Tunnel secondary lining double-side concrete synchronous reverse pouring system and pouring method

By designing double-side concrete pumping pipelines and concrete three-way valves on the tunnel second-lined trolley, synchronous reverse pouring of double-sided concrete on the tunnel second-lined trolley, the problems of degradation of cement slurry performance and complex pipeline switching in the existing technology are solved. Improve construction efficiency and troubleshooting convenience.

CN118959029APending Publication Date: 2024-11-15HUAQIANG JINGGONG (TIANJIN) TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411284570.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The casting method of existing tunnel second-lined trolleys leads to a decrease in the performance of cement slurry, which is prone to hollowing, and the structure of the concrete pumping pipeline is complex, manual dismantling and switching is cumbersome and inconvenient for emergency repair.

Method used

A two-lined tunnel concrete synchronous reverse pouring system was designed, and concrete pumping pipes were installed on both sides of the bench, combined with concrete three-way valves and top punching mechanisms to realize synchronous pouring and automatic pipeline switching on both sides to ensure balance of cement slurry. Distribute and simplify disconnection of pipe connections.

Benefits of technology

Improve pouring efficiency, save manpower, ensure that the performance of cement slurry is not damaged, and simplifies the troubleshooting and emergency repair process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959029A_ABST
    Figure CN118959029A_ABST
Patent Text Reader

Abstract

The invention provides a tunnel secondary lining double-side concrete synchronous reverse pouring system and method, and relates to the technical field of tunnel trolley equipment, the pouring system comprises a secondary lining trolley, and the secondary lining trolley comprises a rack and a supporting formwork; the supporting formwork is arched, and pouring openings distributed in an array mode are formed in the two sides of the supporting formwork correspondingly. Concrete pumping pipelines corresponding to the pouring ports are arranged on the two sides of the rack respectively; the concrete pumping pipeline comprises a main pipeline extending in the first direction. A first pouring pipeline and a second pouring pipeline are mounted on the main pipeline in parallel; the output end of the double-discharge-port concrete pump is correspondingly connected with the two main pipelines respectively; the concrete three-way valve is installed between the main pipeline and the first pouring pipeline and between the main pipeline and the second pouring pipeline and used for controlling connection and disconnection of the main pipeline and connection and disconnection between the main pipeline and the first pouring pipeline and between the main pipeline and the second pouring pipeline. The concrete pumping pipelines are arranged on the two sides of the rack correspondingly and matched with the double-discharging-port concrete pump, simultaneous pouring on the two sides can be effectively achieved, and then stress on the two sides of the supporting formwork is balanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel trolley equipment, and in particular to a synchronous reverse pouring system and method for double-sided concrete pouring of a tunnel secondary lining. Background Art

[0002] With the development of social economy and production, the use of a large number of advanced equipment in tunnel construction has not only improved the safety and quality assurance, but also shortened the construction period and reduced the construction cost. The use of secondary lining trolleys plays an important role in tunnel construction, and the skilled application of its construction technology is particularly necessary, which not only provides technical support for the improvement of secondary lining construction technology, but also provides technical support for the company in tunnel construction.

[0003] The secondary lining trolley currently has the following defects: its pouring method is to switch pouring directly to both sides through the pouring port on the top. Since the height from the top to the bottom is much higher than two meters, it will not only lead to a decrease in the performance of the cement slurry, but also easily cause hollowing; at the same time, the structure of its concrete pumping pipeline is a one-input-to-multiple-output method; during the pouring process, it is necessary to manually disassemble and switch the connection between the input port and the output pipeline, and since the docking position is concentrated, the remaining space will be narrow, which is not only inconvenient for pipeline switching, but also inconvenient for emergency repairs after pipe blockage occurs; therefore, the above problems need to be solved urgently. Summary of the invention

[0004] In view of the above-mentioned defects or deficiencies in the prior art, it is desired to provide a tunnel secondary lining double-sided concrete synchronous reverse pouring system and pouring method.

[0005] In a first aspect, the present application provides a tunnel secondary lining double-sided concrete synchronous reverse pouring system, comprising a secondary lining trolley, wherein the secondary lining trolley comprises a trolley frame and a supporting formwork;

[0006] The supporting formwork is arched, and array-arranged pouring ports are provided on both sides;

[0007] The height difference between two adjacent pouring openings in the vertical direction is less than four meters; the height of the pouring opening located at the bottom from the ground is less than two meters;

[0008] The stand extends along a first direction, and concrete pumping pipes are provided on both sides corresponding to the pouring ports respectively;

[0009] The concrete pumping pipeline includes a main pipeline extending along the first direction;

[0010] A first pouring pipe and a second pouring pipe are installed in parallel on the main pipe;

[0011] A double-discharge-port concrete pump, wherein the output ends of the double-discharge-port concrete pump are respectively connected to the two main pipelines correspondingly;

[0012] A concrete three-way valve is installed between the main pipeline and the first casting pipeline and the second casting pipeline, and is used to control the opening and closing of the main pipeline and the opening and closing between the first casting pipeline and the second casting pipeline.

[0013] Furthermore,

[0014] The concrete three-way valve comprises a valve body in a cylindrical shape;

[0015] The valve body is provided with a coaxial input port and a first output port in the radial direction on both sides, and a second output port in the axial direction on the bottom;

[0016] The input port and the first output port are respectively installed in series on the main pipeline;

[0017] The second output ports are respectively connected to the corresponding first pouring pipe / second pouring pipe.

[0018] Furthermore,

[0019] The second output port is eccentrically mounted to the valve body and is located at a side of the valve body relatively close to the input port.

[0020] Furthermore,

[0021] The valve body is provided with a relatively rotatable rotating core inside;

[0022] The rotating core is provided with a first channel opening and a second channel opening which are perpendicular to each other in the radial direction;

[0023] The first channel port penetrates the rotating core in the radial direction of the rotating core, and is used to connect the input port and the first output port;

[0024] The second channel opening is L-shaped and is used to connect the input port and the second output port.

[0025] Furthermore,

[0026] The diameter of the input port is the same as the diameters of the first output port and the second output port;

[0027] The diameters of the first channel opening and the second channel opening are the same, and are respectively the same as the diameter of the input port.

[0028] Furthermore,

[0029] The first pouring pipes and the second pouring pipes are alternately arranged along the axial direction of the main pipe;

[0030] The first pouring pipe is located below the main pipe, one end of which is connected to the pouring port and the other end of which is connected to the concrete three-way valve;

[0031] The second pouring pipe is located above the main pipe, one end of which is connected to the pouring port, and the other end of which is connected to the concrete three-way valve.

[0032] Furthermore,

[0033] The top of the platform is also provided with a punching mechanism;

[0034] The input end of the punching mechanism is respectively connected to the two main pipelines, and the output end extends to the side of the supporting template away from the stand for punching and pouring.

[0035] In a second aspect, the present application provides a casting method, comprising

[0036] S100, initial reset, the concrete three-way valves are all switched to a closed state;

[0037] S110, starting the concrete pump to alternately and continuously supply material into the two main pipelines;

[0038] S200, controlling the concrete three-way valve to sequentially connect the main pipeline and the first pouring pipeline, and firstly forward pouring the concrete to a first height;

[0039] S210, controlling the concrete three-way valve to sequentially connect the main pipeline with the first pouring pipeline, and then pouring the concrete to a second height in reverse;

[0040] S300, controlling the concrete three-way valve to sequentially connect the main pipeline and the second pouring pipeline, and first forward pouring the third height;

[0041] S310, controlling the concrete three-way valve to sequentially connect the main pipeline and the second pouring pipeline, and then pouring in reverse to a fourth height;

[0042] S400, top pouring.

[0043] Furthermore, the first pouring pipe 120 and the second pouring pipe 130 are arranged alternately; when switching pouring between the first pouring pipe 120 / the second pouring pipe 130, the second pouring pipe 130 / the first pouring pipe 120 located in the middle is connected to the main pipes 110 located at both ends at the same time.

[0044] The advantages and positive effects of this application are:

[0045] This technical solution can effectively realize simultaneous pouring on both sides by setting concrete pumping pipes on both sides of the platform, and cooperating with double-discharge concrete pumps, thereby balancing the forces on both sides of the supporting formwork; the concrete pumping pipe adopts an installation structure of a main pipe and a branch pipe, and the connection with each branch pipe can be switched through a concrete three-way valve, without the need for manual disassembly and switching, which not only improves efficiency but also saves manpower; at the same time, the branch pipe also adopts a structure of staggered arrangement up and down, and combined with the cyclic pouring method of forward pouring and reverse pouring, it can effectively ensure that the drop of cement is less than two meters, thereby ensuring that the performance of the cement slurry is not damaged; finally, the installation structure of the main pipe and the branch pipe is convenient for disassembly and dredging in the face of pipe blockage, which is more conducive to the progress of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 A schematic diagram of the structure of a tunnel secondary lining double-sided concrete synchronous reverse pouring system provided in an embodiment of the present application.

[0047] The text markings in the figure are as follows: 100 - stand; 110 - main pipeline; 120 - first pouring pipeline; 130 - second pouring pipeline; 200 - supporting formwork; 210 - pouring port; 300 - double-discharge port concrete pump; 400 - concrete three-way valve; 500 - punching mechanism. DETAILED DESCRIPTION

[0048] In order to enable those skilled in the art to better understand the technical solution of the present application, the present application is described in detail below in conjunction with the accompanying drawings. The description in this section is only exemplary and explanatory and should not have any limiting effect on the scope of protection of the present application.

[0049] Please refer to Figure 1 The present embodiment provides a synchronous reverse pouring system for double-sided concrete of a tunnel secondary lining, comprising a secondary lining trolley, the secondary lining trolley comprising a trolley 100 and a supporting formwork 200; the supporting formwork 200 is arched, and array-arranged pouring ports 210 are respectively arranged on both sides; the height difference between two adjacent pouring ports 210 in the vertical direction is less than four meters; the height of the pouring port 210 located at the bottom is less than two meters from the ground; the trolley 100 extends along a first direction, and concrete pumping pipes are respectively arranged on both sides corresponding to the pouring ports 210; the concrete pumping pipes include a first direction and a second direction; the second direction and the second direction are respectively provided with concrete pumping pipes ... A main pipeline 110 extending in one direction; a first casting pipeline 120 and a second casting pipeline 130 are installed in parallel on the main pipeline 110; a double-discharge port concrete pump 300, the output ends of which are respectively connected to the two main pipelines 110; a concrete three-way valve 400, which is installed between the main pipeline 110 and the first casting pipeline 120 and the second casting pipeline 130, and is used to control the on-off of the main pipeline 110 and the on-off between the first casting pipeline 120 and the second casting pipeline 130.

[0050] In this embodiment, the supporting formwork 200 is an arched structure, the inner wall is connected and installed with the stand 100, and a sandwich is formed between the outer wall and the tunnel, and then pouring can be performed into the sandwich through the pouring port 210 set on the supporting formwork 200.

[0051] In this embodiment, two groups of pouring ports 210 are provided on both sides of the supporting formwork 200; the arrangement direction of each group is the first direction, and the intervals are the same; the two groups are arranged up and down, and the pouring ports 210 are arranged alternately.

[0052] In this embodiment, the height of the lower pouring opening 210 from the ground is less than 2 meters; and the height difference between the two groups of pouring openings 210 is less than four meters.

[0053] In this embodiment, a set of concrete pumping pipelines is respectively provided on both sides of the platform 100 corresponding to the pouring ports 210 ; the pumping pipelines include a main pipeline 110 extending along a first direction and a pouring pipeline installed in parallel on the main pipeline 110 .

[0054] In this embodiment, the main pipe 110 is located between the two pouring ports 210 ; the pouring pipes include a first pouring pipe 120 for connecting to the lower pouring port 210 and a second pouring pipe 130 for connecting to the lower pouring port 210 .

[0055] In this embodiment, the input ends of the two main pipelines 110 are respectively connected to the same concrete pump; the concrete pump is a double-discharge port concrete pump, which can output alternately through the two output ports, thereby achieving the effect of synchronous pouring on both sides of the second lining trolley.

[0056] In this embodiment, the first pouring pipe 120 and the second pouring pipe 130 are connected to the main pipe 110 respectively through a concrete three-way valve 400; the concrete three-way valve 400 can effectively control the connection and disconnection between the main pipe 110 and the first pouring pipe 120 or the second pouring pipe 130, as well as the connection and disconnection between two adjacent concrete three-way valves 400.

[0057] In a preferred embodiment, the concrete three-way valve 400 includes a cylindrical valve body; coaxial input ports and a first output port are radially arranged on both sides of the valve body, and a second output port is axially arranged on the bottom; the input port and the first output port are respectively installed in series on the main pipeline 110; the second output port is respectively connected to the corresponding first casting pipeline 120 / second casting pipeline 130.

[0058] In this embodiment, the concrete three-way valve 400 is installed in series on the main pipeline 110 through the input port and the first output port, and is connected to the first pouring pipeline 120 / festival pouring pipeline 130 through the second output port.

[0059] In a preferred embodiment, the second output port is eccentrically mounted to the valve body and is located on a side of the valve body relatively close to the input port.

[0060] In a preferred embodiment, a relatively rotatable rotating core is provided inside the valve body; a first channel opening and a second channel opening which are perpendicular to each other are provided radially on the rotating core; the first channel opening penetrates the rotating core radially, and is used to connect the input port and the first output port; the second channel opening is L-shaped, and is used to connect the input port and the second output port.

[0061] In a preferred embodiment, the diameter of the input port is the same as the diameter of the first output port and the second output port; the diameter of the first channel port and the second channel port are the same, and are respectively the same as the diameter of the input port.

[0062] In a preferred embodiment, an anti-condensation mechanism is provided inside the anti-condensation port; the anti-condensation mechanism includes a placeholder plunger matching the diameter of the anti-condensation port; the placeholder plunger is connected to the concrete three-way valve 400 via a screw rod and can be extended and retracted relative to the anti-condensation port for cleaning the through hole.

[0063] In this embodiment, a retractable spacer plunger is provided in the anti-condensation port, which can effectively extend into the through hole or the connecting hole, so as to clean the concrete retained in the through hole or the connecting hole, thereby preventing the concrete three-way valve 400 from being unable to operate due to the solidification of the concrete.

[0064] In a preferred embodiment, the first casting pipe 120 and the second casting pipe 130 are alternately arranged along the axial direction of the main pipe 110; the first casting pipe 120 is located below the main pipe 110, one end of which is connected to the casting port 210, and the other end is connected to the concrete three-way valve 400; the second casting pipe 130 is located above the main pipe 120, one end of which is connected to the casting port 210, and the other end is connected to the concrete three-way valve 400.

[0065] In a preferred embodiment, a top punching mechanism 500 is also provided on the top of the stand 100; the input end of the top punching mechanism 500 is respectively connected to the two main pipes 120, and the output end extends to the side of the supporting template 200 away from the stand 100 for top punching pouring.

[0066] In a second aspect, this embodiment provides a casting method, comprising:

[0067] S100, initial reset, the concrete three-way valve 400 is switched to a closed state;

[0068] S110, starting the concrete pump 300 to alternately and continuously supply materials into the two main pipelines 110;

[0069] S200, controlling the concrete three-way valve 400 to sequentially connect the main pipeline 110 and the first pouring pipeline 120, and firstly forward pouring the first height;

[0070] S210, controlling the concrete three-way valve 400 to sequentially connect the main pipeline 110 and the first pouring pipeline 120, and then pouring the second height in reverse;

[0071] S300, controlling the concrete three-way valve 400 to sequentially connect the main pipeline 110 and the second pouring pipeline 130, and firstly forward pouring the third height;

[0072] S310, controlling the concrete three-way valve 400 to sequentially connect the main pipeline 110 and the second pouring pipeline 130, and then pouring in reverse to a fourth height;

[0073] S400, top pouring.

[0074] In a preferred embodiment, the first pouring pipe 120 and the second pouring pipe 130 are arranged alternately; when switching pouring between the first pouring pipe 120 / the second pouring pipe 130, the second pouring pipe 130 / the first pouring pipe 120 located in the middle is connected to the main pipes 110 located at both ends at the same time.

[0075] In this embodiment, after the first pouring pipe 120 completes pouring, the concrete three-way valve 400 connected to the adjacent first pouring pipe 120 is switched to a state of connection between the input port and the second output port; the concrete three-way valve 400 located between the two first pouring pipes 120 and connected to the second pouring pipe 130 is switched to a state of connection between the input port and the first output port.

[0076] In this embodiment, after the second pouring pipe 130 completes pouring, the concrete three-way valve 400 connected to the adjacent second pouring pipe 130 is switched to a state of connection between the input port and the second output port; the concrete three-way valve 400 located between the two second pouring pipes 130 and connected to the first pouring pipe 120 is switched to a state of connection between the input port and the first output port.

[0077] In this embodiment, after the first pouring pipe 120 located at the end completes pouring, the concrete three-way valve 400 corresponding to the second pouring pipe 130 located at the front is switched to a connected state between the input port and the first output port, while the concrete three-way valves 400 located behind it are all switched to a closed state; at the same time, the residual concrete inside is cleaned through the anti-condensation mechanism.

[0078] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and its core ideas of this application. The above is only the preferred implementation method of this application. It should be pointed out that due to the limitations of textual expression, there are objectively infinite specific structures. For ordinary technicians in this technical field, without departing from the principles of the present invention, they can also make several improvements, modifications or changes, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the inventive concept and technical solution to other occasions without improvement, should be regarded as the scope of protection of this application.

Claims

1. A tunnel secondary lining double-sided concrete synchronous reverse pouring system, characterized in that: include A secondary lining trolley, the secondary lining trolley comprising a frame (100) and a supporting template (200); The supporting template (200) is arched, and has pouring ports (210) arranged in an array on both sides; The height difference between two adjacent pouring openings (210) in the vertical direction is less than four meters; the height of the pouring opening (210) located at the bottom from the ground is less than two meters; The stand (100) extends along a first direction, and concrete pumping pipelines are provided on both sides respectively corresponding to the pouring openings (210); The concrete pumping pipeline comprises a main pipeline (110) extending along the first direction; The main pipeline (110) is provided with a first pouring pipeline (120) and a second pouring pipeline (130) installed in parallel; A double-discharge-port concrete pump (300), wherein the output ends of the double-discharge-port concrete pump (300) are respectively connected to the two main pipelines (110); A concrete three-way valve (400) is installed between the main pipeline (110) and the first casting pipeline (120) and the second casting pipeline (130), and is used to control the opening and closing of the main pipeline (110) and the opening and closing between the first casting pipeline (120) and the second casting pipeline (130).

2. The tunnel secondary lining double-sided concrete synchronous reverse pouring system according to claim 1 is characterized in that: The concrete three-way valve (400) comprises a valve body in a cylindrical shape; The valve body is provided with a coaxial input port and a first output port in the radial direction on both sides, and a second output port in the axial direction on the bottom; The input port and the first output port are respectively installed in series on the main pipeline (110); The second output ports are respectively connected to the corresponding first pouring pipe (120) / second pouring pipe (130).

3. The tunnel secondary lining double-sided concrete synchronous reverse pouring system according to claim 2 is characterized in that: The second output port is eccentrically mounted to the valve body and is located at a side of the valve body relatively close to the input port.

4. The tunnel secondary lining double-sided concrete synchronous reverse pouring system according to claim 2 is characterized in that: The valve body is provided with a relatively rotatable rotating core inside; The rotating core is provided with a first channel opening and a second channel opening which are perpendicular to each other in the radial direction; The first channel port penetrates the rotating core in the radial direction of the rotating core, and is used to connect the input port and the first output port; The second channel opening is L-shaped and is used to connect the input port and the second output port.

5. The tunnel secondary lining double-sided concrete synchronous reverse pouring system according to claim 4 is characterized in that: The diameter of the input port is the same as the diameters of the first output port and the second output port; The diameters of the first channel opening and the second channel opening are the same, and are respectively the same as the diameter of the input port.

6. The tunnel secondary lining double-sided concrete synchronous reverse pouring system according to claim 1 is characterized in that: The first pouring pipe (120) and the second pouring pipe (130) are alternately arranged along the axial direction of the main pipe (110); The first pouring pipe (120) is located below the main pipe (110), one end of which is connected to the pouring port (210), and the other end of which is connected to the concrete three-way valve (400); The second pouring pipe (130) is located above the main pipe (120), one end of which is connected to the pouring port (210), and the other end of which is connected to the concrete three-way valve (400).

7. The tunnel secondary lining double-sided concrete synchronous reverse pouring system according to claim 1 is characterized in that: The top of the platform (100) is also provided with a punching mechanism (500); The input end of the punching mechanism (500) is respectively connected to the two main pipes (120), and the output end extends to a side of the support template (200) away from the stand (100) for punching and pouring.

8. A pouring method, comprising the tunnel secondary lining double-sided concrete synchronous reverse pouring system according to any one of claims 1 to 7, characterized in that: include, S100, initial reset, the concrete three-way valve (400) is switched to a closed state; S110, starting the concrete pump (300) to alternately and continuously supply material into the two main pipelines (110); S200, controlling the concrete three-way valve (400) to sequentially connect the main pipeline (110) and the first pouring pipeline (120), and firstly forward pouring the first height; S210, controlling the concrete three-way valve (400) to sequentially connect the main pipeline (110) and the first pouring pipeline (120), and then pouring in reverse to a second height; S300, controlling the concrete three-way valve (400) to sequentially connect the main pipeline (110) and the second pouring pipeline (130), and firstly forward pouring the third height; S310, controlling the concrete three-way valve (400) to sequentially connect the main pipeline (110) and the second pouring pipeline (130), and then pouring in reverse at a fourth height; S400, top pouring.

9. The pouring method according to claim 8, characterized in that: The first pouring pipes (120) and the second pouring pipes (130) are arranged alternately; When switching between the first pouring pipe (120) and the second pouring pipe (130) for pouring, the second pouring pipe (130) and the first pouring pipe (120) located in the middle are simultaneously connected to the main pipes (110) located at both ends.