Decoration project cost information management system and method suitable for three-party interaction

Through the three-party interactive decoration project cost information management system, the problem of poor rationality of decoration project data management is solved, efficient processing and utilization of cost information is achieved, information utilization efficiency and security is improved, supply chain coordination is promoted, and operational costs is reduced. , and optimized the owner experience.

CN118967286APending Publication Date: 2024-11-15HANGZHOU KENLI BUILDING DATA TECHNOLOGY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411440970.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing data management methods for decoration projects are poorly rational, which leads to a shortening of the utilization cycle of decoration projects' cost information, underestimated potential value, hinders the improvement of project efficiency, and data resources have failed to effectively tap their potential in all stages of design, construction and operation.

Method used

Provide a decoration project cost information management system suitable for three-party interaction, including the information processing end, the information calling end and the information entry end. By obtaining historical experience information and decoration project information, it generates a cost information list to realize information interaction and sharing, and supports list Adjust and enter quality assurance service information, generate delivery lists, and promote supply chain coordination.

Benefits of technology

Improve the accuracy and efficiency of cost evaluation, reduce manual calculation errors, promote the coordination and transparency of supply chain management, reduce operational costs, optimize owner experience, promote enterprises to transform into a data-driven management model, and improve overall competition force.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967286A_ABST
    Figure CN118967286A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of information management, and discloses a decoration project cost information management system and method suitable for three-party interaction. The system comprises an information processing end, an information calling end and an information input end. The method comprises the steps that an information processing end obtains historical experience information and decoration project information and generates a decoration project cost information list; the information calling end obtains a decoration project cost information list and feeds back list adjustment suggestions; the information processing end modifies based on the list adjustment suggestions to generate a decoration project bid invitation list; the information input end fills in corresponding supply information; and the information processing end generates a delivery list, so that the information calling end obtains the delivery list from the information processing end after the decoration project construction. According to the invention, the decoration project cost information management process is optimized, the information utilization efficiency and safety are improved, supply chain collaboration is promoted, and the owner experience is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of information management, and in particular relates to a decoration engineering cost information management system and method suitable for three-party interaction. Background Art

[0002] In the decoration project bidding process, data from all parties exist in the form of independent and scattered files, which are highly dependent on manual review, which not only slows down the review process, but also increases the risk of human error. More importantly, data resources from design, construction to operation are often limited to the bid clearance stage, and their huge potential in the confirmation and use of the owner's design plan has not been effectively tapped, resulting in a significant shortening of the information utilization cycle.

[0003] In order to solve the problem of decoration project data management, the Chinese invention patent with application number 202010075060.5 provides a system implementation method and intelligent list system for intelligent list. For the specified bidding items, the client obtains the standard list data through the list file compilation operation, and the standard list data includes the standard list sub-item name; under the lock control of the standard list data, the list compilation tool performs the bidding data editing operation in the bidding content area to obtain the bidding data corresponding to the standard list sub-item name; the bidding list data is generated for the standard list sub-item name and the bidding data, and the bidding list data is a list file associated with the standard list data output; the client performs the bid clearing action through the bidding list data. In this way, the supplier's quotation list can be automatically processed, and automatic bid clearing can be achieved. In the standardized list sub-item name, bid clearing errors are avoided, the difficulty of bid clearing is reduced, and the bid clearing efficiency and quality are enhanced. However, it is worth noting that although the patent has a certain effect on information management, its focus is still mainly on the data interaction between suppliers and developers, and the data management needs of the project terminal owners need to be further explored and optimized.

[0004] The current data management method is not rational enough, which directly shortens the utilization cycle of renovation project cost information. Due to the low utilization rate, its potential value is seriously underestimated and wasted. This situation not only weakens the synergy of all parties, resulting in a decrease in decision-making accuracy and efficiency, but also hinders the release of economic benefits, becoming a significant bottleneck restricting the improvement of overall project benefits. Summary of the invention

[0005] Based on the above-mentioned shortcomings and deficiencies in the prior art, one of the objects of the present invention is to at least solve one or more of the above-mentioned problems in the prior art. In other words, one of the objects of the present invention is to provide a decoration project cost information management system and method suitable for three-party interaction that meets one or more of the aforementioned needs, so as to optimize the decoration project cost information management process, improve information utilization efficiency and security, promote supply chain collaboration, reduce operating costs, and optimize owner experience.

[0006] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical solutions: In a first aspect, the present invention provides a decoration project cost information management system suitable for three-party interaction, comprising an information processing end, an information calling end and an information input end; the information processing end is used to obtain historical experience information and decoration project information, and generate a decoration project cost information list based on the historical experience information and the decoration project information; the information calling end is used for corresponding personnel to obtain the decoration project cost information list from the information processing end before the decoration project is tendered, and to feedback the list adjustment opinions; the information processing end modifies the decoration project cost information list based on the list adjustment opinions to generate a decoration project tender list; the information input end is used for each supplier to fill in the corresponding supply information based on the decoration project tender list when participating in the decoration project bidding; the information processing end generates a delivery list based on the decoration project tender list and in combination with the supply information; The information calling end is also used for corresponding personnel to obtain the delivery list from the information processing end after the decoration project is completed.

[0007] In a second aspect, the present invention provides a decoration project cost information management method suitable for three-party interaction, based on a decoration project cost information management system suitable for three-party interaction described in the first aspect, comprising the following steps: an information processing end obtains historical experience information and decoration project information, and generates a decoration project cost information list based on the historical experience information and the decoration project information; an information calling end obtains the decoration project cost information list from the information processing end before the decoration project is tendered, and feeds back list adjustment opinions; the information processing end modifies the decoration project cost information list based on the list adjustment opinions to generate a decoration project tender list and add a cell for filling in quality assurance service information, thereby obtaining a decoration project bid filling list; the information entry end fills in the corresponding supply information and quality assurance service information based on the decoration project bid list when participating in the decoration project bid; the information processing end generates a delivery list based on the supply information and the quality assurance service information filled in by the corresponding supplier of the calibration; the information calling end obtains the delivery list from the information processing end after the decoration project is constructed.

[0008] Compared with the prior art, the present invention has the following beneficial effects: 1. Through automatic processing of historical experience information and current decoration project information, a decoration project cost information list is quickly generated, reducing manual calculation errors and improving the accuracy and efficiency of cost assessment. At the same time, through the list adjustment function of the information call end, instant feedback and iterative optimization are achieved to ensure that the decoration project bidding list is more in line with actual needs, laying a solid foundation for the subsequent execution of the project.

[0009] 2. It realizes information interaction and sharing among three parties (supplier, information processor, and caller), promotes the coordination and transparency of supply chain management, and enables all parties to communicate and collaborate based on a common data platform, thereby improving the response speed and overall efficiency of the supply chain and reducing operating costs.

[0010] 3. The present invention allows relevant parties to obtain and review the cost information list through the information calling terminal before the decoration project is tendered, and put forward adjustment suggestions, so that the end-user owner can better understand the relationship between the design plan and the cost, and reduce the possibility of design adjustments requiring re-tendering due to cost over-budget in the later bidding and tendering stages.

[0011] 4. The information entry terminal allows each supplier to directly fill in the supply information based on the bidding list, which simplifies the cumbersome steps in the traditional bidding process and improves the accuracy and efficiency of information entry. At the same time, the information processing terminal can quickly generate a delivery list based on these supply information, providing clear and definite guidance for subsequent construction, operation and maintenance, and further optimizing the management process of the entire supply chain.

[0012] 5. By accumulating and integrating a large amount of renovation project cost information, the present invention provides enterprises with valuable data assets. These data can not only be used for the optimization management of current projects, but also serve as an important basis for future project decision-making, promoting enterprises to transform to a data-driven management model and improving overall competitiveness.

[0013] Further or more detailed beneficial effects will be described in detail in conjunction with specific examples in the specific implementation manner. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is a schematic diagram of an application scenario of the decoration project cost information management system and method described in an embodiment of the present invention.

[0016] Figure 2 It is a structural diagram of the information processing terminal described in an embodiment of the present invention.

[0017] Figure 3 It is a flow chart of the decoration project cost information management method described in an embodiment of the present invention.

[0018] Figure 4 It is a schematic diagram of the functional zone space area analysis table described in an embodiment of the present invention.

[0019] Figure 5 It is a schematic diagram of the functional area space decoration cost distribution analysis table described in the embodiment of the present invention.

[0020] Figure 6 It is a schematic diagram of the distribution analysis table of the parts and components decoration costs described in the embodiment of the present invention.

[0021] Figure 7 It is a partial schematic diagram of a filling-in checklist for a renovation project bid according to an embodiment of the present invention.

[0022] Figure 8-Figure 10 It is a schematic diagram of the construction unit price analysis table described in an embodiment of the present invention.

[0023] Figure 11-13 It is a schematic diagram of the material unit price analysis table described in the embodiment of the present invention.

[0024] Fig.14 It is a partial schematic diagram of the delivery list described in the embodiment of the present invention. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0026] In the following description, multiple embodiments of the present invention are provided, and different embodiments may be replaced or combined, so the present invention may also be considered to include all possible combinations of the same and / or different embodiments described. Therefore, if one embodiment includes features A, B, and C, and another embodiment includes features B and D, then the present invention should also be considered to include embodiments containing one or more of A, B, C, and D, all other possible combinations, even though the embodiment may not be clearly described in the following text.

[0027] The following description provides examples and does not limit the scope, applicability or examples set forth in the claims. Changes may be made to the functions and arrangements of the elements described without departing from the scope of the present invention. Various processes or components may be appropriately omitted, substituted or added to each example. For example, the described method may be performed in an order different from the described order, and various steps may be added, omitted or combined. In addition, the features described in some examples may be combined in other examples.

[0028] In order to facilitate a better understanding of the embodiments of the present invention, before explaining the specific implementation modes of the present invention in detail, its application scenarios are first described.

[0029] See also Figure 1 , Figure 1 The schematic diagram of the decoration project cost information management system and method under the application scenario is shown. It can be understood that decoration projects usually refer to a series of engineering activities for beautification and functional improvement of the interior or exterior of a building. The buildings involved in the decoration project in this embodiment can at least include residential and commercial buildings. Based on this, the three interactive parties in this embodiment include various suppliers at the information input end, the developer or the cost consulting company entrusted by the owner at the information processing end, and the owner or the entrusted manager at the information calling end.

[0030] like Figure 1 As shown, the information processing end can be realized by setting up a cost information management platform, which is responsible for centralized processing, storage, analysis and display of cost information related to decoration projects. At the same time, the cost information management platform is compatible with multi-terminal access, including smart phones, tablet computers, laptops and desktop computers, so that owners and suppliers can interact with data anytime and anywhere. The information calling end and information input end can be realized by at least smart phones, tablet computers, laptops, desktop computers and other devices, which provide suppliers and owners with flexible and convenient information input channels.

[0031] The decoration project cost information management system and method described in the embodiments of this specification are applied to the design, construction, procurement, acceptance, delivery, after-sales service and other links of decoration projects. Specifically: before bidding, the information processing end collects historical data of relevant decoration projects to obtain historical experience information, and obtains basic data of the decoration projects to be bid to obtain decoration project information. The information processing end first obtains the decoration project information, which includes the initial decoration plan design, and then calculates the corresponding costs based on the historical experience information to generate a decoration project cost information list. The owner of the information calling end or the manager entrusted by the owner can access and call the decoration project cost information list instantly through the information calling end, using a preset key or completing a strict identity authentication process, and pass feedback to the information processing end to confirm the final design plan before conducting bidding and procurement and other activities. In the bidding stage, the information processing end conducts comprehensive analysis and calculation to obtain the construction unit price analysis table (such as Figure 8-Figure 10 as shown) and the material unit price analysis table (as shown Figure 11-13 As shown in the figure, the information processing end can quickly determine the price by accessing the cost information management platform, effectively improving the efficiency of purchasing decisions, controlling costs, and preventing inflated prices and quality risks caused by information asymmetry. During the delivery and acceptance stage, the information processing end obtains the delivery list (as shown in the figure) through information integration. Fig.14 As shown in the figure, the owner of the information calling end or the project manager or third-party acceptance agency appointed by the information calling end can immediately check the list after identity verification through the information calling end to ensure that the quality and cost of the project meet the established standards. The delivery list also comes with quality warranty information to facilitate maintenance contact during the warranty period. After the decoration project is delivered, the caller can quickly query key information such as warranty period, maintenance records and supplier contact information through the information calling end. For maintenance needs, the owner can evaluate the cost based on the system cost information and directly contact the supplier to arrange the service.

[0032] In summary, the application of the renovation project cost information management system and method is aimed at optimizing the renovation project cost management process through digital means to achieve full life cycle management from design to delivery to subsequent maintenance. This system not only improves the efficiency and accuracy of information processing, reduces human errors and communication costs, but also promotes information transparency between suppliers and owners and enhances cooperation trust. Ultimately, these improvements will jointly improve the overall management level and market competitiveness of renovation projects, and provide owners with a better experience and reliable performance.

[0033] Embodiment 1: like Figure 2As shown, this embodiment provides a decoration project cost information management system suitable for three-party interaction, including an information processing end, an information calling end and an information input end; the information processing end is used to obtain historical experience information and decoration project information, and generate a decoration project cost information list based on the historical experience information and the decoration project information; the information calling end is used for corresponding personnel to obtain the decoration project cost information list from the information processing end before the decoration project is tendered, and to feedback the list adjustment opinions; the information processing end modifies the decoration project cost information list based on the list adjustment opinions to generate a decoration project tender list; the information input end is used for each supplier to fill in the corresponding supply information based on the decoration project tender list when participating in the decoration project bidding; the information processing end generates a delivery list based on the decoration project tender list and combined with the supply information; the information calling end is also used for corresponding personnel to obtain the delivery list from the information processing end after the decoration project is constructed.

[0034] Specifically, this embodiment provides a preferred implementation method, the information processing end includes an acquisition module and an analysis module; the acquisition module is used to acquire basic data of multiple delivered decoration projects, and integrate the basic data to obtain the historical experience information, the basic data includes the project name, decoration space and space function planning, location, parts and their brand, model and specifications, procurement mode, material unit price, material loss rate, project quantity and unit, construction unit price and total price corresponding to each of the multiple delivered decoration projects; the acquisition module is also used to acquire the project name and bidding drawings of the decoration project to be tendered to obtain the decoration project information; the analysis module generates the decoration project cost information list based on the historical experience information and the decoration project information.

[0035] Specifically, this embodiment provides a preferred implementation method, wherein the decoration project information list includes a functional area space analysis table, a functional area space decoration cost distribution analysis table and a part and component decoration cost distribution analysis table; the bidding drawings include a functional area division plan for the decoration project to be bid; the analysis module also includes a calculation unit; the calculation unit calculates the corresponding costs for each functional area divided by the bidding drawings based on the historical experience information, so as to obtain the functional area space area analysis table and its corresponding functional area space decoration cost distribution analysis table and the part and component decoration cost distribution analysis table.

[0036] Specifically, this embodiment provides a preferred implementation, wherein the analysis module further comprises a list generation unit; the list generation unit adjusts the decoration plan corresponding to the decoration project information list based on the list adjustment opinion to obtain a new decoration plan, thereby generating a corresponding decoration project bidding list.

[0037] Specifically, this embodiment provides a preferred implementation method, and the information processing end also includes an instruction module and a permission management module; the instruction module is used for the decoration project cost information management personnel to input control instructions; the permission management module is used to review whether the decoration project cost information management personnel has the authority to drive the information processing end to perform corresponding operations.

[0038] Specifically, this embodiment provides a preferred implementation method, and the analysis module also includes a list deployment unit; the list deployment unit is used to add a cell in the decoration project bidding list for each supplier to fill in the quality assurance service information when participating in the decoration project bidding, so as to obtain the decoration project bidding filling list; the information entry end is also used for each supplier to fill in the corresponding supply information and quality assurance service information based on the decoration project bidding filling list when participating in the decoration project bidding.

[0039] Specifically, this embodiment provides a preferred implementation method, wherein the calculation unit performs cost calculation based on the supply information filled in by each supplier to obtain multiple construction unit price analysis tables and their corresponding material unit price analysis tables; the instruction module is also used for the decoration project cost information management personnel to input reference instructions for accessing the construction unit price analysis table and / or the material unit price analysis table; the authority management module is used to authorize the corresponding decoration project cost information management personnel to access the construction unit price analysis table and / or the material unit price analysis table.

[0040] Specifically, this embodiment provides a preferred implementation method, wherein the instruction module is also used for the decoration project cost information management personnel to input calibration instructions; the list generation unit generates a delivery list for the corresponding personnel of the information calling end to call based on the supply information and the warranty service information filled in by the supplier corresponding to the calibration instructions.

[0041] Specifically, this embodiment provides a preferred implementation method, wherein the permission management module is also used to store and manage preset key information to authorize the information calling end; the information calling end is also used to obtain the key information, and based on the key information, apply to the information processing end to call the decoration project information list and the delivery list.

[0042] Embodiment 2: like Figure 3As shown, this embodiment provides a decoration project cost information management method suitable for three-party interaction, based on a decoration project cost information management system suitable for three-party interaction described in Example 1, including the following steps: an information processing end obtains historical experience information and decoration project information, and generates a decoration project cost information list based on the historical experience information and the decoration project information; an information calling end obtains the decoration project cost information list from the information processing end before the decoration project is tendered, and feeds back list adjustment opinions; the information processing end modifies the decoration project cost information list based on the list adjustment opinions to generate a decoration project tender list and add a cell for filling in quality assurance service information, thereby obtaining a decoration project bid filling list; the information input end fills in the corresponding supply information and quality assurance service information based on the decoration project bid list when participating in the decoration project bid; the information processing end generates a delivery list based on the supply information and the quality assurance service information filled in by the corresponding supplier of the calibration; the information calling end obtains the delivery list from the information processing end after the decoration project is constructed.

[0043] Embodiment three: In order to verify the effectiveness of the renovation project cost information management system and method for three-party interaction described in this specification, this embodiment simulates the actual application scenario of the renovation project cost information management system, assuming that the renovation building of the renovation project is a residential building, and the three interactive parties are the various suppliers at the information input end, the developer at the information processing end or the cost consulting company entrusted by the owner, and the owner at the information calling end. In this scenario, the supplier fills in the supply information and warranty service information (such as Figure 7 As shown), including key data such as material type, quantity, price, etc. Subsequently, the information processing end generates a delivery list ( Fig.14 As shown), these cost information lists provide strong data support for the cost management of decoration projects.

[0044] Based on the above, this embodiment verifies the effectiveness of a renovation project cost information management system and method suitable for three-party interaction in this specification. The system not only realizes the real-time sharing and efficient processing of renovation project cost information, but also ensures the security and accuracy of data through authority management, providing a strong guarantee for the smooth progress of the renovation project.

[0045] It should be noted that, for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should know that the present invention is not limited by the described action sequence, because according to the present invention, some steps can be performed in other sequences or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present invention. In the above embodiments, the descriptions of each embodiment have their own emphasis, and the parts that are not described in detail in a certain embodiment can refer to the relevant descriptions of other embodiments. The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited by this. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of the implementation scheme of the present disclosure. The present invention is intended to cover any variation, use or adaptive change of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field that are not recorded in the present disclosure. The description and embodiments are only regarded as exemplary, and the scope and spirit of the present disclosure are defined by the claims.

Claims

1. A decoration engineering cost information management system suitable for three-party interaction, characterized by: It includes information processing end, information calling end and information input end; The information processing end is used to obtain historical experience information and decoration project information, and generate a decoration project cost information list based on the historical experience information and the decoration project information; The information calling end is used for the corresponding personnel to obtain the decoration project cost information list from the information processing end before the decoration project is tendered, and to feedback the list adjustment opinions; The information processing end modifies the decoration project cost information list based on the list adjustment opinion to generate a decoration project bidding list; The information input terminal is used for each supplier to fill in the corresponding supply information based on the decoration project bidding list when participating in the decoration project bidding; The information processing end generates a delivery list based on the decoration project bidding list and in combination with the supply information; The information calling end is also used for corresponding personnel to obtain the delivery list from the information processing end after the decoration project is completed.

2. According to claim 1, a decoration project cost information management system suitable for three-party interaction is characterized in that: The information processing end includes an acquisition module and an analysis module; The acquisition module is used to acquire basic data of multiple delivered decoration projects, and integrate the basic data to obtain the historical experience information, wherein the basic data includes the project name, decoration space and space function planning, location, parts and their brands, models and specifications, procurement mode, material unit price, material loss rate, engineering quantity and its unit, construction unit price and total price corresponding to each of the multiple delivered decoration projects; The acquisition module is also used to acquire the project name and bidding drawings of the decoration project to be tendered, so as to obtain the decoration project information; The analysis module generates the decoration project cost information list based on the historical experience information and the decoration project information.

3. A decoration engineering cost information management system suitable for three-party interaction according to claim 2, characterized in that: The renovation project information list includes a functional area space area analysis table, a functional area space renovation cost distribution analysis table and a part and component renovation cost distribution analysis table; The bidding drawings include the functional area division plan of the renovation project to be bid; The analysis module also includes a measurement unit; The calculation unit calculates the corresponding costs for each functional area divided by the bidding drawings based on the historical experience information to obtain the functional area space area analysis table and its corresponding functional area space decoration cost distribution analysis table and the part and component decoration cost distribution analysis table.

4. A decoration engineering cost information management system suitable for three-party interaction according to claim 3, characterized in that: The analysis module also includes a list generation unit; The list generating unit adjusts the decoration plan corresponding to the decoration project information list based on the list adjustment opinion to obtain a new decoration plan, thereby generating a corresponding decoration project bidding list.

5. According to claim 4, a renovation project cost information management system suitable for three-party interaction is characterized in that: The information processing end also includes an instruction module and a rights management module; The instruction module is used for the renovation project cost information management personnel to input control instructions; The authority management module is used to review whether the renovation project cost information management personnel have the authority to drive the information processing end to perform corresponding operations.

6. A decoration engineering cost information management system suitable for three-party interaction according to claim 5, characterized in that: The analysis module also includes a checklist deployment unit; The list deployment unit is used to add a cell in the decoration project bidding list for each supplier to fill in the quality assurance service information when participating in the decoration project bidding, so as to obtain the decoration project bidding filling list; The information input terminal is also used for each supplier to fill in the corresponding supply information and quality assurance service information based on the decoration project bidding list when participating in the decoration project bidding.

7. A decoration engineering cost information management system suitable for three-party interaction according to claim 6, characterized in that: The calculation unit performs cost calculation based on the supply information filled in by each supplier to obtain multiple construction unit price analysis tables and their corresponding material unit price analysis tables; The instruction module is also used for the renovation project cost information management personnel to input a reference instruction for referring to the construction unit price analysis table and / or the material unit price analysis table; The authority management module is used to authorize the corresponding decoration project cost information management personnel to view the construction unit price analysis table and / or the material unit price analysis table.

8. A decoration engineering cost information management system suitable for three-party interaction according to claim 7, characterized in that: The instruction module is also used for the renovation project cost information management personnel to input calibration instructions; The list generating unit generates a delivery list for calling by a corresponding person at the information calling end based on the supply information and the warranty service information filled in by the supplier corresponding to the calibration instruction.

9. A decoration engineering cost information management system suitable for three-party interaction according to claim 8, characterized in that: The authority management module is further used to store and manage preset key information to authorize the information calling end; The information calling end is also used to obtain the key information, and apply to the information processing end to call the decoration project information list and the delivery list based on the key information.

10. A decoration engineering cost information management method suitable for three-party interaction, characterized in that: A decoration project cost information management system suitable for three-party interaction according to claim 9 comprises the following steps: The information processing end obtains historical experience information and decoration project information, and generates a decoration project cost information list based on the historical experience information and the decoration project information; The information calling end obtains the decoration project cost information list from the information processing end before the decoration project is tendered, and feeds back the list adjustment opinions; The information processing end modifies the decoration project cost information list based on the list adjustment opinion to generate a decoration project bidding list and add a cell for filling in the quality assurance service information, thereby obtaining a decoration project bidding filled list; The information input terminal fills in the corresponding supply information and warranty service information based on the decoration project bidding list when participating in the decoration project bidding; The information processing end generates a delivery list based on the supply information and the warranty service information filled in by the supplier corresponding to the calibration; The information calling end obtains the delivery list from the information processing end after the decoration project is completed.

Citation Information

Patent Citations

  • Bidding and purchasing full-service management and control method, device, equipment, system and medium based on intelligent supply chain

    CN115619340A

  • Intelligent purchasing management method and system based on supplier information collaborative analysis

    CN118446782A