Pipeline installation wall protection machine and pipeline installation method

Through the telescopic support component technology of the pipe-installed wall guard machine, the problems of trench stability and backfill difficulty during drainage pipe laying are solved, and the effect of reducing excavation range and backfill amount is achieved.

CN118959702APending Publication Date: 2024-11-15CHINA RAILWAY CONSTR GRP BEIJING ENG CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411115103.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

During the laying process of drainage pipes, trenches need to be excavated and sloped to ensure the stability of the trenches, resulting in large space occupied, large excavation amount, damage to the original map, large backfill amount and high difficulty.

Method used

Provided is a pipe-mounted wall guard machine, including two wall guard panels and a telescopic support assembly. The wall guard panels are arranged at intervals in the thickness direction, and the telescopic support assembly is close to or away from each other, and abuts on the side wall of the groove to reduce the excavation range. And reduce the difficulty of backfilling.

Benefits of technology

The stability of the trench is achieved without grading, which reduces the excavation range and backfill, reduces disturbances of the original soil, and simplifies the backfill process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959702A_ABST
    Figure CN118959702A_ABST
Patent Text Reader

Abstract

The invention relates to the field of municipal pipeline installation, and provides a pipeline installation wall protection machine and a pipeline installation method.The pipeline installation wall protection machine comprises two wall protection plates, the two wall protection plates are arranged in a spaced mode in the first direction, and the first direction is the thickness direction of the wall protection plates. The telescopic supporting assembly extends in the first direction and is connected between the two wall protection plates, and the two wall protection plates get close to or get away from each other through the telescopic supporting assembly. During pipeline installation construction, after the pipeline installation wall protection machine is placed in a groove, the two wall protection plates are far away from each other through the telescopic supporting assemblies so as to abut against the side wall of the groove, so that the side wall of the groove is stable and does not collapse, the stability of the groove can be achieved without sloping when the groove is excavated during pipeline installation construction, and the excavation range of the groove is reduced; disturbance of undisturbed soil is reduced, the backfilling amount in the later period is small, and the difficulty is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of municipal pipeline installation, and in particular to a pipeline installation wall protection machine and a pipeline installation method. Background Art

[0002] As cities continue to expand in size, water supply and drainage pipeline projects, as one of the basic infrastructures for urban development, are one of the basic guarantees for promoting urban development and meeting people's daily needs.

[0003] When laying drainage pipes, trenches need to be excavated and sloped to ensure the stability of the trenches. This requires a large space, a large amount of excavation, and damage to the original state. After the pipes are laid, a large amount of backfill is required and the difficulty of backfilling is high. Summary of the invention

[0004] In order to solve the above technical problems or at least partially solve the above technical problems, the present application provides a pipeline installation wall protection machine and a pipeline installation method.

[0005] In a first aspect, an embodiment of the present application provides a pipe installation wall protection machine, the pipe installation wall protection machine comprising: two wall protection plates, the two wall protection plates being arranged at intervals along a first direction, the first direction being a thickness direction of the wall protection plates;

[0006] The telescopic support assembly is extended along the first direction, and the telescopic support assembly is connected between the two wall panels. The two wall panels are moved closer to or farther away from each other through the telescopic support assembly.

[0007] According to an embodiment of the first aspect of the present application, the pipe installation wall protection machine also includes two base plates, one of the wall protection plates is movably matched with the other base plate and the wall protection plate can move along a first direction on the base plate, the two base plates are spaced apart along the first direction, and a gap is left between the two base plates to allow the pipe to be placed.

[0008] According to an embodiment of the first aspect of the present application, a slide rail is formed on a side of the base plate facing the wall panel, a slide groove is formed on a side of the wall panel facing the base plate, and the slide rail and the slide groove form a sliding fit.

[0009] According to an embodiment of the first aspect of the present application, the slide rail is a T-shaped slide rail, and the slide groove is a T-shaped slide groove.

[0010] According to an embodiment of the first aspect of the present application, the height of the T-shaped slide rail is greater than the depth of the T-shaped slide groove.

[0011] According to an embodiment of the first aspect of the present application, a moving component is further provided on the base plate, and the base plate can move along the second direction through the moving component.

[0012] According to an embodiment of the first aspect of the present application, each of the base plates includes at least two base plates, at least two of the base plates are spaced apart and distributed along the second direction, and each of the base plates is configured with a pulley.

[0013] According to an embodiment of the first aspect of the present application, a connection position for connecting to the telescopic assembly is provided on the wall guard board, and the length direction of the line connecting the center of the connection position and the center of the pulley is parallel to a third direction, and the third direction is the height direction of the wall guard board.

[0014] According to an embodiment of the first aspect of the present application, the telescopic support assembly includes two support rods and a telescopic cylinder connected between the two support rods.

[0015] In a second aspect, an embodiment of the present application provides a pipeline installation method, the pipeline installation method comprising: S1, digging a trench to a length of L1, placing the above-mentioned pipeline installation wall protection machine in the trench;

[0016] S2, adjusting the two wall panels away from each other through the telescopic support assembly until the two wall panels are pressed against the two side walls of the groove, one end of the two wall panels in the second direction is the first insertion end of the pipe, the other end of the two wall panels in the second direction is the second insertion end of the pipe, and the Nth pipe is inserted into between the two wall panels from the first insertion end;

[0017] S3, continue digging the trench until the length of the trench is L2, adjust the two wall panels to be close to each other through the telescopic support assembly, move the pipeline installation wall protection machine to the target position along the second direction, adjust the two wall panels to be away from each other through the telescopic support assembly until the two wall panels are pressed on the two side walls of the trench, and the N+1th pipeline extends from the second insertion end between the two wall panels to connect the Nth pipeline and the N+1th pipeline;

[0018] S4, continue digging the trench until the length of the trench is L3, repeat step S3, and when connecting the N+1th pipeline and the N+2th pipeline, backfill the trench where the Nth pipeline is located.

[0019] Compared with the prior art, the technical solution provided by the embodiments of the present application has the following advantages:

[0020] The pipe installation wall protection machine and the pipe installation method provided in the embodiment of the present application are configured to provide two wall protection panels spaced apart along a first direction so that the two wall protection panels can abut against the two side walls of the groove. A telescopic support assembly connected between the two wall protection panels is provided, and the telescopic support assembly is extended along the first direction so that the two wall protection panels are moved closer to or away from each other through the telescopic support assembly, so that the two wall protection panels abut against or separate from the side walls of the groove. After the pipe installation wall protection machine is placed into the groove during the pipe installation construction, the two wall protection panels move away from each other through the telescopic support assembly and abut against the side walls of the groove, so that the side walls of the groove are stable and will not collapse. During the pipe installation construction, the trench excavation does not require slope cutting to achieve the stability of the trench, thereby reducing the excavation range of the trench, reducing the disturbance of the original soil, and reducing the amount of backfilling in the later stage with less difficulty. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0022] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0023] Figure 1 This is a schematic diagram of the structure of the pipeline installation wall protection machine described in an embodiment of the present application;

[0024] Figure 2 for Figure 1 Side view of

[0025] Figure 3 It is a sliding fit structure between the base plate and the wall panel.

[0026] Among them, 1. wall panel; 2. telescopic support assembly; 21. support rod; 22. telescopic cylinder; 3. bottom plate; 31. base plate; 4. T-type slide rail; 5. T-type slide groove; 6. pulley. DETAILED DESCRIPTION

[0027] In order to more clearly understand the above-mentioned purposes, features and advantages of the present application, the scheme of the present application will be further described below. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0028] In the following description, many specific details are set forth to facilitate a full understanding of the present application, but the present application may also be implemented in other ways different from those described herein; obviously, the embodiments in the specification are only part of the embodiments of the present application, rather than all of the embodiments.

[0029] When laying drainage pipes, trenches need to be excavated and sloped to ensure the stability of the trenches. Therefore, the width of the trench must include the width of the slope. The trenches require a large space, and the amount of excavation is large, destroying the original state. After the pipelines are laid, the amount of backfill is large and the difficulty of backfilling is high.

[0030] Reference Figures 1 to 3 As shown, this embodiment provides a pipe installation wall protection machine, including a wall protection board 1 and a telescopic support assembly 2, wherein two wall protection boards 1 are provided, and the two wall protection boards 1 are spaced apart along a first direction, and the first direction is the thickness direction of the wall protection board 1.

[0031] The telescopic support assembly 2 is extended along the first direction, and the telescopic support assembly 2 is connected between two wall panels 1. The two wall panels 1 are moved closer to or farther from each other through the telescopic support assembly 2. Figure 1 and Figure 2 As shown, there are multiple groups of telescopic support assemblies 2, and the multiple groups of telescopic support assemblies 2 are spaced apart along the length direction of the wall panel 1. Each group of telescopic support assemblies 2 can be provided with multiple telescopic support members, and the multiple telescopic support members are spaced apart along the height direction of the wall panel 1.

[0032] When the pipe installation wall protection machine provided in the embodiment of the present application is in use, after the pipe installation wall protection machine is placed in the trench during pipeline installation construction, the two wall panels 1 are moved away from each other by the telescopic support assembly 2 and abut against the side wall of the trench, so that the side wall of the trench is stable and will not collapse. During pipeline installation construction, the stability of the trench can be achieved without slope when excavating the trench, thereby reducing the excavation range of the trench, reducing the disturbance of the original soil, and the amount of backfilling in the later stage is small and the difficulty is small.

[0033] In some embodiments, the pipe installation wall protection machine further includes two bottom plates 3, one wall protection plate 1 and one bottom plate 3 form a movable match and the wall protection plate 1 can move on the bottom plate 3 along the first direction, and the two bottom plates 3 are arranged at intervals along the first direction to facilitate the adjustment of the spacing between the two wall protection plates 1. A gap is left between the two bottom plates 3 to allow the placement of pipes. Because the total length of the pipe may be very long during laying, multiple sections of the pipe need to be connected by connectors, and the wall protection plate 1 moves along the length direction of the pipe to protect the installation of the next section of the pipe, and the next section of the pipe needs to pass through the two bottom plates 3 to connect with the previous section of the pipe.

[0034] As an implementation method, a slide rail is formed on the side of the bottom plate 3 facing the wall panel 1, and a slide groove is formed on the side of the wall panel 1 facing the bottom plate 3, and the slide rail and the slide groove form a sliding fit. Of course, the bottom plate 3 can also be provided with a slide table or other structure that can form a sliding fit with the wall panel 1.

[0035] In some embodiments, the slide rail is a T-shaped slide rail 4, and the slide groove is a T-shaped slide groove 5. The T-shaped slide rail 4 has the advantages of fast running speed and preventing debris from falling into and affecting sliding, and when the wall panel 1 is hoisted, the cooperation of the T-shaped slide rail 4 and the T-shaped slide groove 5 prevents the bottom plate 3 from separating from the wall panel 1.

[0036] In some embodiments, the height of the T-shaped slide rail 4 is greater than the depth of the T-shaped slide groove 5, that is, a gap is left between the bottom surface of the wall panel 1 and the upper surface of the bottom plate 3, thereby reducing the friction between the bottom plate 3 and the wall panel 1.

[0037] When laying a longer pipeline, the trench needs to be dug longer and multiple pipelines are connected, so the wall panel 1 needs to be moved to the section of the pipeline being installed. A crane can be used to lift and move the wall panel 1 above the trench, or the wall panel 1 can be moved within the trench. In order to facilitate the movement of the wall panel 1, in some embodiments, a moving component is also provided on the base plate 3, and the base plate 3 can be moved along the second direction through the moving component.

[0038] Along the length direction of the wall panel 1, the bottom plate 3 can be made into a whole long plate. Figure 2 As shown, each base plate 3 includes at least two base plates 31, at least two base plates 31 are spaced apart along the second direction, and each base plate 31 is provided with a pulley 6. The overall weight of the pipeline installation wall protection machine is reduced, and the load of the moving components is reduced. A driver can be provided only on the pulleys 6 on both sides of the front end of the base plate 3, and the driver drives the pulley 6, and the pulley 6 provided with the driver is the driving wheel. The driver can be a driving member such as a motor that can drive the pulley 6 to rotate.

[0039] In some embodiments, Figure 2 As shown, the wall panel 1 is provided with a connection position for connecting with the telescopic assembly, and the length direction of the line connecting the center of the connection position and the center of the pulley 6 is parallel to the third direction, which is the height direction of the wall panel 1. That is to say, in the third direction, the connection between the telescopic support assembly 2 and the wall panel 1 corresponds to the center of the pulley 6, and the bottom of the groove supports the wall panel 1 and the telescopic support assembly 2 through the pulley 6. The connection between the telescopic support assembly 2 and the wall panel 1 corresponds to the center of the pulley 6, which facilitates the gravity of the telescopic support assembly 2 to be transmitted to the ground by the pulley 6. If the pulley 6 is located between the two telescopic support assemblies 2, the wall panel 1 is easy to deform or even bend.

[0040] In some embodiments, the telescopic support assembly 2 includes at least one telescopic support member, which includes two support rods 21 and a telescopic cylinder 22 connected between the two support rods 21. The telescopic cylinder 22 can be a pneumatic cylinder or a hydraulic cylinder. Of course, the telescopic support member can also be an electric telescopic rod.

[0041] Another embodiment of the present application provides a pipeline installation method, comprising:

[0042] S1, dig a trench to a length of L1, and place the above-mentioned pipeline installation wall protection machine in the trench;

[0043] S2, adjusting the two wall panels 1 away from each other by the telescopic support assembly 2 until the two wall panels 1 are pressed against the two side walls of the groove, one end of the two wall panels 1 in the second direction is the first insertion end of the pipe, the other end of the two wall panels 1 in the second direction is the second insertion end of the pipe, and the Nth pipe is inserted into between the two wall panels 1 from the first insertion end;

[0044] S3, continue digging the trench until the length of the trench is L2, adjust the two wall panels 1 to be closer to each other through the telescopic support assembly 2, move the pipeline installation wall protection machine to the target position along the second direction, adjust the two wall panels 1 to be farther away from each other through the telescopic support assembly 2 until the two wall panels 1 are crimped on the two side walls of the trench, and the N+1th pipeline extends from the second insertion end between the two wall panels 1 to connect the Nth pipeline and the N+1th pipeline;

[0045] S4, continue digging the trench until the length of the trench is L3, repeat step S3, and when connecting the N+1th pipeline and the N+2th pipeline, backfill the trench where the Nth pipeline is located.

[0046] The two wall panels 1 move along the length direction of the pipeline. When the two wall panels 1 move to the preset laying section of the N+1th pipeline (the N+1th pipeline has not been laid at this time), the N+1th pipeline is inserted from the second insertion ends of the two wall panels 1. At this time, the Nth pipeline is close to the first insertion ends of the two wall panels 1. After the N+1th pipeline is laid, the two wall panels 1 move to the preset laying section of the N+2th pipeline. At this time, the trench where the Nth pipeline is located can be backfilled. During the pipeline installation and construction, the trench excavation range is small, the occupied space is small, the backfilling amount is small, and the backfilling difficulty is low.

[0047] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0048] The above is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments described herein, but will conform to the widest scope consistent with the principles and novel features applied for herein.

Claims

1. A pipeline installation wall protection machine, characterized in that: include: Two wall panels (1) are provided, and the two wall panels (1) are spaced apart along a first direction, wherein the first direction is the thickness direction of the wall panels (1); The telescopic support assembly (2) is extended along a first direction, and the telescopic support assembly (2) is connected between the two wall panels (1). The two wall panels (1) are moved closer to or farther away from each other through the telescopic support assembly (2).

2. The pipeline wall protection machine according to claim 1, characterized in that: The pipe installation wall protection machine also includes two bottom plates (3), one of the wall protection plates (1) and one of the bottom plates (3) form a movable fit and the wall protection plate (1) can move on the bottom plate (3) along a first direction, the two bottom plates (3) are spaced apart along the first direction, and a gap is left between the two bottom plates (3) to allow the placement of pipes.

3. The pipeline wall protection machine according to claim 2, characterized in that: A slide rail is formed on one side of the bottom plate (3) facing the wall panel (1), and a slide groove is formed on one side of the wall panel (1) facing the bottom plate (3), and the slide rail and the slide groove form a sliding fit.

4. The pipeline wall protection machine according to claim 3, characterized in that: The slide rail is a T-shaped slide rail (4), and the slide groove is a T-shaped slide groove (5).

5. The pipeline wall protection machine according to claim 4, characterized in that: The height of the T-shaped slide rail (4) is greater than the depth of the T-shaped slide groove (5).

6. The pipeline wall protection machine according to claim 2, characterized in that: The bottom plate (3) is also provided with a moving component, and the bottom plate (3) can move along the second direction through the moving component.

7. The pipeline wall protection machine according to claim 6, characterized in that: Each of the base plates (3) comprises at least two base plates (31), the at least two base plates (31) are spaced apart and distributed along the second direction, and each of the base plates (31) is provided with a pulley (6).

8. The pipeline wall protection machine according to claim 7, characterized in that: The wall panel (1) is provided with a connection position for connecting to the telescopic assembly, and the length direction of the line connecting the center of the connection position and the center of the pulley (6) is parallel to a third direction, and the third direction is the height direction of the wall panel (1).

9. The pipeline wall protection machine according to claim 1, characterized in that: The telescopic support assembly (2) comprises two support rods (21) and a telescopic cylinder (22) connected between the two support rods (21).

10. A pipeline installation method, characterized in that: include: S1, digging a trench to a length of L1, placing the pipeline installation wall protection machine as described in any one of claims 1 to 9 in the trench; S2, adjusting the two wall panels (1) to move away from each other through the telescopic support assembly (2) until the two wall panels (1) are pressed onto the two side walls of the groove, one end of the two wall panels (1) in the second direction is the first insertion end of the pipe, the other end of the two wall panels (1) in the second direction is the second insertion end of the pipe, and the Nth pipe is inserted into between the two wall panels (1) from the first insertion end; S3, continue digging the trench until the trench length is L2, adjust the two wall panels (1) to be closer to each other by using the telescopic support assembly (2), move the pipeline installation wall protection machine to the target position along the second direction, adjust the two wall panels (1) to be farther away from each other by using the telescopic support assembly (2) until the two wall panels (1) are pressed against the two side walls of the trench, and the N+1th pipeline extends from the second insertion end between the two wall panels (1) to connect the Nth pipeline and the N+1th pipeline; S4, continue digging the trench until the length of the trench is L3, repeat step S3, and when connecting the N+1th pipeline and the N+2th pipeline, backfill the trench where the Nth pipeline is located.