BIM-based IPDD whole process engineering consultation integrated project digital delivery platform

By providing a BIM-based IPDD full-process engineering consulting integrated project digital delivery platform in construction projects, combined with multi-source heterogeneous BIM data engines and BIM standard modeling, the problem of data interoperability and visualization during the construction process is solved and data standardization is achieved. and visualization of construction results, improving data quality and model traceability.

CN118863801APending Publication Date: 2024-10-29DUXINGXINDAO INTELLIGENT TECH (HENAN) CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411069826.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

In construction projects, how to combine IPDD with BIM models to achieve a visual, traceable, and controllable experience for each user during the construction process is a problem that needs to be solved.

Method used

Provide a BIM-based IPDD full-process engineering consulting integrated project digital delivery platform, including a data interoperable supervision management system and a digital delivery system. It realizes data standardization and unification, lossless compression and analysis of geometric data through multi-source heterogeneous BIM data engines. Combined with the quality inspection engine to ensure data quality, and judge the compliance with construction standards through BIM standard modeling and behavioral digital modules.

Benefits of technology

It realizes data interoperability during the construction process, provides visualization of construction results, standardizes and unifies data, supports the needs of multiple application scenarios, increases the workload of data cleaning, and ensures data quality and model traceability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118863801A_ABST
    Figure CN118863801A_ABST
Patent Text Reader

Abstract

The invention discloses a BIM-based IPDD whole process engineering consultation integrated project digital delivery platform. The platform comprises a supervision management system and a digital delivery system which are in data intercommunication. Data intercommunication between a first party, a second party and different users participating in construction can be realized by adopting a mode of combining supervision on an engineering construction process and BIM modeling, so that a visual effect on the construction process and a construction result is realized; visual monitoring can be performed according to responsible personnel information, material traceability, construction period, structure position and the like which are input before modeling when any structure is selected on the model.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of construction engineering, and specifically, relates to a BIM-based IPDD full-process engineering consulting integrated project digital delivery platform. Background Art

[0002] BIM (Building Information Modeling) is a digital technology-based building design, construction and operation management method. It creates a digital model containing all relevant information of a building project to achieve information sharing, collaborative work and decision support throughout the project life cycle. The core of BIM lies in its parametric model, which contains not only the geometric shape of the building, but also rich information such as materials, costs, construction methods, performance indicators, etc.

[0003] IPD (Integrated Project Delivery) is a project delivery method based on team collaboration and shared risks and rewards. It combines BIM (Building Information Modeling) technology and lean construction principles, aiming to improve project efficiency, reduce costs and improve project quality through close cooperation between cross-disciplinary teams.

[0004] On this basis, Integrated Project Digital Delivery (IPDD) integrates the location numbers, models, attributes, relationships, and document data of different data elements at different stages, from different sources, and in the entire life cycle of the project based on the BIM model. IPDD is the central system in the entire life cycle of IPD. IPDD can realize the free flow of all-round professional data information, laying a digital foundation for decision makers to effectively operate and maintain.

[0005] In the current process of promoting digital technology in construction projects, how to combine IPDD with BIM models to achieve a visual, traceable and controllable experience for all users in the construction process is a problem that needs to be solved. Summary of the invention

[0006] In view of the above defects, the present invention provides a BIM-based IPDD full-process engineering consulting integrated project digital delivery platform for digital delivery between engineering users, including a data interoperable supervision management system and a digital delivery system; Supervision management system, used to digitally manage data in the engineering supervision process, including investment management module, progress management module, quality management module, safety management module, meeting management module and data management module; Investment management module, which is used to digitally manage the drafting, approval, modification, payment and performance unlocking of contracts; The progress management module is used to automatically obtain and identify the preset indicators of the project progress recorded in the investment management module, and issue early warnings for tasks that are about to be due or have exceeded their deadlines; The quality management module is used to explain and report the quality of the construction site, and to carry out corresponding rectification and review management through the built-in quality standard knowledge base; Safety management module, including quality and safety unit and construction hazard source unit. The quality and safety unit compares the quality standard knowledge base built into the quality management module with the construction site operation. The construction hazard source unit is used to inspect the hazard sources at the construction site and grade and identify the comparison results and inspection results. Meeting management module, used to reserve meeting rooms and meeting dates, and to organize, review and download meeting minutes; The data management module is used to store the contract data in the investment management module, the progress data in the progress management module, the site data and rectification data in the quality management module, the data compared between the construction site and the quality standard knowledge base by the quality and safety unit, the data classified by the quality and safety unit based on the hazardous sources of the construction site, and the records of meeting progress and minutes; A digital delivery system for digitally reflecting data input into the regulatory management system, including a physical building digitalization module and a behavioral digitalization module; The physical building digitalization module uses the multi-source heterogeneous BIM data engine to determine the metadata structure of the data in the data management module through the metadata definition unit in turn, and converts the metadata into a multi-language version of the metadata module through the STEP generator. The multi-format file data reading unit then extracts the original file data, and finally the data escape unit converts the original file data into standard metadata, namely, semantic data conversion and geometric data conversion. The built-in BIM software models the converted data according to the BIM standard, and after coding through classification coding, uploads the model according to the directory structure; The behavior digitization module determines whether the construction standards are met based on the model uploaded by the physical building digitization module and the human process during the construction site with reference to the quality standard knowledge base.

[0007] Furthermore, the users include construction units, receiving units, construction units and suppliers, supervision units, operation and maintenance units and design units. Each user can view and operate on the delivery platform after passing the authentication.

[0008] Furthermore, the multi-source heterogeneous BIM data parsing engine includes the following stages: S1. Requirements analysis phase: Analyze and determine the requirements for multi-source heterogeneous BIM data parsing engines, and formulate corresponding technical plans and solutions.

[0009] S2. Technical research phase: Based on demand analysis, key technologies of multi-source heterogeneous BIM data parsing engine are studied and explored to determine the technical principles and methods to be adopted.

[0010] S3. System design phase: Based on technical research, carry out system design and development of multi-source heterogeneous BIM data parsing engine, including system architecture, module design, data processing and analysis, etc.

[0011] S4, system testing and optimization phase: System testing and optimization of the multi-source heterogeneous BIM data parsing engine to ensure the stability, reliability and efficiency of the system.

[0012] Furthermore, the IPDD construction engineering integrated project digital delivery platform includes a WEB terminal and a mobile terminal, and the BIM models in the WEB terminal and the mobile terminal are constructed through paragraphs, tables, lists, layouts, form elements and CSS, JS in HTML.

[0013] Furthermore, the standard modeling of BIM is established in a classification manner from single unit to floor to building.

[0014] Compared with the prior art, the present invention has the following beneficial effects: 1. The combination of supervision of the construction process and BIM modeling can realize data exchange between Party A and Party B and different users involved in the construction, and realize the visualization of the construction process and construction results. Any structure selected on the model can be visually monitored based on the responsible personnel information, material traceability, construction period, structure location, etc. entered before modeling; 2. The use of BIM data engine in BIM modeling has the following advantages: (1) Data standardization and unification: The multi-source heterogeneous BIM data engine can convert BIM data from different sources into the IFC standard format on the server side to achieve standardization and unification of heterogeneous data, and based on this, perform standardized data storage and data services.

[0015] (2) Lossless compression of geometric data: Lossless analysis and data compression of the original model's geometric data can be achieved. The parsed data will be expressed parametrically or by boundaries to achieve lossless translation of the original model's geometric data. Based on this, lightweight files of any precision level can be generated to support multiple application scenarios.

[0016] (3) Analytical data that meets delivery standards: By introducing a data quality inspection engine to ensure that data meets the same set of data storage standard requirements before being stored in the database, even the unified heterogeneous model data can have good quality, which greatly reduces the workload of subsequent data cleaning. When quality inspecting standard files, the standard files compiled by the BIM platform can be used as input files for data quality inspection.

[0017] (4) Full storage of IFC models: By separating the digital and analog data of IFC data, the semantic information of the IFC model, such as component information, attribute information, relationship information, and material information, is fully stored in the database; the geometric data is losslessly stored in files to meet the use requirements of IFC data in subsequent business systems. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the digital delivery platform in the present invention. DETAILED DESCRIPTION

[0019] In order to facilitate the understanding of the present invention, the device of the present invention will be described more fully below with reference to the relevant drawings. Embodiments of the device are given in the drawings. However, the device can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0020] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "set" should be understood in a broad sense, for example, they can be fixedly connected or set, or detachably connected or set, or integrally connected or set. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0021] Example

[0022] like Figure 1 As shown, this embodiment provides a BIM-based IPDD full-process engineering consulting integrated project digital delivery platform, which is used for digital delivery between engineering users, namely, technology, equipment, engineering, construction management and operation and maintenance, network and data security assurance, etc. It proposes to realize the digital application solution of the whole process of design-construction-operation and maintenance with the purpose of digital delivery, specifically including the supervision management system and digital delivery system for data intercommunication. Each user can view and operate on the delivery platform after being authenticated. In detail, the users include the construction unit, the receiving unit, the construction unit and the supplier, the supervision unit, the operation and maintenance unit and the design unit, so that all participants in the early, middle and late stages of the project can perform digital operations; Supervision management system, used to digitally manage data in the engineering supervision process, including investment management module, progress management module, quality management module, safety management module, meeting management module and data management module; The details are as follows: Investment management module, which is used to digitally manage the drafting, approval, modification, payment and performance unlocking of contracts; The progress management module is used to automatically obtain and identify the preset project progress indicators and daily construction progress data recorded by the investment management module (it can also be manually entered, such as the results of daily inspections, the results of camera remote monitoring, the results of safety acceptance at each construction stage, etc.), and issue early warnings for the corresponding tasks that are about to be due or overdue, and notify the corresponding users of the early warning information; The quality management module is used to disclose and report the quality of the construction site, and to carry out corresponding rectification and review management through the built-in quality standard knowledge base. It should be noted that the data of the construction site is collected based on the location number and equipment. According to the data delivery content and the established data relationship specified in the data standard (the self-defined standard in the contract or the delivery standard in the quality standard knowledge base), at the same time, at different project stages, the data of the model, attribute and document of the location number and equipment are collected respectively; Safety management module, including quality and safety unit and construction hazard source unit. The quality and safety unit compares the construction site operations with the quality standard knowledge base built into the quality management module. The construction site operations can be recorded through daily inspections, remote video inspections, etc., and the Internet of Things or AI big data is used to compare the work specifications (it can also be manually observed in the background). The work specifications are based on the custom standards in the quality management module or the delivery standards in the quality standard knowledge base, which can be understood as safety for the construction process and building quality; The construction hazard source unit is used to check the hazard sources at the construction site in the same way as the quality and safety unit. Single hazard sources include the installation or removal of lifting equipment, the erection or removal of scaffolding, the resistance requirements of distribution boxes or switch boxes, etc., which can be understood as hazard sources for equipment used in the construction process; The comparison results and inspection results are graded and marked, such as minor, major, and critical, and different colors are used to mark the corresponding results when displayed; The conference management module is used to reserve conference rooms and meeting dates for different users (including reminders from the conference initiator to all participating users), and to upload, organize, review and download meeting minutes and other data management functions; The data management module mainly includes the sharing and retention of temporary data, the sharing of system regulations and industry norms and standards, and the archiving and review of data. In detail, it can store contract data in the investment management module (the data communicated before the design adopts the digital communication method of the platform to facilitate archiving and tracing), construction progress data in the progress management module, on-site construction data and construction rectification data in the quality management module, data compared between the quality and safety unit based on the construction site and the quality standard knowledge base, data classified by the quality and safety unit based on the hazardous sources of the construction site, and records of meeting progress and minutes; A digital delivery system for digitally reflecting data input into the regulatory management system, including a physical building digitalization module and a behavioral digitalization module; The physical building digitization module uses the multi-source heterogeneous BIM data engine to determine the metadata structure of the data in the information management module through the metadata definition unit in turn, and converts the metadata into a multi-language version of the metadata module through the STEP generator (or protocol buffer generator and other tools), and then the multi-format file data reading unit realizes the extraction of the original file data. There are two specific ways. One is to use the open source framework or the products of non-profit organizations (such as OpenCASCADE, OpenDesignAlliance, etc.) to realize the data reading of multi-format files such as rvt, IFC, dwg, dgn, obj, etc.; the other way is to use the SDK of the original software (such as SketchUp, Rhino, 3DMax, etc.) to realize the extraction of the original file data, and finally the data escape unit converts the original file data into standard metadata, that is, semantic data conversion and geometric data conversion (such as IfcWall, IfcSlab in IFC, etc.). Semantic data conversion requires converting the non-geometric data in the original model into parameters, materials, relationships and other contents according to the requirements of the standard data format. The geometric data conversion requires that the geometric data of each software be converted according to the geometric description method defined in the standard data. In order to facilitate browsing by the rendering engine, the geometric bodies expressed by CSG, BREP, etc. need to be triangulated. This process will be assisted by geometric tools such as OpenCASCADE and CGAL. ​​At the same time, in order to ensure that the geometric data is lossless, the geometric modeling process is involved in geometric analysis. The geometric expression in the original file is converted into a boundary expression or a parametric expression. The built-in BIM software models the converted data according to the BIM standard, and after coding through classification coding, the model is uploaded according to the directory structure. It should be noted that the multi-source heterogeneous BIM data analysis engine includes the following stages: S1. Requirements analysis phase: Analyze and determine the requirements for multi-source heterogeneous BIM data parsing engines, and formulate corresponding technical plans and solutions.

[0023] S2. Technical research phase: Based on demand analysis, key technologies of multi-source heterogeneous BIM data parsing engine are studied and explored to determine the technical principles and methods to be adopted.

[0024] S3. System design phase: Based on technical research, carry out system design and development of multi-source heterogeneous BIM data parsing engine, including system architecture, module design, data processing and analysis, etc.

[0025] S4, System testing and optimization stage: System testing and optimization of multi-source heterogeneous BIM data parsing engine to ensure the stability, reliability and efficiency of the system. Cloud + terminal rendering technology is adopted, which has the advantages of supporting super large models in seconds, cross-hardware, cross-platform, cross-system optimization, no requirements for terminal equipment performance configuration, no local storage, and high data security; The specific process of BIM standard modeling is as follows: S1. Statistics of data in the supervision management system: (1) After receiving the project, the group or project team will register the project and maintain the basic data of the project (such as single unit, section, space, and component classification attribute definition).

[0026] (2) BIM consulting is the compilation of digital standards based on national, industry or enterprise requirements, which stipulates modeling standards such as modeling depth, model splitting method, component classification coding and attribute information of each stage.

[0027] (3) The administrator of the group or project team logs in to the platform and manages standards and specifications according to the requirements of the enterprise or project. They can compile and maintain BIM standard information, upload standard files, and digitize standard files. After the standards are uploaded, they are automatically saved to the platform standard library. They can compile standard clauses and write corresponding digitized clauses based on the content of the clauses. After the standard clauses and digitized specifications are compiled, they are automatically saved to the platform rule library.

[0028] S2, quality management module quality inspection of data in S1: After the BIM standards and specifications are compiled, personnel from other participating construction units can log in to the platform to view them.

[0029] S3. BIM software models according to data: (1) The BIM consultant divides the model into stages, assigns modelers to each stage and authorizes them. Modelers from design, construction and other reference units create the model directory structure according to the stage, model according to BIM standards, and classify and code the model. After the modeling is completed, the model is submitted according to the directory structure.

[0030] (2) After the model is uploaded, the modeler initiates the model review process, performs intelligent inspection on the model according to the BIM standards and specifications set by the enterprise or project, and returns the inspection report and visual problem result display page to facilitate the modeler to modify the problems that arise. After the inspection is passed, manual review is carried out according to the review process.

[0031] (3) Publish the model according to the platform settings. You can set up automatic publishing and initiate the publishing process. Publish after passing the review.

[0032] In detail, BIM's standard modeling is established in the form of single unit to floor to building classification. Its function is that after the model is selected, the structure in the selected different modeling can be used to display its upper structure in the form of a tree diagram or parent-child items, so as to achieve the traceability of various processes.

[0033] S4. After the model is reviewed and released, the model file and review report are automatically archived in the designated directory location of the document management; S5. Supplementary recording of subsequent construction progress: BIM Consulting organizes the basic views of the project according to the business structure of each stage. The platform provides default standard views and can also create views according to project requirements. Configure view rules and filters, associate corresponding data sources, and publish views. After the subsequent data source is updated and published, the view will be automatically updated; BIM consulting creates business views based on business needs by overlaying business information on basic views; At the same time, after the basic view or business view is released, all parties involved in the construction can view the BIM model online through the BIM browser.

[0034] The behavior digitization module determines whether the construction standards are met based on the model uploaded by the physical building digitization module and the human process at the construction site, referring to the quality standard knowledge base. After selecting each structure in the model, it can not only trace the ontological data such as material suppliers and parameters, but also trace the behavior in combination with the data in the progress management module, quality management module and safety management module.

[0035] By adopting the BIM data sharing method, the 5D linkage function can be realized, that is, full-dimensional data linkage browsing can be carried out, including data in five dimensions: bit number, model, attribute, data association relationship (knowledge graph), and document preview. From any data dimension, other dimensional data can be directly linked and viewed, which greatly facilitates the viewing of related data and data reference and comparison.

[0036] It should be noted that all BIM models are uploaded in a unified manner using a single entry point, which is convenient for subsequent unified management, solves problems such as model dispersion and loss, and reserves various API interfaces to facilitate the application extension of subsequent business systems. For models that are updated and upgraded after review in step S4, their previous versions will be overwritten, but the previous original version still retains the business information associated with the component instance in the previous version, ensuring that the model is traceable and the business information can be inherited and used.

[0037] It should be noted that the IPDD construction engineering integrated project digital delivery platform includes a WEB terminal (which can be used for PC and monitoring platform) and a mobile terminal, which is convenient for each user to supervise. The BIM models in the WEB and mobile terminals are built through paragraphs, tables, lists, layouts, form elements, CSS, and JS in HTML.

[0038] It should be noted that the structure described in the present invention can be implemented in a variety of different forms and is not limited to the described embodiments. Any equivalent transformations made by ordinary technicians in this field using the contents of the present invention description and drawings, or directly or indirectly applied to other related technical fields, such as the loading and unloading of other items, are included in the protection scope of the present invention.

Claims

1. A BIM-based IPDD full-process engineering consulting integrated project digital delivery platform for digital delivery between engineering users, characterized by: Including data interoperable regulatory management systems and digital delivery systems; Supervision management system, used to digitally manage data in the engineering supervision process, including investment management module, progress management module, quality management module, safety management module, meeting management module and data management module; Investment management module, which is used to digitally manage the drafting, approval, modification, payment and performance unlocking of contracts; The progress management module is used to automatically obtain and identify the preset indicators of the project progress recorded in the investment management module, and issue early warnings for tasks that are about to be due or have exceeded their deadlines; The quality management module is used to explain and report the quality of the construction site, and to carry out corresponding rectification and review management through the built-in quality standard knowledge base; Safety management module, including quality and safety unit and construction hazard source unit. The quality and safety unit compares the quality standard knowledge base built into the quality management module with the construction site operation. The construction hazard source unit is used to inspect the hazard sources at the construction site and grade and identify the comparison results and inspection results. Meeting management module, used to reserve meeting rooms and meeting dates, and to organize, review and download meeting minutes; The data management module is used to store the contract data in the investment management module, the progress data in the progress management module, the site data and rectification data in the quality management module, the data compared between the construction site and the quality standard knowledge base by the quality and safety unit, the data classified by the quality and safety unit based on the hazardous sources of the construction site, and the records of meeting progress and minutes; A digital delivery system for digitally reflecting data input into the regulatory management system, including a physical building digitalization module and a behavioral digitalization module; The physical building digitalization module uses the multi-source heterogeneous BIM data engine to determine the metadata structure of the data in the data management module through the metadata definition unit in turn, and converts the metadata into a multi-language version of the metadata module through the STEP generator. The multi-format file data reading unit then extracts the original file data, and finally the data escape unit converts the original file data into standard metadata, including semantic data conversion and geometric data conversion. The built-in BIM software models the converted data according to the BIM standard, and after coding through classification coding, uploads the model according to the directory structure; The behavior digitization module determines whether the construction standards are met based on the model uploaded by the physical building digitization module and the human process during the construction site with reference to the quality standard knowledge base.

2. A BIM-based IPDD full-process engineering consulting integrated project digital delivery platform as claimed in claim 1, characterized in that: The users include construction units, receiving units, construction units and suppliers, supervision units, operation and maintenance units and design units. Each user can view and operate on the delivery platform after passing the authentication.

3. The BIM-based IPDD full-process engineering consulting integrated project digital delivery platform as claimed in claim 1, characterized in that: The workflow of the multi-source heterogeneous BIM data parsing engine includes the following stages: S1. Requirements analysis phase: Analyze and determine the requirements for the multi-source heterogeneous BIM data parsing engine, and formulate corresponding technical plans and solutions; S2, Technical Research Phase: Based on demand analysis, research and explore the key technologies of multi-source heterogeneous BIM data parsing engine to determine the technical principles and methods to be adopted; S3, System Design Phase: Based on technical research, carry out system design and development of multi-source heterogeneous BIM data parsing engine, including system architecture, module design, data processing and analysis; S4, system testing and optimization phase: System testing and optimization of the multi-source heterogeneous BIM data parsing engine.

4. The BIM-based IPDD full-process engineering consulting integrated project digital delivery platform as claimed in claim 1, characterized in that: The IPDD construction engineering integrated project digital delivery platform includes a WEB terminal and a mobile terminal, and the BIM models in the WEB terminal and the mobile terminal are built through paragraphs, tables, lists, layouts, form elements and CSS, JS in HTML.

5. The BIM-based IPDD full-process engineering consulting integrated project digital delivery platform as claimed in claim 1, characterized in that: The standard modeling of BIM is established in the manner of classification from single unit to floor to building.

Citation Information

Cited By

  • Method and system for subsea tunnel project delivery BIM model

    CN119089561A

  • A method and system for delivering BIM models for undersea tunnel projects

    CN119089561B