Steel beam connecting joint structure and steel beam connecting method
Through the design of the steel beam connection node structure, the combination of connecting plates and bolts is used to solve the raised problems during steel beam splicing, ensuring the flatness and connection strength of the steel beam, simplifying the paving process of prefabricated plates, and improving the building structure stability.
Patent Information
- Application Number
- CN202411470411.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2024-11-29
AI Technical Summary
The existing steel beam connecting structures are prone to protruding the upper flange of the steel beam during splicing, affecting the laying and installation of prefabricated steel frames. More specifications of prefabricated plates are required to meet the raised requirements, and the processing is complicated.
The steel beam connection node structure is adopted. Through the combination of two symmetrically arranged connecting plates, counterstop bolts and flat head bolts, the upper flange of the steel beam is flat, avoiding protrusions, and enhancing the connection strength and stability.
The flatness of the steel beam connection is achieved, the subsequent paving of prefabricated plates is simplified, the specification demand for prefabricated plates is reduced, and the overall stability and connection strength of the building roof structure are improved.
Smart Images

Figure CN119041568A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building engineering, and in particular to a steel beam connection node structure and a steel beam connection method. Background Art
[0002] The existing fully assembled substation beam tops are constructed with steel skeleton prefabricated panels, thus forming a structural force system of "steel frame + steel skeleton prefabricated panels", in which the steel skeleton prefabricated panels are mass-produced in the factory and then transported to the construction site for installation. When installing the steel skeleton prefabricated panels, high requirements are placed on the flatness of the upper flange of the supporting steel beam. The existing steel beam splicing mostly uses bolts + connecting plates to connect the two sections of the steel beam, that is, bolts are used to fix the connecting plates on the upper surface of the upper flange of the two sections of the steel beam and the lower surface of the lower flange, so as to connect the two sections of the steel beam into an integrated structure; however, the above connection structure is prone to produce bulges (bolts, connecting plates) on the upper surface of the upper flange of the steel beam, which greatly affects the subsequent laying and installation of the steel skeleton prefabricated panels. More specifications of steel skeleton prefabricated panels are required to meet the bulge requirements, and the bulges need to be processed separately. Summary of the invention
[0003] The object of the present invention is to provide a steel beam connection node structure and a steel beam connection method, which can improve the flatness of the steel beam connection node and facilitate the subsequent paving of the roof prefabricated panels.
[0004] To achieve this object, the present invention adopts the following technical solutions:
[0005] The present invention provides a steel beam connection node structure, which is used to connect two steel beams along the length direction of the steel beam. The steel beam connection node structure includes:
[0006] Two connecting plates, the two connecting plates are symmetrically arranged on both sides of the web of the steel beam, each of the connecting plates comprises an upper connecting portion and a middle connecting portion, the upper connecting portion is respectively arranged against the lower surface of the upper flange of the two steel beams, and the middle connecting portion is respectively arranged against the web of the two steel beams;
[0007] A countersunk bolt, wherein the upper flange is provided with a countersunk hole for accommodating the countersunk bolt, the stem of the countersunk bolt passes through the upper flange and the upper connecting portion and is screwed with a nut, the head of the countersunk bolt is buried in the countersunk hole, and the head of the countersunk bolt is flush with the upper flange;
[0008] A first flat head bolt, wherein the rod of the first flat head bolt sequentially passes through the middle connection portion on one side, the web plate and the middle connection portion on the other side and is then connected to a nut.
[0009] Preferably, the upper connecting portion and the middle connecting portion are integrally formed.
[0010] Preferably, the steel beam connection node structure also includes a lower cross plate and a second flat head bolt, the lower cross plate is respectively arranged against the lower surfaces of the lower flanges of the two steel beams, and the rod of the second flat head bolt passes through the lower flange and the lower cross plate and is screwed with a nut.
[0011] Preferably, the lower cross plate is symmetrically arranged on the lower flange with respect to the plane where the web plate is located, and a plurality of the second flat head bolts are provided.
[0012] Preferably, the steel beam connection node structure also includes a second flat head bolt, and the connecting plate also includes a lower connecting portion, which is respectively arranged in contact with the upper surfaces of the lower flanges of the two steel beams, and the rod of the second flat head bolt passes through the lower flange and the lower connecting portion and is screwed with a nut.
[0013] Preferably, the middle connecting portion and the lower connecting portion are integrally formed.
[0014] Preferably, each of the upper connecting portions is connected to the upper flange of each of the steel beams by at least two of the countersunk bolts.
[0015] Preferably, at least three first flat head bolts are provided.
[0016] Preferably, at least three of the first flat head bolts are evenly spaced apart in the height direction.
[0017] The steel beam connection method, using the above-mentioned steel beam connection node structure, comprises the following steps:
[0018] S1. Opening a countersunk hole on the upper surface of the upper flange of the first steel beam;
[0019] S2, placing the two connecting plates on both sides of the web of the first steel beam respectively, and adjusting the positions of the connecting plates so that the upper connecting portion abuts against the lower surface of the upper flange of the first steel beam, and the middle connecting portion abuts against the web of the first steel beam;
[0020] S3, inserting the countersunk bolt into the countersunk hole, and threading a nut on the end of the countersunk bolt extending out of the upper connecting portion;
[0021] S4, inserting the first flat head bolt on the middle connection part, so that the first flat head bolt passes through the middle connection part on one side, the web plate of the first steel beam and the middle connection part on the other side in sequence, and a nut is screwed on the end of the first flat head bolt extending out of the middle connection part on the other side;
[0022] S5. Repeat steps S1 to S4, and use the same method to connect the connecting plate to the second steel beam.
[0023] The beneficial effects of the present invention are:
[0024] The present invention provides a steel beam connection node structure, wherein the upper connection part of the connection plate is respectively arranged against the lower surfaces of the upper flanges of the two steel beams, and the middle connection part of the connection plate is respectively arranged against the webs of the two steel beams. Since the upper connection part is fixedly connected to the upper flange by countersunk bolts, and the middle connection part is fixedly connected to the web by first flat-head bolts, the two steel beams are spliced through the connection plate; since countersunk holes are provided on the upper flanges of the steel beams, the heads of the countersunk bolts are buried in the countersunk holes and the heads of the countersunk bolts are flush with the upper flanges of the steel beams, there is no convex structure on the upper surfaces of the upper flanges of the two steel beams after the connection is completed, thereby ensuring the flatness of the upper flanges of the steel beams, thereby ensuring the paving quality of subsequent prefabricated panels and reducing the specifications of the steel skeleton prefabricated panels; since two connection plates are provided, and the two connection plates are symmetrically arranged on both sides of the webs of the steel beams, the two steel beams are connected through the two connection plates, thereby greatly enhancing the connection strength and stability of the steel beams.
[0025] By using this steel beam connection method, countersunk holes are opened on the upper flange of the steel beam and the upper connection part is connected to the lower surface of the upper flange, so as to avoid unevenness and protrusions on the contact surface between the steel beam and the prefabricated panel. The operation is simple, convenient and fast, and the paving quality of the prefabricated panel is improved, thereby ensuring the overall stability and connection strength of the building roof structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is a schematic diagram of a steel beam connection node structure provided in Embodiment 1 of the present invention;
[0027] Figure 2 It is a schematic diagram of the steel beam connection node structure provided in the second embodiment of the present invention.
[0028] In the figure:
[0029] 110-web; 120-upper flange; 130-lower flange;
[0030] 1-connecting plate; 11-upper connecting part; 12-middle connecting part; 13-lower connecting part;
[0031] 2-countersunk bolts;
[0032] 3-first flat head bolt;
[0033] 4-lower horizontal board;
[0034] 5-Second flat head bolt. DETAILED DESCRIPTION
[0035] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0036] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0037] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0038] In the description of this embodiment, the terms "upper", "lower", "right", "left" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operate in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0039] Embodiment 1
[0040] like Figure 1As shown, this embodiment provides a steel beam connection node structure, which is used to connect two steel beams along the length direction of the steel beam. The steel beam connection node structure includes two connection plates 1, countersunk bolts 2 and first flat head bolts 3. The two connection plates 1 are symmetrically arranged on both sides of the steel beam web 110. Each connection plate 1 includes an upper connection portion 11 and a middle connection portion 12. The upper connection portion 11 is respectively arranged against the lower surface of the upper flange 120 of the two steel beams, and the middle connection portion 12 is arranged against the lower surface of the upper flange 120 of the two steel beams. The connecting portion 12 is respectively arranged in contact with the webs 110 of the two steel beams; the upper flange 120 is provided with a countersunk hole for accommodating the countersunk bolt 2, the rod of the countersunk bolt 2 passes through the upper flange 120 and the upper connecting portion 11 and is screwed with a nut, the head of the countersunk bolt 2 is buried in the countersunk hole, and the head of the countersunk bolt 2 is flush with the upper flange 120; the rod of the first flat head bolt 3 passes through the middle connecting portion 12 on one side, the web 110 and the middle connecting portion 12 on the other side in turn and is connected to the nut. In this embodiment, the upper connection portion 11 of the connecting plate 1 is respectively arranged against the lower surface of the upper flange 130 of the two steel beams, and the middle connection portion 12 of the connecting plate 1 is respectively arranged against the webs 110 of the two steel beams. Since the upper connection portion 11 is fixedly connected to the upper flange 120 by the countersunk bolt 2, and the middle connection portion 12 is fixedly connected to the web 110 by the first flat head bolt 3, the two steel beams are spliced through the connecting plate 1; since the upper flange 120 of the steel beam is provided with a countersunk hole, the head of the countersunk bolt 2 The head of the countersunk bolt 2 buried in the countersunk hole is flush with the upper flange 120 of the steel beam. Therefore, after the two steel beams are connected, there is no protruding structure on the upper surface of the upper flange 120, which ensures the flatness of the upper flange 120 of the steel beam, thereby ensuring the subsequent paving quality of the prefabricated slabs; since there are two connecting plates 1, and the two connecting plates 1 are symmetrically arranged on both sides of the steel beam web 110, the two steel beams are connected by two connecting plates 1, which greatly enhances the connection strength and stability of the steel beams. Specifically, the upper connection portion 11 and the middle connection portion 12 both extend along the length direction of the steel beam, a portion of the upper connection portion 11 is connected to the upper flange 120 of one of the steel beams, and another portion of the upper connection portion 11 is connected to the upper flange 120 of the other steel beam. Similarly, a portion of the middle connection portion 12 is connected to the web 110 of one of the steel beams, and another portion of the middle connection portion 12 is connected to the web 110 of the other steel beam. The countersunk bolt 2 is a bolt with a conical head commonly used in the field, and the head of the countersunk bolt 2 can be completely hidden in the countersunk hole.
[0041] Furthermore, if Figure 1 As shown, the upper connecting portion 11 and the middle connecting portion 12 are integrally formed. In this embodiment, the cross section of the connecting plate 1 is L-shaped, and the upper connecting portion 11 and the middle connecting portion 12 are integrally formed, thereby improving the structural strength and rigidity of the connecting plate.
[0042] Specifically, Figure 1As shown, the steel beam connection node structure also includes a lower cross plate 4 and a second flat head bolt 5. The lower cross plate 4 is respectively arranged against the lower surface of the lower flanges 130 of the two steel beams. The rod of the second flat head bolt 5 passes through the lower flange 130 and the lower cross plate 4 and is screwed with a nut. In this embodiment, the steel beam connection node structure also includes a lower cross plate 4, which extends along the length direction of the steel beam and is connected to the lower flanges 130 of the two steel beams by the second flat head bolt 5; the lower cross plate 4 cooperates with the two connecting plates 1 to further improve the connection strength and stability between the two steel beams.
[0043] Specifically, Figure 1 As shown, the lower cross plate 4 is symmetrically arranged on the lower flange 130 about the plane where the web 110 is located, and a plurality of second flat head bolts 5 are arranged. In this embodiment, the lower cross plate 4 is a rectangular plate structure, the long side of the lower cross plate 4 is parallel to the length direction of the steel beam, and the center of the wide side of the lower cross plate 4 is aligned with the plane where the center of the web 110 of the steel beam is located, that is, the contact area between the lower cross plate 4 and the lower flange 130 on both sides of the web 110 is the same, thereby improving the stability and balance of the connection between the lower cross plate 4 and the steel beam, and preventing errors in the later assembly due to connection deviation.
[0044] Furthermore, if Figure 1 As shown, each upper connection portion 11 is connected to the upper flange 120 of each steel beam by at least two countersunk bolts 2. In this embodiment, the upper connection portion 11 of each connecting plate 1 is connected and fixed to the upper flange 120 of one of the steel beams by two countersunk bolts 2, thereby ensuring a stable and reliable connection effect.
[0045] Furthermore, if Figure 1 As shown, at least three first flat head bolts 3 are provided. In this embodiment, the middle connection parts 12 of the two connecting plates 1 are connected and fixed to the web 110 of each steel beam by at least three first flat head bolts 3.
[0046] Specifically, Figure 1 As shown, at least three first flat head bolts 3 are evenly spaced in the height direction. In this embodiment, three first flat head bolts 3 are provided, and the three first flat head bolts 3 are evenly spaced, so as to ensure the stability of the connection between the web 110 and the middle connecting portion 12 and avoid local stress concentration.
[0047] This embodiment also provides a steel beam connection method, using the above-mentioned steel beam connection node structure, comprising the following steps:
[0048] S1. A countersunk hole is formed on the upper surface of the upper flange 120 of the first steel beam. In this embodiment, a countersunk hole is formed on the upper surface of the upper flange 120 of the first steel beam to be connected, and the countersunk hole is used to pass the countersunk bolt 2.
[0049] S2. Place two connection plates 1 on both sides of the web 110 of the first steel beam, and adjust the position of the connection plates 1 so that the upper connection portion 11 abuts against the lower surface of the upper flange 120 of the first steel beam, and the middle connection portion 12 abuts against the web 110 of the first steel beam. In this embodiment, two L-shaped connection plates 1 are placed on both sides of the web 110, and each upper connection portion 11 abuts against the lower surface of the upper flange 120, and each middle connection portion 12 abuts against the web 110, so as to adjust the installation position of the connection plates 1.
[0050] S3, insert a countersunk bolt 2 into the countersunk hole, and screw a nut onto the end of the countersunk bolt 2 extending out of the upper connecting portion 11. In this embodiment, the upper connecting portion 11 is fixedly connected to the upper flange 120 using the countersunk bolt 2, and the nut on the countersunk bolt 2 is tightened so that the head of the countersunk bolt 2 is flush with the upper surface of the upper flange 120.
[0051] S4. Install the first flat head bolt 3 on the middle connection 12, and make the first flat head bolt 3 pass through the middle connection 12 on one side, the web 110 of the first steel beam, and the middle connection 12 on the other side in sequence, and screw the nut on the end of the first flat head bolt 3 extending out of the middle connection 12 on the other side. In this embodiment, the web 110 and the middle connection 12 on both sides are fixedly connected by the first flat head bolt 3, so that the two connecting plates 1 are connected to the first steel beam; then the lower cross plate 4 is fixedly connected to the lower flanges 130 of the two steel beams by the second flat head bolt 5.
[0052] S5, repeating steps S1 to S4, and connecting the connecting plate 1 to the second steel beam in the same manner. In this embodiment, the two connecting plates 1 are respectively connected and fixed to the second steel beam in the same manner as described above, thereby completing the connection between the first steel beam and the second steel beam.
[0053] Embodiment 2
[0054] like Figure 2 As shown, this embodiment provides a steel beam connection node structure, which is basically the same as the steel beam connection node structure in the first embodiment, and the main difference is that in this embodiment, the steel beam connection node structure includes a second flat head bolt 5, and the connecting plate 1 also includes a lower connecting portion 13, and the lower connecting portion 13 is respectively arranged against the upper surface of the lower flange 130 of the two steel beams, and the rod of the second flat head bolt 5 passes through the lower flange 130 and the lower connecting portion 13 and is screwed with a nut. Specifically, the lower connecting portion 13 is connected to the middle connecting portion 12, and the lower connecting portion 13 extends along the length direction of the steel beam, and the lower connecting portion 13 is connected to the upper surface of the lower flange 130 of the two steel beams through the second flat head bolt 5.
[0055] Specifically, the middle connection portion 12 and the lower connection portion 13 are integrally formed. In this embodiment, the cross section of the connection plate 1 is C-shaped, the upper connection portion 11, the middle connection portion 12 and the lower connection portion 13 are integrally formed, and the upper connection portion 11, the middle connection portion 12 and the lower connection portion 13 are respectively abutted against and fixedly connected to the upper flange 120, the web 110 and the lower flange 130, which greatly improves the connection strength between the connection plate 1 and the steel beam. At the same time, the connection plate 1 can play a certain supporting and reinforcing role on the steel beam, thereby improving the bearing stability of the steel beam.
[0056] This embodiment also provides a steel beam connection method, using the above-mentioned steel beam connection node structure, comprising the following steps:
[0057] S1. A countersunk hole is formed on the upper surface of the upper flange 120 of the first steel beam. In this embodiment, a countersunk hole is formed on the upper surface of the upper flange 120 of the first steel beam to be connected, and the countersunk hole is used to pass the countersunk bolt 2.
[0058] S2. Place two connecting plates 1 on both sides of the web 110 of the first steel beam, and adjust the position of the connecting plates 1 so that the upper connecting portion 11 abuts against the lower surface of the upper flange 120 of the first steel beam, and the middle connecting portion 12 abuts against the web 110 of the first steel beam. In this embodiment, two C-shaped connecting plates 1 are placed on both sides of the web 110, and each upper connecting portion 11 abuts against the lower surface of the upper flange 120, each middle connecting portion 12 abuts against the web 110, and each lower connecting portion 13 abuts against the upper surface of the lower flange 130, so as to adjust the installation position of the connecting plates 1.
[0059] S3. Insert a countersunk bolt 2 into the countersunk hole, and screw a nut onto the end of the countersunk bolt 2 extending out of the upper connection portion 11. In this embodiment, the upper connection portion 11 is fixedly connected to the upper flange 120 using the countersunk bolt 2, and the nut on the countersunk bolt 2 is tightened so that the countersunk bolt 2 firmly fixes the upper connection portion 11 on the upper flange 120 and the head of the countersunk bolt 2 is flush with the upper surface of the upper flange 120.
[0060] S4. Install the first flat head bolt 3 on the middle connection part 12, and make the first flat head bolt 3 pass through the middle connection part 12 on one side, the web 110 of the first steel beam, and the middle connection part 12 on the other side in sequence, and screw the nut on the end of the first flat head bolt 3 extending out of the middle connection part 12 on the other side. In this embodiment, the web 110 and the middle connection parts 12 on both sides are fixedly connected by the first flat head bolt 3, and then the lower connection part 13 is fixedly connected with the lower flange 130 by the second flat head bolt 5, so that the two connecting plates 1 are connected to the first steel beam.
[0061] S5, repeating steps S1 to S4, and connecting the connecting plate 1 to the second steel beam in the same manner. In this embodiment, the two connecting plates 1 are respectively connected and fixed to the second steel beam in the same manner as described above, thereby completing the connection between the first steel beam and the second steel beam.
[0062] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. Steel beam connection node structure, used to connect two steel beams along the length direction of the steel beam, It is characterized in that The steel beam connection node structure comprises: Two connecting plates (1), the two connecting plates (1) being symmetrically arranged on both sides of the web (110) of the steel beam, each connecting plate (1) comprising an upper connecting portion (11) and a middle connecting portion (12), the upper connecting portion (11) being respectively arranged in contact with the lower surfaces of the upper flanges (120) of the two steel beams, and the middle connecting portion (12) being respectively arranged in contact with the webs (110) of the two steel beams; A countersunk bolt (2), the upper flange (120) is provided with a countersunk hole for accommodating the countersunk bolt (2), the rod of the countersunk bolt (2) passes through the upper flange (120) and the upper connecting portion (11) and is screwed with a nut, the head of the countersunk bolt (2) is buried in the countersunk hole, and the head of the countersunk bolt (2) is flush with the upper flange (120); A first flat head bolt (3), wherein the shank of the first flat head bolt (3) sequentially passes through the middle connection portion (12) on one side, the web (110) and the middle connection portion (12) on the other side and is then connected to a nut.
2. The steel beam connection node structure according to claim 1, It is characterized in that The upper connecting portion (11) and the middle connecting portion (12) are integrally formed.
3. The steel beam connection node structure according to claim 2, It is characterized in that The steel beam connection node structure also includes a lower transverse plate (4) and a second flat head bolt (5), wherein the lower transverse plate (4) is respectively arranged in contact with the lower surfaces of the lower flanges (130) of the two steel beams, and the rod of the second flat head bolt (5) passes through the lower flange (130) and the lower transverse plate (4) and is screwed with a nut.
4. The steel beam connection node structure according to claim 3, It is characterized in that The lower transverse plate (4) is symmetrically arranged on the lower flange (130) with respect to the plane where the web (110) is located, and a plurality of the second flat head bolts (5) are arranged.
5. The steel beam connection node structure according to claim 2, It is characterized in that The steel beam connection node structure also includes a second flat head bolt (5), and the connection plate (1) also includes a lower connecting portion (13), and the lower connecting portion (13) is respectively arranged in contact with the upper surface of the lower flanges (130) of the two steel beams, and the rod of the second flat head bolt (5) passes through the lower flange (130) and the lower connecting portion (13) and is screwed with a nut.
6. The steel beam connection node structure according to claim 5, It is characterized in that The middle connecting portion (12) and the lower connecting portion (13) are integrally formed.
7. The steel beam connection node structure according to claim 1, It is characterized in that Each of the upper connecting parts (11) is connected to the upper flange (120) of each of the steel beams via at least two of the countersunk bolts (2).
8. The steel beam connection node structure according to claim 1, It is characterized in that At least three first flat head bolts (3) are provided.
9. The steel beam connection node structure according to claim 8, It is characterized in that At least three of the first flat head bolts (3) are evenly spaced apart in the height direction.
10. Steel beam connection method, It is characterized in that Using the steel beam connection node structure according to any one of claims 1 to 8 comprises the following steps: S1. Opening a countersunk hole on the upper surface of the upper flange (120) of the first steel beam; S2, placing the two connecting plates (1) on both sides of the web (110) of the first steel beam, and adjusting the position of the connecting plates (1) so that the upper connecting portion (11) and the lower surface of the upper flange (120) of the first steel beam are in contact with each other, and the middle connecting portion (12) and the web (110) of the first steel beam are in contact with each other; S3, inserting the countersunk bolt (2) into the countersunk hole, and threading a nut onto the end of the countersunk bolt (2) extending out of the upper connecting portion (11); S4, inserting the first flat head bolt (3) on the middle connection part (12), so that the first flat head bolt (3) passes through the middle connection part (12) on one side, the web plate (110) of the first steel beam and the middle connection part (12) on the other side in sequence, and screwing a nut on the end of the first flat head bolt (3) extending out of the middle connection part (12) on the other side; S5, repeating steps S1 to S4, and using the same method to connect the connecting plate (1) to the second steel beam.
