 1 means enabled; C de,k , H r,k,t , H g,k They represent the penalty coefficient for cabinet deviation, the cabinet height of gas k at time t, and the target cabinet height respectively;

[0151] The constraints include: equipment range constraints, energy balance constraints, supply and demand balance constraints, and calorific value constraints;

[0152] Device scope constraints:

[0153] G i,j,min ≤G i,j,t ≤G i,j,max (9)

[0154] H k,min ≤H k,t ≤H k,max (10)

[0155] M i,speed,min ≤M i,speed,t ≤M i,speed,max (11)

[0156] The above formulas (9), (10), and (11) are respectively the upper and lower limit constraints of equipment capacity energy consumption, the upper and lower limit constraints of gas tank positions, and the upper and lower limit constraints of equipment climbing speed; where G i,j,t represents the amount of energy generated or consumed by device i, H k,t Indicates the height of the gas cabinet k, M i,speed,t Indicates the climbing speed of device i;

[0157] Device node balance constraints:

[0158]

[0159] In formula (12), n ef,i,j represents the conversion coefficient of energy j into energy p in device i, m represents the number of energy types consumed by device i, E in,i,j represents the energy consumption of equipment i, h j represents the calorific value of energy j, F out,i,p represents the amount of energy p generated by device i, h p represents the calorific value of energy p;

[0160] Supply and demand balance constraints:

[0161]

[0162] In formula (13), (ΔT i , ΔT i+1 ) is a period in ΔT, W j,Δt Indicates the unbalance introduced by the working conditions within ΔT, Indicates (ΔT i , ΔT i+1 ) The amount of energy generated during time period j, Indicates (ΔT i , ΔT i+1 ) is the change in the number of cabinets storing energy j during the period. If energy j is not gas, the value is 0. Respectively represent (ΔT i , ΔT i+1 ) The emission and consumption of energy j in time period;

[0163] Heat balance constraints:

[0164]

[0165] In formula (14), X i , Y i They represent the minimum and maximum specific calorific values ​​of the total calorific value of the mixed energy consumed by equipment i, respectively;

[0166] Under different production conditions, various energy production / consumption equipment, energy conversion equipment, and gas tanks will make corresponding adjustments, and the penalty coefficient for adjusting each device is equivalent to providing a priority for the equipment adjustment sequence. That is, when other conditions are the same, the model will give priority to adjusting the equipment with a small penalty coefficient. Deviation from the penalty coefficient can ensure that the gas tank position remains around the target position, which is also one of the important indicators for optimizing the rationality of the scheduling instruction output;

[0167] Finally, based on the energy dynamic prediction and multi-energy flow coupling optimization model, through the development and integration of model database, data acquisition software, model service software, client software, etc., an energy medium production and consumption prediction and intelligent scheduling system is formed, and finally the functions of automatic data collection, automatic collection of working condition related signals, Gantt chart working condition management, autonomous operation of scheduling model, and optimized scheduling instruction push are realized.

[0168] The present invention also provides an energy management and control system for energy dynamic prediction and multi-energy flow coupling optimization, which integrates core modules from basic energy management to energy production and consumption prediction, multi-energy medium coupling optimization allocation, and energy scheduling decision push, and finally realizes functions such as automatic data collection, automatic collection of working condition related signals, Gantt chart working condition management, autonomous operation of scheduling model, and optimized scheduling instruction push, and provides a visual interface to facilitate dispatchers to manage and allocate energy more intuitively;

[0169] Specific features include:

[0170] 1. Data collection and cleaning module:

[0171] Data collection steps:

[0172] Using advanced sensor technology and Internet of Things (IoT) technology, the SCADA system collects real-time energy production and consumption data from various devices. By adopting ETL tools, data from different sources and in different formats are converted into a unified data type to ensure data consistency and compatibility, and perform preliminary processing and filtering to reduce the transmission of invalid data and improve data processing efficiency.

[0173] Data cleaning steps:

[0174] (1) Missing value processing: The system automatically detects missing values ​​in the data set. For missing completely at random (MCAR) data and non-critical data, it deletes them according to the unified time granularity of the model, thereby saving data processing time. When processing missing at random (MAR) and missing not at random (MNAR) data, the random forest method is used to fill in the missing data, thereby fully restoring the true situation of the original data.

[0175] (2) Abnormal data identification and correction: Use the KMeans clustering algorithm to cluster the data, count the number of data points in each cluster, set a threshold, and if the number of clusters is less than the threshold, the data point is considered an outlier and corrected using the mean interpolation method.

[0176] (3) Data deduplication: Through similarity matching technology, the system can efficiently identify and remove duplicate data to ensure the uniqueness and accuracy of the data set.

[0177] (4) Data standardization: The system standardizes the data, including unit conversion and dimension unification, to ensure the consistency and comparability of the data.

[0178] 2. Energy management and diagnosis module:

[0179] (1) Energy management: Establish a data dictionary to record the type, unit and other information of data, and provide data query and usage functions; record metadata information such as the source, collection time, and collection method of data to ensure data transparency and traceability. Through metadata information, trace the source and collection process of data. When data anomalies occur, metadata can be used to trace the specific sensor device and collection time to find out the cause of the problem and solve the data anomaly problem. The MySQL distributed architecture is used to implement the above storage functions, and the master-slave replication mechanism and asynchronous replication mode that come with MySQL are used to meet the needs of enterprises for large-scale data management and high-performance database systems.

[0180] (2) Diagnostic function: Statistical analysis of the types and consumption of energy used by the enterprise to identify the main energy consumption points and energy saving potential. Efficiency evaluation of the enterprise's main production equipment to identify problems such as low equipment efficiency and energy waste.

[0181] 3. Gantt chart condition management module:

[0182] The working condition samples are entered into the system through the Gantt chart working condition management module. The entered working condition sample information will be displayed through a movable Gantt chart. The unbalanced amount is introduced by superimposing the working condition samples to simulate the change in equipment production and consumption under the actual production plan conditions. The specific functions are as follows:

[0183] (1) The working conditions can be manually entered and adjusted. By dragging the Gantt bar, users can intuitively change the start and end time of the plan, and can manually modify the working condition sample corresponding to the working condition Gantt bar;

[0184] (2) The operating condition combination of production equipment can be extracted from the production schedule, or the equipment operating conditions can be directly selected from the equipment operating condition type definition function for combination.

[0185] (3) The working conditions can be automatically tracked and refreshed in the background to reflect the latest changes in the working conditions;

[0186] Energy online prediction and optimization scheduling module:

[0187] (1) The module displays the dynamic prediction curve of gas / steam production and consumption through visual charts. The above-mentioned prediction curves include the various types of gas and steam production and consumption curves of various energy equipment, the various types of gas and steam production and consumption curves of the whole plant, the prediction curve of gas / steam network pressure, and the prediction curve of blast furnace / coke oven / converter gas tank position;

[0188] (2) Based on the energy dynamic prediction curve, users can call the multi-energy coupling optimization scheduling model to provide an energy optimization allocation plan. At this time, the visualization chart shows the equipment energy production and consumption, total energy change trend, and cabinet change trend in the future period after the implementation plan is implemented.

[0189] 4. Energy scheduling decision push module:

[0190] When the energy online prediction and optimization scheduling module generates a new scheduling decision, the scheduling decision and optimization suggestions are displayed in the form of charts and text through the system interface. For the scheduling decision confirmed by the user, the system can automatically perform corresponding adjustment operations, such as adjusting equipment load, starting and stopping operations, etc. All pushed scheduling decisions and their execution status are saved to form historical records, and the execution effects of historical decisions are analyzed to evaluate the accuracy and effectiveness of optimization suggestions to improve future scheduling models and algorithms.

[0191] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for energy dynamic prediction and multi-energy flow coupling optimization, characterized in that: The steps include: S1. Obtain historical data on energy production and consumption, a list of operating conditions, and production and maintenance plans for future scheduling cycles; S2, preprocessing the historical data to obtain preprocessed historical data; using a template matching method to extract periodic features in the preprocessed historical data; Acquire strongly correlated feature points based on periodic features; construct and train a short prediction model of a long short-term memory neural network fused with a self-attention mechanism; use the Gray Wolf Optimization Algorithm to optimize the trained short prediction model of a long short-term memory neural network fused with a self-attention mechanism; use the optimized long short-term memory neural network fused with a self-attention mechanism to output prediction results; S3. Based on the prediction results of S2, a working condition sample library is established, and a Gantt chart working condition management module is established. In the Gantt chart working condition management module, the equipment working condition type is defined according to the energy equipment and its working condition type list, and the working condition sample curve is defined based on the equipment working condition type. The Gantt chart working condition management module is used to realize the automatic calling of the working condition sample curve or working condition instance as the working condition rhythm changes; S4. Collect the real-time data of energy production and consumption of different equipment in the SCADA system, collect abnormal working condition information, superimpose the real-time data, abnormal working condition information, and working condition sample curves, and obtain the equipment energy production and consumption prediction curve under multiple working conditions and the future trend curve of total gas and steam production and consumption; find out the historical data sequence with the same working condition as the prediction day as the correction information of the prediction curve, and correct the production and consumption prediction curve and the future trend curve according to the correction information to obtain the energy production and consumption prediction curve of different equipment, the gas tank cabinet prediction curve, and the total gas and steam production and consumption prediction curve, and finally realize dynamic prediction; S5. Determine the scheduling model variables and model constraints, determine the parameter selection method for the cost item and the penalty item in the scheduling function, use a data-driven approach to obtain the equipment's efficiency characteristic equation in combination with the equipment's historical production and consumption data, comprehensively optimize the objective function, and establish a multi-energy coupling optimization scheduling model. Based on the energy dynamic prediction curve in S4, the energy distribution of each device in the future and the overall energy change trend, that is, the future production and consumption of each device, are known. The multi-energy coupling optimization scheduling model is called to provide an energy optimization allocation plan based on the future production and consumption of each device.

2. The method for energy dynamic prediction and multi-energy flow coupling optimization according to claim 1 is characterized in that: S1 specifically includes: Obtain the energy topology network structure and historical data of energy production and consumption of the enterprise through the server of the enterprise comprehensive data integration platform. Obtain the types and quantity of energy media generated and consumed under different working conditions and the changing rules over time through the server of the enterprise comprehensive data integration platform. Obtain the production plan and maintenance plan within the future scheduling cycle through the server of the enterprise comprehensive data integration platform. The enterprise energy topology network structure and energy production and consumption history data include boiler gas consumption and steam generation, generator set steam intake and extraction as well as power generation, gas discharge tower discharge volume, and real-time gas tank position.

3. The energy dynamic prediction and multi-energy flow coupling optimization method according to claim 1 is characterized in that: S2 specifically includes the following steps: S201, preprocessing the historical data of the impact of different types of working conditions on the energy consumption of equipment to obtain preprocessed historical data; the preprocessing method includes time series stabilization, data patching, serialized data, normalization and data segmentation; S202, determining periodic features in the preprocessed historical data, constructing a periodic matching template, matching the periodic matching template with the preprocessed historical data, and extracting specific periodic features in the preprocessed historical data; The Pearson correlation coefficient is used to measure the matching degree between the template and the data, and strong correlation feature points are obtained; the key information of the strong correlation feature points is extracted for time series prediction; The calculation formula of the Pearson correlation coefficient is as follows: In the formula, r xy is the correlation coefficient, X is the independent variable, and Y is the dependent variable; S203. Construct a short prediction model of a long short-term memory neural network integrating a self-attention mechanism to fully extract the dependencies between time series; The self-attention mechanism algorithm process is as follows: In the formula, Tr, Tm, Tk are matrices composed of three vectors of length h that are converted into w sequences in the sample in parallel. The Softmax function is an important activation function in the field of deep learning. The Softmax function converts the original scores output by the neural network into the probability distribution of each category, so that the model can classify different categories in the form of probability; S204, using the Gray Wolf Optimization Algorithm to optimize the parameters of the long short-term memory neural network short prediction model integrating the self-attention mechanism, training the long short-term memory neural network short prediction model integrating the self-attention mechanism with the best prediction ability and outputting the prediction results of the impact of different working conditions on the energy consumption of the equipment; The specific formula of the gray wolf optimization algorithm is as follows: In the formula, Represents the predicted value of production and consumption, y i Indicates the true value of production and consumption.

4. The energy dynamic prediction and multi-energy flow coupling optimization method according to claim 1 is characterized in that: S3 specifically includes the following steps: S301, defining the working condition type according to the equipment type, and entering each working condition type into the Gantt chart management module; Define the working condition types for the main gas production and consumption units, including blast furnace replacement, blast furnace wind stop, coke oven maintenance, converter furnace, converter maintenance, and steel rolling maintenance, for selection when entering working conditions; S302, defining production and consumption curves of various media for various working conditions of energy equipment, and using the production and consumption curves as working condition sample curves of the type and quantity of energy media of the equipment changing over time; S303, matching the duration of each working condition of each device with the working condition sample curve or working condition instance of the working condition one by one, so as to realize automatic calling of the working condition sample curve or working condition instance as the working condition rhythm changes; When an abnormal operating condition occurs, a sample curve of a certain production and consumption medium is directly entered according to the operating condition, that is, the operating condition instance data, and the operating condition instance data has a higher priority than the sample data.

5. The method for energy dynamic prediction and multi-energy flow coupling optimization according to claim 1 is characterized in that: S4 specifically includes the following steps: S401, collecting real-time data in the SCADA system and preprocessing the real-time data; S402, select the energy equipment and its working condition type that need to be automatically tracked, determine the working condition signal collection location in the steel plant; establish the working condition rhythm prediction logic based on the production / maintenance plan and the real-time working condition signal, and automatically track and correct the working condition rhythm; S403. Drag the Gantt bar to introduce abnormal working conditions in the production / maintenance plan for a certain period of time in the future. The formula for the imbalance caused by the superposition of abnormal working conditions in a certain period of time is as follows: In the formula, i,m,z represents the i-th time point, the m-th energy medium, and the z-th working condition, (t i ,t i+1 ) is one of the h-1 time periods; S404. Conduct in-depth mining of historical energy data in the system and use the K-nearest neighbor algorithm to find the historical data with the same operating conditions as the forecast day to correct the forecast curve of production and consumption changes. Correct the production and consumption forecast curve and future trend curve according to the correction information to finally achieve dynamic forecasting.

6. The method for energy dynamic prediction and multi-energy flow coupling optimization according to claim 1 is characterized in that: S5 includes the following steps: S501. Clarify the enterprise energy dispatching rules and safety supply requirements, including the safe operating pressure of the gas / steam network, the safe position of the gas tank, the safe pressure of the steam accumulator, the safe load of the hot blast furnace to ensure production, the safe load of the heating furnace to ensure production, the minimum load of the generator set, and the safe range of the demand for purchased electricity; S502. Prepare a list of adjustable energy equipment, including gas / steam generator sets and gas cabinets, set adjustment priorities, establish an adjustable energy equipment performance database, and track the operating status of adjustable equipment in real time; S503. According to the corresponding relationship between the energy conversion efficiency of each boiler and the boiler operating load in a certain period, the operating load of the energy conversion equipment and the energy conversion efficiency under the corresponding load are characterized as a quadratic function by a quadratic curve fitting method. And according to the test data and online production data of each steam turbine, the consumption characteristic equation of the steam turbine is established by using the principle of multivariate linear regression. The formulas are as follows: In the formula, represents the actual load of the energy conversion equipment during stable operation, and C1, C2, and C3 represent fitting parameters; They represent the steam intake, extraction and condensation of the steam turbine in the time period t respectively; S504. According to the list of adjustable equipment, combined with energy dispatching rules and safety supply requirements, determine the dispatching model variables and model constraints, comprehensively optimize the objective function, and establish a multi-energy coupling optimization dispatching model; S505. Based on the energy dynamic prediction curve in S4, the energy distribution of each device and the overall energy change trend in the future are known, and the multi-energy coupling optimization scheduling model is called to provide an energy optimization allocation plan.

7. The method for energy dynamic prediction and multi-energy flow coupling optimization according to claim 6 is characterized in that: The multi-energy coupling optimization scheduling model includes an objective function and constraints. Assuming that the scheduling period of the multi-energy coupling optimization scheduling model is T, a certain time period is recorded as t (1≤t≤T), D is the number of different devices, and N represents the number of different energy media, the objective function formula of the model is as follows: In the formula, C buy,j , E j,t represent the purchase price of fuel j and the purchase quantity of fuel j in period t respectively; C os,t , P t Respectively represent the electricity price and the purchased electricity quantity in peak, valley and normal periods; C adj,j , ΔF i,j,t They represent the adjustment penalty coefficient of fuel j and the adjustment amount of fuel j by equipment i in time period t respectively; C re,k , D k,t They represent the penalty coefficient of gas k and the amount of gas k released in time period t respectively; C st,i , L i,t They represent the downtime cost of device i and the downtime flag of device i, 0 means downtime and 1 means enabled; C de,k , H r,k,t , H g,k They represent the penalty coefficient for cabinet deviation, the cabinet height of gas k at time t, and the target cabinet height respectively; The constraints include equipment range constraints, equipment node balance constraints, supply and demand balance constraints, and calorific value balance constraints; Equipment scope constraints include upper and lower limits on equipment capacity and energy consumption, upper and lower limits on gas tank positions, and upper and lower limits on equipment climbing speed; The upper and lower limits of equipment capacity and energy consumption are as follows: G i,j,min ≤G i,j,t ≤G i,j,max The upper and lower limits of gas tank positions are as follows: H k,min ≤H k,t ≤H k,max The upper and lower limits of the equipment climbing speed are as follows: M i,speed,min ≤M i,speed,t ≤M i,speed,max In the formula, G i,j,t represents the amount of energy generated or consumed by device i, H k,t Indicates the height of the gas cabinet k, M i,speed,t Indicates the climbing speed of device i; Device node balance constraints: Where n ef,i,j represents the conversion coefficient of energy j into energy p in device i, m represents the number of energy types consumed by device i, E in,i,j represents the energy consumption of equipment i, h j represents the calorific value of energy j, F out,i,p represents the amount of energy p generated by device i, h p represents the calorific value of energy p; Supply and demand balance constraints: In the formula, (ΔT i , ΔT i+1 ) is a period in ΔT, W j,Δt Indicates the unbalance introduced by the working conditions within ΔT, Indicates (ΔT i , ΔT i+1 ) The amount of energy j generated during the time period, Indicates (ΔT i , ΔT i+1 ) is the change in the number of cabinets storing energy j during the period. If energy j is not gas, the value is 0. Respectively represent (ΔT i , ΔT i+1 ) The emission and consumption of energy j in time period; Heat balance constraints: In the formula, X i , Y i They represent the minimum and maximum specific calorific values ​​of the total calorific value of the mixed energy consumed by equipment i, respectively; Under different production conditions, various energy production / consumption equipment, energy conversion equipment, and gas tanks will make corresponding adjustments, and the penalty coefficient for adjusting each device is equivalent to providing a priority for the equipment adjustment order. That is, when other conditions are the same, the model will give priority to adjusting equipment with a small penalty coefficient. Deviation from the penalty coefficient can ensure that the gas tank position remains around the target position.

8. An energy management and control system for energy dynamic prediction and multi-energy flow coupling optimization, used to implement the energy dynamic prediction and multi-energy flow coupling optimization method described in any one of claims 1 to 7, characterized in that: It includes data collection and cleaning module, energy management and diagnosis module, Gantt chart condition management module, energy online prediction and optimization scheduling module and energy scheduling decision push module; The data collection and cleaning module is used to perform data collection steps and data cleaning steps: The data collection steps are as follows: Using advanced sensor technology and Internet of Things technology, the SCADA system collects real-time energy production and consumption data from various devices. By using ETL tools, data from different sources and in different formats are converted into a unified data type to ensure data consistency and compatibility, and perform preliminary processing and filtering to reduce the transmission of invalid data and improve data processing efficiency. The data cleaning steps are as follows: T1. Missing value processing: The system automatically detects missing values ​​in the data set. For completely random missing data and non-critical data, it deletes them according to the unified time granularity of the model, thereby saving data processing time; When dealing with missing data at random and missing data not at random (MNAR), the random forest method is used to fill in the missing data, thereby fully restoring the true situation of the original data. T2. Abnormal data identification and correction: Use KMeans clustering algorithm to cluster the data, count the number of data points in each cluster, set a threshold, and if the number of clusters is less than the threshold, the data point is considered to be an outlier and corrected by using the mean value interpolation method; T3. Data deduplication: Identify and remove duplicate data through similarity matching technology to ensure the uniqueness and accuracy of the data set; T4. Data standardization: The system standardizes the data, including unit conversion, dimension unification, etc., to ensure the consistency and comparability of the data; The energy management and diagnosis module is used to perform energy management and diagnosis functions; The energy management is as follows: establish a data dictionary to record the type, unit and other information of the data, and provide data query and use functions; record metadata information such as the source, collection time, and collection method of the data to ensure the transparency and traceability of the data. Through the metadata information, the source and collection process of the data can be traced. When data anomalies occur, the metadata can be traced back to the specific sensor device and collection time to find out the cause of the problem and solve the data anomaly problem. The distributed architecture of MySQL is used to realize the storage function, and the master-slave replication mechanism and asynchronous replication mode provided by MySQL are used; The diagnostic functions are as follows: statistically analyzing the types and consumption of energy used by the enterprise, identifying the main energy consumption points and energy saving potential, evaluating the efficiency of the enterprise's main production equipment, and identifying problems of low equipment efficiency and energy waste; The Gantt chart working condition management module has the following functions: the working condition samples are entered into the system through the Gantt chart working condition management module, the entered working condition sample information will be displayed through a movable Gantt chart, and the unbalanced amount is introduced by superimposing the working condition samples to simulate the change in equipment production and consumption under the actual production plan conditions; The energy online prediction and optimization scheduling module displays the gas / steam production and consumption dynamic prediction curve through a visual chart. The production and consumption prediction curve includes various gas and steam production and consumption curves of various energy equipment, various gas and steam production and consumption curves of the whole plant, gas / steam pipeline pressure prediction curve, and blast furnace / coke oven / converter gas tank cabinet prediction curve; based on the energy dynamic prediction curve, the user calls the multi-energy coupling optimization scheduling model to give an energy optimization allocation plan. At this time, the visual chart shows the equipment energy production and consumption, total energy change trend and cabinet change trend in the future period after the implementation plan is implemented; The energy scheduling decision push module, when the energy online prediction and optimization scheduling module generates a new scheduling decision, displays the scheduling decision and optimization suggestions in the form of charts and text through the system interface. For the scheduling decision confirmed by the user, the system automatically performs corresponding adjustment operations; saves all pushed scheduling decisions and their execution status to form historical records, analyzes the execution effects of historical decisions, evaluates the accuracy and effectiveness of optimization suggestions, and improves future scheduling models and algorithms.

9. A storage medium, characterized in that: The storage medium includes a stored program, wherein when the program is run, the energy dynamic prediction and multi-energy flow coupling optimization method described in any one of claims 1 to 7 is executed.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: The processor executes the energy dynamic prediction and multi-energy flow coupling optimization method described in any one of claims 1 to 7 through the computer program.

Citation Information

Patent Citations

  • Multi-scene multi-energy dynamic optimization regulation and control method based on complex energy system

    CN116184959A

  • Comprehensive operation control system of power plant

    CN116300551A

  • Short-term building load prediction method

    CN117526294A

  • Wind power prediction method and system for optimizing deep transformer network

    US20220197233A1

Cited By

  • Multi-generator-set gas pipe network pressure adjusting system and method based on operation planning optimization

    CN119167570A

  • Optimization method based on industrial energy consumption big data model

    CN119204357A

  • An optimization method based on industrial energy consumption big data model

    CN119204357B

  • Multi-target factory scheduling method considering machine limitation

    CN119204611A

  • A multi-objective factory scheduling method considering machine constraints

    CN119204611B