Splicing construction method and splicing device for steel truss girder bridge sections
By setting up horizontal tire frames and vertical tire frames on the concrete T-beam bridge deck, and fixing the truss frames with connecting parts and pulling devices, the high-altitude operation problems caused by terrain slope are solved, and the steel truss beam bridge section is improved assembled accuracy and efficiency of the segment.
Patent Information
- Application Number
- CN202411209567.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-29
AI Technical Summary
Under the western mountainous and high climate conditions, the concrete T-beam bridge deck has horizontal and vertical slopes, which causes the tire frame to be raised to be placed in parallel, resulting in high-altitude operations, affecting the assembly accuracy and efficiency of the steel truss beam bridge sections.
A horizontal tire frame and a vertical tire frame are erected on the concrete T-beam bridge deck, and the truss frame is fixed through connecting parts and pulling devices to avoid high-altitude operations and improve assembly accuracy and safety.
It effectively reduces construction risks, improves assembly accuracy and efficiency, avoids high-altitude operation risks, simplifies the construction process, and improves construction efficiency and safety.
Smart Images

Figure CN119041298A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel truss beam bridges, and in particular to an assembling construction method and a splicing device for steel truss beam bridge segments. Background Art
[0002] The segment assembly of steel truss bridges is the most important, fundamental, core and critical link in the entire prefabrication process. Due to its large cross-section and limited transportation conditions, it can often only be assembled in the form of rods at the on-site assembly site of the bridge.
[0003] In the prior art, the segments of steel truss bridges are usually assembled on a tire frame, which is placed on a concrete T-beam bridge deck. The placement surface of the tire frame is parallel to the horizontal plane, thereby facilitating the assembly of the segments of the steel truss bridge. However, due to the special terrain and climate of some western mountainous and high-altitude areas, the site is limited and the only option is to assemble on a concrete T-beam bridge deck. The concrete T-beam bridge deck has horizontal and longitudinal slopes. In order to make the placement surface of the tire frame parallel to the horizontal plane, one side of the tire frame will be raised, which will cause the height of the truss on the tire frame to increase, resulting in high-altitude operations, affecting the assembly accuracy and efficiency. Summary of the invention
[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defects in the prior art that due to the special terrain and climate, the concrete T-beam bridge deck has a transverse and longitudinal slope. In order to make the placement surface of the tire frame parallel to the horizontal plane, one side of the tire frame will be raised, which will cause the height of the truss on the tire frame to increase, resulting in high-altitude operations, affecting the assembly accuracy and assembly efficiency, thereby providing an assembly construction method and splicing device for steel truss beam bridge segments.
[0005] In order to solve the above problems, the present invention provides a method for assembling and constructing steel truss beam bridge segments, comprising the following steps:
[0006] A horizontal tyre frame and a vertical tyre frame are set up on the concrete T-beam bridge deck, and the horizontal tyre frame and the vertical tyre frame are parallel to the concrete T-beam bridge deck;
[0007] On the horizontal frame, assemble the belly rod and the chord rod into a truss frame;
[0008] The assembled truss frames are then moved to the vertical assembly frame and fixed, and a connecting piece is set between the two opposite truss frames. The two ends of the connecting piece are respectively fixedly connected to the two truss frames, so that the left and right truss frames are fixedly connected by the connecting piece, and a steel truss beam bridge segment can be obtained.
[0009] Furthermore, after the horizontal tire frame is assembled into the truss frame, a plurality of cantilever arms are welded and fixed on the truss frame.
[0010] Furthermore, after the truss frame is moved to the vertical assembly frame, the truss frame is fixed to the vertical assembly frame by a pulling device.
[0011] Furthermore, the pulling device has a steel wire rope and a ground anchor. The steel wire rope is located on both sides of the truss frame. One end of the steel wire rope is connected to the upper chord of the truss frame, and the other end of the steel wire rope is connected to the ground anchor, so that the truss frame can be fixed on the vertical tire frame.
[0012] Furthermore, after the two opposite truss frames are fixedly connected and assembled by connecting pieces, a bridge deck is laid on top of the truss frames.
[0013] Furthermore, the truss frame assembled on the horizontal assembling frame is turned over by a hoisting device so that the truss frame is perpendicular to the vertical assembling frame, and then the truss frame is moved to the vertical assembling frame by the hoisting device.
[0014] Furthermore, after obtaining the steel truss beam bridge segment, it is necessary to inspect the segment assembly line type, segment geometric dimensions, and segment docking accuracy. After passing the inspection, the segment is removed from the vertical assembly frame and the steel truss beam bridge segment is transferred to the bridge site for installation.
[0015] The present invention further discloses a steel truss beam bridge segment splicing device, which is applied to the steel truss beam bridge segment assembling construction method described in any one of the above schemes, comprising:
[0016] A horizontal tire frame and a vertical tire frame, wherein the vertical tire frame is arranged on one side of the horizontal tire frame, the horizontal tire frame and the vertical tire frame are arranged on a concrete T-beam bridge deck, and the horizontal tire frame and the vertical tire frame are respectively parallel to the concrete T-beam bridge deck.
[0017] Furthermore, it also includes:
[0018] The pulling device is arranged on both sides of the truss frame, and the pulling device comprises a steel wire rope, a hand chain hoist and a ground anchor. The two ends of the steel wire rope are respectively connected to the truss frame and the hand chain hoist, and the other end of the hand chain hoist is connected to the ground anchor.
[0019] Furthermore, the bottoms of the horizontal tyre frame and the vertical tyre frame are both provided with height-adjustable brackets, and the horizontal tyre frame and the vertical tyre frame are parallel to the concrete T-beam bridge deck through the brackets.
[0020] The present invention has the following advantages:
[0021] 1. The present invention provides a method for assembling and constructing steel truss beam bridge segments, by setting up a horizontal assembling frame and a vertical assembling frame on a concrete T-beam bridge deck, and making the horizontal assembling frame and the vertical assembling frame parallel to the concrete T-beam bridge deck, thereby avoiding the situation of raising the horizontal assembling frame and the vertical assembling frame to increase the height of the truss frame and causing high-altitude operations, effectively reducing the construction risk, and at the same time, when high-altitude operations are not required, construction personnel can better assemble the truss frames, which can effectively improve the assembly accuracy and ensure the integrity of the truss frames.
[0022] 2. The present invention provides a method for assembling a steel truss beam bridge segment. After the horizontal assembly frame is assembled with the truss frame, the cantilever arm is welded and fixed on the truss frame, thereby avoiding welding of the cantilever arm during vertical assembly. The method of the present invention is used to weld the cantilever arm during horizontal assembly, which can effectively improve the welding accuracy of the cantilever arm and avoid the risk of high-altitude operations.
[0023] 3. The present invention provides a method for assembling and constructing a steel truss beam bridge segment. After the truss frame is moved to the vertical assembly frame, the truss frame is fixed on the vertical assembly frame by a pulling device. In the prior art, the truss frame is usually fixed by setting up a supporting bracket, and the supporting bracket needs to be disassembled repeatedly, which reduces the construction efficiency. By adopting the pulling device disclosed in the present application, there is no need for repeated disassembly, which is simple and convenient, and the precision adjustment can be performed, which greatly facilitates the vertical assembly installation and ensures precision and safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 It is a structural schematic diagram of a truss beam bridge segment in the present invention;
[0026] Figure 2 It is a structural schematic diagram of a horizontal tire frame in the present invention;
[0027] Figure 3 It is a structural schematic diagram of the neutral tire assembly frame of the present invention;
[0028] Figure 4 It is a schematic diagram of a tire frame and a concrete T-beam bridge deck in the present invention;
[0029] Figure 5 The structure of the truss frame in the present invention is schematically shown in FIG. Figure 1 ;
[0030] Figure 6 The structure of the truss frame in the present invention is schematically shown in FIG. Figure 2 ;
[0031] Figure 7 The structure diagram of the truss frame in the present invention is shown in FIG. Figure 1 ;
[0032] Figure 8 The structure diagram of the truss frame in the present invention is shown in FIG. Figure 2 ;
[0033] Fig. 9 is a schematic diagram of the pulling device in the present invention;
[0034] Fig.10 The structure diagram of the truss frame in the present invention is shown in FIG. Figure 3 ;
[0035] Description of reference numerals:
[0036] 1. Concrete T-beam bridge deck; 2. Horizontal cradle; 3. Vertical cradle; 4. Truss frame; 5. Steel truss beam bridge segment; 6. Cantilever arm; 7. Pulling device; 8. Wire rope; 9. Ground anchor; 10. Bridge deck; 11. Hand winch; 12. Bracket. DETAILED DESCRIPTION
[0037] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0039] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0040] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0041] Embodiment 1
[0042] like Figures 1 to 10 As shown, the present embodiment discloses a method for assembling and constructing a steel truss beam bridge segment, comprising the following steps: setting up a horizontal assembling frame 2 and a vertical assembling frame 3 on a concrete T-beam bridge deck 1, wherein the horizontal assembling frame 2 and the vertical assembling frame 3 are parallel to the concrete T-beam bridge deck 1; assembling web members and chord members into a truss frame 4 on the horizontal assembling frame 2; then moving the assembled truss frame 4 to the vertical assembling frame 3 and fixing them, and arranging a connecting piece between two opposite truss frames 4, wherein both ends of the connecting piece are respectively fixedly connected to the two truss frames 4, so that the left and right truss frames 4 are fixedly connected by the connecting piece, thereby obtaining a steel truss beam bridge segment 5.
[0043] Specifically, the concrete T-beam bridge deck 1 is first divided into a truss assembly area and a segment vertical assembly area, and a horizontal assembly frame 2 and a vertical assembly frame 3 are arranged in the truss assembly area and the segment vertical assembly area respectively. Due to the influence of the geographical environment and climate, the concrete T-beam bridge deck 1 is constructed with transverse and longitudinal slopes, which has the effect of facilitating drainage, etc. Figures 2 to 4 As shown, when arranging the horizontal tyre frame 2 and the vertical tyre frame 3, the horizontal tyre frame 2 and the vertical tyre frame 3 are arranged parallel to the concrete T-beam bridge deck 1 to avoid raising the height of the tyre frame, resulting in a large elevation difference in the longitudinal length direction of the tyre frame, and requiring high-altitude work;
[0044] After the horizontal truss frame 2 is erected, the web bars and the chord bars can be placed on the horizontal truss frame 2, and the web bars and the chord bars are assembled and welded into a truss frame 4;
[0045] Then, the truss frame 4 is moved to the vertical frame 3 and fixed, two truss frames 4 are arranged opposite to each other, and a connecting piece is arranged between the two truss frames 4, and the two ends of the connecting piece are respectively connected to the two truss frames 4 so that the two truss frames 4 are fixedly connected, and the steel truss beam bridge segment 5 can be obtained. Preferably, in this embodiment, the connecting piece is an upper cross beam and a lower cross beam, and the two truss frames 4 are connected to each other through the upper cross beam and the lower cross beam.
[0046] Furthermore, after the horizontal tire frame 2 is assembled with the truss frame 4 , a plurality of cantilever arms 6 are welded and fixed on the truss frame 4 .
[0047] Specifically, Figure 5 and Figure 6 As shown, after the webs and chords are assembled and welded into the truss frame 4 on the horizontal assembly frame 2, a plurality of cantilever arms 6 are welded and fixed to the truss frame 4. By welding the cantilever arms 6 during the horizontal assembly, it is possible to avoid welding the cantilever arms 6 at high altitude after the assembly and welding of the steel truss beam bridge segments 5 is completed. Welding the cantilever arms 6 during the horizontal assembly helps to improve the welding accuracy.
[0048] Furthermore, after the truss frame 4 is moved to the vertical assembly frame 3, the truss frame 4 is fixed to the vertical assembly frame 3 by the pulling device 7.
[0049] Furthermore, the truss frame 4 assembled on the horizontal frame 2 is turned over by a hoisting device so that the truss frame 4 is perpendicular to the horizontal direction, and then the truss frame 4 is moved to the vertical frame 3 by the hoisting device.
[0050] Furthermore, the pulling device 7 has a steel wire rope 8 and a ground anchor 9. The steel wire rope 8 is located on both sides of the truss frame 4. One end of the steel wire rope 8 is connected to the upper chord of the truss frame 4, and the other end of the steel wire rope 8 is connected to the ground anchor 9, so that the truss frame 4 can be fixed on the vertical tire frame 3.
[0051] Specifically, Figures 7 to 9 As shown, the truss frame 4 assembled on the horizontal frame 2 is turned over by the lifting device so that the truss frame 4 is perpendicular to the vertical frame 3, and then the truss frame 4 is moved to the vertical frame 3 by the lifting device. After the truss frame 4 is moved to the vertical frame 3, the truss frame 4 is fixed to the vertical frame 3 by the pulling device 7. The pulling device 7 has a steel wire rope 8 and a ground anchor 9. The ground anchor 9 is arranged on both sides of the vertical frame 3 and fixedly arranged on the concrete T-beam bridge deck 1. One end of the steel wire rope 8 is connected to the ground anchor 9, and the other end of the steel wire rope 8 is wound on the truss frame 4, thereby fixing the truss frame 4 on the vertical frame 3. In the prior art, the truss frame 4 is usually fixed by setting up a supporting bracket, but the supporting bracket needs to be disassembled before the truss frame 4 can be removed from the vertical assembly frame 3. When a new truss frame 4 is set on the vertical assembly frame 3, the supporting bracket needs to be rebuilt, resulting in the need to repeatedly build and disassemble the supporting bracket, which has low construction efficiency. The pulling device 7 does not require repeated disassembly, is simple and convenient, and can be adjusted for accuracy, which greatly facilitates the vertical assembly installation while ensuring accuracy and safety.
[0052] Furthermore, after the two opposite truss frames 4 are fixedly connected and assembled by connecting pieces, the bridge deck 10 is laid on the top of the truss frames 4 .
[0053] Specifically, Fig.10As shown, two truss frames 4 are fixedly set on the vertical frame 3, and the two truss frames 4 are arranged opposite to each other, and a connecting piece is arranged between the two truss frames 4, so that the two oppositely arranged truss frames 4 are fixedly connected by the connecting piece, and then a bridge deck 10 is laid on the top of the truss frames 4 to obtain a steel truss beam bridge segment 5.
[0054] Furthermore, after obtaining the steel truss beam bridge segment 5, it is necessary to inspect the segment assembly line type, segment geometric dimensions, segment docking accuracy, etc. After passing the inspection, the segment is removed from the vertical assembly frame 3 and the steel truss beam bridge segment 5 is transferred to the bridge position for installation.
[0055] Embodiment 2
[0056] This embodiment discloses a steel truss beam bridge segment splicing device, which is applied to the steel truss beam bridge segment assembling construction method described in the first embodiment, and includes: a horizontal splicing frame 2 and a vertical splicing frame 3. The vertical splicing frame 3 is arranged on one side of the horizontal splicing frame 2, and the horizontal splicing frame 2 and the vertical splicing frame 3 are arranged on a concrete T-beam bridge deck 1, and the horizontal splicing frame 2 and the vertical splicing frame 3 are parallel to the concrete T-beam bridge deck 1 respectively.
[0057] Furthermore, it also includes: a pulling device 7. The pulling device 7 is arranged on both sides of the truss frame 4, and the pulling device 7 includes a wire rope 8, a hand chain hoist 11 and a ground anchor 9. The two ends of the wire rope 8 are respectively connected to the truss frame 4 and the hand chain hoist 11, and the other end of the hand chain hoist 11 is connected to the ground anchor 9.
[0058] Specifically, Fig. 9 As shown, the bottom of the truss frame 4 is connected to the vertical frame 3 and the truss frame 4 is perpendicular to the vertical frame 3, the ground anchors 9 are arranged on both sides of the vertical frame 3, the upper end of the wire rope 8 is fixedly connected to the truss frame 4, the lower end of the wire rope 8 is fixedly connected to one end of a hand winch 11, and the other end of the hand winch 11 is connected to the ground anchor 9, and the angle 0 of the truss frame 4 can be adjusted by adjusting the hand winch 11, which greatly facilitates the vertical installation and ensures the accuracy and construction safety of the truss frame 4.
[0059] Further, such as Figures 2 to 4 As shown, the bottom of the horizontal frame 2 and the vertical frame 3 are both provided with a height-adjustable bracket 12, and the horizontal frame 2 and the vertical frame 3 are parallel to the concrete T-beam bridge deck 1 through the bracket 12. The bracket 12 can be adjusted in height by being threadedly connected with the horizontal frame 2 / vertical frame 3, or by using positioning holes and pins.
[0060] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A method for assembling a steel truss beam bridge segment, characterized in that: The following steps are involved: A horizontal tyre frame (2) and a vertical tyre frame (3) are set up on the concrete T-beam bridge deck (1), wherein the horizontal tyre frame (2) and the vertical tyre frame (3) are parallel to the concrete T-beam bridge deck (1); On the horizontal tyre frame (2), the web bars and the chord bars are assembled into a truss frame (4); Subsequently, the assembled truss frame (4) is moved to the vertical assembly frame (3) and fixed, and a connecting piece is arranged between two opposite truss frames (4), and the two ends of the connecting piece are respectively fixedly connected to the two truss frames (4), so that the left and right truss frames (4) are fixedly connected by the connecting piece, and a steel truss beam bridge segment (5) can be obtained.
2. The method for assembling steel truss bridge segments according to claim 1, characterized in that: After the horizontal tire frame (2) is assembled with the truss frame (4), a plurality of cantilever arms (6) are welded and fixed on the truss frame (4).
3. The method for assembling steel truss bridge segments according to claim 1, characterized in that: After the truss frame (4) is moved to the vertical assembly frame (3), the truss frame (4) is fixed to the vertical assembly frame (3) by a pulling device (7).
4. The method for assembling steel truss bridge segments according to claim 3 is characterized in that: The pulling device (7) comprises a steel wire rope (8) and a ground anchor (9). The steel wire rope (8) is located on both sides of the truss frame (4). One end of the steel wire rope (8) is connected to the upper chord of the truss frame (4), and the other end of the steel wire rope (8) is connected to the ground anchor (9), so that the truss frame (4) can be fixed on the vertical assembly frame (3).
5. The method for assembling steel truss bridge segments according to any one of claims 1 to 4, characterized in that: After the two opposite truss frames (4) are fixedly connected and assembled by connecting pieces, a bridge deck (10) is laid on the top of the truss frames (4).
6. The method for assembling steel truss bridge segments according to claim 5, characterized in that: The truss frame (4) assembled on the horizontal assembling frame (2) is turned over by a hoisting device so that the truss frame (4) is perpendicular to the vertical assembling frame (3), and then the truss frame (4) is moved to the vertical assembling frame (3) by the hoisting device.
7. The method for assembling steel truss bridge segments according to claim 6, characterized in that: After obtaining the steel truss beam bridge segment (5), it is necessary to inspect the segment assembly line type, segment geometric dimensions, and segment butt joint accuracy. After passing the inspection, the segment is unloaded from the vertical assembly frame (3), and the steel truss beam bridge segment (5) is transferred to the bridge site for installation.
8. A steel truss beam bridge segment splicing device, applied to the steel truss beam bridge segment assembling construction method according to any one of claims 1 to 7, characterized in that: include: A horizontal tyre frame (2) and a vertical tyre frame (3), wherein the vertical tyre frame (3) is arranged on one side of the horizontal tyre frame (2), the horizontal tyre frame (2) and the vertical tyre frame (3) are arranged on a concrete T-beam bridge deck (1), and the horizontal tyre frame (2) and the vertical tyre frame (3) are respectively parallel to the concrete T-beam bridge deck (1).
9. The steel truss bridge segment splicing device according to claim 8, characterized in that: Also includes: A pulling device (7), the pulling device (7) is arranged on both sides of the truss frame (4), the pulling device (7) comprises a steel wire rope (8), a hand chain hoist (11) and a ground anchor (9), the two ends of the steel wire rope (8) are respectively connected to the truss frame (4) and the hand chain hoist (11), and the other end of the hand chain hoist (11) is connected to the ground anchor (9).
10. The steel truss bridge segment splicing device according to claim 8 or 9, characterized in that: The bottoms of the horizontal tyre frame (2) and the vertical tyre frame (3) are both provided with a height-adjustable bracket (12), and the horizontal tyre frame (2) and the vertical tyre frame (3) are parallel to the concrete T-beam bridge deck (1) through the bracket (12).