Automatic management method and device of power guarantee and supply work order, electronic equipment and storage medium
Through automated management of work order processes and intelligent execution of line hang-and-disconnect operations, the problem of inefficiency in the power supply work order process in the existing technology is solved, and efficient and accurate power scheduling and task management are achieved.
Patent Information
- Application Number
- CN202411287467.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-12-13
AI Technical Summary
In the prior art, the power supply work order process relies on manual management, resulting in inefficiency, complexity and prone to operational errors, and cannot adapt to the needs of expansion of power grid scale and business complexity.
It proposes an automatic management method for power supply work orders, which checks the work orders by responding to the start command, joins the automatic management queue, and automatically performs the listing and delisting operations at the beginning and end of the task, fills in and archives the work orders, and reduces the Manual intervention.
Improve the efficiency and accuracy of power scheduling, avoid operational errors, ensure the timely execution and end of power supply tasks, improve the flexibility and response speed of the system, reduce the work burden of dispatchers, and improve the overall power system Operational efficiency.
Smart Images

Figure CN119130723A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power dispatching automation, and in particular to an automatic management method and device for power supply guarantee work orders, electronic equipment, and storage medium. Background Art
[0002] With the development of smart grids, power supply security services are becoming an increasingly important part of the power system. Power dispatching units need to collaborate with energy companies, power companies, equipment companies and other units to ensure the operation and maintenance of power equipment, reliability and power supply safety.
[0003] In the existing technology, power business work orders are mostly managed manually. The power supply work order process needs to apply for the power supply work order through the power dispatching system. After the dispatcher reviews the power supply work order, he will hang and remove the line according to the content of the work order. After the work order is executed, the dispatcher needs to notify the end of the work order and notify the on-site operator to start executing the work order. The manual work order process is complicated, the operation is cumbersome, the efficiency is low, and there are omissions and wrong fillings. With the continuous expansion of the scale of the power grid and the increasing complexity of power business, the manual processing mode can no longer meet the needs of power business management, the work efficiency is low, and it is easy to make operational errors.
[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0005] The embodiments of the present invention provide a method and device for automatically managing a power supply guarantee work order, an electronic device, and a storage medium, so as to at least solve the technical problem in the related art that the traditional power supply guarantee work order process has many manual execution steps, resulting in low efficiency.
[0006] According to one aspect of an embodiment of the present invention, there is provided a method for automatically managing power supply work orders, comprising: responding to a start instruction of a power supply task process, performing work order verification on the power supply work order corresponding to the target power supply task, and obtaining a verification result; when the verification result indicates that the work order verification has passed, receiving the power supply work order and adding it to an automatic management queue; after the power supply task starts, performing a sign-out operation on the power supply line based on the automatic management queue, and filling in the power supply work order based on the start time point and the sign-out operation status; after the power supply task ends, performing a sign-out operation on the power supply line based on the automatic management queue, filling in the power supply work order again based on the end time point and the sign-out operation status, and archiving the power supply work order.
[0007] Furthermore, after performing work order verification on the power supply work order corresponding to the target power supply task and obtaining the verification result, it also includes: when the verification result indicates that the work order verification fails, performing a verification exception mark on the power supply work order corresponding to the target power supply task; and performing a rollback operation on the power supply work order carrying the verification exception mark.
[0008] Furthermore, the step of performing work order verification on the power supply work order corresponding to the target power supply task to obtain a verification result includes: obtaining a work order verification rule list, wherein the work order verification rule list contains R work order verification rules, and the work order verification rule includes at least any one of the following: content verification rule, time verification rule and task type verification rule, R is a positive integer; verifying the power supply work order in turn based on each of the work order verification rules to obtain R verification sub-results; when all of the R verification sub-results are passed, determining the verification result as a work order verification pass, and, when any of the verification sub-results is failed, determining the verification result as a work order verification failure.
[0009] Furthermore, after receiving the power supply work order and adding it to the automatic management queue, it also includes: reading the basic dispatching information of the power supply line recorded in the power supply work order; before performing the sign-off operation on the power supply line, writing a line sign-off notification, and sending the line sign-off notification to the line dispatching port based on the basic dispatching information; after performing the sign-off operation on the power supply line, writing a line sign-off notification, and sending the line sign-off notification to the line dispatching port based on the basic dispatching information.
[0010] Furthermore, after writing the line listing notification, it also includes: obtaining the current listing status of the power supply line; when the current listing status indicates that the power supply line is in a listed state, feedback of a successful listing result is given, but the current listing operation is not performed; when the current listing status indicates that the power supply line is in an unlisted state, the listing operation is performed, and a successful listing result is fed back; after the successful listing result is fed back, the line listing notification is sent to the line scheduling port based on the basic scheduling information.
[0011] Furthermore, after writing the line removal notification, it includes: obtaining the power supply task status executed on the power supply line; when the power supply task status indicates that only the target power supply task is executed on the power supply line, executing the removal operation and feeding back the removal success result; when the power supply task status indicates that at least two tasks are being executed on the power supply line, feeding back the removal success result, but not performing this removal operation.
[0012] Furthermore, after responding to the start instruction of the power supply guarantee task process, it also includes: obtaining the process progress of the power supply guarantee task process; and setting the work order status of the power supply guarantee work order based on the process progress.
[0013] According to another aspect of an embodiment of the present invention, there is also provided an automatic management device for power supply work orders, comprising: a verification unit, for responding to a start instruction of a power supply task process, performing work order verification on the power supply work order corresponding to the target power supply task, and obtaining a verification result; a receiving unit, for receiving the power supply work order and adding it to an automatic management queue when the verification result indicates that the work order verification has passed; a hanging unit, for after the power supply task starts, performing a hanging operation on the power supply line based on the automatic management queue, and filling in the power supply work order based on the start time point and the hanging operation status; a removing unit, for after the power supply task ends, performing a removing operation on the power supply line based on the automatic management queue, filling in the power supply work order again based on the end time point and the removing operation status, and archiving the power supply work order.
[0014] Furthermore, the automatic management device for the power supply guarantee work order also includes: an identification module, which is used to mark the power supply guarantee work order corresponding to the target power supply guarantee task as an abnormality in verification when the verification result indicates that the work order verification fails; and a rollback module, which is used to perform a rollback operation on the power supply guarantee work order carrying the verification exception mark.
[0015] Furthermore, the verification unit includes: a first acquisition module, used to obtain a work order verification rule list, wherein the work order verification rule list contains R work order verification rules, and the work order verification rules include at least any of the following: content verification rules, time verification rules and task type verification rules, and R is a positive integer; a verification module, used to verify the power supply work order in turn based on each of the work order verification rules to obtain R verification sub-results; a determination module, used to determine that the verification result is a work order verification pass when all R verification sub-results are passed, and to determine that the verification result is a work order verification failure when any of the verification sub-results is a failure.
[0016] Furthermore, the automatic management device of the power supply work order also includes: a reading module, which is used to read the basic scheduling information of the power supply line recorded in the power supply work order; a first writing module, which is used to write a line listing notification before the power supply line is listed, and send the line listing notification to the line scheduling port based on the basic scheduling information; a second writing module, which is used to write a line removal notification after the power supply line is removed, and send the line listing notification to the line scheduling port based on the basic scheduling information.
[0017] Furthermore, the automatic management device of the power supply work order also includes: a second acquisition module, used to obtain the current listing status of the power supply line; a first feedback module, used to feedback the listing success result when the current listing status indicates that the power supply line is in a listing state, but not perform this listing operation; a first execution module, used to perform the listing operation and feedback the listing success result when the current listing status indicates that the power supply line is in an unlisted state; a first sending module, used to send the line listing notification to the line scheduling port based on the basic scheduling information after feeding back the listing success result.
[0018] Furthermore, the automatic management device of the power supply work order also includes: a third acquisition module, used to obtain the power supply task status performed on the power supply line; a second execution module, used to execute the card removal operation and feedback the successful card removal result when the power supply task status indicates that only the target power supply task is executed on the power supply line; a second feedback module, used to feedback the successful card removal result when the power supply task status indicates that at least two tasks are being executed on the power supply line, but not execute this card removal operation.
[0019] Furthermore, the automatic management device for the power supply guarantee work order also includes: a fourth acquisition module, used to obtain the process progress of the power supply guarantee task process; and a setting module, used to set the work order status of the power supply guarantee work order based on the process progress.
[0020] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is also provided, wherein the computer-readable storage medium includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute any one of the above-mentioned automatic management methods for power supply work orders.
[0021] According to another aspect of an embodiment of the present invention, there is also provided an electronic device, comprising one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement any one of the above-mentioned methods for automatically managing power supply work orders.
[0022] In the present invention, an automatic management method for power supply work orders is proposed. The method first responds to the start instruction of the power supply task process, performs work order verification on the power supply work order corresponding to the target power supply task, obtains the verification result, and then receives the power supply work order and adds it to the automatic management queue when the verification result indicates that the work order verification has passed. Then, after the power supply task starts, the power supply line is put on display based on the automatic management queue, and the power supply work order is filled in based on the start time point and the putting on display operation status. Finally, after the power supply task ends, the power supply line is removed from the display based on the automatic management queue, and the power supply work order is filled in again based on the end time point and the removing operation status, and the power supply work order is archived.
[0023] In the present invention, the efficiency and accuracy of power dispatching are significantly improved through automated management of work order processes, intelligent execution of line hanging and removing signs, and one-key automated operation. The automated process reduces manual intervention, avoids operational errors, and ensures the timely execution and completion of power supply guarantee tasks. At the same time, the intelligent execution mechanism can automatically adjust according to real-time conditions, thereby improving the flexibility and response speed of the system. The one-key automated operation makes the entire power supply guarantee process more continuous and automated, greatly reducing the workload of dispatchers and improving the overall operating efficiency of the power system, thereby solving the technical problem in related technologies that the traditional power supply guarantee work order process has many manual execution steps, resulting in low efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0025] Figure 1 is a flow chart of an optional automatic management method of a power supply guarantee work order according to an embodiment of the present invention;
[0026] Figure 2 is a flow chart of an optional automatic driving method for a power dispatching and power supply guarantee task according to an embodiment of the present invention;
[0027] Figure 3 is a schematic diagram of an optional automatic management device for power supply guarantee work orders according to an embodiment of the present invention;
[0028] Figure 4 The present invention is a hardware structure block diagram of an electronic device (or mobile device) for an automatic management method of a power supply guarantee work order according to an embodiment of the present invention. DETAILED DESCRIPTION
[0029] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0031] The following embodiments of the present invention can be applied to various systems / applications / equipment that require automatic processing of power supply guarantee work orders and automatic dispatch of power systems, and can realize automated management of work order processes, intelligent execution of line hanging and removing signs, and one-key automated operations. The present invention significantly improves the efficiency and accuracy of power dispatching. The automated process reduces manual intervention, avoids operational errors, and ensures the timely execution and completion of power supply guarantee tasks. At the same time, the intelligent execution mechanism can automatically adjust according to real-time conditions, improving the flexibility and response speed of the system.
[0032] The present invention is described in detail below in conjunction with various embodiments.
[0033] Embodiment 1
[0034] According to an embodiment of the present invention, an embodiment of a method for automatically managing power supply work orders is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0035] The implementation subject of the embodiment of the present invention may be a power system dispatching center or a distribution network technology platform. In the prior art, the distribution network technology platform is a dispatching automation system that serves the main power grid (high voltage or ultra-high voltage power grid), which monitors, collects data, analyzes and controls the operation of the main power grid to ensure the safe and stable operation of the power grid. However, the power supply guarantee module of the distribution network technology platform is not intelligent enough, and has not established effective connection with the main grid OCS system ("Operational Control System"), and cannot automatically hang / delist according to the working line equipment, and cannot automatically identify the hanging list and make corresponding operations according to the line in execution when hanging and delisting. It is impossible to automatically send notifications to the operation and maintenance personnel corresponding to the line before and after the start of work.
[0036] The embodiment of the present invention proposes to set up a one-key driving function for work orders, from the approval of work orders to the automatic notification and automatic listing at the beginning of power supply guarantee, and then to the automatic notification, automatic delisting and work order archiving after the end of power supply guarantee, the whole process is automatically processed without manual intervention in each specific step. This function is intended to improve the efficiency of power dispatching work, reduce errors in manual operations, ensure the accurate execution of power supply guarantee tasks, and realize efficient management of power supply guarantee work orders.
[0037] Figure 1 is a flow chart of an optional automatic management method of a power supply guarantee work order according to an embodiment of the present invention, such as Figure 1 As shown, the method comprises the following steps:
[0038] Step S101, responding to the start instruction of the power supply guarantee task process, performing a work order verification on the power supply guarantee work order corresponding to the target power supply guarantee task, and obtaining a verification result.
[0039] Specifically, the power supply guarantee task process refers to a series of operational steps and procedures to ensure continuous and stable power supply, usually including task formulation, execution, monitoring, etc., aimed at ensuring the stable operation of the power system. The target power supply guarantee task is a specific power guarantee task, which is processed and executed in accordance with the process requirements indicated by the power supply guarantee task process to ensure the continuity and stability of power supply.
[0040] The start instruction of the power supply guarantee task process refers to the command or signal that triggers the power supply guarantee task process, so that the system starts to perform related operations to ensure power supply. The power supply guarantee work order is a document or electronic record that records and manages the specific content and execution status of the power supply guarantee task, including the details, requirements and status information of the execution task.
[0041] In the embodiment of the present invention, a start instruction is used to trigger the power supply guarantee task process, and the power supply guarantee work order is a tool used to record and verify the execution of the task in the process. After the start instruction starts the process, the target task will generate a corresponding work order, and the work order ensures the correct execution of the task through a series of verification rules.
[0042] In order to improve the reliability and standardization of the execution of power supply guarantee tasks, the accuracy and effectiveness of the power supply guarantee work order can be first ensured through systematic rule verification. Optionally, step S101 includes: obtaining a work order verification rule list, wherein the work order verification rule list contains R work order verification rules, and the work order verification rule includes at least any of the following: content verification rules, time verification rules and task type verification rules, and R is a positive integer; based on each work order verification rule, the power supply guarantee work order is verified in turn to obtain R verification sub-results; when all R verification sub-results are passed, the verification result is determined to be a work order verification pass, and, when any verification sub-result is failed, the verification result is determined to be a work order verification failure.
[0043] It should be noted that the work order verification rule list is a collection of multiple verification rules, each of which defines how to verify different aspects of the power supply work order. These rules include but are not limited to content, time and task type verification rules. Among them, the content verification rules are used to check whether the work order content conforms to the predetermined format and requirements, such as data integrity, accuracy, etc.; the time verification rules are used to ensure that the time information in the work order (such as start time and end time) meets the preset standards or logical requirements; the task type verification rules are used to verify whether the work order task type meets the system's expectations, such as whether the task category is correct and whether it can match the type required by the system.
[0044] Furthermore, the verification sub-result generated after the application of each verification rule can be "passed" or "failed". These sub-results jointly determine the final verification result of the work order. If and only if all verification sub-results are "passed", the overall verification result is "work order verification passed", otherwise it is "work order verification failed".
[0045] Optionally, after executing step S101, it also includes: when the verification result indicates that the work order verification fails, marking the power supply guarantee work order corresponding to the target power supply guarantee task with a verification exception; and performing a rollback operation on the power supply guarantee work order carrying the verification exception mark.
[0046] Specifically, the verification exception mark is used to indicate that an abnormality or non-compliance occurs during the verification process of a work order. This label enables abnormal work orders to be identified and processed in a timely manner. The rollback operation is used to restore the work order and / or power supply task to a historical state when the work order verification fails and a verification exception is identified. It usually refers to undoing the operations that have been performed or restoring to the previous state in the process.
[0047] The above steps ensure that when a work order verification fails, the system can automatically identify and mark the problem work order and perform rollback processing at the same time, which helps to avoid further processing of work orders that do not meet the standards, thereby improving system stability and data accuracy.
[0048] Step S102: When the verification result indicates that the work order verification has passed, the power supply guarantee work order is received and added to the automatic management queue.
[0049] Specifically, the automatic management queue refers to the internal queue of the system, which is used to automatically manage and process the power supply guarantee work orders that have passed the verification. After the work order is added to the queue, the subsequent steps are automatically executed according to the predetermined process.
[0050] Optionally, after executing step S102, it also includes: reading the basic dispatching information of the power supply line recorded in the power supply work order; before performing the sign-off operation on the power supply line, writing a line sign-off notice, and sending the line sign-off notice to the line dispatching port based on the basic dispatching information; after performing the sign-off operation on the power supply line, writing a line sign-off notice, and sending the line sign-off notice to the line dispatching port based on the basic dispatching information.
[0051] Specifically, basic dispatch information refers to basic data contained in the power supply guarantee work order, such as the dispatch arrangement and timetable of the power line, etc., which is used to support subsequent hanging and removing operations. The basic dispatch information in the embodiment of the present invention at least includes: the port address of the line dispatch port, so as to synchronize information to the line dispatch port.
[0052] Another thing that needs to be explained is that the line sign notification refers to the notification file generated before the line sign operation is performed, which informs the relevant personnel or system about the detailed information of the line sign to ensure that the relevant parties know that the line will be signed. Correspondingly, the line sign removal notification refers to the notification file generated after the line sign removal operation is performed, which informs the relevant personnel or system about the detailed information of the line sign removal to ensure that the relevant parties know that the line will be removed.
[0053] The embodiment of the present invention ensures that the work order can be effectively managed and processed through the above steps after the work order verification is passed. The reading of basic scheduling information, the generation and sending of notifications improve the transparency and coordination of operations, and ensure the accuracy and timeliness of line listing and removal operations.
[0054] Optionally, after writing the line listing notification, it also includes: obtaining the current listing status of the power supply line; when the current listing status indicates that the power supply line is in a listed state, feedback of a successful listing result is given, but the current listing operation is not performed; when the current listing status indicates that the power supply line is in an unlisted state, the listing operation is performed, and a successful listing result is fed back; after the successful listing result is fed back, the line listing notification is sent to the line scheduling port based on the basic scheduling information.
[0055] It should be noted that determining whether the current line is listed is to avoid repeated listing. If the power supply line is already in the listed state, the system will report that the listing has been successful and will not repeat the listing operation, thus avoiding repeated operations while maintaining system consistency.
[0056] If the line is not currently listed, the system will perform the actual listing operation according to the listing requirements, update the line listing status, and then feedback the listing success result to ensure that the operation has been executed and recorded, and then send the line listing notification to the line dispatch port to ensure that the dispatch port is synchronized with the latest line status information. The above steps can improve the operating efficiency and accuracy of the system and reduce errors and redundant operations.
[0057] Optionally, after writing the line removal notification, it includes: obtaining the power supply task status performed on the power supply line; when the power supply task status indicates that only the target power supply task is performed on the power supply line, performing the removal operation and feeding back the result of successful removal; when the power supply task status indicates that at least two tasks are being performed on the power supply line, feeding back the result of successful removal, but not performing this removal operation.
[0058] It should be noted that the step of obtaining the status of power supply tasks performed on the power supply lines involves querying and obtaining the list of tasks currently being executed on the power supply lines, including information such as the type of tasks being executed, the number of tasks, task priority, and task status, so as to avoid the card removal operation interfering with other important tasks being executed.
[0059] Furthermore, if the query result shows that there is only one target power supply task on the line, it means that the task status on the line is simple enough, and the target task refers to the only task on this line that needs maintenance or attention, and the card removal operation can be performed safely; if two or more tasks are being executed on the line, it means that the task status of the line is complex, and card removal may affect the execution of multiple tasks, so the card removal operation needs to be handled with caution. In this case, the system will report that the card removal operation is successful, but it will not actually be performed to prevent potential problems caused by the card removal operation when the task is complex.
[0060] The above steps ensure that the card removal operation is carried out without interfering with the existing power supply guarantee tasks. By checking the complexity of the tasks on the line in advance, the card removal operation is prevented from affecting the important tasks in progress, thereby improving the safety and reliability of the system and ensuring the correctness of the card removal operation and minimal interference with the execution of the task.
[0061] Step S103, after the power supply guarantee task starts, the power supply guarantee line is listed based on the automatic management queue, and a power supply guarantee work order is filled out based on the start time point and the listing operation status.
[0062] It should be noted that the signboard operation is usually associated with the start time of the task, and is used to mark or configure tags on the power supply line to record the task status of the power supply task on the line. When filling out the power supply work order, it is necessary to record the start time of the task and the details of the signboard operation. The work order usually contains: the time of the operation, the lines involved, the results of the operation and other information, which helps to track the progress of the task and ensure the integrity of the information.
[0063] Step S103 ensures that the system can automatically and accurately perform line tagging operations after the power supply guarantee task begins. Automatic queue management improves operational efficiency. Maintaining detailed records by recording the start time and operation status helps optimize task management and monitoring, while ensuring transparency and traceability of the operation process.
[0064] Step S104, after the power supply guarantee task is completed, the power supply guarantee line is delisted based on the automatic management queue, and the power supply guarantee work order is filled in again based on the end time point and the delisting operation situation, and the power supply guarantee work order is archived.
[0065] It should be noted that the sign removal operation is usually associated with the end time of the task, and is used to remove the label or mark on the line after the task is completed to indicate that the power supply task has ended and the line can be restored to normal. When filling out the power supply work order, it is necessary to record the end time of the task and the details of the sign removal operation to ensure that all operations after the task is completed are accurately recorded for subsequent review and tracking.
[0066] In addition, archiving work orders is to store completed work orders in the system for future reference and management. This process ensures that the history of all operations is preserved and can be traced back.
[0067] Step S104 ensures that the card removal operation can proceed smoothly after the power supply guarantee task is completed, and all relevant information is accurately recorded and archived; the efficiency and accuracy of the operation are improved by automatically managing the queue, and the completion time and operation status are recorded to ensure the integrity of the task. The work order archive provides a detailed historical record, which is helpful for subsequent review and management. The above measures jointly optimize the task management process and data tracking, and help ensure the transparency and reliability of the operation process.
[0068] Optionally, after responding to the start instruction of the power supply guarantee task process in step S101, it also includes: obtaining the process progress of the power supply guarantee task process; and setting the work order status of the power supply guarantee work order based on the process progress.
[0069] It should be noted that obtaining the process progress means extracting the progress status of the current task from the task management system, including whether each stage of the power supply guarantee task has been completed, and if not, which stage it is currently in; updating the work order status according to the obtained process progress, including marking the work order as "in progress", "completed" or other appropriate status. The above steps ensure that the status of the work order is consistent with the actual task progress through real-time monitoring and updating of tasks.
[0070] Through the above steps S101 to S104, the start instruction of the power supply task process can be responded to first, the power supply work order corresponding to the target power supply task can be verified, and the verification result can be obtained. Then, when the verification result indicates that the work order verification has passed, the power supply work order can be received and added to the automatic management queue. Then, after the power supply task starts, the power supply line can be put on display based on the automatic management queue, and the power supply work order can be filled in based on the starting time point and the listing operation status. Finally, after the power supply task is completed, the power supply line can be removed from the display based on the automatic management queue, and the power supply work order can be filled in again based on the ending time point and the removal operation status, and the power supply work order can be archived.
[0071] In the embodiments of the present invention, the efficiency and accuracy of power dispatching are significantly improved through automated management of work order processes, intelligent execution of line hanging and removing signs, and one-click automated operations. The automated process reduces manual intervention, avoids operational errors, and ensures the timely execution and completion of power supply guarantee tasks. At the same time, the intelligent execution mechanism can automatically adjust according to real-time conditions, thereby improving the flexibility and response speed of the system. The one-click automated operation makes the entire power supply guarantee process more continuous and automated, greatly reducing the workload of dispatchers and improving the overall operating efficiency of the power system, thereby solving the technical problem in related technologies that the traditional power supply guarantee work order process has many manual execution steps, resulting in low efficiency.
[0072] The present invention is described below in conjunction with another specific implementation manner.
[0073] An embodiment of the present invention provides an automatic driving method for power dispatching and power supply guarantee tasks, which realizes one-key driving of work orders through an automatic driving queue (i.e., the automatic management queue in Example 1), and automatically performs power line hanging / delisting operations and power supply guarantee tasks without human intervention, thereby improving the flexibility, response speed and system operation efficiency of power system dispatching.
[0074] It should be noted that one-click driving of work orders means that the entire process from the approval of the work order, to automatic notification and automatic hanging / delisting at the beginning of power supply guarantee, and then to automatic notification and archiving of the work order after the end of power supply guarantee can be completed automatically through a start command (ie "one-click driving"), without the need for manual intervention in each specific step.
[0075] Figure 2 is a flow chart of an optional automatic driving method for a power dispatching and power supply guarantee task according to an embodiment of the present invention, such as Figure 2 As shown, the method comprises the following steps:
[0076] 1. Approval of power supply guarantee process based on the start-up instruction;
[0077] 2. The power dispatching system conducts a comprehensive work order verification and adds a reminder mark to the power supply guarantee work order that fails the verification (i.e., the verification abnormality mark in the first embodiment). The power dispatching system will roll back the abnormal work order during the dispatching approval process;
[0078] 3. If the work order verification is passed, the power supply guarantee work order will be included in the automatic driving queue (i.e., the automatic management queue), and the target program responsible for executing the automatic driving will enter the standby state;
[0079] 4. When the power supply guarantee start time arrives, the target program automatically sends a listing notification to the dispatching end, and the automatic listing operation starts after the notification ends;
[0080] 5. During the automatic listing process, obtain the listing status of the target power line. If it has been listed, do not repeat the listing. If it has not been listed, perform the actual listing operation, and fill the execution information generated during the execution process back into the power supply guarantee work order, and change the work order status to "in execution";
[0081] 6. After automatically completing the power supply start task, the target program enters the standby state again;
[0082] 7. When the power supply guarantee end time is reached, the target program automatically performs task repeatability detection on the target power line, prompts or marks the power supply lines that are still performing other power supply guarantee tasks and have not been completed, and does not remove the cards for these power supply guarantee lines;
[0083] 8. For other power lines that do not have repeated tasks, the actual removal operation is performed, and a removal notification is automatically sent to the dispatching end. After the notification is completed, the power supply work order is archived, and the overall process ends here.
[0084] The beneficial effect brought by the implementation mode of the present invention is that the work order can be driven with one key through a one-key driving instruction, without the need for manual intervention in each specific step, thereby improving the efficiency of power dispatching work, reducing manual operation errors, ensuring the accurate execution of power supply guarantee tasks, and realizing efficient management of power supply guarantee work orders.
[0085] The present invention is described below in conjunction with another optional embodiment.
[0086] Embodiment 2
[0087] An automatic management device for power supply work orders provided in this embodiment includes multiple implementation units, each of which corresponds to each implementation step in the above-mentioned embodiment 1.
[0088] Figure 3 is a schematic diagram of an optional automatic management device for power supply guarantee work orders according to an embodiment of the present invention, such as Figure 3 As shown, the device may include: a verification unit 31, a receiving unit 32, a card hanging unit 33, and a card removing unit 34.
[0089] The verification unit 31 is used to respond to the start instruction of the power supply guarantee task process, perform work order verification on the power supply guarantee work order corresponding to the target power supply guarantee task, and obtain a verification result.
[0090] The receiving unit 32 is used to receive the power supply guarantee work order and add it to the automatic management queue when the verification result indicates that the work order verification has passed.
[0091] The sign-on unit 33 is used to sign-off the power supply line based on the automatic management queue after the power supply task starts, and fill in the power supply work order based on the start time point and the sign-off operation situation.
[0092] The card removal unit 34 is used to remove the card for the power supply line based on the automatic management queue after the power supply task is completed, fill in the power supply work order again based on the end time point and the card removal operation situation, and archive the power supply work order.
[0093] The automatic management device for the above-mentioned power supply work order can first respond to the start instruction of the power supply task process through the verification unit 31, perform work order verification on the power supply work order corresponding to the target power supply task, and obtain the verification result, and then receive the power supply work order and add it to the automatic management queue through the receiving unit 32 when the verification result indicates that the work order verification has passed, and then after the power supply task starts, the power supply line is put on display based on the automatic management queue through the hanging unit 33, and the power supply work order is filled in based on the start time point and the hanging operation situation, and finally, after the power supply task is completed, the power supply line is removed based on the automatic management queue through the removal unit 34, and the power supply work order is filled in again based on the end time point and the removal operation situation, and the power supply work order is archived.
[0094] In the embodiments of the present invention, the efficiency and accuracy of power dispatching are significantly improved through automated management of work order processes, intelligent execution of line hanging and removing signs, and one-click automated operations. The automated process reduces manual intervention, avoids operational errors, and ensures the timely execution and completion of power supply tasks. At the same time, the intelligent execution mechanism can automatically adjust according to real-time conditions, thereby improving the flexibility and response speed of the system. The one-click automated operation makes the entire power supply process more continuous and automated, greatly reducing the workload of dispatchers and improving the overall operating efficiency of the power system, thereby solving the technical problem in related technologies that the traditional power supply work order process has many manual execution steps, resulting in low efficiency.
[0095] Optionally, the automatic management device for power supply work orders also includes: an identification module, which is used to mark the power supply work order corresponding to the target power supply task as an abnormality in verification when the verification result indicates that the work order verification fails; and a rollback module, which is used to perform a rollback operation on the power supply work order carrying the verification abnormality mark.
[0096] Optionally, the verification unit includes: a first acquisition module, used to obtain a work order verification rule list, wherein the work order verification rule list contains R work order verification rules, and the work order verification rule includes at least any of the following: content verification rule, time verification rule and task type verification rule, and R is a positive integer; a verification module, used to verify the power supply work order in turn based on each work order verification rule to obtain R verification sub-results; a determination module, used to determine that the verification result is a work order verification pass when all R verification sub-results are passed, and to determine that the verification result is a work order verification failure when any verification sub-result is a failure.
[0097] Optionally, the automatic management device of the power supply work order also includes: a reading module, which is used to read the basic scheduling information of the power supply line recorded in the power supply work order; a first writing module, which is used to write a line listing notification before the power supply line is listed, and send the line listing notification to the line scheduling port based on the basic scheduling information; a second writing module, which is used to write a line removal notification after the power supply line is removed, and send the line listing notification to the line scheduling port based on the basic scheduling information.
[0098] Optionally, the automatic management device of the power supply work order also includes: a second acquisition module, used to obtain the current listing status of the power supply line; a first feedback module, used to feedback the listing success result when the current listing status indicates that the power supply line is in a listing state, but not perform this listing operation; a first execution module, used to perform the listing operation when the current listing status indicates that the power supply line is in an unlisted state, and feedback the listing success result; a first sending module, used to send the line listing notification to the line scheduling port based on the basic scheduling information after feedback of the listing success result.
[0099] Optionally, the automatic management device of the power supply work order also includes: a third acquisition module, used to obtain the power supply task status executed on the power supply line; a second execution module, used to perform the card removal operation and feedback the successful card removal result when the power supply task status indicates that only the target power supply task is executed on the power supply line; a second feedback module, used to feedback the successful card removal result when the power supply task status indicates that at least two tasks are being executed on the power supply line, but not perform the current card removal operation.
[0100] Optionally, the automatic management device for power supply guarantee work orders also includes: a fourth acquisition module, used to obtain the process progress of the power supply guarantee task process; and a setting module, used to set the work order status of the power supply guarantee work order based on the process progress.
[0101] The above-mentioned automatic management device for power supply work orders may also include a processor and a memory. The above-mentioned verification unit 31, receiving unit 32, hanging unit 33, removing unit 34, etc. are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize the corresponding functions.
[0102] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and after the power supply task is completed, the power supply line is delisted based on the automatic management queue by adjusting the kernel parameters, and the power supply work order is filled out again based on the end time point and the delisting operation situation, and the power supply work order is archived.
[0103] The above-mentioned memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one storage chip.
[0104] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program that is initialized with the following method steps: responding to a start instruction of a power supply guarantee task process, performing a work order verification on the power supply guarantee work order corresponding to the target power supply guarantee task, and obtaining a verification result; when the verification result indicates that the work order verification has passed, receiving the power supply guarantee work order and adding it to an automatic management queue; after the power supply guarantee task begins, performing a sign-on operation on the power supply guarantee line based on the automatic management queue, and filling in the power supply guarantee work order based on the start time point and the sign-on operation status; after the power supply guarantee task ends, performing a sign-off operation on the power supply line based on the automatic management queue, filling in the power supply guarantee work order again based on the end time point and the sign-off operation status, and archiving the power supply work order.
[0105] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is also provided, the computer-readable storage medium including a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the automatic management method of the power supply work order of any one of the above-mentioned embodiments one.
[0106] According to another aspect of an embodiment of the present invention, there is also provided an electronic device, comprising one or more processors and a memory, the memory being used to store one or more programs, wherein when the one or more programs are executed by one or more processors, the one or more processors implement the automatic management method of the power supply work order of any one of the above-mentioned embodiments one.
[0107] Figure 4 1 is a hardware structure block diagram of an electronic device (or mobile device) for an automatic management method of a power supply guarantee work order according to an embodiment of the present invention. Figure 4 As shown, the electronic device may include one or more ( Figure 4 402a, 402b, ..., 402n are used to illustrate) processor 402 (processor 402 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA), memory 404 for storing data. In addition, it may also include: a display, an input / output interface (I / O interface), a universal serial bus (USB) port (which may be included as one of the ports of the I / O interface), a network interface, a keyboard, a power supply and / or a camera. It can be understood by those skilled in the art that Figure 4The structure shown is only for illustration and does not limit the structure of the above electronic device. Figure 4 More or fewer components as shown, or with Figure 4 Different configurations are shown.
[0108] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0109] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0110] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0111] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0112] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0113] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0114] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for automatically managing power supply work orders, characterized in that: include: Respond to the start instruction of the power supply guarantee task process, perform work order verification on the power supply guarantee work order corresponding to the target power supply guarantee task, and obtain the verification result; If the verification result indicates that the work order verification has passed, receiving the power supply guarantee work order and adding it to the automatic management queue; After the power supply guarantee task starts, the power supply guarantee line is put on display based on the automatic management queue, and the power supply guarantee work order is filled out based on the start time point and the listing operation situation; After the power supply guarantee task is completed, the power supply guarantee line is delisted based on the automatic management queue, the power supply guarantee work order is filled in again based on the end time point and the delisting operation situation, and the power supply guarantee work order is archived.
2. The automatic management method according to claim 1, characterized in that: After verifying the power supply guarantee work order corresponding to the target power supply guarantee task and obtaining the verification result, it also includes: If the verification result indicates that the work order verification fails, marking the power supply guarantee work order corresponding to the target power supply guarantee task as abnormal; The power supply guarantee work order carrying the verification abnormality mark is rolled back.
3. The automatic management method according to claim 1, characterized in that: The steps of verifying the power supply guarantee work order corresponding to the target power supply guarantee task and obtaining the verification result include: Obtain a work order verification rule list, wherein the work order verification rule list contains R work order verification rules, and the work order verification rule includes at least any one of the following: content verification rule, time verification rule and task type verification rule, and R is a positive integer; Based on each of the work order verification rules, the power supply guarantee work order is verified in turn to obtain R verification sub-results; When all R of the syndrome results are passed, the verification result is determined to be a work order verification pass, and when any of the syndrome results is failed, the verification result is determined to be a work order verification failure.
4. The automatic management method according to claim 1, characterized in that: After receiving the power supply guarantee work order and adding it to the automatic management queue, the method further includes: Read the basic dispatching information of the power supply line recorded in the power supply work order; Before performing a sign-off operation on the power supply guarantee line, a line sign-off notice is written, and the line sign-off notice is sent to a line dispatch port based on the basic dispatch information; After the power supply guarantee line is delisted, a line delisting notice is written, and the line listing notice is sent to a line scheduling port based on the basic scheduling information.
5. The automatic management method according to claim 4, characterized in that: After writing the line listing notice, also include: Obtain the current listing status of the guaranteed power supply line; When the current listing status indicates that the power supply guarantee line is in a listing state, a listing success result is fed back, but the current listing operation is not performed; When the current listing status indicates that the power supply line is in an unlisted state, executing the listing operation and feeding back a listing success result; After the successful listing result is fed back, the line listing notification is sent to the line scheduling port based on the basic scheduling information.
6. The automatic management method according to claim 4, characterized in that: After writing the line removal notice, include: Obtaining the power supply guarantee task status performed on the power supply guarantee line; When the power supply guarantee task situation indicates that only the target power supply guarantee task is to be performed on the power supply guarantee line, the card removal operation is performed, and a card removal success result is fed back; When the power supply guarantee task situation indicates that at least two tasks are being executed on the power supply guarantee line, a result of successful card removal is fed back, but the current card removal operation is not performed.
7. The automatic management method according to claim 1, characterized in that: After responding to the start instruction of the power supply guarantee task process, it also includes: Obtaining the process progress of the power supply guarantee task process; The work order status of the power supply guarantee work order is set based on the process progress.
8. An automatic management device for power supply work orders, characterized in that: include: A verification unit is used to respond to the start instruction of the power supply guarantee task process, perform work order verification on the power supply guarantee work order corresponding to the target power supply guarantee task, and obtain a verification result; A receiving unit, configured to receive the power supply guarantee work order and add it to the automatic management queue if the verification result indicates that the work order verification has passed; A sign-on unit, used for, after the power supply guarantee task starts, performing a sign-on operation on the power supply guarantee line based on the automatic management queue, and filling in the power supply guarantee work order based on the start time point and the sign-on operation situation; A card removal unit is used to remove the card from the power supply line based on the automatic management queue after the power supply task is completed, fill in the power supply work order again based on the end time point and the card removal operation situation, and archive the power supply work order.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the automatic management method of the power supply work order according to any one of claims 1 to 7.
10. An electronic device, characterized in that: It includes one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the automatic management method of the power supply work order as described in any one of claims 1 to 7.
Citation Information
Cited By
Power supply guarantee management method and system, storage medium and electronic equipment
CN119809333A
Intelligent work order filling method and device, storage medium and equipment
CN120689010A
Intelligent work order filling methods, devices, storage media and equipment
CN120689010B