Distribution and micro collaborative optimization scheduling method and device and storage medium

Through the micro-coordinated optimization scheduling method, the optimization problems of distribution network and micro-grid are decoupled, and the diagonal quadratic approximation method is used for parallel solution, which solves the distribution network voltage fluctuation caused by distributed power supply access, and realizes distribution Safe and stable operation and efficient output regulation of the power grid.

CN119050994APending Publication Date: 2024-11-29SOUTHEAST UNIV +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411109547.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The voltage fluctuation problem of distribution network caused by distributed power supply access, especially voltage instability caused by strong output and randomness, is difficult to effectively solve through centralized optimization, limiting the autonomy of the microgrid and the coordination of the multi-subject interests of the microgrid. .

Method used

The micro-distribution collaborative optimization scheduling method is adopted to obtain the micro-distribution system parameters, build a global optimization model, decouple the connection power of the distribution network and the micro-distribution network, and solve the optimization sub-problem in parallel by truncating the diagonal quadratic approximation method to obtain the power distribution The adjustment amount of the network and microgrid improves the algorithm's solution efficiency and system stability.

Benefits of technology

It improves the safe and stable operation of the distribution network, can efficiently respond to voltage fluctuations, ensures the safety and stability of the distribution system, and improves the output control capability after distributed energy access.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119050994A_ABST
    Figure CN119050994A_ABST
Patent Text Reader

Abstract

The invention discloses a distribution network collaborative optimization method and device and a storage medium, and belongs to the technical field of distribution network optimization scheduling. The method comprises the following steps: acquiring micro-system parameters; constructing a global optimization model of the micro-distribution system according to the parameters of the micro-distribution system; the distribution network contact power and the micro-grid contact power at the distribution micro-grid boundary serve as a virtual power source and a virtual load respectively, the distribution micro-grid system global optimization model is decoupled, and a decoupled distribution network optimization sub-problem and a decoupled micro-grid optimization sub-problem are obtained; and performing parallel solution on the distribution network optimization sub-problem and the microgrid optimization sub-problem by adopting a truncated diagonal quadratic approximation method to obtain regulating variables of the distribution network and each microgrid, decoupling a global distribution and microgrid collaborative optimization problem, and performing optimization solution on the decoupled sub-problems by adopting a parallel mode, so that the calculation efficiency is improved, and the calculation cost is reduced. A power distribution system under distributed photovoltaic large-scale access can respond to system voltage fluctuation more efficiently, and operation is safer and more stable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of distribution network optimization scheduling, and in particular to a distribution network micro-coordinated optimization scheduling method, device and storage medium. Background Art

[0002] In recent years, as the penetration rate of new energy in new distribution systems has gradually increased, problems such as mismatched source-load distribution and increased line losses have gradually emerged. The large-scale access of new energy sources such as distributed photovoltaics to the power grid has brought more uncertainty and randomness to the distribution system.

[0003] After low-voltage distributed photovoltaics are aggregated, they are incorporated into the upper distribution network by microgrids, which can effectively reduce the impact of the uncertainty of photovoltaic output on its local consumption. Smart distribution networks have become key nodes connecting various forms of energy, but the power interaction between distribution networks and microgrids is complex, which limits the high level of autonomy of microgrids and the interests of multiple subjects in the distribution and microgrid system. In addition, due to the privacy of each subject's data and the complexity of calculation, centralized optimization is difficult to achieve. Summary of the invention

[0004] The purpose of the present invention is to provide a distribution network collaborative optimization scheduling method, device and storage medium to specifically solve the problem of voltage fluctuation in the distribution network caused by the strong output and randomness of distributed power access, and ensure the safe and stable operation of the distribution network. The technical solution adopted by the present invention is as follows.

[0005] In one aspect, the present invention provides a method for coordinated optimization scheduling of distribution and micro-distribution, comprising:

[0006] Get the parameters of the micro-distribution system;

[0007] According to the micro-distribution system parameters, a global optimization model of the micro-distribution system is constructed;

[0008] The distribution network interconnection power and microgrid interconnection power at the distribution-microgrid boundary are respectively used as virtual power sources and virtual loads, and the global optimization model of the distribution-microgrid system is decoupled to obtain the decoupled distribution network optimization subproblem and microgrid optimization subproblem;

[0009] The truncated diagonal quadratic approximation method is used to solve the distribution network optimization subproblem and the microgrid optimization subproblem in parallel to obtain the regulation quantities of the distribution network and each microgrid.

[0010] Optionally, the distribution micro-system parameters include: topological parameters of the distribution network, parameters of each adjustable device in the distribution network and the micro-grid, loads of each feeder in the distribution network, and total load in the micro-grid; photovoltaic output prediction within the geographical range of the distribution micro-system;

[0011] The regulation amount of the distribution network and each microgrid includes: the regulation amount of the adjustable equipment in the distribution network, and the amount of electricity purchased and sold by the microgrid to the distribution network through the interconnection line.

[0012] Among them, the adjustable equipment parameters in the distribution network include gas turbines, capacitor banks, etc., and the regulating equipment in the microgrid includes distributed photovoltaics, energy storage, micro gas turbines, etc. For adjustable equipment, the adjustment amount of the capacitor bank is the gear position, and the adjustment amount of the gas turbine is the active output and start-stop state. After aggregation, the microgrid can be equivalent to an adjustable PQ node, so there is no need to obtain its internal topology parameters.

[0013] Optionally, the global optimization model of the micro-distribution system is expressed as:

[0014]

[0015] Where N m is the number of microgrids, F d (·) and x d They represent the optimization objectives and decision variables on the distribution network side, respectively. m,i (·) and x m,i They represent the optimization objectives and decision variables of the microgrid i side, where the optimization objective is the operating cost; let T be the number of optimization periods, and the set represents the coupling variable vector on the distribution network side, r i represents the coupling variable vector on the microgrid side; h d and g d are the equality and inequality constraints on the distribution network side, h m,i and g m,i are the equality and inequality constraints on the i-side of the microgrid.

[0016] Among them, the optimization solution constraints on the distribution network side include the adjustable device model constraints, power flow constraints, and voltage safety constraints in the distribution network optimization sub-problem. The optimization solution constraints on the microgrid side include the adjustable device model constraints and power balance constraints.

[0017] Optionally, the decoupling of the global optimization model of the distribution-microgrid system includes: relaxing the distribution network interconnection power and the microgrid interconnection power at the distribution-microgrid boundary by an augmented Lagrangian penalty function, wherein the penalty function is expressed as:

[0018]

[0019] In the formula, c i represents the difference of the coupled variables, μ and ω are the multipliers of the first and second terms of the penalty function, respectively, and the symbol Represents the Hadamard product of matrices;

[0020] make The decoupled distribution network optimization sub-problem is expressed as:

[0021]

[0022] The decoupled microgrid optimization subproblem is expressed as:

[0023]

[0024] At this point, the traditional ATC method can be used to serially solve the distribution network and microgrid optimization sub-problems, and the penalty function multipliers can be updated through iterative solution to make the coupling variables meet the consistency constraints, but the calculation efficiency is low.

[0025] Therefore, the truncated diagonal quadratic approximation (TDQA) method is used to parallelize the traditional ATC algorithm and establish a fully parallel distributed collaborative optimization model. Optionally, the method also includes establishing a distribution network optimization subproblem model and each microgrid optimization subproblem model, wherein the distribution network optimization subproblem model establishes an objective function with the minimum operating cost F1 as the goal, which is expressed as:

[0026]

[0027] In the formula, The cost of electricity purchase and sale from the distribution network to the lower-level power grids. The equipment adjustment cost is calculated as follows:

[0028]

[0029] In the formula, P represents the electricity price at time t; t TD and They represent the power purchased and sold by the distribution network to the lower and upper level power grids at time t; a i DG 、b i DG and are the cost coefficient and active output of adjustable equipment in the distribution network respectively; N DG The number of adjustable devices in the distribution network;

[0030] Microgrid i optimization sub-problem model to minimize the day-ahead operation cost F 2,i Establish the objective function for the target, expressed as:

[0031]

[0032] In the formula, The cost of electricity purchase and sale from microgrid i to the upper distribution network; Aggregate distributed device regulation cost for microgrid i, and the calculation formula is:

[0033]

[0034] In the formula, is the interaction power between microgrid i and distribution network in period t; and They are the output regulation costs of the micro gas turbine, distributed energy storage and distributed photovoltaics aggregated in microgrid i; and They are the active output regulation of micro gas turbine, distributed energy storage and distributed photovoltaic at time t respectively.

[0035] Optionally, the constraints of the objective function in the distribution network optimization sub-problem model include:

[0036] (1) Flexible interconnect device FID device constraint, expressed as:

[0037]

[0038]

[0039] Where N FID is the number of interconnected FID devices on the DC side; is the interaction power between the ith FID device and the distribution network in period t, The maximum capacity of the DC side of the FID device;

[0040] (2) CB group device constraints, expressed as:

[0041]

[0042] In the formula, and are the reactive compensation power invested in the CB group in period t and the compensation power of each CB group respectively; and are discrete variables, representing the number of CB operation groups and the maximum number of operation groups; and It is the CB group switching action mark. Indicates that CB group i performs a cut-out action in period t, It means that CB group i is put into operation in period t; Indicates the maximum number of actions that a CB group can take in a scheduling cycle.

[0043] (3) Controllable distributed generation DG constraint, expressed as:

[0044]

[0045] In the formula, and They are the upper and lower limits of the active output of DG respectively; is the active power output of the ith DG in period t; It is the start and stop mark of DG. Indicates that DG is put into operation. Indicates DG cut-out;

[0046] (4) AC power flow constraint of distribution network, expressed as:

[0047]

[0048] Where P ij and Q ij Respectively represent the active and reactive power flowing through branch ij; θ ij =θ i -θ j ; V i and V j are the voltage amplitudes at nodes i and j at both ends of branch ij, θ i and θ j are the voltage phase angles at nodes i and j, respectively, and g ij and b ij are the branch conductance and susceptance of branch ij respectively;

[0049] Introducing variable x i =V i 2 , x ij,1 =V i V j cosθ ij , x ij,2 =V i V j sinθ ij The equivalent relationship is as follows:

[0050]

[0051] According to the equivalent relationship, the phase angle of each node voltage is restored and Perform a second-order cone relaxation, expressed as:

[0052] (2x ij,1 ) 2 +(2x ij,2 ) 2 +(x i -x j ) 2 ≤(x i +x j ) 2

[0053] The power balance constraint of node j is obtained as follows:

[0054]

[0055] Where d(j) is the set of interconnection lines of the upper distribution network or lower microgrid at node j; Indicates the active power purchased by the distribution network from the main grid. Indicates the amount of electricity sold by the distribution network to the microgrid, Indicates the reactive power purchased by the distribution network from the main grid. and is the load at node j; v(j) is the set of DGs connected to the distribution network at node j; c(j) is the set of CB groups connected to the distribution network at node j; u(j) is the set of head-end nodes of the branch with node j as the terminal node in the distribution network topology.

[0056] (5) Line power flow safety constraint, expressed as:

[0057] U i,min ≤U i ≤U i,max

[0058] -θ ij,max ≤θ ij ≤θ ij,max

[0059] -P ij,max ≤P ij ≤P ij,max

[0060] Where U i ,θ ij , P ij are the voltage of node i, the voltage phase angle of branch ij, and the power of branch ij respectively; U i,min and U i,max x m,i The voltage U at node i is i The upper and lower limits of θ ij,max and P ij,max is the phase angle difference θ of branch ij ij upper limit and power upper limit.

[0061] Optionally, the constraints of the objective function in the microgrid optimization sub-problem model include:

[0062] (1) Power balance constraint, expressed as:

[0063]

[0064] In the formula, is the negative active load in microgrid i during period t, It represents the aggregated output of controllable distributed power sources in the microgrid. Represents the aggregated output of distributed photovoltaics in the microgrid, Indicates the aggregated output of energy storage devices in the microgrid. Indicates the active power in the microgrid;

[0065] (2) Tie line power constraint, expressed as:

[0066]

[0067] In the formula, is the interaction power of the microgrid interconnection line between microgrid i and the distribution network, is the maximum interactive power on the distribution micro-interconnection line;

[0068] (3) Controllable distributed power constraints, expressed as:

[0069]

[0070] In the formula, and They are the upper and lower limits of the active output of DG respectively; is the active power output of the i-th DG in the microgrid during period t; is the start / stop mark of DG. It means DG is put into operation;

[0071] (4) Distributed energy storage constraints, expressed as:

[0072]

[0073] In the formula, represents the active output of energy storage in microgrid i at time t, and are the operating power of the energy storage in the charging and discharging states during period t, represents the maximum output of energy storage in microgrid i; is the amount of energy stored in period t; represents the charging efficiency of energy storage, Indicates the discharge efficiency of energy storage; and It is the charging and discharging status mark of the time period energy storage. Indicates that the energy storage is in the discharge state during period t. Indicates that the energy storage is in charging state during period t;

[0074] (5) PV operation constraints, expressed as:

[0075]

[0076] In the formula, represents the active power of photovoltaic power in microgrid i during period t, is the predicted active power of PV in microgrid i during period t; It is the deviation of photovoltaic output prediction, which is a fuzzy variable.

[0077] Optionally, the use of the truncated diagonal quadratic approximation method to solve the distribution network optimization subproblem and the microgrid optimization subproblem in parallel includes:

[0078] The quadratic term in the augmented Lagrangian penalty function is expanded as follows:

[0079]

[0080] For the cross term in the kth iteration Performing a first-order Taylor expansion, the linearized approximation result is:

[0081]

[0082] In the formula, and They represent the coupling variables of the k-1th iteration and are constants in the kth iteration;

[0083] Then the quadratic term in the penalty function can be approximately expressed as follows:

[0084]

[0085] In the formula, is a constant term;

[0086] Substituting the approximate expression of the quadratic term into the original augmented Lagrangian penalty function, the diagonal quadratic approximation form of the augmented Lagrangian penalty function is obtained as follows:

[0087]

[0088] The objective functions of the reconstructed micro-optimization sub-problems are expressed as follows:

[0089]

[0090] In the above technical solutions, the truncated diagonal quadratic approximation (TDQA) strategy only considers the outer loop and omits the inner loop. The penalty function multiplier is updated after each iteration, and the transformation is reconstructed based on the penalty function. The solution of each subproblem uses the coupling variables obtained in the previous iteration. When solving the subproblems of micro-cooperative optimization in full parallel, the time of one iteration is reduced to the time of solving the slowest subproblem.

[0091] In a second aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the method for coordinated optimization scheduling of the distribution and micro-device described in the first aspect is implemented.

[0092] Beneficial Effects

[0093] The present invention aims at the problem of voltage fluctuation in distribution network caused by strong output and randomness of distributed power source access, improves the safe and stable operation of distribution network by means of distribution-micro grid collaborative optimization, constructs distributed collaborative optimization model, distribution network optimization sub-problem model, microgrid optimization sub-problem model, etc., and decouples the global distribution-micro grid collaborative optimization problem into two types of sub-problems: distribution network optimization and microgrid optimization. The diagonal quadratic approximation method is used to parallelize the consistency constraint penalty function of the collaborative optimization problem, and the sequential solution method is converted into a fully parallel solution method, so as to improve the solution efficiency of the collaborative optimization algorithm, so that the distribution system under large-scale access of distributed energy can more efficiently respond to voltage fluctuations for output regulation, thereby ensuring safer and more stable operation of the distribution system. BRIEF DESCRIPTION OF THE DRAWINGS

[0094] Figure 1 The figure is a schematic diagram of the flow chart of the coordination and micro-coordination optimization scheduling method in one embodiment of the present invention;

[0095] Figure 2 It is a schematic diagram of the technical concept of decoupling the global micro-coordinated optimization problem of the present invention;

[0096] Figure 3 The figure shows a flow chart of parallel optimization solution of sub-problems using truncated diagonal quadratic approximation (TDQA);

[0097] Figure 4 The figure shows a schematic diagram of the structure of the flexible interconnection device FID accessing the distribution network. DETAILED DESCRIPTION

[0098] Glossary

[0099] The Analytical Target Cascading (ATC) method is a method for solving decentralized, hierarchical coordination problems. It allows each element in the hierarchy to make its own decisions, and the parent element coordinates and optimizes the decision of the child element to obtain the overall optimal solution to the problem.

[0100] The Truncated Diagonal Quadratic Approximation (TDQA) method is an approximation method used to solve many-body systems in quantum mechanics, especially when dealing with problems related to quantum many-body interactions. It is a technique that simplifies complex systems by making quadratic approximations to energy eigenvalues ​​and eigenstates.

[0101] The invention is further described below with reference to the accompanying drawings and specific embodiments.

[0102] Example 1

[0103] This embodiment introduces a distribution micro-cooperative optimization scheduling method. The distribution micro-cooperative optimization method provided in this embodiment can be applied to a terminal and can be executed by a distribution network control device of a smart distribution network;

[0104] Figure 1 is a flow chart of the method for coordinating and optimizing scheduling of the micro-distribution system in this embodiment. This flow chart only shows the logical sequence of the method described in this embodiment. In other possible embodiments of the present invention, different methods may be used without conflict. Figure 1 The steps shown or described are accomplished in the order shown.

[0105] like Figure 1 As shown, the coordination and micro-coordination optimization scheduling method of this embodiment includes:

[0106] Get the parameters of the micro-distribution system;

[0107] According to the micro-distribution system parameters, a global optimization model of the micro-distribution system is constructed;

[0108] The distribution network interconnection power and microgrid interconnection power at the distribution-microgrid boundary are respectively used as virtual power sources and virtual loads, and the global optimization model of the distribution-microgrid system is decoupled to obtain the decoupled distribution network optimization subproblem and microgrid optimization subproblem;

[0109] The truncated diagonal quadratic approximation method is used to solve the distribution network optimization subproblem and the microgrid optimization subproblem in parallel to obtain the regulation amount of the distribution network and each microgrid. The specific implementation process is as follows.

[0110] 1. Obtaining Micro-system Parameters

[0111] The basic data required to be obtained in this embodiment include: topological parameters of the distribution network; parameters of each regulating device in the distribution network, such as gas turbines and capacitor banks; load PQ of each feeder in the distribution network; parameters of each regulating device in the microgrid, such as distributed photovoltaic, energy storage, and micro gas turbines; total load PQ in the microgrid; photovoltaic output forecast within the geographical range of the distribution microsystem. Since the microgrid is equivalent to an adjustable PQ node after aggregation, the internal topological parameters are not required.

[0112] 2. Construction of global optimization model of micro-distribution system

[0113] According to all the information of the micro-distribution system obtained, the following global optimization model is constructed:

[0114]

[0115] In the formula, F d (·),x d and F m,i (·),x m,iRepresent the optimization objectives and decision variables on the distribution network side and microgrid i side, respectively, where the optimization objectives are the distribution network operation cost and the operation cost of microgrid i; let T be the number of optimization time periods, and the set Represents the coupling variable vector on the distribution network side, and the cluster Empathy Cluster N m is the number of microgrids; h d , g d 、h m,i , g m,i Respectively represent the equality and inequality constraints in the distribution network and microgrid optimization models, the subscript d represents the distribution network side variables; the subscript m represents the microgrid side variables; the subscript i represents the coupling variable between the distribution network and the microgrid i; the subscript t represents the tth hour in an optimization scheduling cycle T = 24. Specifically, the constraints in the distribution network optimization subproblem include adjustable device model constraints, power flow constraints, and voltage safety constraints, and the constraints in the microgrid optimization subproblem include adjustable device model constraints, power balance constraints, etc.

[0116] 3. Decoupling of the global optimization model of the micro-distribution system

[0117] In order to solve the problem that centralized optimization is difficult to achieve due to the privacy of each subject's data and the complexity of calculation, this paper uses a two-layer structure based on the ATC method to decompose the distribution-micro collaborative optimization model, in which the coupling variable is the active power transmitted by the distribution-micro interconnection line. For the distribution network, the microgrid interconnection power at the boundary can be regarded as a virtual load; for the microgrid, the distribution network interconnection power at the boundary can be regarded as a virtual power source, refer to Figure 2 shown.

[0118] The tie line power obtained in the distribution microgrid optimization sub-problem must satisfy the consistency constraint. The augmented Lagrangian penalty function is introduced to relax the consistency constraint so that the coupling variables can satisfy the consistency constraint when solving. After the centralized optimization model is decoupled, the coupling variables can be solved independently in their respective sub-problems. The penalty function form is as follows:

[0119]

[0120] In the formula, c i represents the difference of the coupled variables, μ and ω are the multipliers of the first and second terms of the penalty function, respectively, and the symbol represents the Hadamard product of the matrix;

[0121] make The distribution network optimization sub-problem after hierarchical decomposition is expressed as follows:

[0122]

[0123] Similarly, the optimization sub-problem of microgrid i is as follows:

[0124]

[0125] 4. Parallel solution of distribution network optimization sub-problem and microgrid optimization sub-problem

[0126] The traditional ATC method solves the distribution network and microgrid optimization sub-problems (3) and (4) in series, and updates the penalty function multiplier through iterative solution so that the coupling variables meet the consistency constraint. The penalty function multiplier update form is as follows, where the superscript represents the kth iteration:

[0127]

[0128] The present invention adopts the TDQA algorithm, which is improved on the basis of ATC and can solve each sub-problem in parallel. The specific process is as follows.

[0129] 4.1) Establishing the distribution network optimization sub-problem model

[0130] First, the objective function is established. The model of the distribution network optimization sub-problem takes the minimum operating cost as the goal, and the objective function is established as follows:

[0131]

[0132] In the formula, The cost of electricity purchase and sale from the distribution network to the upper and lower level power grids; The specific calculation formulas for each item are as follows:

[0133]

[0134] In the formula, P represents the electricity price at time t; t TD and They represent the power purchased and sold by the distribution network to the lower and upper level power grids at time t; a i DG 、b i DG and are the cost coefficient and active output of adjustable equipment in the distribution network respectively; N DG The number of adjustable devices in the distribution network.

[0135] 4.2) Clarify the constraints for solving the distribution network optimization sub-problem, including the following constraints:

[0136] (1) FID device constraints

[0137] The FID device is connected to the distribution grid feeder through a filter on the AC side and interconnected on the DC side through a voltage source converter. Its structure is as follows: Figure 4As shown, where U i FID and E i FID are the voltage amplitudes of FID at the grid connection point and at the converter outlet respectively; R L and X L is the filter impedance; P i FID is the interactive power between FID and distribution network. The present invention does not make detailed modeling on the DC side of FID, but only considers the power balance and capacity constraints satisfied by the AC side as follows:

[0138]

[0139]

[0140] Where N FID is the number of interconnected FIDs on the DC side; It is the maximum capacity constraint of FID DC side.

[0141] (2) CB group device constraints

[0142] Each switching of the CB group is operated by group, and the number of switching times in a scheduling cycle is limited. The present invention introduces a 0-1 variable to characterize the switching state of the CB group, and the modeling is as follows:

[0143]

[0144] In the formula, and are the reactive compensation power invested in the CB group in period t and the compensation power of each CB group respectively; and are discrete variables, representing the number of CB operation groups and the maximum number of operation groups; and It is the CB group switching action mark. Indicates that CB group i performs a cut-out action in period t, It means that CB group i is put into operation in period t; Indicates the maximum number of actions that a CB group can take in a scheduling cycle.

[0145] (3) Controllable distributed power constraints

[0146] For simplification, the controllable distributed power supply model of the present invention does not consider reactive power compensation capability, and its constraints are:

[0147]

[0148] In the formula, and They are the upper and lower limits of the active output of DG respectively; is the active power output of the ith DG in period t; It is the start and stop mark of DG. Indicates that DG is put into operation. Indicates DG cut-out.

[0149] (4) AC power flow constraints in distribution networks

[0150]

[0151] Where P ij and Q ij Respectively represent the active and reactive power passing through branch ij; θ i and θ j are the voltage phase angles at nodes i and j, θ ij =θ i -θ j ; V i is the voltage amplitude of node i, g ij and b ij are the branch conductance and susceptance of branch ij respectively.

[0152] Introducing variable x i =V i 2 , x ij,1 =V i V j cosθ ij , x ij,2 =V i V j sinθ ij The equivalent relationship is as follows:

[0153]

[0154]

[0155] For radial networks, the phase angle of each node voltage can be restored according to equation (13). The second-order cone relaxation of equation (14) is as follows:

[0156] (2x ij,1 ) 2 +(2x ij,2 ) 2 +(x i -x j ) 2 ≤(x i +x j ) 2 (15)

[0157] According to the above relationship, the power balance constraint of node j is established as follows:

[0158]

[0159] Where d(j) is the set of interconnection lines of the upper distribution network or lower microgrid at node j; Indicates the active power purchased by the distribution network from the main grid. Indicates the amount of electricity sold by the distribution network to the microgrid, Indicates the reactive power purchased by the distribution network from the main grid. and is the load at node j; v(j) is the set of DGs connected to the distribution network at node j; c(j) is the set of CB groups connected to the distribution network at node j; u(j) is the set of head-end nodes of the branch with node j as the terminal node in the distribution network topology.

[0160] The line power flow safety constraints are as follows:

[0161] U i,min ≤U i ≤U i,max

[0162] -θ ij,max ≤θ ij ≤θ ij,max

[0163] -P ij,max ≤P ij ≤P ij,max

[0164] Where U i ,θ ij , P ij are the voltage of node i, the voltage phase angle of branch ij, and the power of branch ij respectively; U i,max and U i,min The voltage U at node i is i The upper and lower limits of -θ ij,max and P ij,max is the phase angle difference θ of branch ij ij upper limit and power upper limit.

[0165] 4.3) Establish the objective function of the microgrid optimization sub-problem model

[0166] The microgrid i sub-model aims to minimize the day-ahead operating cost. To simplify the process, the microgrid of the present invention only considers the active interaction with the upper-level distribution network, and establishes the objective function as follows:

[0167]

[0168] In the formula, The cost of purchasing and selling electricity from the microgrid to the upper-level distribution network; Aggregate distributed equipment adjustment costs for microgrids. The specific calculation formulas are as follows:

[0169]

[0170] In the formula, is the interaction power between microgrid i and distribution network in period t; and They are the output regulation costs of the micro gas turbine, distributed energy storage and distributed photovoltaics aggregated in microgrid i; and They are the active output regulation of micro gas turbine, distributed energy storage and distributed photovoltaic at time t respectively.

[0171] 4.4) Clarify the constraints for solving the microgrid optimization sub-problem, including the following constraints:

[0172] (1) Power balance constraints

[0173]

[0174] In the formula, is the negative active load in microgrid i during period t, It represents the aggregated output of controllable distributed power sources in the microgrid. Represents the aggregated output of distributed photovoltaics in the microgrid, Indicates the aggregated output of energy storage devices in the microgrid. Indicates the active power in the microgrid.

[0175] (2) Tie-line power constraints

[0176]

[0177] In the formula, It is the maximum interactive power on the distribution line.

[0178] (3) The controllable distributed generation constraints are the same as those in equation (11) in the distribution network optimization sub-problem model constraints.

[0179] (4) Distributed energy storage constraints

[0180]

[0181] In the formula, represents the active output of energy storage in microgrid i at time t, and are the operating power of the energy storage in the charging and discharging states during period t, represents the maximum output of energy storage in microgrid i; is the amount of energy stored in period t; represents the charging efficiency of energy storage, Indicates the discharge efficiency of energy storage; and It is the charging and discharging status mark of the time period energy storage. Indicates that the energy storage is in the discharge state during period t. Indicates that the energy storage is in charging state during period t;

[0182] (5) PV operation constraints

[0183] The present invention considers the uncertainty of photovoltaic output in the microgrid, and the photovoltaic operation constraint modeling is as follows:

[0184]

[0185] In the formula, represents the active power of photovoltaic power in microgrid i during period t, is the predicted active power of photovoltaic power in microgrid i during period t; It is the deviation of photovoltaic output prediction, which is a fuzzy variable.

[0186] 4.5) The truncated diagonal quadratic approximation (TDQA) method is used to solve the distribution network optimization subproblem and the microgrid optimization subproblem in parallel.

[0187] The augmented Lagrangian penalty function is shown in formula (2). The diagonal quadratic approximation (DQA) method can be used to separate the coupled variables of the quadratic term in the penalty function.

[0188] First, expand the quadratic part as follows:

[0189]

[0190] For the cross term in the kth iteration Performing a first-order Taylor expansion, the linearized approximation result is as follows:

[0191]

[0192] In the formula, and They represent the coupling variables of the k-1th iteration and are constants in the kth iteration. According to the above formula, the quadratic term in the penalty function can be approximated as follows:

[0193]

[0194] In the formula, is a constant term and has no effect in the penalty function. Substituting the above formula into formula (2), the diagonal quadratic approximation form of the augmented Lagrangian penalty function is as follows:

[0195]

[0196] The objective function of the reconstructed micro-optimization subproblem is expressed as follows:

[0197]

[0198] Based on the penalty function reconstruction transformation, the solution of each sub-problem uses the coupling variables obtained in the previous iteration. When solving the micro-cooperative optimization sub-problems in full parallel, the time of one iteration is reduced to the solution time of the slowest sub-problem.

[0199] Equation (23) is the linearized approximate result obtained after the first-order Taylor expansion. To ensure the accuracy of the approximate result, the conventional method is to use two layers of inner and outer loops to update the iterative values ​​of the coupling variables and the penalty function multiplier. In the inner loop, the penalty function multiplier is fixed and the coupling variables are iteratively updated. The purpose is to improve the linearization result and find the optimal coupling variable under the given penalty function multiplier. The outer loop updates the penalty function multiplier according to the coupling variable determined in the inner loop.

[0200] However, obtaining a high-precision solution to the distribution microgrid optimization subproblem in the inner loop is of little significance, because the penalty function multiplier used in the inner loop does not necessarily make the inner loop solution close to the optimal solution, but only increases the amount of invalid calculations.

[0201] Therefore, reference Figure 3 The truncated diagonal quadratic approximation TDQA strategy proposed in this invention only considers the outer loop, omits the inner loop, updates the penalty function multiplier after each iteration, and the multiplier moves quickly to the optimal value. Truncating the inner loop does not affect the convergence of the algorithm. It also reduces a large number of meaningless inner loop calculations, further improving the computational efficiency of the algorithm.

[0202] Example 2

[0203] Based on the same inventive concept as Example 1, this embodiment introduces a coordinated optimization scheduling device for distribution and microelectronics, including:

[0204] A data acquisition module is configured to acquire parameters of the micro-distribution system;

[0205] A global model building module is configured to build a global optimization model of the micro-distribution system according to the micro-distribution system parameters;

[0206] The distribution-microgrid optimization problem decoupling module is configured to use the distribution network interconnection power and the microgrid interconnection power at the distribution-microgrid boundary as virtual power and virtual load, respectively, to decouple the distribution-microgrid system global optimization model, and obtain the decoupled distribution network optimization subproblem and microgrid optimization subproblem;

[0207] The optimization solution module is configured to use the truncated diagonal quadratic approximation method to solve the distribution network optimization subproblem and the microgrid optimization subproblem in parallel to obtain the regulation amount of the distribution network and each microgrid.

[0208] The specific functional implementation of each of the above modules can be found in the relevant contents of the method in Example 1 and will not be elaborated here.

[0209] Example 3

[0210] Based on the same inventive concept as other embodiments, this embodiment introduces a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the coordination and micro-coordinated optimization scheduling method described in Embodiment 1 is implemented.

[0211] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0212] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0213] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0214] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1A step that specifies a function in one or more boxes.

[0215] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the enlightenment of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which all fall within the protection of the present invention.

Claims

1. A method for optimizing the scheduling of distribution and micro-distribution collaboration, comprising: Get the parameters of the micro-distribution system; According to the micro-distribution system parameters, a global optimization model of the micro-distribution system is constructed; The distribution network interconnection power and microgrid interconnection power at the distribution-microgrid boundary are respectively used as virtual power sources and virtual loads, and the global optimization model of the distribution-microgrid system is decoupled to obtain the decoupled distribution network optimization subproblem and microgrid optimization subproblem; The truncated diagonal quadratic approximation method is used to solve the distribution network optimization subproblem and the microgrid optimization subproblem in parallel to obtain the regulation quantities of the distribution network and each microgrid.

2. The method according to claim 1, characterized in that: The distribution micro-system parameters include: topological parameters of the distribution network, parameters of each adjustable device in the distribution network and the micro-grid, loads of each feeder in the distribution network, and total load in the micro-grid; photovoltaic output prediction within the geographical range of the distribution micro-system; The regulation amount of the distribution network and each microgrid includes: the regulation amount of the adjustable equipment in the distribution network, and the amount of electricity purchased and sold by the microgrid to the distribution network through the interconnection line.

3. The method according to claim 1, characterized in that: The global optimization model of the micro-distribution system is expressed as: Where N m is the number of microgrids, F d (·) and x d They represent the optimization objectives and decision variables on the distribution network side, respectively. m,i (·) and x m,i They represent the optimization objectives and decision variables of the microgrid i side, where the optimization objective is the operating cost; let T be the number of optimization periods, and the set represents the coupling variable vector on the distribution network side, r i represents the coupling variable vector on the microgrid side; h d and g d are the equality and inequality constraints on the distribution network side, h m,i and g m,i are the equality and inequality constraints on the i-side of the microgrid.

4. The method according to claim 3, characterized in that: The decoupling of the global optimization model of the distribution-micro system includes: relaxing the distribution network interconnection power and the microgrid interconnection power at the distribution-micro boundary by an augmented Lagrangian penalty function, wherein the penalty function is expressed as: In the formula, c i represents the difference of the coupled variables, and ω i are the multipliers of the first and second terms of the penalty function respectively, and the symbol ο represents the Hadamard product of the matrix; make The decoupled distribution network optimization sub-problem is expressed as: The decoupled microgrid optimization subproblem is expressed as:

5. The method according to claim 4, characterized in that: It also includes establishing a distribution network optimization sub-problem model and each microgrid optimization sub-problem model, wherein the distribution network optimization sub-problem model establishes an objective function with the minimum operating cost F1 as the goal, which is expressed as: In the formula, The cost of electricity purchase and sale from the distribution network to the lower-level power grids. The equipment adjustment cost is calculated as follows: In the formula, represents the electricity purchase and sale price at time t; and They represent the power purchased and sold by the distribution network to the lower and upper level power grids at time t respectively; and are the cost coefficient and active output of adjustable equipment in the distribution network respectively; N DG The number of adjustable devices in the distribution network; Microgrid i optimization sub-problem model to minimize the day-ahead operation cost F 2,i Establish the objective function for the target, expressed as: In the formula, The cost of electricity purchase and sale from microgrid i to the upper distribution network; Aggregate distributed device regulation cost for microgrid i, and the calculation formula is: In the formula, is the interaction power between microgrid i and distribution network during period t; and They are the output regulation costs of the micro gas turbine, distributed energy storage and distributed photovoltaics aggregated in microgrid i; and They are the active output regulation of micro gas turbine, distributed energy storage and distributed photovoltaic at time t respectively.

6. The method according to claim 5, characterized in that: The constraints of the objective function in the distribution network optimization sub-problem model include: (1) FID device constraints, expressed as: Where N FID is the number of interconnected FID devices on the DC side; is the interaction power between the ith FID device and the distribution network in period t, The maximum capacity of the DC side of the FID device; (2) CB group device constraints, expressed as: In the formula, and are the reactive compensation power invested in the CB group during period t and the compensation power of each CB group respectively; and are discrete variables, representing the number of CB operation groups and the maximum number of operation groups respectively; and It is the CB group switching action mark. Indicates that CB group i performs a cut-out action in period t, It means that CB group i is put into operation in period t; Indicates the maximum number of actions of the CB group in a scheduling cycle; (3) Controllable distributed generation DG constraint, expressed as: In the formula, and They are the upper and lower limits of the active output of DG respectively; is the active power output of the ith DG in period t; It is the start and stop mark of DG. Indicates that DG is put into operation. Indicates DG cut-out; (4) AC power flow constraint of distribution network, expressed as: Where P ij and Q ij Respectively represent the active and reactive power flowing through branch ij; θ i and θ j are the voltage phase angles at nodes i and j, θ ij =θ i -θ j ; V i and V j are the voltage amplitudes at nodes i and j at both ends of branch ij, θ i and θ j are the voltage phase angles at nodes i and j, respectively, and g ij and b ij are the branch conductance and susceptance of branch ij respectively; Introducing variables x ij,1 =V i V j cosθ ij , x ij,2 =V i V j sinθ ij The equivalent relationship is as follows: According to the equivalent relationship, the phase angle of each node voltage is restored and Perform a second-order cone relaxation, expressed as: (2x ij,1 ) 2 +(2x ij,2 ) 2 +(x i -x j ) 2 ≤(x i +x j ) 2 The power balance constraint of node j is obtained as follows: Where d(j) is the set of interconnection lines of the upper distribution network or lower microgrid at node j; Indicates the active power purchased by the distribution network from the main grid. Indicates the amount of electricity sold by the distribution network to the microgrid, Indicates the reactive power purchased by the distribution network from the main grid. and is the load at node j; v(j) is the set of DGs connected to the distribution network at node j; c(j) is the set of CB groups connected to the distribution network at node j; u(j) is the set of head-end nodes of the branch with node j as the terminal node in the distribution network topology; (5) Line power flow safety constraint, expressed as: IN i,min ≤U i ≤U i,max -θ ij,max ≤θ ij ≤θ ij,max -P ij,max ≤P ij ≤P ij,max Where U i ,θ ij , P ij are the voltage of node i, the voltage phase angle of branch ij, and the power of branch ij respectively; U i,min and U i, max x m,i The voltage U at node i is i The upper and lower limits of θ ij,max and P ij,max is the phase angle difference θ of branch ij ij upper limit and power upper limit.

7. The method according to claim 6, characterized in that: The constraints of the objective function in the microgrid optimization sub-problem model include: (1) Power balance constraint, expressed as: In the formula, is the negative active load in microgrid i during period t, It represents the aggregated output of controllable distributed power sources in the microgrid. Represents the aggregated output of distributed photovoltaics in the microgrid, Indicates the aggregated output of energy storage devices in the microgrid. Indicates the active power in the microgrid; (2) Tie line power constraint, expressed as: In the formula, is the interaction power of the microgrid interconnection line between microgrid i and the distribution network, is the maximum interactive power on the distribution micro-interconnection line; (3) Controllable distributed power constraints, expressed as: In the formula, and They are the upper and lower limits of the active output of DG respectively; is the active power output of the ith DG in period t; It is the start and stop mark of DG. Indicates that DG is put into operation. Indicates DG cut-out; (4) Distributed energy storage constraints, expressed as: In the formula, represents the active output of energy storage in microgrid i at time t, and are the operating power of the energy storage in the charging and discharging states during period t, represents the maximum output of energy storage in microgrid i; is the amount of energy stored in period t; represents the charging efficiency of energy storage, Indicates the discharge efficiency of energy storage; and It is the charging and discharging status mark of the time period energy storage. Indicates that the energy storage is in the discharge state during period t. Indicates that the energy storage is in charging state during period t; (5) PV operation constraints, expressed as: In the formula, represents the active power of photovoltaic power in microgrid i during period t, is the predicted active power of PV in microgrid i during period t; is the deviation of the photovoltaic output prediction.

8. The method according to claim 7, characterized in that: The method of using the truncated diagonal quadratic approximation method to solve the distribution network optimization subproblem and the microgrid optimization subproblem in parallel includes: The quadratic term in the augmented Lagrangian penalty function is expanded as follows: For the cross term t in the kth iteration i οr i Performing a first-order Taylor expansion, the linearized approximation result is: In the formula, and They represent the coupling variables of the k-1th iteration and are constants in the kth iteration; Then the quadratic term in the penalty function can be approximately expressed as follows: In the formula, is a constant term; Substituting the approximate expression of the quadratic term into the original augmented Lagrangian penalty function, the diagonal quadratic approximation form of the augmented Lagrangian penalty function is obtained as follows: The objective functions of the reconstructed micro-optimization sub-problems are expressed as follows:

9. A distribution and micro-coordinated optimization scheduling device, characterized in that it includes: A data acquisition module is configured to acquire parameters of the micro-distribution system; A global model building module is configured to build a global optimization model of the micro-distribution system according to the micro-distribution system parameters; The distribution-microgrid optimization problem decoupling module is configured to use the distribution network interconnection power and the microgrid interconnection power at the distribution-microgrid boundary as virtual power and virtual load, respectively, to decouple the distribution-microgrid system global optimization model, and obtain the decoupled distribution network optimization subproblem and microgrid optimization subproblem; The optimization solution module is configured to use the truncated diagonal quadratic approximation method to solve the distribution network optimization subproblem and the microgrid optimization subproblem in parallel to obtain the regulation amount of the distribution network and each microgrid.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the coordination and micro-coordination optimization scheduling method described in any one of claims 1 to 8 is implemented.