Regional integrated energy system elasticity improvement method considering user demand diversification

By constructing a fragility model of typhoon wind farm and electrical components, dividing load types and analyzing the uncertainty of photovoltaic wind power output, establishing a regional comprehensive energy system elastic improvement model, solving the problem of insufficient energy system elasticity under typhoon disasters in the existing technology, and achieving Cost-effective improvement and rapid recovery after disasters.

CN119047858APending Publication Date: 2024-11-29CHINA THREE GORGES UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410879721.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing regional integrated energy system cannot effectively improve its elasticity when facing extreme natural disasters such as typhoons, resulting in serious load reduction in the energy system and lack of consideration of the diversity of user needs, resulting in high cost of improving elasticity.

Method used

By analyzing the uncertainty of wind speed in the wind farm under typhoon disasters, building a typhoon wind farm model and electrical component vulnerability model, calculating the line failure probability, dividing key and non-critical loads, and analyzing the uncertainty of photovoltaic and wind power outputs by using robust optimization method. Establish an elastic enhancement model of the regional comprehensive energy system with the smallest total cost during the pre-disaster planning period, and use the solver to obtain an elastic enhancement strategy.

Benefits of technology

It effectively improves the flexibility of the regional comprehensive energy system under typhoon disasters, reduces the elasticity and improves costs, ensures the electricity demand for key loads, increases the recovery speed after disasters, and reduces the total cost of pre-disaster planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047858A_ABST
    Figure CN119047858A_ABST
Patent Text Reader

Abstract

A regional integrated energy system elasticity improvement method considering user demand diversification comprises the steps that a typhoon wind field model is constructed, an electrical element vulnerability model is established based on the model, the line fault probability is obtained, and a fault scene is generated; considering energy demand characteristics of different types of users, dividing loads into critical loads and non-critical loads, constructing a load fluctuation model, establishing photovoltaic and wind power output models at the same time, and finally based on a generated fault scene; and establishing a regional integrated energy system elasticity improvement model which takes the minimum total cost in the pre-disaster planning period as a target function and takes user demand diversification into consideration, and then solving by using a solver to obtain a regional integrated energy system elasticity improvement strategy under the typhoon disaster. According to the method, multiple uncertainties of the energy system are fully considered, diversified user requirements are considered at the same time, different types of users are divided, the elasticity of the regional integrated energy system under typhoon disasters can be effectively improved, the elasticity improvement cost is reduced, and the economical efficiency of the regional integrated energy system is considered.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of regional integrated energy system planning and design, and in particular to a method for improving the elasticity of a regional integrated energy system taking into account the diversity of user demands. Background Art

[0002] With the continuous development of my country's economy and society, the energy production and consumption patterns have undergone major changes. Regional integrated energy systems characterized by multi-energy complementarity and coordinated optimization are gradually replacing traditional energy systems. Regional integrated energy systems can promote the complementarity and mutual assistance of multiple energy sources and the coordinated optimization of multiple systems, and promote the consumption of new energy on the basis of ensuring energy security. However, when encountering extreme natural disasters such as typhoons, the probability of component failure in regional integrated energy systems will be greatly increased, thus affecting the normal operation of the energy system. Therefore, the study of improving the resilience of regional integrated energy systems is of great significance. Compared with post-disaster emergency response and power supply restoration, incorporating the impact of extreme natural disasters into the pre-disaster planning of regional integrated energy systems is more important for improving the disaster resistance of the system. The regional integrated energy system couples multiple energy sources, integrates various links of the energy system such as source, grid, load and storage, and can meet the various energy needs of electricity, cooling, heat and other energy in a specific area. At the same time, it can also play a vital role in pre-disaster planning.

[0003] At present, most of the planning and design research on regional integrated energy systems focuses on economic analysis, taking into account the uncertainty of load forecasting and renewable energy generation. However, it is still impossible to avoid severe load shedding of energy systems in the face of extreme natural disasters such as typhoons. Some studies incorporate resilience improvement into the energy system planning framework, but focus on the resilience improvement of the macro energy system without considering the diversity of user needs, resulting in high resilience improvement costs. Summary of the invention

[0004] In order to solve the above technical problems, the present invention proposes a method for improving the resilience of a regional integrated energy system taking into account the diversity of user needs. The method fully considers the multiple uncertainties of the energy system, while taking into account the diverse user needs, and divides different types of users. It can effectively improve the resilience of the regional integrated energy system under typhoon disasters, reduce the cost of improving resilience, and take into account the economy of the regional integrated energy system.

[0005] The technical solution adopted by the present invention is:

[0006] The method for improving the resilience of a regional integrated energy system considering the diverse needs of users includes the following steps:

[0007] Step 1: Analyze the uncertainty of wind speed in the wind field under typhoon disasters, obtain the wind speed distribution when the typhoon disaster occurs, and construct a typhoon wind field model that considers temporal and spatial differences;

[0008] Step 2: Based on the typhoon wind field model established in step 1, considering the uncertainty of line damage under typhoon disasters, an electrical component vulnerability model based on stress-strength interference theory is constructed;

[0009] Step 3: Based on the electrical component vulnerability model established in step 2, the probability of damage to electrical components on the line is calculated, the line failure probability is obtained, and the failure scenario is generated;

[0010] Step 4: Considering the energy demand characteristics of different types of users, the load is divided into critical load and non-critical load. At the same time, in view of the uncertainty of load fluctuation, the load random multiplier method is used to analyze the load fluctuation range and build a load fluctuation model;

[0011] Step 5: Aiming at the uncertainty of photovoltaic and wind power output in the regional integrated energy system, the robust optimization method is used to analyze the fluctuation range of photovoltaic and wind power output and build photovoltaic and wind power output models;

[0012] Step 6: Based on the fault scenario generated in step 3, considering the models established in steps 4 and 5, a regional integrated energy system resilience improvement model is established with the minimum total cost in the pre-disaster planning period as the objective function, taking into account the diversity of user needs;

[0013] Step 7: Use the solver to solve the regional integrated energy system resilience improvement model established in step 6 that takes into account the diversity of user needs;

[0014] Through the above steps, a strategy for improving the resilience of the regional integrated energy system under typhoon disasters is obtained.

[0015] In step 1, the typhoon wind field model considering time and space differences is constructed, specifically including:

[0016] 1) Establish a typhoon wind field composite wind speed model:

[0017] The composite wind speed model at any point in the typhoon is established as follows:

[0018]

[0019] In the formula, is the ground gust wind speed within 3s from the typhoon eye r; is the surface gradient wind speed within 1 h from the typhoon eye r; κ is the Karman constant, κ = 0.4; γ is the time-related factor; χ is the relationship between the surface roughness s0 and the gradient height h g Related factors; h g is the gradient height, s0 is the surface roughness, and t is the time period number.

[0020]

[0021] In the formula, is the radial wind speed component of the ground gust within 3 seconds at any height H from the typhoon eye r, is the ground gust wind speed within 3s at a distance r from the typhoon eye; H is the vertical height of the typhoon cloud wall;

[0022]

[0023] In the formula, is the tangential wind speed component of the ground gust at any height H from the typhoon eye within 3s; α is the inflow angle of the cyclone;

[0024]

[0025]

[0026] Where V sh is the offset wind speed component, is the composite wind speed component, V T is the moving speed of the typhoon, R max is the maximum radius of the typhoon wind field;

[0027] 2) Establish extreme wind speed model:

[0028] Extreme wind speed refers to the wind speed value exceeding the specific wind speed v0, which occurs once every Y years with a probability of P V , V>v0, the calculation formula is as follows:

[0029]

[0030] Where V is the random variable of wind speed; F(V) is the wind speed distribution function; and Y is the recurrence period of extreme wind speed.

[0031] Therefore, the wind speed V with a return period of Y years Y The calculation formula is as follows:

[0032]

[0033] 3) Establish a real-time wind speed model in the typhoon wind field:

[0034] For the real-time wind speed v in the wind farm, take and The maximum value of is:

[0035]

[0036] Thus, the optimal distribution of wind speed is obtained

[0037] For each research point in the wind field, the real-time wind speed of the wind field is calculated by the above formula, and then the optimal distribution function of the real-time wind speed in the typhoon wind field is obtained:

[0038] In step 2, the electrical component vulnerability model based on the stress-strength interference theory is constructed. The electrical component vulnerability model includes a conductor stress model and a pole bending moment model. The specific modeling process is as follows:

[0039] Calculate wind loads on conductors and poles:

[0040]

[0041] Where W c and W p are the wind loads on the conductor and pole respectively (unit: kN); μ u , μ H , μ sc and μ sp are wind pressure unevenness coefficient, wind pressure height variation coefficient, conductor shape coefficient and pole shape coefficient respectively; θ is the moving direction angle of the typhoon; D is the outer diameter of the conductor (unit: mm); l s is the wire spacing (unit: m); l and l2 are the height of the pole (unit: m) and the buried depth (unit: m) respectively; d r and d t are the diameters of the bottom and top of the pole respectively (unit: mm); W c (v) is the function of wind load on the conductor with respect to wind speed v; W p (v) is the function of wind load on the pole with respect to wind speed v.

[0042] Cross-sectional stress of the conductor σ c The calculation formula is as follows:

[0043] σ c (v) = W c / S c ;

[0044] In the formula, S c is the cross-sectional area of ​​the conductor (unit: m 2 );σ c (v) is the cross-sectional stress of the conductor as a function of wind speed v; W c is the wind load on the conductor.

[0045] In addition to the wind load on the pole body, the pole also bears the wind load from the traction wire:

[0046] M1(v)=W p (l-l2) / 2;

[0047] M2(v)=2W c l1+W c (l-l2);

[0048]

[0049] Where: M1 is the bending moment at the root of the pole caused by the wind load acting on the middle of the pole; M2 is the bending moment at the root of the pole caused by the wind load of the traction conductor (unit: kN·m); M3 is the composite bending moment at the root of the pole (unit: kN·m); l1 is the height of the pole cross arm from the ground (unit: m); M1(v) is the function of the bending moment at the root of the pole caused by the wind load acting on the middle of the pole with respect to the wind speed v; M2(v) is the function of the bending moment at the root of the pole caused by the wind load of the traction conductor with respect to the wind speed v; M3(v) is the function of the composite bending moment at the root of the pole with respect to the wind speed v; W p is the wind load on the conductors and poles; θ is the moving angle of the typhoon.

[0050] The component strength follows a normal distribution, represented by o; σ c Both M and M3 are functions of wind speed v, so they are collectively referred to as element wind load effect variables, represented by w, then:

[0051]

[0052] Where Φ(w) is the normal cumulative distribution function of the wind load effect variable of the component; is the normal probability density function of the component strength.

[0053] Conductor stress mathematical model:

[0054] When the conductor strength is less than the wind load effect, the conductor will break under the action of wind load. The stress intensity of the conductor obeys the normal distribution, and its probability density can be expressed as:

[0055]

[0056] σ θ =ε1σ μ ;

[0057] In the formula, is the density function of the conductor strength, σ θ is the standard deviation of the conductor strength (unit: MPa), σ μ is the expected mean value of the conductor strength (unit: MPa), ε1 is the conductor strength variation coefficient; is the density function of the wire strength.

[0058] Mathematical model of pole bending moment:

[0059] When the pole strength is less than the wind load effect, the pole will break under the action of wind load. The stress intensity of the pole is related to its bending resistance, that is, the maximum bending moment it can withstand. The bending resistance of the pole follows a normal distribution, and its probability density can be expressed as:

[0060]

[0061]

[0062] M θ =ε2M μ ;

[0063] In the formula, M is the density function of the bending resistance of the pole; θ and M μ are the standard deviation (unit: kN·m) and expected mean (unit: kN·m) of the bending capacity of the pole; M exam It is the verification value of the pole bending moment on the pole bearing capacity (unit: kN·m); is the calibration coefficient; ε2 is the pole strength variation coefficient; is the density function of the bending resistance of the pole.

[0064] The step 3 comprises the following steps:

[0065] S3.1: Construct line fault probability model:

[0066] 3) From the typhoon wind field model constructed in step 2, it can be seen that the wind speed v is a random variable and obeys the optimal distribution F(v); since the component wind load effect variable w is a function of the wind speed v, the wind load effect variable is also a random variable, represented by W(v), and obeys the following distribution:

[0067]

[0068] Where F(w) is the distribution function of the wind load effect variable of the component; W -1 (w) is the inverse function of the wind load effect variable; is the optimal distribution function of the inverse function of the wind load effect variable; p w {W(v)≤w} is the probability of wind load action; p v {v≤W -1 (w)} is the probability of occurrence of extreme wind speed.

[0069] The failure probability of the conductor and the pole can be obtained from the stress of the conductor and the bending moment of the pole:

[0070]

[0071] In the formula, is the normal probability density function of the conductor strength; is the normal probability density function of the pole strength; F(o) is the distribution function of the component strength; W -1 (o) is the inverse function of the wind load effect variable with respect to the component strength; is the distribution function of wind load effect with respect to the inverse function of element strength; M3 is the composite bending moment at the root of the rod.

[0072] p c and p p are the failure probabilities of the conductor and the pole respectively. From this, we can get the failure probability of the line:

[0073]

[0074] In the formula, p ij is the failure probability of line (i, j); k1 and k2 are the number of conductors and poles in the line respectively; p c,a and p p,b are the failure probabilities of the a-th conductor and the b-th pole in the line respectively.

[0075] After the line is reinforced, the probability of line failure can be effectively reduced, but there is still a potential risk of damage. The final fault state of line (i, j) is expressed as follows:

[0076]

[0077] In the formula, is a 0-1 variable, It means that in scenario s, line (i, j) fails, otherwise it means that no failure occurs; is a 0-1 variable. When , it means that the line (i, j) has been reinforced, otherwise it means that it has not been reinforced; are the relevant parameters of line (i, j) when it is not reinforced, Indicates that line (i, j) is faulty, otherwise it indicates normal operation; are the relevant parameters of line (i, j) after reinforcement, Indicates that line (i, j) is faulty, otherwise it indicates normal operation. When generating a fault scenario, for all lines in the scenario, you only need to and Just perform sampling; Ω1 is the set of nodes in the system; is a collection of fault scenarios; For any line (i, j).

[0078] S3.2: Generate failure scenarios:

[0079] 4) For the generation of fault scenarios, the threshold method is used to determine the fault state of the line and obtain and The scene generation process is as follows:

[0080]

[0081]

[0082] p u ~U(0,1);

[0083] In the formula, and are the probability of damage of line (i, j) before and after reinforcement, p u is the fault threshold that follows uniform distribution. When the line damage probability is greater than the fault threshold, the line fails; U(0,1) represents 0-1 distribution.

[0084] In step 4, the load is divided into critical load and non-critical load, and the load division principle is determined by the energy demand characteristics of the user;

[0085] Critical loads are divided into critical power loads and critical heating loads. Critical power loads include hospital power, fire protection power, and power for uninterrupted production lines in factories, etc.; critical heating loads include the temperature requirements of hospitals, factory workshops and warehouses, etc. The power supply system needs to ensure uninterrupted power supply to critical loads, and non-critical loads are allowed to suffer appropriate losses after extreme natural disasters, and available resources are transferred to critical loads;

[0086]

[0087] Where P t sh and are the electrical load rejection and thermal load rejection at time t respectively; r e and r t are the key load ratio coefficients for electricity and heating, and are the electricity and heating demand loads at time t respectively.

[0088] In step 4, the load fluctuation model constructed is specifically described as follows:

[0089]

[0090] In the formula, and are the active load (unit: kW) and reactive load (unit: kVar) at node j in scenario s, respectively; and They are respectively the active load reference value (unit: kW) and reactive load reference value (unit: kVar) at node j; is the random multiplier of the load of node j in scenario s, which follows a normal distribution; For any node j; N(1,0.1 2 ) means the mathematical expectation is 1 and the variance is 0.1 2 The normal distribution of .

[0091] In step 5, the specific modeling process of photovoltaic and wind power output models is as follows:

[0092]

[0093]

[0094] Where P t pv,r and P t wt,r are the ranges of photovoltaic power generation and wind power generation at time t; P t pv and P t wt are the photovoltaic and wind power generation at time t before robust optimization; and are the maximum deviations of photovoltaic and wind power generation at time t from their predicted values; r t pv and r t wt are the uncertainty coefficients of photovoltaic and wind power generation at time t, respectively. t =1, indicating that the uncertainty of photovoltaic and wind power output at time t is the largest. t = 0, it means that there is no uncertainty in the photovoltaic and wind power output at time t; R t is the robustness coefficient of renewable energy output at time t, R t The larger it is, the greater the uncertainty in the renewable energy output power.

[0095] In step 6, the relevant constraints of the constructed regional comprehensive energy system planning model include photovoltaic component constraints, wind turbine constraints, cogeneration unit constraints, heating-only unit constraints, out-of-region energy purchase constraints, energy storage constraints, thermal energy balance constraints, and power balance constraints;

[0096] 1) PV panel constraints:

[0097]

[0098] Where P pv is the rated output power of the photovoltaic module, F tis the solar radiation intensity at time t, F0 is the solar radiation intensity at room temperature, f pt is the power temperature coefficient of the photovoltaic module, T t is the operating temperature of the photovoltaic module at time t, T0 is the room temperature, which is 25℃.

[0099] 2) Wind turbine constraints:

[0100]

[0101] Where P wt is the rated output power of the wind turbine, V q 、V d and V0 are the cut-in wind speed, cut-out wind speed and rated wind speed of the wind turbine respectively.

[0102] 3) Constraints on cogeneration units:

[0103]

[0104]

[0105] Where P t chp and are the output power and heat generated by the cogeneration unit at time t; η e and η h are the power generation efficiency and heat generation efficiency of the cogeneration unit respectively; G t is the amount of natural gas purchased by the system at time t; is the rated capacity of the cogeneration unit.

[0106] 4) Constraints for heating units only:

[0107]

[0108] Where P t hp and are the power consumption and heat generation of the heating unit at time t, is the upper limit of heat production of the heating unit only, η hp is the heat production coefficient of the heating unit only.

[0109] 5) Constraints on purchasing energy outside the region:

[0110] The constraints of purchasing energy outside the region are divided into the constraints of purchasing electricity outside the region and purchasing gas outside the region. The specific description is as follows:

[0111]

[0112]

[0113] Where P t buy and is the amount of electricity and natural gas purchased from outside the region at time t, and It is the upper limit of out-of-region electricity and gas purchases for the system.

[0114] 6) Energy storage constraints:

[0115]

[0116] In the formula, is the electrical energy stored in the battery at time t; and are the charge and discharge amounts of the battery at time t respectively; η ese is the battery loss rate; and They are the lower capacity limit and rated capacity of the battery respectively; is the upper limit of battery charge and discharge; M is an infinite positive real number; and are 0-1 variables, representing the charging state and discharging state of the battery at time t; and Respectively represent the initial capacity and final capacity of the battery; is the electrical energy stored in the battery at time t-1.

[0117] 7) Thermal energy balance constraints:

[0118]

[0119] 8) Power balance constraints:

[0120]

[0121] Where P t l is the active load at time t; P t pv,r and P t wt,r is a nonlinear variable, and the above power balance constraint is linearized by duality theory:

[0122]

[0123]

[0124] In the formula, r t , b t pv and b t wt They are all robust parameters after linearization.

[0125] In step 6, the regional integrated energy system planning model constructed aims to minimize the total cost during the pre-disaster planning period.

[0126] The standard function includes investment cost, maintenance cost and operating cost, as shown below:

[0127] f=min(f1+f2+f3)

[0128] Where f is the total cost during the planning period, f1, f2 and f3 are investment cost, maintenance cost and operating cost respectively.

[0129] (1) Investment cost:

[0130] The investment cost includes the annual investment cost of the equipment in the system and the line reinforcement cost:

[0131]

[0132] In the formula, is the investment recovery rate; is the reinforcement cost of line (i, j); c d Cost of reinforcing poles; and are the installation costs of photovoltaic modules and wind turbines respectively; P0 pv and P0 wt are the rated capacities of PV modules and wind turbines respectively; Ω2 and Ω3 are the node sets where PV modules and wind turbines are located respectively; I r is the interest rate, T y is the investment payback period; f1 is the investment cost; is a 0-1 variable. When , it means that the line (i, j) has been reinforced, otherwise it means that it has not been reinforced; k is the node number where the photovoltaic module is located; d is the node number where the wind turbine is located; Ω3 are the node sets where the wind turbine is located.

[0133] (2) Maintenance cost:

[0134] Assume that maintenance cost is proportional to equipment capacity as shown in the following formula:

[0135]

[0136] Where f2 is the maintenance cost; m,s is the mathematical expectation of renewable energy equipment maintenance under scenario s; and are the maintenance costs per unit capacity of PV panels and wind turbines respectively.

[0137] (3) Operating costs:

[0138] The operating costs include the system operating costs under normal circumstances and the system operating costs under extreme disasters, namely the cost of purchasing energy from outside the region and the load reduction penalty cost.

[0139] f3=Ε o,s (f4+f5)

[0140]

[0141] Where: f3 is the operating cost; o,s is the mathematical expectation of system operation under scenario s; f4 and f5 are the system operation costs under normal conditions and under extreme disasters, respectively; n d and n j They are the normal operating days and extreme disaster days of the system in a year; and are the electricity price and natural gas price at time t respectively; and are the load reduction penalty costs per unit electrical load and thermal load respectively; P t buy and are the amount of electricity and natural gas purchased from outside the region at time t of the system; P t sh and are the electrical load rejection and thermal load rejection at time t respectively; and are the load reduction penalty costs per unit electrical load and thermal load, respectively.

[0142] The regional integrated energy system planning model constructed in step 6 defines the total load of the system during the entire typhoon disaster process.

[0143] The load index represents the elasticity of the system, which is specifically expressed as follows:

[0144]

[0145] In the formula, R E It represents the elasticity of the regional integrated energy system, which is the accumulation of system load shedding over time.

[0146] In step 7, the regional integrated energy system planning model established in step 6 is built based on the MATLAB platform, and after determining the objective function with the minimum total cost during the pre-disaster planning period, the gurobi solver is used to solve the problem, thereby obtaining a strategy for improving the resilience of the regional integrated energy system under typhoon disasters.

[0147] The specific solution process is as follows:

[0148] S7.1: Establish a typhoon wind field model based on step 1, and establish an electrical component vulnerability model based on steps 2 and 3, and generate fault scenarios. The number of fault scenarios is N′, and the fault scenarios are u1′, u2′, ..., u′ N′ ;

[0149] S7.2: Set the number of cycles to N′;

[0150] S7.3: Enter the n′th loop and write the corresponding fault scenario u n Substitute the regional integrated energy system resilience improvement model established in step 6 and solve it using the MATLAB / Gurobi solver to obtain the resilience improvement solution x n′ ;

[0151] S7.4: Let n′=n′+1, and repeat S7.3 until the difference between the elasticity index of the n′th and n′-1th times is less than 1% of the elasticity index of the n′-1th time, that is, |R E,n′ -R E,n′-1 |<0.01R E,n′-1 , R E,n′ is the elasticity index of the n′th cycle, R E,n′-1 is the elasticity index of the n′-1th cycle. The cycle ends and the final elasticity improvement plan is obtained.

[0152] The present invention provides a method for improving the elasticity of a regional integrated energy system taking into account the diversified needs of users, and the technical effects are as follows:

[0153] 1) The present invention takes into account the uncertainty of wind speed and line damage under typhoon disasters, simulates the failure scenario of the regional integrated energy system under typhoon disasters, and makes the cost calculation results in the pre-disaster planning period more realistic and credible.

[0154] 2) The present invention divides the load according to the demand characteristics of various users and transfers the available resources to the key load, thereby ensuring the electricity demand of the key load under extreme natural disasters and greatly reducing the cost of improving the resilience of the regional integrated energy system.

[0155] 3) The present invention adopts the robust optimization method to construct the photovoltaic and wind power output model, and incorporates the uncertainty of photovoltaic and wind power output into the framework of improving the resilience of the regional integrated energy system, so as to greatly improve the operating capacity of the regional integrated energy system after encountering extreme natural disasters.

[0156] 4) The present invention takes into account the multiple uncertainties under typhoon disasters, can effectively resist the impact of typhoon disasters, and greatly improves the performance of regional integrated energy systems under typhoon disasters; considering the different demand characteristics of users, it can effectively improve the recovery speed of regional integrated energy systems after disasters, minimize the losses of the system, and greatly reduce the total cost of pre-disaster planning of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0157] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0158] Figure 1 This is a schematic diagram of the structure of the poles of the regional integrated energy system.

[0159] Figure 2 This is a schematic diagram of the structure of the regional integrated energy system.

[0160] Figure 3 Schematic diagram of the heat load and electricity load of the regional integrated energy system in one day.

[0161] Figure 4 Schematic diagram of system performance changes in various scenarios after the regional integrated energy system encounters a typhoon disaster. DETAILED DESCRIPTION

[0162] A strategy for improving the resilience of a regional integrated energy system considering the diversity of user needs is firstly to construct a typhoon wind field model that considers temporal and spatial differences, and to establish an electrical component vulnerability model based on the model, to obtain the line failure probability, and to generate a failure scenario; secondly, considering the energy demand characteristics of different types of users, the load is divided into critical loads and non-critical loads, and a load fluctuation model is constructed. At the same time, in view of the uncertainty of photovoltaic and wind power output in the regional integrated energy system, a photovoltaic and wind power output model is established; finally, based on the generated failure scenario, the load fluctuation model and the photovoltaic and wind power output model are considered, and a regional integrated energy system resilience improvement model considering the diversity of user needs is established with the minimum total cost in the pre-disaster planning period as the objective function, and then the solver is used to solve the problem, and a strategy for improving the resilience of the regional integrated energy system under typhoon disasters is obtained. According to the empirical results in the embodiment of the present invention, a strategy for improving the resilience of a regional integrated energy system considering the diversity of user needs can well take into account the economy of the regional integrated energy system while improving the resilience of the regional integrated energy system under typhoon disasters. Specifically comprising the following steps:

[0163] Step 1: Analyze the uncertainty of wind speed in the wind field under typhoon disasters, obtain the wind speed distribution when the disaster occurs, and construct a typhoon wind field model that takes into account temporal and spatial differences;

[0164] Step 2: Based on the typhoon wind field model established in step 1, considering the uncertainty of line damage under typhoon disasters, an electrical component vulnerability model based on stress-strength interference theory is constructed;

[0165] Step 3: Based on the electrical component vulnerability model established in step 2, the probability of damage to electrical components on the line is calculated, the line failure probability is obtained, and the failure scenario is generated;

[0166] Step 4: Considering the energy demand characteristics of different types of users, the load is divided into critical load and non-critical load. At the same time, in view of the uncertainty of load fluctuation, the load random multiplier method is used to analyze the load fluctuation range and build a load fluctuation model;

[0167] Step 5: Aiming at the uncertainty of photovoltaic and wind power output in the regional integrated energy system, the robust optimization method is used to analyze the fluctuation range of photovoltaic and wind power output and build photovoltaic and wind power output models;

[0168] Step 6: Based on the fault scenario generated in step 3, considering the models established in steps 4 and 5, a regional integrated energy system resilience improvement model that takes into account the diversity of user needs and takes the minimum total cost during the pre-disaster planning period as the objective function is established;

[0169] Step 7: Use the solver to solve the regional integrated energy system resilience enhancement model established in step 6 that takes into account the diversity of user needs, and obtain the regional integrated energy system resilience enhancement strategy under typhoon disasters.

[0170] The wind field model considering time and space differences constructed in step 1 has the following specific steps:

[0171] 1) Establishment of composite wind speed model of typhoon wind field: The composite wind speed model of any point in the typhoon is established as follows:

[0172]

[0173]

[0174] 2) Establishment of extreme wind speed model: Extreme wind speed refers to the wind speed value exceeding the specific wind speed v0, which occurs once every Y years with a probability of P V (V>v0), the calculation formula is as follows:

[0175]

[0176] Therefore, the wind speed V with a return period of Y years Y The calculation formula is as follows:

[0177]

[0178] 3) Establishment of real-time wind speed model in typhoon wind field. For the real-time wind speed v in the wind field, take and The maximum value of is:

[0179]

[0180] Thus, the optimal distribution of wind speed is obtained

[0181] The electrical component vulnerability model based on stress-strength interference theory constructed in step 2, typical power grid components mainly include wires and poles on the line, and the electrical component vulnerability model includes a wire stress model and a pole bending moment model. The specific modeling process is as follows:

[0182] Calculate wind loads on conductors and poles:

[0183]

[0184] Cross-sectional stress of the conductor σ c The calculation formula is as follows:

[0185] σ c (v) = W c / S c

[0186] In addition to the wind load on the pole body, the pole also bears the wind load from the traction wire.

[0187] M1(v)=W p (l-l2) / 2

[0188] M2(v)=2W c l1+W c (l-l2)

[0189]

[0190] The component strength follows a normal distribution, represented by o. c Both M and M3 are functions of wind speed v, so they are collectively referred to as element wind load effect variables, represented by w, then:

[0191]

[0192] Mathematical model of conductor stress: When the conductor strength is less than the wind load effect, the conductor will break under the action of wind load. The stress intensity of the conductor obeys the normal distribution, and its probability density can be expressed as:

[0193]

[0194] σ θ =ε1σ μ

[0195] Mathematical model of bending moment of electric pole: When the strength of electric pole is less than the wind load effect, the electric pole will break under the action of wind load. The stress intensity of electric pole is related to its bending resistance, that is, the maximum bending moment it can withstand. The bending resistance of electric pole follows normal distribution, and its probability density can be expressed as:

[0196]

[0197]

[0198] M θ =ε2M μ

[0199] The generation process of the fault scenario in step 3 is specifically as follows:

[0200] 1) Construction of line fault probability model. From the wind field model constructed in step 2, we can see that the wind speed v is a random variable and obeys the optimal distribution Since the wind load effect variable w of the component is a function of the wind speed v, the wind load effect variable is also a random variable, represented by W(v), and obeys the following distribution:

[0201]

[0202] The failure probability of the conductor and the pole can be obtained from the stress of the conductor and the bending moment of the pole:

[0203]

[0204] From this we can get the failure probability of the line:

[0205]

[0206] After the line is reinforced, the probability of line failure can be effectively reduced, but there is still a potential risk of damage. The final fault state of line (i, j) is expressed as follows:

[0207]

[0208] 2) Generation of fault scenarios. For the generation of fault scenarios, the threshold method is used to determine the fault state of the line and obtain and The scene generation process is as follows:

[0209]

[0210] p u ~U(0,1)

[0211] When the line damage probability is greater than the fault threshold, the line fails. The failure probability of each branch is shown in Table 1.

[0212] Table 1 Branch failure probability

[0213]

[0214] In step 4, the load is divided into critical load and non-critical load, and the load division principle is determined by the energy demand characteristics of the user.

[0215] Critical loads are divided into critical power loads and critical heating loads. Critical power loads include hospital power, fire protection power, and power for uninterrupted production lines in factories. Critical heating loads include the temperature requirements of hospitals, factory workshops and warehouses, etc. The power supply system needs to ensure uninterrupted power supply to critical loads, and non-critical loads are allowed to suffer appropriate losses after extreme natural disasters, and available resources are transferred to critical loads.

[0216]

[0217]

[0218] The load fluctuation model constructed in step 4 is specifically described as follows:

[0219]

[0220] The photovoltaic and wind power output models constructed in step 5 are specifically constructed by using a robust optimization method to analyze the uncertainty of photovoltaic and wind power output. The specific modeling process is as follows:

[0221]

[0222] r t pv +r t wt ≤R t

[0223] 0≤r t pv ≤1,0≤r t wt ≤1

[0224] The relevant constraints of the regional comprehensive energy system planning model constructed in step 6 include photovoltaic component constraints, wind turbine constraints, cogeneration unit constraints, heating-only unit constraints, out-of-region energy purchase constraints, energy storage constraints, thermal energy balance constraints, and power balance constraints.

[0225] 1) PV panel constraints

[0226]

[0227] 2) Wind turbine constraints

[0228]

[0229] 3) Cogeneration unit constraints

[0230]

[0231]

[0232]

[0233] 4) Only heating unit constraints

[0234]

[0235]

[0236] 5) Constraints on purchasing energy outside the region

[0237] The constraints of purchasing energy outside the region are divided into the constraints of purchasing electricity outside the region and purchasing gas outside the region. The specific description is as follows:

[0238]

[0239] 6) Energy storage constraints

[0240]

[0241] 7) Thermal energy balance constraints

[0242]

[0243] 8) Power balance constraints

[0244]

[0245] P t pv,r and P t wt,r is a nonlinear variable, and the above power balance constraint is linearized by duality theory:

[0246]

[0247] The regional integrated energy system planning model constructed in step 6 takes the minimum total cost during the pre-disaster planning period as the objective function, which specifically includes investment cost, maintenance cost and operating cost, as shown below:

[0248] f=min(f1+f2+f3)

[0249] Where f is the total cost during the planning period, f1, f2 and f3 are investment cost, maintenance cost and operating cost respectively.

[0250] 1) Investment cost:

[0251] The investment cost includes the annual investment cost of the equipment in the system and the line reinforcement cost:

[0252]

[0253]

[0254] 2) Maintenance cost:

[0255] Assume that maintenance cost is proportional to equipment capacity as shown in the following formula:

[0256]

[0257] 3) Operating costs:

[0258] The operating costs include the system operating costs under normal circumstances and the system operating costs under extreme disasters, namely the cost of purchasing energy from outside the region and the load reduction penalty cost.

[0259] f3=Ε o,s (f4+f5)

[0260]

[0261] The regional integrated energy system planning model constructed in step 6 defines the total load shedding index of the system during the entire typhoon disaster process to characterize the system elasticity, which is specifically expressed as follows:

[0262]

[0263] The step 7 is specifically as follows:

[0264] The regional integrated energy system planning model established in step 6 was built based on the matlab platform, and the parameters of the regional integrated energy system were substituted into the model. After determining the objective function with the minimum total cost during the pre-disaster planning period, the gurobi solver was used to solve the problem. The failure probability of each branch is shown in Table 1, the proportion of key loads of different users is shown in Table 2, the parameters of each device in the system are shown in Table 3, and other system parameters are shown in Table 4.

[0265] Table 2 Critical load ratio of different users

[0266]

[0267] Table 3 Other system parameters

[0268]

[0269] Table 4 System other parameters

[0270]

[0271] This embodiment selects the following four scenarios for comparative analysis:

[0272] Scenario 1: A regional integrated energy system planning model that does not consider multiple uncertainties under typhoon disasters and does not consider the different demand characteristics of users;

[0273] Scenario 2: A regional integrated energy system planning model that considers multiple uncertainties under typhoon disasters but does not consider the different demand characteristics of users;

[0274] Scenario 3: A regional integrated energy system planning model that does not consider multiple uncertainties under typhoon disasters but takes into account the different demand characteristics of users;

[0275] Scenario 4: A regional integrated energy system planning model that considers multiple uncertainties under typhoon disasters and the different demand characteristics of users.

[0276] Table 5 Cost breakdown under four scenarios

[0277]

[0278]

[0279] Table 5 shows the various cost details for the four scenarios. Figure 4 The changes in system performance under the four scenarios after the disaster. From the comparison results in Table 5, it can be seen that the unit maintenance cost, out-of-region energy purchase cost and load reduction penalty cost of scenario 1 and scenario 3 are much higher than those of scenario 2 and scenario 4, while the line reinforcement cost of scenario 1 and scenario 3 is lower than that of scenario 2 and scenario 4. This is because scenario 1 and scenario 3 do not consider the multiple uncertainties under typhoon disasters, and cannot accurately predict the state of the system after the typhoon disaster. Therefore, they cannot resist the impact of typhoon disasters, causing great losses to the system. Scenario 2 does not consider the different demand characteristics of users. After encountering a typhoon disaster, it is impossible to minimize the loss of the system. The load reduction penalty cost is higher than that of scenario 4, so the total cost of scenario 4 is the lowest.

[0280] Depend on Figure 4 It can be seen that after the disaster, the system performance of scenario 1 is most seriously degraded and takes the longest time to recover. The system performance of scenario 2 is higher than that of scenario 3, but because scenario 3 takes into account the different needs of users, the system performance of scenario 3 recovers to the original level faster than that of scenario 2. The system performance of scenario 1 is much higher than that of scenario 1 and scenario 3, and slightly higher than that of scenario 2, and the system performance of scenario 1 recovers to the original level in the shortest time.

[0281] To sum up, considering the multiple uncertainties under typhoon disasters can effectively resist the impact of typhoon disasters and greatly improve the performance of regional integrated energy systems under typhoon disasters; considering the different demand characteristics of users can effectively improve the recovery speed of regional integrated energy systems after disasters and minimize the losses of the system, while greatly reducing the total cost of pre-disaster planning of the system.

Claims

1. A method for improving the resilience of a regional integrated energy system taking into account the diverse needs of users, characterized by The following steps are involved: Step 1: Analyze the uncertainty of wind speed in the wind field under typhoon disasters, obtain the wind speed distribution when the typhoon disaster occurs, and construct a typhoon wind field model that considers temporal and spatial differences; Step 2: Based on the typhoon wind field model established in step 1, considering the uncertainty of line damage under typhoon disasters, an electrical component vulnerability model based on stress-strength interference theory is constructed; Step 3: Based on the electrical component vulnerability model established in step 2, the probability of damage to electrical components on the line is calculated, the line failure probability is obtained, and the failure scenario is generated; Step 4: Considering the energy demand characteristics of different types of users, the load is divided into critical load and non-critical load. At the same time, in view of the uncertainty of load fluctuation, the load random multiplier method is used to analyze the load fluctuation range and build a load fluctuation model; Step 5: Aiming at the uncertainty of photovoltaic and wind power output in the regional integrated energy system, the robust optimization method is used to analyze the fluctuation range of photovoltaic and wind power output and build photovoltaic and wind power output models; Step 6: Based on the fault scenario generated in step 3, considering the models established in steps 4 and 5, a regional integrated energy system resilience improvement model is established with the minimum total cost in the pre-disaster planning period as the objective function, taking into account the diversity of user needs; Step 7: Solve the regional integrated energy system resilience improvement model established in step 6 that takes into account the diversity of user needs; Through the above steps, a strategy for improving the resilience of the regional integrated energy system under typhoon disasters is obtained.

2. The method for improving the elasticity of a regional integrated energy system taking into account the diversified needs of users according to claim 1, characterized in that: In step 1, the typhoon wind field model considering time and space differences is constructed, specifically including: 1) Establish a composite wind speed model for typhoon wind field: The composite wind speed model at any point in the typhoon is established as follows: In the formula, is the ground gust wind speed within 3s from the typhoon eye r; is the surface gradient wind speed within 1 h from the typhoon eye r; κ is the Karman constant; γ is the time-related factor; χ is the relationship between the surface roughness s0 and the gradient height h g Related factors; h g is the gradient height, s0 is the surface roughness, and t represents the time period number; In the formula, is the radial wind speed component of the ground gust within 3 seconds at any height H from the typhoon eye r, is the ground gust wind speed within 3s at a distance r from the typhoon eye; H is the vertical height of the typhoon cloud wall; In the formula, is the tangential wind speed component of the ground gust at any height H from the typhoon eye within 3s; α is the inflow angle of the cyclone; Where V sh is the offset wind speed component, is the composite wind speed component, V T is the moving speed of the typhoon, R max is the maximum radius of the typhoon wind field; 2) Establish extreme wind speed model: Extreme wind speed refers to the wind speed value exceeding the specific wind speed v0, which occurs once every Y years with a probability of P V , V>v0, the calculation formula is as follows: Where V is the random variable of wind speed; F(V) is the wind speed distribution function; Y is the recurrence period of extreme wind speed; Therefore, the wind speed V with a return period of Y years Y The calculation formula is as follows: 3) Establish a real-time wind speed model in the typhoon wind field: For the real-time wind speed v in the wind farm, take and The maximum value of is: Thus, the optimal distribution of wind speed is obtained 3. The method for improving the elasticity of a regional integrated energy system taking into account the diversified needs of users according to claim 1, characterized in that: In step 2, the electrical component vulnerability model based on the stress-strength interference theory is constructed. The electrical component vulnerability model includes a conductor stress model and a pole bending moment model. The specific modeling process is as follows: Calculate wind loads on conductors and poles: Where W c and W p are the wind loads on the conductors and poles respectively; μ u , μ H , μ sc and μ sp are wind pressure unevenness coefficient, wind pressure height variation coefficient, conductor shape coefficient and pole shape coefficient respectively; θ is the moving direction angle of the typhoon; D is the outer diameter of the conductor; l s is the wire spacing; l and l2 are the height and burial depth of the pole respectively; d r and d t are the diameters of the bottom and top of the pole respectively; W c (v) is the function of wind load on the conductor with respect to wind speed v; W p (v) is the function of wind load on the pole with respect to wind speed v; Cross-sectional stress of the conductor σ c The calculation formula is as follows: s c (v)=W c / S c ; In the formula, S c is the cross-sectional area of ​​the conductor; σ c (v) is the cross-sectional stress of the conductor as a function of wind speed v; W c is the wind load on the conductor; In addition to the wind load on the pole body, the pole also bears the wind load from the traction wire: M1(v)=W p (l-l2) / 2; <h2 style=";text-align:left;direction:ltr">M2(v) = 2W<h2 style=";text-align:left;direction:ltr"> c <h2 style=";text-align:left;direction:ltr"> l1+W<h2 style=";text-align:left;direction:ltr"> c <h2 style=";text-align:left;direction:ltr"> (l-l2); Where: M1 is the bending moment at the root of the pole caused by the wind load acting on the middle of the pole; M2 is the bending moment at the root of the pole caused by the wind load of the traction conductor; M3 is the composite bending moment at the root of the pole; l1 is the height of the pole cross arm from the ground; M1(v) is the function of the bending moment at the root of the pole caused by the wind load acting on the middle of the pole with respect to the wind speed v; M2(v) is the function of the bending moment at the root of the pole caused by the wind load of the traction conductor with respect to the wind speed v; M3(v) is the function of the composite bending moment at the root of the pole with respect to the wind speed v; W p is the wind load on the conductors and poles; θ is the moving angle of the typhoon; The component strength follows a normal distribution, represented by o; σ c Both M and M3 are functions of wind speed v, so they are collectively referred to as element wind load effect variables, represented by w, then: Where Φ(w) is the normal cumulative distribution function of the wind load effect variable of the component; is the normal probability density function of the component strength; Conductor stress mathematical model: When the conductor strength is less than the wind load effect, the conductor will break under the action of wind load; the stress intensity of the conductor obeys the normal distribution, and its probability density can be expressed as: s θ =ε1σ μ ; In the formula, is the density function of the conductor strength, σ θ is the standard deviation of the wire strength, σ μ is the expected mean value of the conductor strength, ε1 is the coefficient of variation of the conductor strength; is the density function of the wire strength; Mathematical model of pole bending moment: When the pole strength is less than the wind load effect, the pole will break under the action of wind load; the stress intensity of the pole is related to its bending resistance, that is, the maximum bending moment it can withstand; the bending resistance of the pole obeys the normal distribution, and its probability density can be expressed as: M μ =lM exam ; M θ =ε2M μ ; In the formula, M is the density function of the bending resistance of the pole; θ and M μ are the standard deviation and expected mean of the bending resistance of the poles; M exam is the calibration value of the pole bending moment on the pole bearing capacity; l is the calibration coefficient; ε2 is the pole strength variation coefficient; is the density function of the bending resistance of the pole.

4. The method for improving the elasticity of a regional integrated energy system taking into account the diversified needs of users according to claim 1, characterized in that: The step 3 comprises the following steps: S3.1: Construct line fault probability model: 1) From the typhoon wind field model constructed in step 2, it can be seen that the wind speed v is a random variable and obeys the optimal distribution Since the wind load effect variable w of the component is a function of the wind speed v, the wind load effect variable is also a random variable, represented by W(v), and obeys the following distribution: Where F(w) is the distribution function of the wind load effect variable of the component; W -1 (w) is the inverse function of the wind load effect variable; is the optimal distribution function of the inverse function of the wind load effect variable; p w {W(v)≤w} is the probability of wind load action; p v {v≤W -1 (w)} is the probability of occurrence of extreme wind speed; The failure probability of the conductor and the pole can be obtained from the stress of the conductor and the bending moment of the pole: In the formula, is the normal probability density function of the conductor strength; is the normal probability density function of the pole strength; F(o) is the distribution function of the component strength; W -1 (o) is the inverse function of the wind load effect variable with respect to the component strength; is the distribution function of wind load effect with respect to the inverse function of element strength; M3 is the composite bending moment at the root of the rod; p c and p p are the failure probabilities of conductors and poles respectively; thus, the failure probability of the line can be obtained: In the formula, p ij is the failure probability of line (i, j); k1 and k2 are the number of conductors and poles in the line respectively; p c,a and p p,b are the failure probabilities of the a-th conductor and the b-th pole in the line respectively; After the line is reinforced, the probability of line failure can be effectively reduced, but there is still a potential risk of damage; the final fault state of line (i, j) is expressed as follows: In the formula, is a 0-1 variable, It means that in scenario s, line (i, j) fails, otherwise it means that no failure occurs; is a 0-1 variable. When , it means that the line (i, j) has been reinforced, otherwise it means that it has not been reinforced; are the relevant parameters of line (i, j) when it is not reinforced, Indicates that line (i, j) is faulty, otherwise it indicates normal operation; are the relevant parameters of line (i, j) after reinforcement, indicates that line (i, j) is faulty, otherwise it indicates normal operation. When generating a fault scenario, for all lines in the scenario, you only need to and Just perform sampling; Ω1 is the set of nodes in the system; is a collection of fault scenarios; For any line (i, j); S3.2: Generate failure scenarios: 2) For the generation of fault scenarios, the threshold method is used to determine the fault state of the line and obtain and The scene generation process is as follows: p u ~U(0,1); In the formula, and are the probability of damage of line (i, j) before and after reinforcement, p u is the fault threshold that obeys uniform distribution; when the line damage probability is greater than the fault threshold, the line fails; U(0,1) represents 0-1 distribution.

5. The method for improving the elasticity of a regional integrated energy system considering the diversified needs of users according to claim 1, characterized in that: In step 4, the load is divided into critical load and non-critical load, and the load division principle is determined by the energy demand characteristics of the user; Critical loads are divided into critical electricity loads and critical heating loads; Key power loads include hospital power, fire protection power and factory uninterrupted production line power; Key heating loads include the temperature requirements of hospitals, factory floors and warehouses; The power supply system needs to ensure uninterrupted power supply to critical loads, and allow appropriate losses for non-critical loads after extreme natural disasters, so that available resources can be transferred to critical loads; Where P t sh and are the electrical load rejection and thermal load rejection at time t respectively; r e and r t are the key load ratio coefficients for electricity and heating, and are the electricity and heating demand loads at time t respectively.

6. The method for improving the elasticity of a regional integrated energy system taking into account the diversified needs of users according to claim 5, characterized in that: In step 4, the load fluctuation model constructed is specifically described as follows: Where P j l,s and are respectively the active load and reactive load at node j in scenario s; P j l and are the active load reference value and reactive load reference value at node j respectively; is the random multiplier of the load of node j in scenario s, which follows a normal distribution; For any node j, N(1,0.1 2 ) means the mathematical expectation is 1 and the variance is 0.1 2 The normal distribution of .

7. The method for improving the elasticity of a regional integrated energy system considering the diversified needs of users according to claim 1, characterized in that: In step 5, the specific modeling process of photovoltaic and wind power output models is as follows: r t pv +r t wt ≤R t ; 0≤r t pv ≤1,0≤r t wt ≤1; Where P t pv,r and P t wt,r are the ranges of photovoltaic power generation and wind power generation at time t; P t pv and P t wt are the photovoltaic and wind power generation at time t before robust optimization; and are the maximum deviations of photovoltaic and wind power generation at time t from their predicted values; r t pv and r t wt are the uncertainty coefficients of photovoltaic and wind power generation at time t; R t is the robustness coefficient of renewable energy output at time t, R t The larger it is, the greater the uncertainty in the renewable energy output power.

8. The method for improving the elasticity of a regional integrated energy system considering the diversified needs of users according to claim 1, characterized in that: In step 6, the relevant constraints of the constructed regional comprehensive energy system planning model include photovoltaic component constraints, wind turbine constraints, cogeneration unit constraints, heating-only unit constraints, out-of-region energy purchase constraints, energy storage constraints, thermal energy balance constraints, and power balance constraints; 1) PV panel constraints: Where P pv is the rated output power of the photovoltaic module, F t is the solar radiation intensity at time t, F0 is the solar radiation intensity at room temperature, f pt is the power temperature coefficient of the photovoltaic module, T t is the operating temperature of the photovoltaic module at time t, and T0 is the room temperature; 2) Wind turbine constraints: Where P wt is the rated output power of the wind turbine, V q 、V d and V0 are the cut-in wind speed, cut-out wind speed and rated wind speed of the wind turbine respectively; 3) Constraints on cogeneration units: 0≤P t chp ≤P c chp Where P t chp and are the output power and heat generated by the cogeneration unit at time t; η e and η h are the power generation efficiency and heat generation efficiency of the cogeneration unit respectively; G t is the amount of natural gas purchased by the system at time t; is the rated capacity of the cogeneration unit; 4) Constraints for heating units only: Where P t hp and are respectively the power consumption and heat generated by the heating unit at time t, is the upper limit of heat production of the heating unit only, η hp is the heat production coefficient of the heating unit only; 5) Constraints on out-of-region purchases: The constraints of purchasing energy outside the region are divided into the constraints of purchasing electricity outside the region and purchasing gas outside the region. The specific description is as follows: Where P t buy and is the amount of electricity and natural gas purchased from outside the region at time t, and The upper limit of out-of-region electricity and gas purchases for the system; 6) Energy storage constraints: In the formula, is the electrical energy stored in the battery at time t; and are the charge and discharge amounts of the battery at time t respectively; η ese is the battery loss rate; and They are the lower capacity limit and rated capacity of the battery respectively; The upper limit of battery charge and discharge; M is an infinite positive real number; and are 0-1 variables, representing the charging state and discharging state of the battery at time t; and Respectively represent the initial capacity and final capacity of the battery; is the electric energy stored in the battery at time t-1; 7) Thermal energy balance constraints: 8) Power balance constraints: Where P t l is the active load at time t; P t pv,r and P t wt,r is a nonlinear variable, and the above power balance constraint is linearized by duality theory: In the formula, r t , and They are all robust parameters after linearization.

9. The method for improving the elasticity of a regional integrated energy system taking into account the diversified needs of users according to claim 8, characterized in that: In step 6, the constructed regional integrated energy system planning model takes the minimum total cost during the pre-disaster planning period as the objective function, which specifically includes investment cost, maintenance cost and operating cost, as shown below: f=min(f1+f2+f3) In the formula, f is the total cost in the planning period, f1, f2 and f3 are investment cost, maintenance cost and operating cost respectively; (1) Investment cost: The investment cost includes the annual investment cost of the equipment in the system and the line reinforcement cost: In the formula, θ is the investment recovery rate; is the reinforcement cost of line (i, j); c d Cost of reinforcing poles; and are the installation costs of photovoltaic modules and wind turbines respectively; P0 pv and are the rated capacities of PV modules and wind turbines respectively; Ω2 and Ω3 are the node sets where PV modules and wind turbines are located respectively; I r is the interest rate, T y is the investment payback period; f1 is the investment cost; is a 0-1 variable. When , it means that the line (i, j) has been reinforced, otherwise it means that it has not been reinforced; k is the node number where the photovoltaic module is located; d is the node number where the wind turbine is located; Ω3 is the node set where the wind turbine is located; (2) Maintenance cost: Assume that maintenance cost is proportional to equipment capacity as shown in the following formula: Where f2 is the maintenance cost; m,s is the mathematical expectation of renewable energy equipment maintenance under scenario s; and are the maintenance costs per unit capacity of PV panels and wind turbines respectively; (3) Operating costs: The operating costs include the system operating costs under normal circumstances and the system operating costs under extreme disasters, namely the cost of purchasing energy from outside the region and the penalty cost of load shedding; f3=E o,s (f4+f5) Where: f3 is the operating cost; o,s is the mathematical expectation of system operation under scenario s; f4 and f5 are the system operation costs under normal conditions and under extreme disasters, respectively; n d and n j They are the normal operating days and extreme disaster days of the system in a year; and are the electricity price and natural gas price at time t respectively; and are the load reduction penalty costs per unit electrical load and thermal load respectively; P t buy and are the amount of electricity and natural gas purchased from outside the region at time t of the system; P t sh and are the electrical load rejection and thermal load rejection at time t respectively; and are the load reduction penalty costs per unit electrical load and thermal load, respectively.

10. The method for improving the elasticity of a regional integrated energy system taking into account the diversified needs of users according to claim 9, characterized in that: The regional integrated energy system planning model constructed in step 6 defines the total load shedding index of the system during the entire typhoon disaster process to represent the system elasticity, which is specifically expressed as follows: In the formula, R E It represents the elasticity of the regional integrated energy system, which is the accumulation of system load shedding over time.

Citation Information

Cited By

  • Offshore wind power system planning method for coping with typhoon scene and related equipment

    CN121813504A