Portal crane mounting and dismounting system and mounting and dismounting method thereof
By designing the door machine installation and disassembly system, using the meshing transmission and hydraulic hoisting system of gears and racks, the problems of low installation and disassembly efficiency and high risk of gantry cranes are solved, and rapid, efficient, economical and safe installation is achieved With disassembly, the construction efficiency and equipment stability are improved.
Patent Information
- Application Number
- CN202411249637.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-29
AI Technical Summary
The installation and disassembly of existing gantry cranes is inefficient, dangerous and poor economical. Large lifting equipment is required to lift the main beam to a high altitude, resulting in low construction efficiency and safety hazards.
A door machine installation and disassembly system was designed, including lifting main beam, walking wheel seat, legs and hoisting system. Through the meshing transmission between gears and racks and hydraulic hoisting system, the fast and efficient installation of lifting main beam is achieved. and disassembly avoid dependence on large lifting equipment.
It realizes the rapid, efficient, economical and safe installation and disassembly of the door machine, improves construction efficiency, reduces safety risks, and the design of cross beams improves the stability of the equipment, cancels temporary support beams, and achieves multi-purpose rapidity. Install.
Smart Images

Figure CN119038412A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of gantry cranes, and in particular to a gantry crane installation and disassembly system and an installation and disassembly method thereof. Background Art
[0002] Gantry crane, also known as gantry crane for short, is a kind of lifting equipment running on the ground track. The installation and disassembly of gantry cranes are currently mostly carried out by using large lifting equipment to hoist the parts one by one. After the metal structural parts are installed, the functional equipment is installed at high altitude. This method is inefficient, very dangerous and has poor economic efficiency.
[0003] For example, CN114261901A, with a publication (announcement) date of 2022.04.01, discloses a method for installing a gantry crane, which includes the following steps: setting a connecting section at the installation position of the rigid leg under the main beam, and making the inner side height of the connecting section lower than the first set value of the outer side height, and rotating the outer side of the rigid leg to the outer side of the connecting section; lifting the main beam, and adjusting the rigid leg to be roughly vertical to the main beam, and then temporarily fixing the rigid leg to the connecting section; installing the rigid leg trolley, flexible leg and flexible leg trolley; pulling the main beam, so that the rigid leg reaches the first set offset, and then welding the connecting section to the rigid leg. Its characteristics are: it can solve the problem in the prior art that it is difficult to meet the requirements for the installation of the rigid legs of large-tonnage cranes during installation, resulting in heavy installation and low construction efficiency; its disadvantages are: it is necessary to use large-scale lifting equipment to lift the main beam to a high altitude, which is very dangerous. Summary of the invention
[0004] In order to solve the current technical problems, the main purpose of the present invention is to provide a gantry crane installation and disassembly system and an installation and disassembly method thereof, which can achieve fast, efficient, economical and safe installation and disassembly effects without the aid of external large-scale lifting equipment, but only with the assistance of simple tools and structures.
[0005] The technical solution adopted by the present invention is: A gantry crane installation and disassembly system includes a gantry crane, the gantry crane includes a lifting main beam, a walking wheel seat and a support leg, the support leg is connected and supported between the lifting main beam and the walking wheel seat, the walking wheel seat is used to move on a track, bottom beams are respectively installed at the bottom of both ends of the lifting main beam, and support legs are respectively arranged on both sides of both ends of the lifting main beam, and walking wheel seats are also respectively arranged on both sides of both ends of the lifting main beam, the two ends of the support leg on each side are respectively hinged to the walking wheel seat and the bottom beam on the same side, a gear is installed on one side of the walking wheel seat, the gear is driven by the reduction motor on the walking wheel seat, racks are installed on the tracks on both sides at the positions corresponding to the walking wheel seats, and the gears are meshed with the racks for transmission; it also includes a jacking system, the two jacking systems are respectively used to be arranged under the two ends of the lifting main beam, the jacking system is used to eliminate the dead point between the bottom beam and the support legs, and assist in jacking the lifting main beam.
[0006] The two ends of the bottom beam are respectively provided with a first hinge seat, and the upper end of the support leg and a side away from the lifting main beam are provided with a second hinge seat, and the first hinge seat and the second hinge seat are hingedly connected by a pin shaft.
[0007] A first flange is fixedly connected to the lower side of the bottom beam at a position corresponding to the support leg, and a second flange is fixedly connected to the upper end of the support leg. After the support leg is installed in place, the first flange and the second flange are connected by bolts.
[0008] The lower end of the supporting leg is fixedly connected with a third hinge seat, the top of the walking wheel seat is fixedly connected with a fourth hinge seat, and the third hinge seat and the fourth hinge seat are hingedly connected through a pin shaft.
[0009] Bolt holes are arranged on the side surface of the track and the rack, and the rack is installed on the side surface of the track by bolts.
[0010] The walking wheel seat includes a frame, a roller wheel and a reduction motor. At least two roller wheels are installed in the frame. The reduction motor is installed on the frame. The central axis of one of the roller wheels is fixedly connected to its wheel body, and the central axis is rotatably connected to the frame through a bearing seat. The output shaft of the reduction motor is transmission-connected to one end of the central axis of the roller wheel, and the other end of the central axis extends out of the frame and is installed with the gear.
[0011] The jacking system comprises a jacking cylinder and a hydraulic station. The hydraulic station is connected to the jacking cylinder through a pipeline, and the jacking cylinder is driven to extend and retract through the hydraulic station.
[0012] The jacking system also includes a jacking cylinder vehicle, and the jacking oil cylinder and the hydraulic station are respectively installed on the jacking cylinder vehicle.
[0013] A supporting oil cylinder is also installed at the bottom of the cylinder-lifting vehicle, a piston rod of the supporting oil cylinder extends downward, and a supporting plate is installed at the end of the piston rod.
[0014] A top block is installed at a position where the lower side of the bottom beam contacts the jacking system, or at the top of the jacking system.
[0015] It also includes a cross beam, which has two cross beams. The two cross beams are used to be installed between two legs at both ends of the lifting main beam respectively; wherein, when the gantry crane is installed, the cross beam is used to be placed on the track to support the legs and the lifting main beam above the legs.
[0016] The installation and disassembly method of the door crane installation and disassembly system comprises the following steps: S1. Install the track foundation and track on the ground, and then install the rack to the appropriate position on the side of the track according to the length of the legs; S2. Use a lifting device to install the four traveling wheel seats to the positions corresponding to the racks on the tracks on both sides; S3. Temporarily place two beams on the track, with the beam on each side located between the two running wheel seats; S4, the outrigger is horizontally installed, one end of the outrigger is hinged to the walking wheel seat through a pin, and the other end is placed on the crossbeam; S5, hoisting the lifting main beam onto the supporting legs by using lifting equipment, and hinge the two ends of the bottom beam to the top ends of the supporting legs on both sides respectively; S6. Install the devices and equipment in the machine room on the main lifting beam, as well as the external frame, roof and lightning rod of the machine room. The functional components of the gantry crane are installed close to the ground, and the internal power supply and control circuits of the gantry crane are installed and debugged; S7, jacking operation; during the jacking operation, at least two jacking systems are placed on the ground below the two ends of the lifting main beam respectively, and the jacking systems at both ends of the lifting main beam perform jacking actions synchronously to lift the lifting main beam steadily, and the jacking stage ends when the lifting is lifted to a certain height; during the jacking process, the gear and the rack are meshed and driven, so that the two walking wheel seats on each side move synchronously toward each other; S8, climbing operation; after the main beam of the crane is lifted to a certain height through the lifting operation, it enters the climbing operation stage, the reduction motor drives the gear to mesh with the rack to drive the walking wheel seats on each side of the track to continue to run synchronously towards each other, and further lift the main beam of the crane by pushing the lower end of the outrigger. When the two outriggers are closed to the final installation angle, they stop, and the upper end of the outrigger contacts the bottom beam, connecting and fixing the legs to the bottom beam; S9. Lift the beam placed on the track to the installation height by means of a manual hoist or lifting equipment, and connect and fix the two ends of the beam to the legs on both sides respectively; S10, remove the gear and rack to complete the installation; When the door machine needs to be disassembled, operate S2-S9 in reverse.
[0017] The present invention has the following beneficial effects: 1. Based on the existing gantry crane and track, the present invention adjusts the corresponding positions of the upper part of the gantry crane leg and the lower part of the bottom beam to a matching flange connection mode, and also sets a hinge point on the outside to connect through a pin shaft; the connection part between the lower end of the gantry crane leg and the running wheel is adjusted to a hinge point and a pin shaft connection mode to facilitate the swing angle of the leg during installation; a gear is installed on the outside of the gantry crane running wheel seat, and a rack is installed on the side of the track, and the hoisting main beam is driven to climb by the meshing of the rack; a jacking system is also provided, which is used to eliminate the dead point between the bottom beam and the leg, and assist in jacking the hoisting main beam. The above structure is used to install or disassemble the gantry crane, so that the gantry crane can be installed or disassembled quickly, efficiently, economically and safely without the help of external large-scale lifting equipment, and only with the assistance of simple tools and structures.
[0018] 2. The present invention also includes a crossbeam, which is used to be placed on the track when the gantry crane is installed to support the legs and the lifting main beam above the legs; after the lifting main beam climbs into place, the crossbeam is connected between the two legs to improve the stability of the gantry crane. This also eliminates the temporary supporting beam, achieving multiple uses while also realizing quick installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is a schematic diagram of the state of the present invention before jacking operation.
[0021] Figure 2 for Figure 1 Enlarged structural diagram at A in the middle.
[0022] Figure 3 It is a structural schematic diagram of the jacking system of the present invention.
[0023] Figure 4 It is a schematic diagram of the structure after the present invention is installed.
[0024] In the figure: Lifting main beam 100, bottom beam 110, first hinge seat 111, first flange 112, top block 120, bolt 130; Traveling wheel seat 200, frame 201, fourth hinge seat 202, roller wheel 203, gear 210; Leg 300, second hinge seat 301, third hinge seat 302, second flange 303; Beam 400; Track 500, rack 510; Lifting system 700 , lifting cylinder 710 , hydraulic station 720 , lifting cylinder vehicle 730 , supporting cylinder 740 , support plate 741 . DETAILED DESCRIPTION
[0025] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0028] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0029] Embodiment 1: See also Figure 1-4As shown, a gantry crane installation and disassembly system includes a gantry crane, which includes a lifting main beam 100, a traveling wheel seat 200 and a leg 300, wherein the leg 300 is connected and supported between the lifting main beam 100 and the traveling wheel seat 200, and the traveling wheel seat 200 is used to move on a track 500, and bottom beams 110 are respectively installed at the bottom of both ends of the lifting main beam 100, and the legs 300 are respectively arranged on both sides of both ends of the lifting main beam 100, and the traveling wheel seats 200 are also respectively arranged on both sides of both ends of the lifting main beam 100, and the two ends of each side of the leg 300 are respectively connected to the traveling wheel seat on the same side. 200 and the bottom beam 110 are hinged, a gear 210 is installed on one side of the walking wheel seat 200, the gear 210 is driven by the reduction motor on the walking wheel seat 200, and racks 510 are installed on the tracks 500 on both sides at the positions corresponding to the walking wheel seats 200, and the gear 210 and the rack 510 are meshed for transmission; it also includes a jacking system 700, and the two jacking systems 700 are respectively used to be arranged under the two ends of the lifting main beam 100, and the jacking system 700 is used to eliminate the dead point between the bottom beam 110 and the support leg 300, and assist in jacking the lifting main beam 100.
[0030] By arranging the bottom beam 110 at the lower side of the lifting main beam 100, it is convenient to hinge the bottom beam 110 with the supporting legs 300. Figure 1 In the embodiment, both ends of the bottom beam 110 extend out of the lifting main beam 100. The bottom beam 110 can be a rod, a plate, or a metal structure. After the lifting main beam 100 is lifted to a certain height by two lifting systems 700, the gear 210 on the walking wheel seat 200 is meshed with the rack 51 on the track 500 to further lift the lifting main beam 100. When the top of the support leg 300 is close to the bottom beam 110, it can be welded or bolted to the bottom beam 110, thereby completing the installation of the gantry crane.
[0031] The above structure is used to install or dismantle the gantry crane, so that fast, efficient, economical and safe installation or dismantling can be achieved without the aid of external large-scale lifting equipment, and only with the aid of simple tools and structures.
[0032] See also Figure 1 , 2 Specifically, first hinge seats 111 are respectively provided at both ends of the bottom beam 110, and a second hinge seat 301 is provided at the upper end of the support leg 300 and on the side away from the lifting main beam 100. The first hinge seat 111 and the second hinge seat 301 are hinged by a pin shaft.
[0033] See also Figure 1 , 3The lower side of the bottom beam 110 is fixed with a first flange 112 at a position corresponding to the leg 300, and the upper end of the leg 300 is fixed with a second flange 303. After the leg 300 is installed in place, the first flange 112 and the second flange 303 are connected by bolts. When the top of the leg 300 is close to the bottom beam 110, the first flange 112 and the second flange 303 are connected by bolts, so that the leg 300 is quickly connected to the bottom beam 110.
[0034] See also Figure 1 , 2 Specifically, the lower end of the support leg 300 is fixedly connected to a third hinge seat 302, the top of the walking wheel seat 200 is fixedly connected to a fourth hinge seat 202, and the third hinge seat 302 and the fourth hinge seat 202 are hinged by a pin shaft.
[0035] In order to facilitate the installation and removal of the rack 510, a bolt hole is provided on the rack 510, and a threaded hole is provided on the side of the track 500. The rack 510 is installed on the side of the track 500 by bolts. During installation, the tooth groove of the rack 510 faces upward and meshes with the gear 210. Of course, in order to improve the stability of the installation of the rack 510, a support block for supporting the rack 510 is also installed below the rack 510 on the track 500.
[0036] In one embodiment, see Figure 2 The walking wheel seat 200 includes a frame 201, a roller wheel 203 and a reduction motor, which is not shown in the figure. At least two roller wheels 203 are installed in the frame 201, and the reduction motor is installed on the frame 201. The central axis of one of the roller wheels 203 is fixedly connected to its wheel body, and the central axis is rotatably connected to the frame 201 through a bearing seat. The output shaft of the reduction motor is transmission-connected to one end of the central axis of the roller wheel 203, and the other end of the central axis extends out of the frame 201 and is installed with a gear 210. The reduction motor drives one of the roller wheels 203 and the gear 210 to rotate, so that the walking wheel seat 200 can stably walk on the track 500.
[0037] Of course, the gear 21 can also be driven by a reduction motor separately installed on the traveling wheel seat 200 .
[0038] See also Figure 3 The jacking system 700 includes a jacking cylinder 710 and a hydraulic station 720. The hydraulic station 720 is connected to the jacking cylinder 710 through a pipeline, and the jacking cylinder 710 is driven to extend and retract by the hydraulic station 720. The dead point between the bottom beam 110 and the support leg 300 is eliminated by the extension of the jacking cylinder 710, and the lifting main beam 100 is assisted. The jacking system 700 can use a multi-stage cylinder. The jacking cylinder 710 on each side can be one or more.
[0039] Further, the jacking system 700 also includes a jacking cylinder vehicle 730, and the jacking oil cylinder 710 and the hydraulic station 720 are respectively installed on the jacking cylinder vehicle 730. By providing the jacking cylinder vehicle 730, it is convenient to move the jacking oil cylinder 710 and the hydraulic station 720.
[0040] Furthermore, a supporting oil cylinder 740 is installed at the bottom of the cylinder jacking vehicle 730. The piston rod of the supporting oil cylinder 740 extends downward, and a supporting plate 741 is installed at the end of the piston rod. When in use, the piston rod of the supporting oil cylinder 740 is extended, and the supporting plate 741 contacts the ground. This makes the cylinder jacking vehicle 730 more stable. Specifically, the supporting oil cylinders 740 are installed at the four corners and the middle of the bottom of the cylinder jacking vehicle 730, respectively. The supporting oil cylinders 740 are centrally controlled by the hydraulic station 720 to achieve precise and synchronous extension and retraction.
[0041] Further, in order to improve the stability of the lifting cylinder 710, see Figure 1 , 3 The lower side of the bottom beam 110 is in contact with the jacking system 700, or a top block 120 is installed on the top of the jacking system 700. Specifically, the lower side of the bottom beam 110 is in contact with the piston rod of the jacking cylinder 710, or a top block 120 is installed on the top of the piston rod of the jacking cylinder 710.
[0042] See also Figure 1 , 3 , and also includes a crossbeam 400, which has at least two crossbeams 400, and the two crossbeams 400 are used to be installed between the two legs 300 at both ends of the lifting main beam 100. When the gantry crane is installed, the crossbeam 400 is accurately placed on the track 500 after calculation and positioning, and is used to support the legs 300 and the lifting main beam 100 above the legs 300; after the lifting main beam 100 climbs to the position, the crossbeam 400 is connected between the two legs 300 to improve the stability of the gantry crane. The crossbeam 400 can be welded to the legs 300, or connected by flange structure bolts.
[0043] Embodiment 2: See also Figure 1 , 4 A door machine installation and disassembly method is used, and the door machine installation method includes the following steps: S1. Install the track foundation and the track 500 on the ground, and then install the rack 510 to a suitable position on the side of the track 500 after calculation according to the length of the support leg 300.
[0044] S2. Use a lifting device to install the four traveling wheel seats 200 to the positions corresponding to the racks 510 on the two side rails 500.
[0045] S3. After accurately calculating and positioning the two cross beams 400, they are temporarily placed on the track 500, with the cross beam 400 on each side being located between the two traveling wheel seats 200.
[0046] S4. The outrigger 300 is installed horizontally, with one end of the outrigger 300 being hinged to the travel wheel seat 200 through a pin, and the other end being placed on the crossbeam 400 and elevated by supports such as sleepers to meet the installation angle and height.
[0047] S5. Use a lifting device to hoist the lifting main beam 100 onto the supporting legs 300, and hinge the two ends of the bottom beam 110 to the top ends of the supporting legs 300 on both sides respectively.
[0048] S6. Install the devices and equipment in the machine room, as well as the external frame, roof, and lightning rod of the machine room on the lifting main beam 100. The functional components of the gantry crane are installed close to the ground, and the internal power supply and control circuits of the gantry crane are installed and debugged.
[0049] S7, jacking operation; during the jacking operation, at least two jacking systems 700 are placed on the ground below the two ends of the lifting main beam 100 respectively, and the jacking systems 700 at both ends of the lifting main beam 100 are synchronously lifted to steadily lift the lifting main beam 100. When it is lifted to a certain height, the jacking stage ends; during the jacking process, the gear 210 and the rack 510 are meshed and transmitted, so that the two walking wheel seats 200 on each side move toward each other synchronously.
[0050] S8, climbing operation; after the lifting main beam 100 is lifted to a certain height through the lifting operation, it enters the climbing operation stage, the reduction motor drives the gear 210 to mesh with the rack 510 for transmission, driving the walking wheel seat 200 on each side of the track 500 to continue to run synchronously towards each other, and perform synchronous measurement during the climbing process so that the lifting main beam 100 can be lifted synchronously, smoothly and gradually, and the lifting main beam 100 is further lifted by pushing the lower end of the support leg 300. When the two support legs 300 are closed to the final installation angle, they stop. At this time, the upper end of the support leg 300 contacts the bottom beam 110, and the leg 300 is connected and fixed to the bottom beam 110.
[0051] S9. Lift the crossbeam 400 placed on the track 500 vertically to the installation height by means of a manual hoist or lifting equipment, and connect and fix the two ends of the crossbeam 400 to the supporting legs 300 on both sides respectively.
[0052] S10, remove the gear 210 and the rack 510 to complete the installation.
[0053] When the door machine needs to be disassembled, operate S2-S9 in reverse.
[0054] Embodiment three: Specifically, the door machine installation process is as follows: First, install the track foundation and track 500 on the ground, and then install the rack 510 on the side of the track 500 after calculating and accurately measuring the size of the leg 300, and use bolts to reliably install and fix it. After measuring the size and position, use a small lifting device to install the travel wheel seat 200 on the track 500 at the corresponding position, and then use the leg 300 in a horizontal installation mode, respectively connected to the travel wheel seat 200 through a pin shaft, and the other end of the leg 300 is supported on the crossbeam 400 placed in the appropriate position of the track in advance and temporarily supported to meet the appropriate installation height and angle, and then use a small lifting device to hoist the lifting main beam 100, and connect it to the hinge point at the upper end of the leg 300 through the hinge point and the pin shaft, and further install the devices and equipment in the machine room on the lifting main beam 100, as well as the external frame, roof, lightning rod and other facilities of the machine room, and the entire gantry crane is installed in a low-frame state.
[0055] Install and debug the internal power supply and control circuits of the gantry crane, ensure that all mechanisms are adjusted in place and the electric debugging meets the operation requirements, and then start the subsequent top climbing operation.
[0056] Subsequent operations are divided into two stages: jacking and climbing. If only the one-stage jacking method is used, the jacking height is high, and the requirements for the jacking height of the jacking equipment are very high, and the economy and applicability are poor; if only the one-stage climbing method is used, in the initial stage of climbing, because the climbed equipment is heavy and the horizontal angle is small, the horizontal component force required for climbing is very large, and the power and structural strength requirements of the climbing equipment are very high, and the economy and feasibility are very poor, so the combination of jacking and climbing is the best method. During the jacking operation, multiple jacking systems 700 are parked on the ground outside the gantry track and below the top block 120 corresponding to the bottom beam 110. Generally, at least two jacking cylinder vehicles are symmetrically arranged to first drive the supporting cylinder 740 of the jacking system 700 to move, and the piston rod end of the supporting cylinder 740 is connected to the support plate 741, and the piston rod of the supporting cylinder 740 is extended, and the support plate 741 is reliably supported on the ground for leveling. Then drive the lifting cylinder 710 to extend the piston rod to support the top block 120. The lifting cylinders 710 move synchronously to lift the lifting main beam 100 smoothly and as a whole. The lifting stage ends when it is lifted to a certain height. The lifting height is determined by calculation, which should ensure that the force of the subsequent climbing operation is within the design range without overload problems. The gear 210 and the motor can push the support leg 300 to continue to complete the climbing operation.
[0057] The climbing process is that the reduction motor on the walking wheel seat 200 drives the gear 210 to rotate, the gear 210 is meshed with the rack 510, and the two walking wheel seats 200 on both sides of the track move synchronously towards each other. During the process, the support legs 300 are further gradually lifted and gradually approached. When the two support legs 300 are closed to the final installation angle and then stop, the second flange 303 on the upper part of the support leg 300 and the first flange 112 at the bottom of the bottom beam 110 are also accurately aligned. The bolts 130 are used to ensure that the flange surfaces are reliably connected. Further, the crossbeam 400 that has been placed in the corresponding position of the track 500 in advance is lifted by a hoist or a small lifting equipment and bolted to the connecting surface on the inner side of the support leg, and all the installation and debugging work is completed.
[0058] The advantage of this installation method is that it does not require the use of large lifting equipment. The equipment debugging is completed when the gantry crane is at a low altitude stage. If problems occur during the debugging process, it is convenient to replace accessories, repair and replace them in time. The jacking process is safe and efficient. The rack 510, pin shaft, gear 210 and jacking system 700 can be repeatedly used in other equipment, and the economy is also excellent.
[0059] In addition to being used for the installation or removal of the gantry crane described in this patent, the installation device and method can also be widely used on various large equipment, large steel components or structures with hinged legs. The principles and steps are similar to those described in this patent, but all fall within the scope of protection of this patent.
[0060] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A gantry crane installation and disassembly system, comprising a gantry crane, the gantry crane comprising a lifting main beam (100), a traveling wheel seat (200) and a support leg (300), the support leg (300) being connected and supported between the lifting main beam (100) and the traveling wheel seat (200), the traveling wheel seat (200) being used to move on a track (500), Features: Bottom beams (110) are respectively installed at the bottom of both ends of the lifting main beam (100), and legs (300) are respectively provided on both sides of both ends of the lifting main beam (100). Both sides of both ends of the lifting main beam (100) are also respectively provided with walking wheel seats (200), and both ends of the legs (300) on each side are respectively hinged to the walking wheel seat (200) and the bottom beam (110) on the same side, and a gear (210) is installed on one side of the walking wheel seat (200), and the gear (210) is connected to the walking wheel seat (200) through the walking wheel seat (200). ), racks (510) are installed on the rails (500) on both sides at positions corresponding to the walking wheel seats (200), and the gears (210) and the racks (510) are meshed for transmission; and also includes a jacking system (700), wherein the two jacking systems (700) are respectively arranged below the two ends of the lifting main beam (100), and the jacking systems (700) are used to eliminate the dead point between the bottom beam (110) and the support legs (300), and to assist in jacking up the lifting main beam (100).
2. A door crane installation and removal system according to claim 1, It is characterized in that The two ends of the bottom beam (110) are respectively provided with first hinge seats (111), and the upper end of the support leg (300) and a side away from the lifting main beam (100) are provided with a second hinge seat (301), and the first hinge seat (111) and the second hinge seat (301) are hingedly connected via a pin shaft.
3. A door crane installation and removal system according to claim 1 or 2, It is characterized in that A first flange (112) is fixedly connected to the lower side of the bottom beam (110) at a position corresponding to the support leg (300), and a second flange (303) is fixedly connected to the upper end of the support leg (300). After the support leg (300) is installed in place, the first flange (112) and the second flange (303) are connected by bolts.
4. A door crane installation and removal system according to claim 1, It is characterized in that The lower end of the supporting leg (300) is fixedly connected to a third hinge seat (302), the top of the walking wheel seat (200) is fixedly connected to a fourth hinge seat (202), and the third hinge seat (302) and the fourth hinge seat (202) are hingedly connected via a pin shaft.
5. A door crane installation and removal system according to claim 1, It is characterized in that Bolt holes are provided on the side surface of the track (500) and the rack (510), and the rack (510) is mounted on the side surface of the track (500) by means of bolts.
6. A door crane installation and removal system according to claim 1, It is characterized in that The travel wheel seat (200) comprises a frame (201), a roller wheel (203) and a reduction motor. At least two roller wheels (203) are installed in the frame (201). The reduction motor is installed on the frame (201). The central axis of one of the roller wheels (203) is fixedly connected to its wheel body, and the central axis is rotationally connected to the frame (201) via a bearing seat. The output shaft of the reduction motor is transmission-connected to one end of the central axis of the roller wheel (203). The other end of the central axis extends out of the frame (201) and is installed with the gear (210).
7. A door crane installation and removal system according to claim 1, It is characterized in that The jacking system (700) comprises a jacking cylinder (710) and a hydraulic station (720); the hydraulic station (720) is connected to the jacking cylinder (710) via a pipeline, and the jacking cylinder (710) is driven to extend and retract via the hydraulic station (720).
8. A door crane installation and removal system according to claim 7, It is characterized in that The jacking system (700) further comprises a jacking cylinder vehicle (730), and the jacking cylinder (710) and the hydraulic station (720) are respectively mounted on the jacking cylinder vehicle (730).
9. A door crane installation and removal system according to claim 8, It is characterized in that A supporting oil cylinder (740) is also installed at the bottom of the cylinder-supporting vehicle (730). The piston rod of the supporting oil cylinder (740) extends downward, and a support plate (741) is installed at the end of the piston rod.
10. A door crane installation and removal system according to claim 1 or 7, It is characterized in that A top block (120) is installed at a position where the bottom side of the bottom beam (110) contacts the jacking system (700), or at the top of the jacking system (700).
11. A door crane installation and removal system according to claim 1, It is characterized in that It also includes a crossbeam (400), wherein two crossbeams (400) are used to be respectively installed between two legs (300) at both ends of the lifting main beam (100); wherein, when the gantry crane is installed, the crossbeam (400) is used to be placed on a track (500) to support the legs (300) and the lifting main beam (100) above the legs (300).
12. A method for installing and disassembling a door crane installation and disassembly system according to claim 11, It is characterized in that The installation method of the door machine includes the following steps: S1. Install the track foundation and the track (500) on the ground, and then install the rack (510) to a suitable position on the side of the track (500) according to the length of the support leg (300); S2, using a lifting device to install the four traveling wheel seats (200) respectively to the positions corresponding to the racks (510) on the rails (500) on both sides; S3, temporarily placing two crossbeams (400) on the track (500), with the crossbeam (400) on each side being located between two traveling wheel seats (200); S4, the outrigger (300) is horizontally mounted, one end of the outrigger (300) is hinged to the travel wheel seat (200) via a pin, and the other end is placed on the crossbeam (400); S5, using a lifting device to hoist the lifting main beam (100) onto the supporting legs (300), and hinge the two ends of the bottom beam (110) to the top ends of the supporting legs (300) on both sides respectively; S6. Install the devices and equipment in the machine room, as well as the external frame, roof, and lightning rod of the machine room on the lifting main beam (100). Complete the installation of the functional components of the gantry crane close to the ground, and install and debug the power supply and control circuits inside the gantry crane. S7, jacking operation; during the jacking operation, at least two jacking systems (700) are placed on the ground below the two ends of the lifting main beam (100), and the jacking systems (700) at the two ends of the lifting main beam (100) are synchronously lifted to smoothly lift the lifting main beam (100). When the lifting is lifted to a certain height, the jacking stage ends; during the jacking process, the gear (210) and the rack (510) are meshed and transmitted, so that the two walking wheel seats (200) on each side move synchronously towards each other; S8, climbing operation; after the lifting main beam (100) is lifted to a certain height through the lifting operation, the climbing operation phase is entered, the reduction motor drives the gear (210) to mesh with the rack (510) to drive the walking wheel seat (200) on each side track (500) to continue to run synchronously in the opposite direction, and further lifts the lifting main beam (100) by pushing the lower end of the support leg (300). When the two support legs (300) are closed to the final installation angle, they stop, and at this time, the upper end of the support leg (300) contacts the bottom beam (110), and the leg (300) is connected and fixed to the bottom beam (110); S9, lifting the crossbeam (400) placed on the track (500) to the installation height by means of a manual hoist or a lifting device, and connecting and fixing the two ends of the crossbeam (400) to the supporting legs (300) on both sides respectively; S10, removing the gear (210) and the rack (510) to complete the installation; When the door machine needs to be disassembled, operate S2-S9 in reverse.
Citation Information
Patent Citations
Portal crane mounting method
CN114261901A
Cited By
Gantry crane mounting and dismounting system and mounting and dismounting method therefor
WO2026052151A1