Production device of acetic anhydride
By designing and automatic detection system in the acetic anhydride production device in parallel, the problem of quencher blockage after cracking is solved, the efficiency and safety of acetic anhydride production are improved, and the cost of equipment investment and manpower investment are reduced.
Patent Information
- Application Number
- CN202411119037.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-29
Smart Images

Figure CN119034638A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of acetic anhydride preparation, and in particular to a production device for acetic anhydride. Background Art
[0002] At present, acetic anhydride needs to undergo a cracking process during its production, and the cracking unit uses glacial acetic acid to crack acetic acid vapor to generate ketene and water under high temperature, negative pressure, and in the presence of a highly selective triethyl phosphate catalyst. The high-temperature gas produced after cracking is collectively referred to as cracking gas (mainly including ketene and steam, as well as some other gas impurities); the cracking gas is then subjected to multiple stages of condensation and cooling for rapid separation, thereby separating the unreacted acetic acid and water. The liquid phase is dilute acetic acid, and the gas phase is ketene (due to the high boiling point of ketene, it is not easy to be condensed and liquefied). Subsequently, glacial acetic acid is added back to the absorption tower and the ketene after multiple stages of rapid cooling is absorbed by glacial acetic acid, and crude acetic anhydride is then generated. The separated liquid dilute acetic acid can be recycled again to prepare acetic anhydride after subsequent purification.
[0003] At present, each cracking furnace corresponds to its own quenching unit. In this application, a four-process quenching separation process is adopted, so that each cracking furnace needs to be connected to a quencher from four quenchers in sequence (that is, each cracking line needs to be equipped with four quenchers), so the total investment cost of the equipment is high, and the cracking process needs to be optimized. In addition, since the high-temperature cracking gas after the cracking is first entered into a quenching stage for dilute acetic acid separation, the probability of blockage of a quencher is greatly increased and the cleaning frequency is higher than that of other quenchers. The existing multiple cracking lines adopt the method of intermittent shutdown before and after to clean a quencher on each cracking line respectively. Specifically, a certain cracking line is first stopped, and then manually A section of the quench cooler is disassembled from the cracking unit line, and then a high-pressure cleaning vehicle is manually operated to perform high-pressure flushing inside the quench cooler. After the cleaning is completed, the section of the quench cooler is reinstalled and the cracking line is restarted for the second time, and then the next cracking line is shut down for cleaning. However, due to the uncertainty in the cracking quenching process, the problem of manual failure to discover the blockage of the section of the quench cooler in time may occur. If the cleaning cycle of the section of the quench cooler is shortened, it will be more difficult to detect, which will affect the subsequent acetic anhydride production process, causing a long interruption and excessive pressure, which will be dangerous, and the production efficiency of acetic anhydride will be greatly reduced. In summary, the two technical problems in the above-mentioned acetic anhydride production and preparation process need to be solved urgently. Summary of the invention
[0004] The purpose of the present invention is to solve the problems raised in the above background technology, and then proposes a production device for acetic anhydride.
[0005] The technical solution adopted by the present invention to solve the technical problem is:
[0006] An acetic anhydride production device includes four cracking lines, each of which includes an evaporator, a cracking furnace and a quench cooler. The evaporator is connected to the cracking furnace, and the cracking furnace is connected to the quench cooler.
[0007] A first stage quench cooler in the first cracking line and the second cracking line is connected in parallel with a two-stage quench cooler, a first stage quench cooler in the third cracking line and the fourth cracking line is connected in parallel with a two-stage quench cooler, two two-stage quench coolers are connected in parallel with a three-stage quench cooler, the three-stage quench cooler is connected to a four-stage quench cooler, and the four-stage quench cooler is connected to an absorption tower;
[0008] A first-stage quench cooler is arranged obliquely and includes an air inlet pipe, an air outlet pipe and a liquid discharge pipe. Pressure gauges are arranged on the air inlet pipe and the air outlet pipe, and the air inlet pipe is connected to a flushing pipe arranged obliquely. The flushing pipe is connected to a high-pressure device. The pressure gauge, high-pressure device, evaporator and cracking furnace on each cracking line are electrically connected to the controller for automatic blockage detection and cleaning of the first-stage quench cooler. During the cleaning process, the evaporator and the cracking furnace are in a shutdown state. The liquid discharge pipe is connected to a diversion component to realize independent storage of liquid dilute acetic acid and flushing waste liquid.
[0009] This device can significantly reduce the number of quench coolers in the production process of crude acetic anhydride, thereby reducing the total investment cost. The first-stage quench cooler and the second-stage quench cooler are connected in parallel in pairs, and the preparation process is optimized. In addition, by intelligently calculating the difference in gas phase pressure values before and after condensation of the first-stage quench cooler, the blockage degree of the first-stage quench cooler can be automatically known, and cleaning can be automatically completed when the blockage upper limit is reached.
[0010] Furthermore, the second-stage quench cooler includes a liquid outlet pipe, which is connected to an inclined tube and the other end of which is blocked. The inclined tube is connected to a U-shaped tube and the end of the U-shaped tube is connected to a liquid return pipe which is inclined downward, and the liquid return pipe is connected to the second dilute acetic acid storage tank.
[0011] The above scheme can reduce the probability of ketene gas being brought into the dilute acetic acid liquid pipe through the U-shaped tube.
[0012] Furthermore, a jacket is provided on the U-shaped tube, the jacket includes a water cooling chamber, and the water cooling chamber is connected to a water supply device.
[0013] The above scheme can further reduce the downward liquid resistance of the dilute acetic acid through the jacket, and effectively reduce the occurrence of hydrolysis reaction, while cooling the liquid phase dilute acetic acid.
[0014] Furthermore, the diversion component includes a distributor, a circulation pipe, a first dilute acetic acid storage tank and a waste residue tank. The discharge pipe is connected to the distributor. Two output pipelines of the distributor are respectively connected to the circulation pipes, one circulation pipe is connected to the first dilute acetic acid storage tank, and the other circulation pipe is connected to the waste residue tank.
[0015] In the above scheme, the waste liquid is independently recovered during the cleaning process and is not mixed with the liquid phase dilute acetic acid discharged under the working state, so it is effectively separated automatically.
[0016] Furthermore, a plurality of flushing pipes are arranged on the circumference of the air inlet pipe and a flow valve is arranged on each flushing pipe, and the high-pressure equipment adopts a high-pressure pump.
[0017] The above scheme can expand the flushing area of the colloidal waste residue inside the quench cooler, thereby achieving a better cleaning effect, and the flow rate of cleaning water in each flushing pipe can be independently controlled.
[0018] Furthermore, each of the first-stage quench coolers is provided with an alarm, and the alarm is electrically connected to the controller.
[0019] In the above scheme, when cleaning a section of the quench cooler for a period of time still fails to make the difference in the gas phase pressure values before and after the section of the quench cooler return to the normal value range, the controller then controls the alarm to sound an alarm to remind the staff in the main control room to come and deal with it immediately, and at this time the evaporator, cracking furnace and high-pressure equipment are all kept in a shutdown state.
[0020] Furthermore, a shower valve and a first sight glass are provided on the air outlet pipe of each of the first-stage quench coolers, and a second sight glass located above the distributor is provided on the liquid discharge pipe of each of the first-stage quench coolers.
[0021] The above scheme can facilitate observation of whether there is liquid in the gas phase pipeline of a quench cooler through the shower valve and the first sight glass, and if so, drain the liquid in time, and facilitate on-site observation of the liquid discharge of dilute acetic acid through the second sight glass.
[0022] Furthermore, the air inlet pipe of each of the two-stage quench coolers is rotated 90 degrees and the air outlet pipe of the two-stage quench cooler is a straight pipe.
[0023] The above scheme can reduce the resistance to the flow of ethylene ketone gas and effectively reduce the occurrence of partial hydrolysis.
[0024] Furthermore, a filter screen is movably arranged in the waste residue tank, and a side-opening sealing door is rotatably connected to the waste residue tank. Level sensors are arranged in the waste residue tank and the first dilute acetic acid storage tank, and a suction pump electrically connected to the level sensor is arranged on one side of the waste residue tank and the first dilute acetic acid storage tank.
[0025] The above scheme can separate the waste residue in the waste liquid through the filter screen, and the side sealing door can be opened regularly to replace the filter screen. When the material level in the waste residue tank or the first dilute acetic acid storage tank reaches the upper limit, it can be transferred to a fixed area through a suction pump for subsequent treatment or recycling.
[0026] Furthermore, the three-stage quench cooler and the four-stage quench cooler are connected to the third dilute acetic acid storage tank, and coolers are provided in the first dilute acetic acid storage tank, the second dilute acetic acid storage tank, and the third dilute acetic acid storage tank.
[0027] Compared with the prior art, the present invention has the following beneficial effects:
[0028] 1. This device can significantly reduce the number of quenchers in the production process of crude acetic anhydride, thereby reducing the total investment cost. The first-stage quencher and the second-stage quencher are connected in parallel in pairs, the preparation process is optimized, and the actual use effect is basically the same as the previous 16 quenchers, without any adverse effects. In addition, by intelligently calculating the difference in the gas phase pressure values before and after the condensation of the first-stage quencher, the blockage degree of the first-stage quencher can be automatically known, and the cleaning is automatically completed when the blockage upper limit is reached. As the cleaning proceeds, when the difference in the gas phase pressure values before and after the first-stage quencher gradually returns to the normal value range, the work can be resumed and a new round of crude acetic anhydride preparation process can be started, and the subsequent crude acetic anhydride preparation interruption caused by untimely cleaning of the first-stage quencher will not occur. The safety and intelligence are improved, and the manpower investment cost is reduced; and during the cleaning process, the waste liquid is independently recovered and is not mixed with the liquid dilute acetic acid discharged under the working state, and is effectively separated automatically.
[0029] 2. In this device, when the difference in the gas phase pressure before and after a section of the quench cooler cannot be restored to the normal value range after cleaning for a period of time, the controller will then control the alarm to sound an alarm to remind the staff in the main control room to come and deal with it immediately. At this time, the evaporator, cracking furnace and high-pressure equipment are all kept in a shutdown state, and the preparation process of crude acetic anhydride is more intelligent.
[0030] 3. The device can reduce the probability of ketene gas being brought into the dilute acetic acid downpipe through the U-shaped tube; the downpipe resistance of the dilute acetic acid can be further reduced through the jacket, and the occurrence of hydrolysis reaction can be effectively reduced, while the liquid phase dilute acetic acid can be cooled. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0032] Figure 2 This is a schematic diagram of a quench cooler;
[0033] Figure 3 It is a schematic diagram of a two-stage quench cooler;
[0034] Figure 4 This is a schematic diagram of the jacket installation;
[0035] Reference numerals:
[0036] 1. Evaporator; 2. Cracking furnace; 3. One-stage quench cooler; 31. Air inlet pipe; 32. Air outlet pipe; 33. Liquid discharge pipe; 34. Alarm; 4. Two-stage quench cooler; 41. Liquid outlet pipe; 42. Inclined pipe; 43. U-shaped pipe; 431. Liquid return pipe; 44. Jacket; 45. Water supply equipment; 5. Three-stage quench cooler; 6. Four-stage quench cooler; 7. Pressure gauge; 8. Flushing pipe; 81. Flow valve; 9. High-pressure pump; 10. Distributor; 11. Circulation pipe; 12. First dilute acetic acid storage tank; 13. Waste residue tank. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. The present invention is further described in combination with the drawings and embodiments:
[0038] like Figures 1 to 4 As shown, an acetic anhydride production device includes four cracking lines, each cracking line includes an evaporator 1, a cracking furnace 2 and a first-stage quench cooler 3, the evaporator 1 is connected to the cracking furnace 2, the cracking furnace 2 is connected to the first-stage quench cooler 3, the first-stage quench cooler 3 in the first cracking line and the second cracking line is connected in parallel with a second-stage quench cooler 4, the first-stage quench cooler 3 in the third cracking line and the fourth cracking line is connected in parallel with a second-stage quench cooler 4, the two second-stage quench coolers 4 are connected in parallel with a three-stage quench cooler 5, the three-stage quench cooler 5 is connected to a four-stage quench cooler 6, the four-stage quench cooler 6 is connected to an absorption tower; the first-stage quench cooler 3 is arranged obliquely and includes an air inlet pipe 31, an air outlet pipe 32 and a liquid discharge pipe 33. The air inlet pipe 31 and the air outlet pipe 32 are both provided with a pressure gauge 7 and the air inlet pipe 31 is connected to a flushing pipe 8 arranged obliquely. The flushing pipe 8 is connected to a high-pressure device. The pressure gauge 7, the high-pressure device, the evaporator 1 and the cracking furnace 2 on each cracking line are all electrically connected to the controller for automatic blockage detection and cleaning of a first-stage quench cooler 3. During the cleaning process, the evaporator 1 and the cracking furnace 2 are both in a shutdown state. The liquid discharge pipe 33 is connected to the diversion component to realize the independent storage of liquid dilute acetic acid and flushing waste liquid.
[0039] Further refinement of the embodiment of the present invention, such as Figure 1 As shown, the diversion component includes a distributor 10, a circulation pipe 11, a first dilute acetic acid storage tank 12 and a waste residue tank 13. The discharge pipe 33 is connected to the distributor 10. The two output pipelines of the distributor 10 are respectively connected to the circulation pipe 11. One circulation pipe 11 is connected to the first dilute acetic acid storage tank 12, and the other circulation pipe 11 is connected to the waste residue tank 13.
[0040] Further refinement of the embodiment of the present invention, such as Figure 2As shown, a plurality of flushing pipes 8 are arranged on the circumference of the air inlet pipe 31 and a flow valve 81 is arranged on each flushing pipe 8 . The high-pressure device adopts a high-pressure pump 9 .
[0041] In a further refinement of the embodiment of the present invention, a drain valve and a first sight glass are provided on the air outlet pipe 32 of each stage quench cooler 3, and a second sight glass located above the distributor 10 is provided on the liquid discharge pipe 33 of each stage quench cooler 3, and the drain valve, the first sight glass and the second sight glass are not shown in the figure; the drain valve and the first sight glass can be used to conveniently observe whether there is liquid in the gas phase pipeline of the stage quench cooler 3, and discharge the liquid in time, and the second sight glass can be used to conveniently observe the liquid discharge of the dilute acetic acid on site.
[0042] In a further optimization of the above embodiment, the air inlet pipe of each second-stage quench cooler 4 is rotated 90 degrees and the air outlet pipe of the second-stage quench cooler 4 is a straight pipe; the above scheme can reduce the flow resistance of ethylene ketone gas and effectively reduce the occurrence of partial hydrolysis.
[0043] In a further refinement of the embodiment of the present invention, the three-stage quench cooler 5 and the four-stage quench cooler 6 are connected to the third dilute acetic acid storage tank, each one-stage quench cooler 3 is connected to a first dilute acetic acid storage tank 12, each two-stage quench cooler 4 is connected to a second dilute acetic acid storage tank, the three-stage quench cooler 5 and the four-stage quench cooler 6 are commonly connected to the third dilute acetic acid storage tank, and coolers are provided in the first dilute acetic acid storage tank 12, the second dilute acetic acid storage tank and the third dilute acetic acid storage tank, which are not shown in the figure.
[0044] The workflow of the present invention is:
[0045] The present application adopts four cracking lines to work simultaneously for the production and preparation of crude acetic anhydride. At the same time, through the parallel design of the first and second stage quenchers 4, the outlets of the four cracking furnaces 2 can enter 4 first stage quenchers 3, 2 second stage quenchers 4, 1 third stage quencher 5 and 1 fourth stage quencher 6 respectively, thereby significantly reducing the number of equipment of the second stage quencher 4, the third stage quencher 5 and the fourth stage quencher 6, and at the same time achieving the same cracking preparation effect, thus greatly reducing the investment cost of the equipment and simplifying the process. In addition, pressure gauges 7 are provided in the gas phase pipelines of the first stage quencher 3, the second stage quencher 4, the third stage quencher 5 and the fourth stage quencher 6 to intelligently detect the blockage degree of the corresponding stage quencher, among which the first stage quencher 3 has the highest probability of being blocked and is more frequent. The corresponding use effect achieved by the design of the present application is as follows:
[0046] When a section of the quench cooler 3 is clogged, it will affect the difference in gas phase pressure values before and after condensation. The pressure gauge 7 will feed back the real-time value to the controller and calculate the difference through the controller. If the difference in gas phase pressure values reaches the upper limit set in advance in the controller, the controller will immediately control the evaporator 1 and the cracking furnace 2 on the cracking line to stop working immediately, and then control the high-pressure equipment to operate the suction water source and inject it into the section of the quench cooler 3 at high pressure for cleaning. The circumferential arrangement of the flushing pipe 8 can expand the flushing area of the colloidal waste residue inside the quench cooler, thereby improving the cleaning effect, and the flow rate of the cleaning water in each flushing pipe 8 can be independently controlled. As the cleaning progresses, The right passage of the distributor 10 is opened, and the waste residue is mixed with water and injected into the waste residue tank 13 for collection. When there is no need to clean the quencher 3 (i.e., the cracking line is working normally), the left passage of the distributor 10 is opened, and the liquid dilute acetic acid flows into the first dilute acetic acid storage tank 12 for collection. In this way, the two are stored independently without affecting each other. After cleaning for a period of time, the difference in the gas phase pressure value measured by the controller will gradually return to the normal value range. When it returns to the normal value range, it means that the blockage has been effectively unblocked. At this time, the cleaning is stopped, and the controller controls the evaporator 1 and the cracking furnace 2 to resume work and start a new round of crude acetic anhydride production and preparation process.
[0047] Compared with the prior art, the present device can significantly reduce the number of quenchers in the production process of crude acetic anhydride, thereby reducing the total investment cost. The first-stage quencher 3 and the second-stage quencher 4 are connected in parallel in pairs, the preparation process is optimized, and the actual use effect is basically the same as the previous 16 quenchers, without any adverse effects. In addition, by intelligently calculating the difference in the gas phase pressure values before and after the condensation of the first-stage quencher 3, the blockage degree of the first-stage quencher 3 can be automatically known, and the cleaning is automatically completed when the blockage upper limit is reached. As the cleaning proceeds, when the difference in the gas phase pressure values before and after the first-stage quencher 3 gradually returns to the normal value range, the work can be resumed and a new round of crude acetic anhydride preparation process can be started, and the subsequent crude acetic anhydride preparation interruption caused by the untimely cleaning of the first-stage quencher 3 will not occur. The safety and intelligence are improved, and the manpower investment cost is reduced; and during the cleaning process, the waste liquid is independently recovered and is not mixed with the liquid dilute acetic acid discharged under the working state, and is effectively separated automatically.
[0048] In some embodiments, Figure 2 As shown, the second-stage quench cooler 4 includes a liquid outlet pipe 41, the liquid outlet pipe 41 is connected to an inclined tube 42 which is arranged obliquely, and the other end of the inclined tube 42 is blocked, the inclined tube 42 is connected to a U-shaped tube 43, and the end of the U-shaped tube 43 is connected to a liquid return pipe 431 which is arranged obliquely downward, and the liquid return pipe 431 is connected to the second dilute acetic acid storage tank; this embodiment can reduce the probability of ketene gas being brought into the dilute acetic acid lower liquid pipe through the U-shaped tube 43.
[0049] In a further refinement of the above embodiment, a jacket 44 is provided on the U-shaped tube 43, and the jacket 44 includes a water cooling chamber, and the water cooling chamber is connected to a water supply device 45; this embodiment can further reduce the downward liquid resistance of the dilute acetic acid and effectively reduce the occurrence of the hydrolysis reaction, while cooling the liquid phase dilute acetic acid.
[0050] In other embodiments, Figure 2 As shown, each stage quencher 3 is provided with an alarm 34, and the alarm 34 is electrically connected to the controller. In this embodiment, when the difference in the gas phase pressure before and after the stage quencher 3 cannot be restored to the normal value range after cleaning the stage quencher 3 for a period of time, the controller then controls the alarm 34 to sound an alarm to remind the staff in the main control room to come and deal with it immediately, and at this time, the evaporator 1, the cracking furnace 2 and the high-pressure equipment are all kept in a shutdown state.
[0051] In other embodiments, a filter screen is movably provided in the waste residue tank 13, and a side-opening sealing door is rotatably connected to the waste residue tank 13, a material level sensor is provided in the waste residue tank 13 and the first dilute acetic acid storage tank 12, and a suction pump electrically connected to the material level sensor is provided on one side of the waste residue tank 13 and the first dilute acetic acid storage tank 12, which is not shown in the figure; this embodiment can separate the waste residue in the waste liquid through the filter screen, and the side-opening sealing door can be opened regularly to replace the filter screen. When the material level in the waste residue tank 13 or the first dilute acetic acid storage tank 12 reaches the upper limit, it can be transferred to a fixed area through the suction pump for subsequent treatment or recycling.
[0052] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. An acetic anhydride production device, comprising four cracking lines, each cracking line comprising an evaporator (1), a cracking furnace (2) and a first-stage quencher (3), the evaporator (1) being connected to the cracking furnace (2), the cracking furnace (2) being connected to the first-stage quencher (3), characterized in that: A first-stage quench cooler (3) in the first cracking line and the second cracking line is connected in parallel with a second-stage quench cooler (4), a first-stage quench cooler (3) in the third cracking line and the fourth cracking line is connected in parallel with a second-stage quench cooler (4), two second-stage quench coolers (4) are connected in parallel with a third-stage quench cooler (5), the third-stage quench cooler (5) is connected to a fourth-stage quench cooler (6), and the fourth-stage quench cooler (6) is connected to an absorption tower; A first-stage quench cooler (3) is arranged obliquely and comprises an air inlet pipe (31), an air outlet pipe (32) and a liquid discharge pipe (33). The air inlet pipe (31) and the air outlet pipe (32) are both provided with a pressure gauge (7). The air inlet pipe (31) is connected to a flushing pipe (8) arranged obliquely. The flushing pipe (8) is connected to a high-pressure device. The pressure gauge (7), the high-pressure device, the evaporator (1) and the cracking furnace (2) on each cracking line are all electrically connected to a controller for automatic blockage detection and cleaning of the first-stage quench cooler (3). During the cleaning process, the evaporator (1) and the cracking furnace (2) are both in a shutdown state. The liquid discharge pipe (33) is connected to a diversion component to realize independent storage of liquid-phase dilute acetic acid and flushing waste liquid.
2. The production device of acetic anhydride according to claim 1, characterized in that: The second-stage quench cooler (4) comprises a liquid outlet pipe (41), the liquid outlet pipe (41) is connected to an inclined pipe (42) arranged obliquely, and the other end of the inclined pipe (42) is blocked, the inclined pipe (42) is connected to a U-shaped pipe (43), and the end of the U-shaped pipe (43) is connected to a liquid return pipe (431) arranged obliquely downward, and the liquid return pipe (431) is connected to a second dilute acetic acid storage tank.
3. The production device of acetic anhydride according to claim 2, characterized in that: The U-shaped tube (43) is provided with a jacket (44), the jacket (44) includes a water cooling chamber, and the water cooling chamber is connected to a water supply device (45).
4. The production device of acetic anhydride according to claim 2, characterized in that: The flow distribution component comprises a distributor (10), a circulation pipe (11), a first dilute acetic acid storage tank (12) and a waste residue tank (13); the discharge pipe (33) is connected to the distributor (10); two output pipelines of the distributor (10) are respectively connected to the circulation pipe (11); one circulation pipe (11) is connected to the first dilute acetic acid storage tank (12), and the other circulation pipe (11) is connected to the waste residue tank (13).
5. The production device of acetic anhydride according to claim 1, characterized in that: A plurality of flushing pipes (8) are arranged on the circumference of the air inlet pipe (31), and each flushing pipe (8) is provided with a flow valve (81), and the high-pressure equipment adopts a high-pressure pump (9).
6. The production device of acetic anhydride according to claim 1, characterized in that: Each of the first-stage quench coolers (3) is provided with an alarm (34), and the alarm (34) is electrically connected to the controller.
7. The production device of acetic anhydride according to claim 4, characterized in that: A shower valve and a first sight glass are provided on the air outlet pipe (32) of each of the first-stage quench coolers (3), and a second sight glass located above the distributor (10) is provided on the liquid discharge pipe (33) of each of the first-stage quench coolers (3).
8. The production device of acetic anhydride according to claim 1, characterized in that: The air inlet pipe of each of the two-stage quench coolers (4) is rotated 90 degrees and the air outlet pipe of the two-stage quench cooler (4) is a straight pipe.
9. The production device of acetic anhydride according to claim 4, characterized in that: A filter screen is movably arranged in the waste residue tank (13), and a side-opening sealing door is rotatably connected to the waste residue tank (13). Level sensors are arranged in the waste residue tank (13) and the first dilute acetic acid storage tank (12), and a suction pump electrically connected to the level sensor is arranged on one side of the waste residue tank (13) and the first dilute acetic acid storage tank (12).
10. The production device of acetic anhydride according to claim 4, characterized in that: The three-stage quench cooler (5) and the four-stage quench cooler (6) are connected to the third dilute acetic acid storage tank, and coolers are provided in the first dilute acetic acid storage tank (12), the second dilute acetic acid storage tank, and the third dilute acetic acid storage tank.