Slope early warning method and device, computer equipment and storage medium
By collecting geomorphological distribution information and depth maps of slopes, and using a threshold prediction model to dynamically adjust the early warning threshold, the accuracy problem of traditional slope monitoring and early warning methods has been solved. This has enabled more accurate judgment and early warning of slope safety, reduced false alarms and missed alarms, and improved slope stability.
Patent Information
- Application Number
- CN202411093847.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-22
AI Technical Summary
Traditional slope monitoring and early warning methods rely on subjective human judgment, resulting in low accuracy in assessing slope safety and a high risk of missed or false warnings, which affects the safety and stability of slopes.
The geomorphological distribution information and depth map of the slope are obtained by geomorphological acquisition equipment. The pre-trained threshold prediction model is used to predict the early warning threshold of the monitoring data. The target monitoring data is combined to determine whether the slope meets the early warning conditions. The early warning threshold is dynamically adjusted to improve the accuracy of the judgment.
It improves the accuracy of slope safety assessment, reduces missed or false warnings, enhances slope stability and safety, and reduces the risk of disasters.
Smart Images

Figure CN119007109A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of slope monitoring, and in particular to a slope early warning method, device, computer equipment and storage medium. Background Art
[0002] Slope refers to the side of a sloping terrain, which is commonly seen in projects such as roads, rivers, canals, dams, railways, and construction sites. In engineering, the stability of slopes is one of the important considerations, because unstable slopes may lead to landslides or collapses, endangering the safety of personnel and the stability of facilities.
[0003] The reinforcement structure of the slope (such as anchor piles, anchor rods, anchor cables, etc.) will gradually deteriorate over time, thus affecting the safety performance of the slope. Therefore, it is necessary to regularly monitor the safety of the slope to reduce the occurrence of disasters. However, traditional slope monitoring and early warning mainly combines people's subjective judgment of whether the slope is safe. The accuracy of slope safety judgment is relatively low, and it is easy to miss or mis-warn the slope safety warning. Summary of the invention
[0004] In order to improve the accuracy of slope safety judgment and reduce the situation of missed or false slope safety warnings, the present application provides a slope warning method, device, computer equipment and storage medium.
[0005] In a first aspect, in order to achieve the above-mentioned invention object, the present application provides a slope early warning method, the method comprising: Collecting geomorphic distribution information of the target slope area by using a geomorphic collection device, wherein the geomorphic distribution information includes at least one of terrain information and vegetation information of the target slope area; Acquire a target depth map of the target slope area by an image acquisition device; By using a trained threshold prediction model, a prediction is performed based on the target depth map and the landform distribution information to obtain a monitoring data warning threshold of the target slope area, wherein the monitoring data warning threshold includes at least one of a warning threshold of stress monitoring data, a warning threshold of displacement monitoring data, a warning threshold of inclination monitoring data, a warning threshold of groundwater level monitoring data, and a warning threshold of rainfall monitoring data; Acquire target monitoring data of the target slope area, wherein the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; Determine whether the target slope area meets the preset warning condition according to the target monitoring data and the monitoring data warning threshold, and issue a safety warning to the target slope area when the target slope area meets the preset warning condition.
[0006] In a second aspect, in order to achieve the above-mentioned invention object, the present application provides a slope warning device, the slope warning device comprising: A first acquisition unit is used to acquire geomorphic distribution information of a target slope area through a geomorphic acquisition device, wherein the geomorphic distribution information includes at least one of terrain information and vegetation information of the target slope area; A second acquisition unit is used to acquire a target depth map of the target slope area through an image acquisition device; A prediction unit, configured to predict, by means of a trained threshold prediction model, based on the target depth map and the landform distribution information, to obtain a monitoring data warning threshold of the target slope area, wherein the monitoring data warning threshold includes at least one of a warning threshold of stress monitoring data, a warning threshold of displacement monitoring data, a warning threshold of inclination monitoring data, a warning threshold of groundwater level monitoring data, and a warning threshold of rainfall monitoring data; A monitoring unit, used to obtain target monitoring data of the target slope area, wherein the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; The early warning unit is used to determine whether the target slope area meets the preset early warning conditions according to the target monitoring data and the monitoring data early warning threshold, and to issue a safety early warning to the target slope area when the target slope area meets the preset early warning conditions.
[0007] In a third aspect, in order to achieve the above-mentioned purpose of the invention, the present application provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned slope warning method when executing the computer program.
[0008] In a fourth aspect, in order to achieve the above-mentioned purpose of the invention, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned slope warning method are implemented.
[0009] In the present application, on the one hand, by collecting the geomorphic distribution information and the target depth map of the target slope area for predicting the monitoring data warning threshold, it is possible to avoid directly setting the monitoring data warning threshold based on human experience, thereby avoiding the problem of unreasonable setting of the monitoring data warning threshold; on the other hand, since the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data, it can better reflect the changes in the slope and / or the changes that may be affected. Therefore, the target monitoring data of the target slope area is combined with the monitoring data warning threshold to determine whether the target slope area meets the preset warning conditions, which can improve The accuracy of slope safety judgment can more accurately identify whether the slope meets the warning conditions; thirdly, since the landform distribution information predicts the monitoring data warning threshold, the monitoring data warning threshold can be dynamically adjusted according to the actual slope changes to avoid using the same warning threshold in all situations, thereby reducing the situation of missed or false slope safety warnings; fourthly, since the target depth can better reflect the changes in the slope and the particularity of the terrain, the reliability of the monitoring data warning threshold can be improved by combining the depth map to predict the monitoring data warning threshold; therefore, the present application can improve the accuracy of slope safety judgment, reduce the situation of missed or false slope safety warnings, and reduce the occurrence of slope disasters. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 A schematic diagram of a flow chart of a slope warning method provided in an embodiment of the present application; Figure 2 A schematic diagram of an embodiment of step 103 provided in an embodiment of the present application; Figure 3 A schematic diagram of the structure of a slope warning system provided in an embodiment of the present application; Figure 4 A schematic block diagram of a slope warning device provided in an embodiment of the present application; Figure 5 The present invention is a block diagram showing the structure of a computer device according to an embodiment of the present application.
[0011] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0012] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0013] The flowcharts shown in the accompanying drawings are only examples and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may also be decomposed, combined or partially merged, so the actual execution order may change according to actual conditions.
[0014] It should be understood that the terms used in this application specification are only for the purpose of describing specific embodiments and are not intended to limit the application. As used in this application specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0015] It should be further understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0016] The embodiments of the present application provide a slope warning method, device, computer equipment and storage medium. The slope warning method can improve the accuracy of slope safety judgment and reduce the situation of missed or false slope safety warnings.
[0017] In conjunction with the accompanying drawings, some embodiments of the present application are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0018] Please refer to Figure 1 , Figure 1 A schematic flow chart of a slope warning method provided in an embodiment of the present application. The slope warning method is mainly applied to computer equipment, such as PC (Personal Computer) or server and other terminal equipment with data processing function.
[0019] Among them, the server can be an independent server or a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, content distribution networks (CDN), as well as big data and data analysis platforms.
[0020] like Figure 1 As shown, the slope warning method includes steps 101 to 105.
[0021] Step 101: collect the geomorphic distribution information of the target slope area by using geomorphic collection equipment.
[0022] Slope refers to the side of a sloping terrain, which is commonly found in projects such as roads, rivers, canals, dams, railways, and construction sites. Among them, the target slope area is the slope that needs to be monitored.
[0023] The landform distribution information includes at least one of the terrain information and vegetation information of the target slope area.
[0024] Among them, terrain information is used to indicate the morphology and topographic features of the earth's surface in the target slope area, including mountains, hills, plains, rivers, lakes, etc. The terrain information can be collected using optical sensors, radar remote sensors, laser radars, ground surveying instruments and other geomorphic collection equipment. For example, the surface image is taken by an optical sensor (such as a camera on a satellite or an airplane), and then the elevation, terrain features, etc. are extracted through image processing technology to obtain terrain information. For another example, microwaves or radar waves are emitted by a radar sensor, and the surface terrain information is obtained by measuring the time and intensity of the return signal. For another example, the surface elevation information is obtained by emitting laser pulses through a laser radar and measuring their return time, thereby obtaining terrain information. For another example, ground surveying instruments (such as total stations, GPS surveying instruments, etc.) conduct field measurements of the surface, and then generate terrain information through data processing and geographic information system (GIS) technology.
[0025] Among them, vegetation information is used to indicate the type, distribution, density and health status of vegetation covering the surface of the target slope area. Vegetation information can be collected using geomorphic collection equipment such as optical remote sensors, hyperspectral remote sensors, radar remote sensors, and infrared remote sensors. For example, optical remote sensors can collect image data in visible light, infrared, and near-infrared bands. Vegetation has specific reflection characteristics in these bands, so vegetation information can be obtained by interpreting image data. For another example, hyperspectral remote sensors can collect continuous, high-spectral resolution image data, covering a wider range of bands; vegetation has specific spectral characteristics in different bands, and hyperspectral data can be used to identify different types of vegetation and evaluate the physiological state of vegetation, thereby obtaining vegetation information. For another example, radar remote sensors can penetrate clouds and vegetation coverage to obtain microwave reflection and scattering signals from the surface; the structure and biomass of vegetation have specific responses to radar waves, so the type, density and growth state of vegetation can be inferred from radar data, thereby obtaining vegetation information. For example, infrared remote sensors can be used to collect infrared radiation data from the ground surface to evaluate the physiological state and growth conditions of vegetation (for example, indicators such as chlorophyll content and leaf area index in the infrared band can reflect the growth vitality and health of vegetation), thereby obtaining vegetation information.
[0026] Step 102: acquiring a target depth map of the target slope area by using an image acquisition device.
[0027] There are many ways to collect the target depth map of the target slope area in step 102, illustratively including: In some embodiments, a depth map of the entire target slope area captured at one time may be directly captured by an image capture device as a target depth map of the target slope area.
[0028] In some embodiments, since the topographic information in the image has important indicative significance for safety warning, in order to improve the clarity of the target depth map and thus improve the accuracy of slope warning, the target slope area can be divided into multiple sub-slope areas, and a depth image can be collected for each sub-slope area by an image acquisition device. Then, the depth images of all the sub-slope areas are spliced together to obtain a target depth map of the target slope area.
[0029] Step 103 , using the trained threshold prediction model, prediction is performed based on the target depth map and the landform distribution information to obtain a monitoring data warning threshold of the target slope area.
[0030] Among them, the monitoring data warning threshold includes at least one of the warning threshold of stress monitoring data, the warning threshold of displacement monitoring data, the warning threshold of inclination monitoring data, the warning threshold of groundwater level monitoring data, and the warning threshold of rainfall monitoring data.
[0031] There are many ways to set the early warning threshold of the monitoring data of the target slope area in step 103, which include, for example: (1) The monitoring data warning threshold is one of the warning threshold of stress monitoring data, the warning threshold of displacement monitoring data, the warning threshold of inclination monitoring data, the warning threshold of groundwater level monitoring data, and the warning threshold of rainfall monitoring data. Taking the monitoring data warning threshold as the warning threshold of stress monitoring data as an example, in this case, step 103 may specifically include the following steps 1031A to 1033A: 1031A. Using a first partitioning network in a trained threshold prediction model, based on terrain information of the target slope area, the target depth map is partitioned into a plurality of terrain area maps according to terrain categories.
[0032] For example, through the first segmentation network in the trained threshold prediction model, based on the terrain information of the target slope area, the target depth map is segmented into a mountain area map, a hill area map, a plain area map, a river area map, a lake area map, etc. There may be multiple terrain area maps of each terrain category.
[0033] 1032A. Using a second partitioning network in a trained threshold prediction model, based on vegetation information of the target slope area, the target depth map is partitioned into a plurality of vegetation area maps.
[0034] For example, through the second segmentation network in the trained threshold prediction model, based on the vegetation information of the target slope area, the area in the target depth map with a vegetation area greater than a threshold is segmented out, thereby obtaining a plurality of vegetation area maps.
[0035] 1033A. Predictions are made based on the terrain area map and the vegetation area map through the prediction network in the trained threshold prediction model to obtain the early warning threshold of the stress monitoring data of the target slope area.
[0036] In some embodiments, the prediction network in the trained threshold prediction model can directly make predictions based on the terrain category of the terrain area map and the vegetation area map to obtain the monitoring data warning threshold of the target slope area.
[0037] In some embodiments, in order to improve the reliability of the monitoring data warning threshold, the monitoring data warning threshold can also be predicted in combination with the terrain category of the terrain area map, the terrain annotation information of the terrain area map, and the vegetation annotation information of the vegetation area map. At this time, step 1033A may include: annotating the terrain elevation and terrain area of the terrain area map through the first partitioning network to obtain the terrain annotation information of the terrain area map; annotating the vegetation type, vegetation area, vegetation density and vegetation health status of the vegetation area map through the second partitioning network to obtain the vegetation annotation information of the vegetation area map; and predicting the warning threshold of the stress monitoring data of the target slope area according to the terrain area map, the vegetation area map, the terrain category of the terrain area map, the terrain annotation information and the vegetation annotation information through the prediction network in the trained threshold prediction model.
[0038] Among them, terrain elevation refers to the vertical height of the corresponding locations or objects in the terrain area map relative to the sea level.
[0039] (2) The early warning thresholds of monitoring data include the early warning thresholds of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data. Figure 2 As shown, step 103 may specifically include the following steps 1031B to 1033B: 1031B. Annotate the terrain elevation and terrain area of the terrain area map through the first division network to obtain terrain annotation information of the terrain area map.
[0040] 1032B. Using the second partitioning network, label the vegetation type, vegetation area, vegetation density and vegetation health status of the vegetation area map to obtain vegetation labeling information of the vegetation area map.
[0041] 1033B. Prediction is performed through the prediction network in the trained threshold prediction model according to the terrain area map, the vegetation area map, the terrain annotation information and the vegetation annotation information to obtain the warning threshold of the stress monitoring data, the warning threshold of the displacement monitoring data, the warning threshold of the inclination monitoring data, the warning threshold of the groundwater level monitoring data and the warning threshold of the rainfall monitoring data of the target slope area.
[0042] In some embodiments, through the prediction network in the trained threshold prediction model, it is possible to directly predict based on the terrain category of the terrain area map and the vegetation area map, and obtain the warning threshold of the stress monitoring data, the warning threshold of the displacement monitoring data, the warning threshold of the inclination monitoring data, the warning threshold of the groundwater level monitoring data, and the warning threshold of the rainfall monitoring data of the target slope area. Therefore, by dividing the target depth map into multiple vegetation area maps according to the terrain information, and dividing the target depth map into multiple vegetation area maps according to the vegetation information, the terrain area map, the terrain information carried by the vegetation area map, and the vegetation information can be fully utilized to predict the warning threshold of the monitoring data of the target slope area, which can improve the reliability of the warning threshold of the monitoring data, thereby improving the accuracy of the slope warning and reducing the false warning of the slope.
[0043] In some embodiments, in order to improve the reliability of the monitoring data warning threshold, the monitoring data warning threshold can also be predicted in combination with the terrain category of the terrain area map, the terrain annotation information of the terrain area map, and the vegetation annotation information of the vegetation area map. At this time, step 1033B may include: annotating the terrain elevation and terrain area of the terrain area map through the first partitioning network to obtain the terrain annotation information of the terrain area map; annotating the vegetation type, vegetation area, vegetation density and vegetation health status of the vegetation area map through the second partitioning network to obtain the vegetation annotation information of the vegetation area map; and predicting the warning threshold of the stress monitoring data, the displacement monitoring data, the inclination monitoring data, the groundwater level monitoring data, and the rainfall monitoring data of the target slope area according to the prediction network in the trained threshold prediction model.
[0044] Therefore, through the prediction network in the trained threshold prediction model, predictions are made based on the terrain area map, vegetation area map, terrain annotation information and vegetation annotation information to obtain the monitoring data warning threshold of the target slope area, which can improve the reliability of the monitoring data warning threshold, thereby improving the accuracy of slope warnings and reducing false slope warnings.
[0045] Step 104, obtaining target monitoring data of the target slope area.
[0046] The target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data of the target slope area.
[0047] Among them, stress monitoring data is used to indicate the stress exerted on the reinforcement structure (such as anchor piles, anchor rods, anchor cables, etc.) in the target slope area.
[0048] In some embodiments, the monitoring data of the target slope area can be collected at preset intervals, so as to obtain the target monitoring data of the target slope area at each time point. For example, the stress monitoring data can be obtained by detecting such as anchor cable meters, stress meters, etc., the displacement monitoring data can be obtained by detecting such as displacement monitors, etc., the inclination monitoring data can be detected by inclinometers, etc., the groundwater level monitoring data can be detected by water level meters, ultrasonic depth sounders, resistivity meters, etc., and the rainfall monitoring data can be detected by rain gauges, rainfall observers, etc.
[0049] Step 105, determining whether the target slope area meets the preset warning condition according to the target monitoring data and the monitoring data warning threshold, and issuing a safety warning to the target slope area when the target slope area meets the preset warning condition.
[0050] Taking the target monitoring data including stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data and rainfall monitoring data as an example, there are multiple ways to determine whether the target slope area meets the preset warning conditions in step 105, illustratively, including the following ways (1) and (2): Method (1): When the stress monitoring data of the target slope area is greater than the warning threshold of the stress monitoring data, the displacement monitoring data of the target slope area is greater than the warning threshold of the displacement monitoring data, the inclination monitoring data of the target slope area is greater than the warning threshold of the inclination monitoring data, the groundwater level monitoring data of the target slope area is greater than the warning threshold of the groundwater level monitoring data, or the rainfall monitoring data of the target slope area is greater than the warning threshold of the rainfall monitoring data, it is determined that the target slope area meets the preset warning condition; when the stress monitoring data of the target slope area is less than or equal to the warning threshold of the stress monitoring data, the displacement monitoring data of the target slope area is less than or equal to the warning threshold of the displacement monitoring data, the inclination monitoring data of the target slope area is less than or equal to the warning threshold of the inclination monitoring data, the groundwater level monitoring data of the target slope area is less than or equal to the warning threshold of the groundwater level monitoring data, and the rainfall monitoring data of the target slope area is less than or equal to the warning threshold of the rainfall monitoring data, it is determined that the target slope area does not meet the preset warning condition.
[0051] Method (2): When at least N of the following conditions are met, it is determined that the target slope area meets the preset warning conditions: the stress monitoring data of the target slope area is greater than the warning threshold of the stress monitoring data, the displacement monitoring data of the target slope area is greater than the warning threshold of the displacement monitoring data, the inclination monitoring data of the target slope area is greater than the warning threshold of the inclination monitoring data, the groundwater level monitoring data of the target slope area is greater than the warning threshold of the groundwater level monitoring data, and the rainfall monitoring data of the target slope area is greater than the warning threshold of the rainfall monitoring data; otherwise, it is determined that the target slope area does not meet the preset warning conditions.
[0052] There are multiple ways to perform safety warning on the target slope area in step 105, illustratively including the following ways 1 and 2: Method 1: Regardless of the warning level, the same warning information is output uniformly when the target slope area meets the preset warning conditions.
[0053] Method 2: Combine the monitoring data with the number of exceeded values and abnormal time points to identify the warning level and issue a safety warning to the target slope area according to the identified warning level. This allows different warning levels to be output for different dangerous situations on the slope, which can improve the reference of the warning information and enable relevant personnel to determine the order of processing the target slope area and select the processing strategy according to the warning level, thereby improving the timeliness and safety of the slope processing. At this time, the warning can be issued according to the following steps a1 to a4: a1. When the target slope area meets the preset warning conditions, the number of abnormal time points within the reference time period of the current time point is obtained, wherein the reference time period is a time period of a preset length from the reference time point forward.
[0054] The monitoring data of the target slope area can be collected at preset intervals, so as to obtain the target monitoring data of the target slope area at each time point. The abnormal time point refers to the time point at which the target monitoring data exceeds the monitoring data warning threshold among the time points at which the target monitoring data is collected within the reference time period.
[0055] The number of abnormal time points refers to the number of abnormal time points within the reference time period of the current time point.
[0056] For example, the current time point is 9:00 on January 2, 2020, and the past 24 hours can be used as the reference time period of the current time point 9:00 (i.e., 9:00 on January 1, 2020 to 9:00 on January 2, 2020). Assuming that the time points at which the target monitoring data exceeds the monitoring data warning threshold in the reference time period of the current time point 9:00 (i.e., 9:00 on January 1, 2020 to 9:00 on January 2, 2020) are 9:00 on January 1, 2020, 12:00 on January 1, 2020, 18:00 on January 1, 2020, 20:00 on January 1, 2020, and 9:00 on January 2, 2020, respectively, it can be determined that the number of abnormal time points in the reference time period of the current time point is 5.
[0057] a2. According to the target monitoring data at each abnormal time point within the reference time period and the monitoring data warning threshold, obtain the monitoring data excess value at each abnormal time point.
[0058] a3. Using the trained level recognition model, a prediction is made based on the monitoring data exceeding value at each abnormal time point and the number of abnormal time points to obtain the warning level at the current time point.
[0059] The stress excess value is the value of the stress monitoring data (such as 30) exceeding the warning threshold value (such as 20) of the stress monitoring data (ie, 30-20=10).
[0060] The displacement excess value is a value at which the displacement monitoring data exceeds the warning threshold of the displacement monitoring data.
[0061] The inclination angle exceeding value is a value at which the inclination angle monitoring data exceeds the warning threshold value of the inclination angle monitoring data.
[0062] Among them, the groundwater level exceedance value is the value of the groundwater level monitoring data exceeding the warning threshold of the groundwater level monitoring data.
[0063] The rainfall excess value is the value at which the rainfall monitoring data exceeds the warning threshold of the rainfall monitoring data.
[0064] In some embodiments, the warning level at the current time point can be determined in combination with the following monitoring data excess values and the number of abnormal time points: stress excess value, displacement excess value, inclination excess value, groundwater level excess value, and rainfall excess value. Taking the target monitoring data as stress monitoring data as an example, at this time, the monitoring data warning threshold is the warning threshold of stress monitoring data, and the monitoring data excess value is the stress excess value. Step a2 can specifically include: based on the stress monitoring data of each abnormal time point and the warning threshold of the stress monitoring data, obtain the stress excess value of each abnormal time point. Step a3 can specifically include: through the trained level recognition model, according to the stress excess value of each abnormal time point and the number of abnormal time points, identify and obtain the warning level of the current time point; according to the warning level of the current time point, the target slope area is given a safety warning. For example, the stress excess value of each abnormal time point and the number of abnormal time points can be combined to output a first-level warning, a second-level warning, and a third-level warning.
[0065] In some embodiments, in order to improve the referenceability of different warning levels, the warning level of the current time point is determined by combining all the following monitoring data excess values and the number of abnormal time points: stress excess value, displacement excess value, inclination excess value, groundwater level excess value, and rainfall excess value. At this time, step a2 may specifically include: based on the stress monitoring data of each abnormal time point and the warning threshold of the stress monitoring data, obtaining the stress excess value of each abnormal time point; based on the displacement monitoring data of each abnormal time point and the warning threshold of the displacement monitoring data, obtaining the displacement excess value of each abnormal time point; based on the inclination monitoring data of each abnormal time point and the warning threshold of the inclination monitoring data, obtaining the inclination excess value of each abnormal time point; based on the groundwater level monitoring data of each abnormal time point and the warning threshold of the groundwater level monitoring data, obtaining the groundwater level excess value of each abnormal time point; based on the rainfall monitoring data of each abnormal time point and the warning threshold of the rainfall monitoring data, obtaining the rainfall excess value of each abnormal time point. Step a3 may specifically include: using a trained level recognition model, identifying the stress excess value at each abnormal time point, the displacement excess value at each abnormal time point, the groundwater level excess value at each abnormal time point, the rainfall excess value at each abnormal time point, and the number of abnormal time points, to obtain the warning level of the current time point. For example, according to the preset data format [x1, x2, x3, x4, x5, t] (where x1, x2, x3, x4, x5 represent the stress excess value, displacement excess value, inclination excess value, groundwater level excess value, and rainfall excess value at each abnormal time point, respectively), the stress excess value (such as 3) at each abnormal time point, the displacement excess value (such as 4) at each abnormal time point, the displacement excess value (such as 5) at each abnormal time point, the groundwater level excess value (such as 6) at each abnormal time point, and the rainfall excess value (such as 7) at each abnormal time point can be obtained. As shown in 7) and the number of abnormal time points (as shown in 1) are represented as vectors [x1,x2,x3,x4,x5,t] (at this time [x1,x2,x3,x4,x5,t]=[3,4,5,6,7,1]), and then the represented vectors [x1,x2,x3,x4,x5,t] are input into the trained level recognition model, and the trained level recognition model is used to identify the represented vectors [x1,x2,x3,x4,x5,t], and finally outputs the first-level warning, the second-level warning, and the third-level warning. In this way, the warning level can be determined by combining more information that affects the safety of the slope, thereby improving the reference of the warning level and improving the timeliness and safety of the slope treatment.
[0066] a4. Provide a safety warning for the target slope area according to the warning level at the current time point.
[0067] Furthermore, in order to reduce the amount of data processing, the target depth map and the landform distribution information can be used to roughly predict the safety index of the target slope. When the safety index is less than the preset safety index threshold, the process of determining the monitoring data warning threshold and subsequent steps in step 103 is entered. When the safety index is greater than or equal to the preset safety index threshold, the target slope area is determined to be in a safe state, and step 103 and subsequent steps are no longer entered. At this time, step 103 can specifically include: dividing the depth image of the target slope area into multiple sub-image areas based on the landform distribution information, and annotating the sub-image areas to obtain the annotation information of the sub-image areas; predicting based on the target depth map and the landform distribution information through a trained safety recognition model to obtain the safety index of the target slope; when the safety index is less than the preset safety index threshold, predicting based on the target depth map and the landform distribution information through a trained threshold prediction model to obtain the monitoring data warning threshold of the target slope area.
[0068] It can be seen that in the embodiments of the present application, on the one hand, by collecting the geomorphic distribution information and the target depth map of the target slope area for predicting the monitoring data warning threshold, it is possible to avoid directly setting the monitoring data warning threshold based on human experience, thereby avoiding the problem of unreasonable setting of the monitoring data warning threshold; on the other hand, since the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data, it can better reflect the changes in the slope and / or the changes that may be affected. Therefore, the target monitoring data of the target slope area is combined with the monitoring data warning threshold to determine whether the target slope area meets the preset warning conditions. It can improve the accuracy of slope safety judgment and can more accurately identify whether the slope meets the warning conditions; thirdly, since the landform distribution information predicts the monitoring data warning threshold, the monitoring data warning threshold can be dynamically adjusted according to the actual slope changes to avoid using the same warning threshold in all situations, thereby reducing the situation of missed warnings or false warnings for slope safety; fourthly, since the target depth can better reflect the changes in the slope and the particularity of the terrain, the reliability of the monitoring data warning threshold can be improved by combining the depth map to predict the monitoring data warning threshold; therefore, the present application can improve the accuracy of slope safety judgment, reduce the situation of missed warnings or false warnings for slope safety, and reduce the occurrence of slope disasters.
[0069] In one embodiment, the above method can be applied in a slope warning system. Figure 3 This is a schematic diagram of the architecture of the slope warning system.
[0070] like Figure 3 As shown, the slope early warning system mainly includes landform acquisition equipment, image acquisition equipment, monitoring equipment, computer equipment, etc.
[0071] Geomorphology acquisition equipment is used to collect geomorphology distribution information of the target slope area and send it to the computer equipment. Geomorphology acquisition equipment includes but is not limited to: optical sensors, radar remote sensors, laser radars, ground measuring instruments, optical remote sensors, hyperspectral remote sensors, radar remote sensors, infrared remote sensors, etc.
[0072] The image acquisition device is used to acquire the target depth map of the target slope area and send it to the computer device.
[0073] Monitoring equipment is used to collect target monitoring data of the target slope area and send it to the computer device. The equipment includes but is not limited to: anchor cable meter, stress meter, displacement monitor, inclinometer, water level meter, ultrasonic depth sounder, resistivity meter rain gauge, rainfall observer, etc. Stress monitoring data can be obtained through anchor cable meter, stress meter, etc., displacement monitoring data can be obtained through displacement monitor, etc., inclination monitoring data can be obtained through inclinometer, etc., groundwater level monitoring data can be obtained through water level meter, ultrasonic depth sounder, resistivity meter, etc., rainfall monitoring data can be detected through rain gauge, rainfall observer, etc.
[0074] A computer device is used to make predictions based on the target depth map and the landform distribution information to obtain a monitoring data warning threshold for the target slope area, wherein the monitoring data warning threshold includes at least one of a warning threshold for stress monitoring data, a warning threshold for displacement monitoring data, a warning threshold for inclination monitoring data, a warning threshold for groundwater level monitoring data, and a warning threshold for rainfall monitoring data; obtain target monitoring data for the target slope area, wherein the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; determine whether the target slope area meets a preset warning condition based on the target monitoring data and the monitoring data warning threshold, and provide a safety warning for the target slope area when the target slope area meets the preset warning condition.
[0075] Exemplarily, the computer device may specifically integrate landform acquisition function, image acquisition function, monitoring function, prediction function, and early warning function.
[0076] In some embodiments, the computer device can call the topography acquisition device in the slope warning system through the topography acquisition function to collect the topography distribution information of the target slope area, call the image acquisition device through the image acquisition function to collect the target depth map of the target slope area, call the monitoring device through the monitoring function to collect the target monitoring data of the target slope area, use the prediction function to predict based on the target depth map and the topography distribution information to obtain the monitoring data warning threshold, determine whether the target slope area meets the preset warning conditions based on the target monitoring data and the monitoring data warning threshold through the warning function, and when the target slope area meets the preset warning conditions, use the warning function to issue a safety warning to the target slope area, thereby issuing a safety warning to the target slope area.
[0077] In some embodiments, the computer device may also integrate the landform acquisition device in the slope warning to realize the landform acquisition function, integrate the image acquisition device to realize the image acquisition function, and ensure the smooth interaction between the functional modules. Thus, the computer device can realize the safety warning of the target slope area.
[0078] In this way, the computer equipment in the slope warning system can execute the technical solutions of the above-mentioned embodiments (refer to the various embodiments of the slope warning method of the present application, which will not be repeated here), realize safety warnings for the target slope area, improve the accuracy of slope safety judgment, and reduce the situation of missed or false slope safety warnings.
[0079] It can be understood that the slope warning system also has good scalability and can increase or reduce functional structures according to actual needs.
[0080] Please refer to 4. Figure 4 A schematic block diagram of a slope warning device provided in an embodiment of the present application.
[0081] like Figure 4 As shown, the slope warning device 400 includes: a first acquisition unit 401 , a second acquisition unit 402 , a prediction unit 403 , a monitoring unit 404 and an early warning unit 405 .
[0082] The first collecting unit 401 is used to collect geomorphic distribution information of the target slope area through a geomorphic collecting device, wherein the geomorphic distribution information includes at least one of terrain information and vegetation information of the target slope area; The second acquisition unit 402 is used to acquire a target depth map of the target slope area through an image acquisition device; The prediction unit 403 is used to predict the target depth map and the landform distribution information through the trained threshold prediction model to obtain the monitoring data warning threshold of the target slope area, wherein the monitoring data warning threshold includes at least one of the warning threshold of stress monitoring data, the warning threshold of displacement monitoring data, the warning threshold of inclination monitoring data, the warning threshold of groundwater level monitoring data, and the warning threshold of rainfall monitoring data; A monitoring unit 404 is used to obtain target monitoring data of the target slope area, wherein the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; The early warning unit 405 is used to determine whether the target slope area meets the preset early warning condition according to the target monitoring data and the monitoring data early warning threshold, and to issue a safety early warning to the target slope area when the target slope area meets the preset early warning condition.
[0083] In one embodiment, the prediction unit 403 may be specifically used for: Using a first partitioning network in a trained threshold prediction model, based on terrain information of the target slope area, the target depth map is divided into a plurality of terrain area maps according to terrain categories; Using a second partitioning network in a trained threshold prediction model, the target depth map is partitioned into a plurality of vegetation area maps based on vegetation information in the target slope area; The prediction network in the trained threshold prediction model is used to make predictions based on the terrain area map and the vegetation area map to obtain the monitoring data warning threshold of the target slope area.
[0084] In one embodiment, the prediction unit 403 may be specifically used for: Annotating the terrain elevation and terrain area of the terrain area map through the first division network to obtain terrain annotation information of the terrain area map; By using the second partitioning network, the vegetation type, vegetation area, vegetation density and vegetation health status of the vegetation area map are marked to obtain vegetation marking information of the vegetation area map; The prediction network in the trained threshold prediction model is used to predict according to the terrain area map, the vegetation area map, the terrain annotation information and the vegetation annotation information to obtain the monitoring data warning threshold of the target slope area.
[0085] In one embodiment, the early warning unit 405 may be specifically used for: When the target slope area meets the preset warning condition, the number of abnormal time points within the reference time period at the current time point is obtained, wherein the reference time period is a time period of a preset length from the reference time point forward; According to the target monitoring data at each abnormal time point within the reference time period and the monitoring data warning threshold, obtaining the monitoring data excess value at each abnormal time point; By using the trained level recognition model, the monitoring data exceeding value at each abnormal time point and the number of abnormal time points are identified to obtain the warning level at the current time point; A safety warning is issued to the target slope area according to the warning level at the current time point.
[0086] In one embodiment, the target monitoring data includes stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; the monitoring data warning threshold includes a warning threshold of stress monitoring data, a warning threshold of displacement monitoring data, a warning threshold of inclination monitoring data, a warning threshold of groundwater level monitoring data, and a warning threshold of rainfall monitoring data; the monitoring data excess value includes a stress excess value, a displacement excess value, an inclination excess value, a groundwater level excess value, and a rainfall excess value; the warning unit 405 can be specifically used to: Based on the stress monitoring data at each abnormal time point and the early warning threshold of the stress monitoring data, obtaining the stress excess value at each abnormal time point; Based on the displacement monitoring data of each abnormal time point and the early warning threshold of the displacement monitoring data, obtaining the displacement excess value of each abnormal time point; Based on the inclination monitoring data of each abnormal time point and the early warning threshold of the inclination monitoring data, obtaining the inclination exceeding value of each abnormal time point; Based on the groundwater level monitoring data at each abnormal time point and the early warning threshold of the groundwater level monitoring data, obtaining the groundwater level excess value at each abnormal time point; Based on the rainfall monitoring data at each abnormal time point and the early warning threshold of the rainfall monitoring data, obtaining the rainfall excess value at each abnormal time point; Through the trained level recognition model, identification is performed according to the stress excess value at each abnormal time point, the displacement excess value at each abnormal time point, the groundwater level excess value at each abnormal time point, the rainfall excess value at each abnormal time point, and the number of abnormal time points, to obtain the warning level of the current time point.
[0087] In one embodiment, the early warning unit 405 may be specifically used for: Dividing the depth image of the target slope area into a plurality of sub-image areas based on the landform distribution information, and annotating the sub-image areas to obtain annotation information of the sub-image areas; By using the trained safety recognition model, a prediction is made based on the target depth map and the landform distribution information to obtain a safety index of the target slope; When the safety index is less than a preset safety index threshold, a trained threshold prediction model is used to predict the target depth map and the landform distribution information to obtain a monitoring data warning threshold for the target slope area.
[0088] In one embodiment, the second acquisition unit 402 may be specifically used for: Acquire a depth image of each sub-slope area by an image acquisition device; The depth images of the sub-slope areas are spliced to obtain a target depth map of the target slope area.
[0089] The apparatus provided in the above embodiment may be implemented in the form of a computer program. The computer program may be Figure 5 Runs on the computer device shown.
[0090] See also Figure 5 , Figure 5 A schematic block diagram of the structure of a computer device provided in an embodiment of the present application.
[0091] like Figure 5 As shown, the computer device 500 includes a processor 502, a memory 503 and a communication interface 504 connected via a system bus 501, wherein the memory may include a non-volatile storage medium and an internal memory.
[0092] The non-volatile storage medium can store an operating system and a computer program. The computer program includes program instructions, and when the program instructions are executed, the processor can execute any slope warning method.
[0093] The processor is used to provide computing and control capabilities and support the operation of the entire computer equipment.
[0094] The internal memory provides an environment for the operation of the computer program in the non-volatile storage medium. When the computer program is executed by the processor, the processor can execute any slope warning method.
[0095] The communication interface is used for network communication, such as sending assigned tasks, etc. Those skilled in the art will understand that Figure 5The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0096] It should be understood that the processor may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. Among them, the general-purpose processor may be a processor or the processor may also be any conventional processor, etc.
[0097] The processor is used to run a computer program stored in the memory, and implements any one of the slope warning methods provided in the embodiments of the present application when executing the computer program. For example, the processor is used to run a computer program stored in the memory, and can implement the following steps when executing the computer program: Collecting geomorphic distribution information of the target slope area by using a geomorphic collection device, wherein the geomorphic distribution information includes at least one of terrain information and vegetation information of the target slope area; Acquire a target depth map of the target slope area by an image acquisition device; By using a trained threshold prediction model, a prediction is performed based on the target depth map and the landform distribution information to obtain a monitoring data warning threshold of the target slope area, wherein the monitoring data warning threshold includes at least one of a warning threshold of stress monitoring data, a warning threshold of displacement monitoring data, a warning threshold of inclination monitoring data, a warning threshold of groundwater level monitoring data, and a warning threshold of rainfall monitoring data; Acquire target monitoring data of the target slope area, wherein the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; Determine whether the target slope area meets the preset warning condition according to the target monitoring data and the monitoring data warning threshold, and issue a safety warning to the target slope area when the target slope area meets the preset warning condition.
[0098] An embodiment of the present application further provides a computer-readable storage medium, on which a computer program is stored. The computer program includes program instructions. The method implemented when the program instructions are executed can refer to the various embodiments of the slope warning method of the present application.
[0099] The computer-readable storage medium may be an internal storage unit of the computer device described in the above embodiment, such as a hard disk or memory of the computer device. The computer-readable storage medium may also be an external storage device of the computer device, such as a plug-in hard disk, a smart memory card (SmartMedia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the computer device.
[0100] Furthermore, the computer-readable storage medium may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function, etc.; the data storage area may store data created according to the use of the blockchain node, etc.
[0101] The blockchain referred to in this application is a new application model of computer technologies such as distributed data storage, peer-to-peer transmission, consensus mechanism, encryption algorithm, etc. Blockchain is essentially a decentralized database, a string of data blocks generated by cryptographic methods. Each data block contains a batch of network transaction information, which is used to verify the validity of its information (anti-counterfeiting) and generate the next block. Blockchain can include the underlying blockchain platform, platform product service layer, and application service layer.
[0102] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a" does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0103] The serial numbers of the embodiments of the present application are for description only and do not represent the advantages and disadvantages of the embodiments. The above description is only a specific implementation mode of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present application, and these modifications or replacements should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. A slope early warning method, characterized in that: The method comprises: Collecting geomorphic distribution information of the target slope area by using a geomorphic collection device, wherein the geomorphic distribution information includes at least one of terrain information and vegetation information of the target slope area; Acquire a target depth map of the target slope area by an image acquisition device; By using a trained threshold prediction model, a prediction is performed based on the target depth map and the landform distribution information to obtain a monitoring data warning threshold of the target slope area, wherein the monitoring data warning threshold includes at least one of a warning threshold of stress monitoring data, a warning threshold of displacement monitoring data, a warning threshold of inclination monitoring data, a warning threshold of groundwater level monitoring data, and a warning threshold of rainfall monitoring data; Acquire target monitoring data of the target slope area, wherein the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; Determine whether the target slope area meets the preset warning condition according to the target monitoring data and the monitoring data warning threshold, and issue a safety warning to the target slope area when the target slope area meets the preset warning condition.
2. The slope early warning method according to claim 1, characterized in that: The trained threshold recognition model is used to identify the target depth map and the landform distribution information, and determine the monitoring data warning threshold of the target slope area, including: Using a first partitioning network in a trained threshold prediction model, based on terrain information of the target slope area, the target depth map is divided into a plurality of terrain area maps according to terrain categories; Using a second partitioning network in a trained threshold prediction model, the target depth map is partitioned into a plurality of vegetation area maps based on vegetation information in the target slope area; The prediction network in the trained threshold prediction model is used to make predictions based on the terrain area map and the vegetation area map to obtain the monitoring data warning threshold of the target slope area.
3. The slope early warning method according to claim 2, characterized in that: The prediction network in the trained threshold prediction model is used to predict according to the terrain area map and the vegetation area map to obtain the monitoring data warning threshold of the target slope area, including: Annotating the terrain elevation and terrain area of the terrain area map through the first division network to obtain terrain annotation information of the terrain area map; By using the second partitioning network, the vegetation type, vegetation area, vegetation density and vegetation health status of the vegetation area map are marked to obtain vegetation marking information of the vegetation area map; The prediction network in the trained threshold prediction model is used to predict according to the terrain area map, the vegetation area map, the terrain annotation information and the vegetation annotation information to obtain the monitoring data warning threshold of the target slope area.
4. The slope early warning method according to claim 1, characterized in that: When the target slope area meets the preset warning condition, providing a safety warning to the target slope area includes: When the target slope area meets the preset warning condition, the number of abnormal time points within the reference time period at the current time point is obtained, wherein the reference time period is a time period of a preset length from the reference time point forward; According to the target monitoring data at each abnormal time point within the reference time period and the monitoring data warning threshold, obtaining the monitoring data excess value at each abnormal time point; By using the trained level recognition model, the monitoring data exceeding value at each abnormal time point and the number of abnormal time points are identified to obtain the warning level at the current time point; A safety warning is issued to the target slope area according to the warning level at the current time point.
5. The slope early warning method according to claim 4, characterized in that: The target monitoring data includes stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; the monitoring data early warning threshold includes the early warning threshold of stress monitoring data, the early warning threshold of displacement monitoring data, the early warning threshold of inclination monitoring data, the early warning threshold of groundwater level monitoring data, and the early warning threshold of rainfall monitoring data; the monitoring data excess value includes the stress excess value, the displacement excess value, the inclination excess value, the groundwater level excess value, and the rainfall excess value; The obtaining, according to the target monitoring data of each abnormal time point within the reference time period and the monitoring data warning threshold, the monitoring data exceeding value of each abnormal time point includes: Based on the stress monitoring data at each abnormal time point and the early warning threshold of the stress monitoring data, obtaining the stress excess value at each abnormal time point; Based on the displacement monitoring data of each abnormal time point and the early warning threshold of the displacement monitoring data, obtaining the displacement excess value of each abnormal time point; Based on the inclination monitoring data of each abnormal time point and the early warning threshold of the inclination monitoring data, obtaining the inclination exceeding value of each abnormal time point; Based on the groundwater level monitoring data at each abnormal time point and the early warning threshold of the groundwater level monitoring data, obtaining the groundwater level excess value at each abnormal time point; Based on the rainfall monitoring data at each abnormal time point and the early warning threshold of the rainfall monitoring data, obtaining the rainfall excess value at each abnormal time point; The trained level recognition model is used to identify the monitoring data exceeding the abnormal time point and the number of abnormal time points to obtain the warning level of the current time point, including: Through the trained level recognition model, identification is performed according to the stress excess value at each abnormal time point, the displacement excess value at each abnormal time point, the groundwater level excess value at each abnormal time point, the rainfall excess value at each abnormal time point, and the number of abnormal time points, to obtain the warning level of the current time point.
6. The slope early warning method according to claim 1, characterized in that: The trained threshold prediction model is used to predict based on the target depth map and the landform distribution information to obtain the monitoring data warning threshold of the target slope area, including: Dividing the depth image of the target slope area into a plurality of sub-image areas based on the landform distribution information, and annotating the sub-image areas to obtain annotation information of the sub-image areas; By using the trained safety recognition model, a prediction is made based on the target depth map and the landform distribution information to obtain a safety index of the target slope; When the safety index is less than a preset safety index threshold, a trained threshold prediction model is used to predict the target depth map and the landform distribution information to obtain a monitoring data warning threshold for the target slope area.
7. The slope early warning method according to claim 1, characterized in that: The target slope area is divided into a plurality of sub-slope areas, and the target depth map of the target slope area is acquired by an image acquisition device, including: Acquire a depth image of each sub-slope area by an image acquisition device; The depth images of the sub-slope areas are spliced to obtain a target depth map of the target slope area.
8. A slope warning device, characterized in that: The slope warning device comprises: A first acquisition unit is used to acquire geomorphic distribution information of a target slope area through a geomorphic acquisition device, wherein the geomorphic distribution information includes at least one of terrain information and vegetation information of the target slope area; A second acquisition unit is used to acquire a target depth map of the target slope area through an image acquisition device; A prediction unit, configured to predict, by means of a trained threshold prediction model, based on the target depth map and the landform distribution information, to obtain a monitoring data warning threshold of the target slope area, wherein the monitoring data warning threshold includes at least one of a warning threshold of stress monitoring data, a warning threshold of displacement monitoring data, a warning threshold of inclination monitoring data, a warning threshold of groundwater level monitoring data, and a warning threshold of rainfall monitoring data; A monitoring unit, used to obtain target monitoring data of the target slope area, wherein the target monitoring data includes at least one of stress monitoring data, displacement monitoring data, inclination monitoring data, groundwater level monitoring data, and rainfall monitoring data; The early warning unit is used to determine whether the target slope area meets the preset early warning conditions according to the target monitoring data and the monitoring data early warning threshold, and to issue a safety early warning to the target slope area when the target slope area meets the preset early warning conditions.
9. A computer device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the slope warning method according to any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program, when executed by a processor, implements the steps of the slope warning method according to any one of claims 1 to 7.
Citation Information
Cited By
Early warning method, device, equipment and storage medium
CN119889009A
Early warning method, device, equipment and storage medium
CN119889009B
Tunnel monitoring method and system based on distributed optical fiber sensors
CN120063369A
Roadbed slope risk monitoring and early warning system based on artificial intelligence
CN120124826A