Side slope surface water seepage prevention structure and seepage prevention method

By designing a slope surface water anti-seepage structure including foundation surrounding beams, protective mesh, waterproof concrete layer, upper retaining beam, planting soil layer, drainage ditches and seepage units, the problem of slope looseness and landslide caused by surface water penetration is solved, and the long-term stability of the slope and the improvement of water quality are achieved.

CN119531394AActive Publication Date: 2025-02-28SHANXI YIJIAN KUNLUN YANGCHENG CONSTR ENG CO LTD

Patent Information

Application Number
CN202510091882.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-21
Publication Date
2025-02-28
Estimated Expiration
2045-01-21

AI Technical Summary

Technical Problem

When the existing slope anti-seepage water structure is infiltrated against surface water, it is difficult to effectively prevent moisture from entering the slope, resulting in loose slope foundations and potential landslide risks.

Method used

A slope surface water anti-seepage structure is designed, including foundation surround beams, protective mesh, waterproof concrete layer, upper retaining beam, planting soil layer, drainage ditch and seepage unit. Through these components, surface water is directed to the drainage ditch, and water is diverted out through the seepage unit and drainage unit to prevent water from seeping into the slope interior.

Benefits of technology

Effectively prevent surface water from penetrating into the slope, reduce the risk of landslide on the slope, maintain the long-term stability of the slope, and centrally treat impurities through impurities filter frames and storage boxes to improve water cleanliness and reduce the cost of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119531394A_ABST
    Figure CN119531394A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of side slope protection, and discloses a side slope surface water anti-seepage structure and an anti-seepage method.The side slope surface water anti-seepage structure comprises a side slope body, a foundation girth is poured on the side slope body, a protective net piece is laid and fixed on the upper surface of the foundation girth, and a waterproof concrete layer is poured on the upper surface of the protective net piece; a plurality of upper soil retaining beams are poured on the upper surface of the waterproof concrete layer together with the waterproof concrete layer, and a planting soil layer used for planting vegetation is laid between every two upper soil retaining beams. When surface water flows through the side slope body, one part of the surface water is discharged into the drainage unit on the lower portion through the drainage ditch to flow away, the other part of the surface water is absorbed by the vegetation and the planting soil layer, and when the vegetation and the planting soil layer cannot absorb the surface water, the redundant surface water permeates into the drainage ditch through the water seepage unit and is discharged. And due to blocking of the waterproof concrete layer, surface water is prevented from permeating into the side slope body, and the long-term stability of the side slope body is kept in cooperation with the foundation girth.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of slope protection, in particular to a slope surface water infiltration prevention structure and an anti-seepage method. Background Art

[0002] An engineering slope refers to a slope surface with a certain slope formed by excavation, filling, reinforcement and other treatments of rock and soil to ensure the safety of engineering construction and operation, while a slope anti-seepage structure refers to certain measures taken on the slope to prevent rainwater from seeping into the slope, thereby achieving the purpose of protecting the slope.

[0003] In order to improve the stability of the slope, the prior art has made many improvements to the anti-seepage structure of the slope. For example, the patent with patent publication number CN219343253U discloses an anti-seepage structure of the slope, and its technical solution is: including a pre-buried culvert, a plurality of drainage channels are opened on the top of the pre-buried culvert, a permeable steel frame is embedded on the top of the pre-buried culvert, a filter layer is provided on the top of the permeable steel frame, a slope is provided on the top of the filter layer, and a plurality of drainage components are provided inside the slope. The drainage component includes a drainage channel, a filter plate is embedded on the top of the drainage channel, a sleeve is provided at the bottom of the drainage channel, the drainage channel and the sleeve are connected by threads, and fixed plates are fixed on both sides of the sleeve, and the other side of the fixed plate is fixedly connected to the side wall of the drainage channel. The beneficial effect of the utility model is: the base soil of the vegetation is fixed by using the fixed frame, which can prevent the huge impact force on the base soil of the vegetation caused by excessive rainfall, resulting in a large loss of nutrients in the base soil of the vegetation, affecting the subsequent planting effect, and ensuring the stability of the groundwater level. The accumulated water can be quickly drained away to prevent the groundwater level from changing and avoid collapse.

[0004] The above patent has obvious beneficial effects, but still has the following shortcomings in actual operation: In the above-mentioned comparative documents, the base soil of the vegetation is fixed by a fixed frame to prevent the rapid surface water from carrying away the base soil. However, in reality, part of the surface water will flow along the surface of the slope, and part of it will penetrate into the interior of the slope, thereby causing the slope foundation to become loose. Long-term water seepage will cause large-scale landslides on the slope. Therefore, the art is in urgent need of a slope surface water infiltration prevention structure and an anti-seepage method to solve the defects of the existing technology. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a slope surface water anti-seepage structure and an anti-seepage method to solve the problems mentioned in the background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions: In a first aspect, the present invention discloses a structure for preventing surface water from seeping into a slope, comprising a slope body, a foundation beam cast on the slope body, a protective mesh laid and fixed on the upper surface of the foundation beam, a waterproof concrete layer cast on the upper surface of the protective mesh, a plurality of upper retaining beams cast together with the waterproof concrete layer on the upper surface of the waterproof concrete layer, a planting soil layer for planting vegetation is laid between each of the upper retaining beams, a plurality of drainage ditches are pre-buried on the planting soil layer, a water seepage unit adapted to the upper retaining beam is provided on the opposite side of each of the drainage ditches, the water seepage unit is used to discharge rainwater in the planting soil layer into the drainage ditch, a quick installation unit is provided between the drainage ditch and the upper retaining beam, the drainage ditch is installed and fixed through the quick installation unit, a drainage unit is provided at the lower part of the slope body, and an impurity collection unit is provided in the drainage unit; The water seepage unit comprises a plurality of water seepage membranes arranged on opposite sides of the drainage ditch, the opposite sides of the drainage ditch are penetrated with water seepage openings, the upper part of the drainage ditch is provided with a plug-in slot adapted to the water seepage membrane, the water seepage openings on the opposite sides of the drainage ditch are rotatably connected with a rotating shaft, the outer wall of the rotating shaft is fixedly connected with a plurality of cleaning plates, one side of the cleaning plate is against the side of the water seepage membrane; The quick installation unit includes a plurality of adjustment bolts arranged on both sides of the upper part of the drainage ditch, stepped holes adapted to the adjustment bolts are provided on both sides of the upper part of the drainage ditch, and a moving cavity is provided on the opposite sides of the drainage ditch, and a moving frame adapted to the moving cavity and having a parallelogram cross section is slidably connected therein, a card interface adapted to one end of the moving frame is provided in the upper retaining beam, a sliding block is slidably connected to the middle of the moving frame, the adjustment bolts penetrate the sliding block and are threadedly connected to the sliding block, and a sealing rubber cover is embedded on the top of the stepped hole; The drainage unit includes a water collecting ditch arranged at the lower part of the slope body, the side of the water collecting ditch is connected to the foundation surrounding beam, the impurity collecting unit includes an impurity filter frame arranged in the water collecting ditch, one side of the impurity filter frame is provided with an impurity storage box connected with the impurity filter frame, a side of the impurity filter frame close to the slope body is provided with a square hole connected with the drainage ditch, and the impurity filter frame is provided with an opening located above the square hole, a rotating shaft is provided in the impurity filter frame, the end of the rotating shaft is rotatably connected to a support frame fixedly installed with the inner wall of the impurity filter frame, the outer wall of the rotating shaft is fixedly connected to a conveying auger, and the conveying auger is fixedly connected to a plurality of push bars, The side of the impurity filter frame is rotatably connected with a snap-in strip, one side of the ditch is provided with an installation groove adapted to the snap-in strip, both sides of the impurity storage box are fixedly connected with fixing strips, the inner wall of the ditch is provided with fixing grooves adapted to the fixing strips, the bottom of the impurity storage box is fixedly connected with two symmetrical support plates, the lower side of the impurity filter frame is fixedly connected with a fixing plate, a number of arc-shaped guide rods penetrate the fixing plate, both ends of the arc-shaped guide rods are fixedly connected with baffles, a spring is sleeved on the side of the arc-shaped guide rod, the spring is located between the fixing plate and one of the baffles, and one side of the bottom of the drainage ditch is fixedly connected with a water guide plate.

[0007] Preferably, a plurality of supporting piles are provided on the upper part of the slope body, a plurality of grouting anchor rods are provided on the inclined surface of the slope body, and the supporting piles and grouting anchor rods are both connected to the foundation surrounding beam.

[0008] Preferably, a plurality of fixed anchor rods are pre-embedded in the upper surface of the foundation perimeter beam, the fixed anchor rods penetrate the protective mesh and the waterproof concrete layer and are connected to the upper retaining beam and the planting soil layer, the protective mesh and the waterproof concrete layer are both connected to the fixed anchor rods, and a plurality of lower retaining beams are integrally cast on the lower surface of the foundation perimeter beam, and the plurality of lower retaining beams are all connected to the slope body.

[0009] Preferably, the upper side surface of each upper retaining beam is provided with a plurality of first clamping grooves, and the lower side surface of each drainage ditch is provided with a second clamping groove matched with the first clamping grooves.

[0010] Preferably, both sides of the sliding block are fixedly connected to limit blocks, and opposite side walls of the moving frame are provided with limit grooves adapted to the limit blocks.

[0011] Preferably, opposite side walls of the water collecting ditch are provided with clamping platforms, a hollow cover plate is installed between the two clamping platforms, and an arc-shaped water blocking plate is provided on the upper part of the side of the water collecting ditch away from the foundation surrounding beam.

[0012] In a second aspect, the present invention discloses a method for preventing surface water from seeping into a slope structure, which specifically comprises the following steps: S1: The support piles and grouting anchor rods are installed on the upper part and the inclined surface of the slope body respectively by hoisting equipment; S2: excavating the upper part and the slope of the slope, and the excavation position is adapted to the position of the support piles and the grouting anchor rods, and the fixed anchor rods are pre-buried through formwork and steel bar binding, and concrete is poured for the foundation beam, the lower retaining beam and the water collection ditch; S3: After the foundation surrounding beam has passed the concrete curing period, fill the foundation surrounding beam with soil, install the protection mesh on the foundation surrounding beam, and fix the protection mesh to the fixing anchor rods; S4: Forming the upper retaining beam on the protective mesh, tying steel bars, and pouring a waterproof concrete layer and an upper retaining beam on the protective mesh; S5: Install the drainage ditch on several upper retaining beams through a quick installation unit, backfill the planting soil layer between the upper retaining beams and plant vegetation, then install the hollow cover plate at the clamping platform position, and install the impurity filter frame and impurity storage box in the ditch.

[0013] In view of the deficiencies of the prior art, the present invention provides a slope surface water anti-seepage structure and an anti-seepage method, which overcome the deficiencies of the prior art. The beneficial effects of the present invention are: In the present invention, when surface water flows over the slope body, part of the surface water is discharged into the drainage unit at the bottom through the drainage ditch, and the other part of the surface water is absorbed by the vegetation and the planting soil layer. When the vegetation and the planting soil layer are unable to absorb the surface water, the excess surface water penetrates into the drainage ditch through the seepage unit and is discharged. In addition, due to the obstruction of the waterproof concrete layer, the surface water is prevented from penetrating into the slope body, and the long-term stability of the slope body is maintained in cooperation with the foundation surrounding beam.

[0014] In the present invention, when there is a lot of surface water, the surface water flows downward in the drainage ditch. The surface water flowing in the drainage ditch will push the cleaning plate to rotate along the rotation axis. Since the side of the cleaning plate is against the side of the water-permeable membrane, the rotating cleaning plate cleans the water-permeable membrane to prevent the water-permeable membrane from being blocked. The water-permeable membrane can be replaced through the plug-in groove, and the excess surface water can be drained into the drainage ditch, reducing the probability of surface water infiltration.

[0015] In the present invention, by rotating the adjusting bolt, the adjusting bolt drives the sliding block to move upward in the moving cavity, and the sliding block drives the moving frame to move upward. At the same time, the sliding block can move in the moving frame. When the moving frame moves upward, one end of the moving frame is squeezed by the side of the moving cavity, and the moving frame moves toward the card interface position until the adjusting bolt is tightened. At this time, one end of the moving frame is carded in the card interface, and the installation of the drain ditch can be completed, which is convenient for the installer to install it and convenient for the later replacement of the drain ditch.

[0016] In the present invention, the water collecting ditch collects and transports surface water, and the water collecting ditch and the foundation surrounding beam are cast as one body, so as to improve the strength of the water collecting ditch, and at the same time, the water collecting ditch has a supporting effect on the slope.

[0017] In the present invention, the supporting piles and grouting anchor rods improve the strength of the overall foundation surrounding beam in supporting the slope body. After the anchor rods, the protective mesh, the waterproof concrete layer, the upper retaining beam, the lower retaining beam and the foundation surrounding beam are cast into a whole, which further improves the stability of the overall slope body.

[0018] In the present invention, water flow will be blocked when passing through the second clamping groove position. After being blocked by each second clamping groove, the potential energy of the water flow is reduced, the impact force of the surface water flow is reduced, and long-term drainage is prevented from causing damage to the surface of the water collection ditch.

[0019] In the present invention, surface water is filtered by an impurity filter frame, and the impurities in the surface water are pushed to the impurity storage box for storage by a conveying auger, so as to facilitate the centralized treatment of the impurities contained in the surface water, utilize the potential energy of the surface water flow to filter the surface water, and collect the impurities, thereby reducing the use cost of the overall device and improving the cleanliness of the surface water in the collection ditch.

[0020] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0022] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the cross-sectional structure of the slope body of the present invention; Figure 3 It is a schematic diagram of the explosion structure at the foundation surrounding beam and the slope body of the present invention; Figure 4 It is a structural schematic diagram of the foundation surrounding beam of the present invention; Figure 5 It is a structural schematic diagram of the upper retaining beam and the drainage ditch of the present invention; Figure 6 It is a schematic structural diagram of the water seepage membrane of the present invention; Figure 7 It is a structural schematic diagram of the mobile frame of the present invention; Figure 8It is a structural schematic diagram of the impurity filtering frame of the present invention; Fig. 9 It is a structural schematic diagram of the impurity storage box of the present invention; Fig.10 It is a schematic cross-sectional structure diagram of the impurity filtering frame and the drainage ditch of the present invention; Fig.11 It is a structural schematic diagram of the rotating shaft and the conveying auger in the present invention; Fig.12 For the present invention Figure 2 A schematic diagram of the enlarged structure at A in the middle; Fig.13 For the present invention Figure 4 A schematic diagram of the enlarged structure at B in the middle; Fig.14 For the present invention Figure 5 Schematic diagram of the enlarged structure at point C in the middle.

[0023] In the figure: 1. Slope; 2. Foundation beam; 3. Protective mesh; 4. Waterproof concrete layer; 5. Upper retaining beam; 6. Drainage ditch; 7. Planting soil layer; 8. Water seepage unit; 9. Quick installation unit; 10. Drainage unit; 11. Water seepage membrane; 12. Water seepage port; 13. Plug slot; 14. Rotating shaft; 15. Cleaning plate; 16. Adjusting bolt; 17. Step hole; 18. Moving cavity; 19. Moving frame; 20. Card interface; 21. Sliding block; 22. Drainage ditch; 23. Card connection platform; 24. Hollow cover plate; 25. Support pile; 26. Grouting anchor rod ; 27. Lower retaining beam; 28. Fixed anchor rod; 29. ​​First clamping groove; 30. Second clamping groove; 31. Limit block; 32. Limiting groove; 33. Arc-shaped water blocking plate; 34. Impurity collecting unit; 35. Sealing rubber cover; 36. Impurity filter frame; 37. Impurity storage box; 38. Rotating shaft; 39. Support frame; 40. Conveying auger; 41. Push bar; 42. Clamping bar; 43. Fixed bar; 44. Support plate; 45. Fixed groove; 46. Fixed plate; 47. Spring; 48. Baffle; 49. Arc-shaped guide rod; 50. Water guide plate; 51. Installation groove. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] See also Figure 1-Figure 14A slope surface water infiltration prevention structure comprises a slope body 1, a foundation beam 2 is cast on the slope body 1, a protective mesh 3 is laid and fixed on the upper surface of the foundation beam 2, a waterproof concrete layer 4 is cast on the upper surface of the protective mesh 3, a plurality of upper retaining beams 5 are cast together with the waterproof concrete layer 4 on the upper surface of the waterproof concrete layer 4, a planting soil layer 7 for planting vegetation is laid between each of the upper retaining beams 5, a plurality of drainage ditches 6 are pre-buried on the planting soil layer 7, a seepage unit 8 adapted to the upper retaining beam 5 is provided on the opposite side of each drainage ditch 6, the seepage unit 8 is used to discharge rainwater in the planting soil layer 7 into the drainage ditch 6, a quick installation unit 9 is provided between the drainage ditch 6 and the upper retaining beam 5, the drainage ditch 6 is installed and fixed by the quick installation unit 9, a drainage unit 10 is provided at the lower part of the slope body 1, and an impurity collection unit 34 is provided in the drainage unit 10.

[0026] Specifically, the slope body 1 is excavated, and the formwork and steel bars are tied. Then, the foundation beam 2 is poured with concrete. The protective mesh 3 is installed on the upper surface of the foundation beam 2, and viscous concrete is sprayed on the protective mesh 3. Then, the formwork and steel bars are tied on the protective mesh 3, and the waterproof concrete layer 4 and the upper retaining beam 5 are poured. The drainage ditch 6 is installed on several upper retaining beams 5 through the quick installation unit 9, and the planting soil layer 7 is filled between the upper retaining beams 5. Vegetation is planted on the planting soil layer 7. When there is a layer of soil on the slope body 1, the soil layer 7 is filled with vegetation. When surface water flows through, part of the surface water is discharged into the lower drainage unit 10 through the drainage ditch 6, and the other part of the surface water is absorbed by the vegetation and planting soil layer 7. When the vegetation and planting soil layer 7 cannot absorb the surface water, the excess surface water penetrates into the drainage ditch 6 through the infiltration unit 8 and is discharged. Due to the obstruction of the waterproof concrete layer 4, the surface water is prevented from penetrating into the slope body 1, and the long-term stability of the slope body 1 is maintained in cooperation with the foundation beam 2. The impurity collection unit 34 is used to collect impurities flowing in the drainage ditch 6, which is convenient for centralized treatment of impurities in the later stage.

[0027] As a technical optimization scheme of the present invention, the seepage unit 8 includes a plurality of seepage membranes 11 arranged on opposite sides of the drainage ditch 6, seepage ports 12 are penetrated through the opposite sides of the drainage ditch 6, a plug-in groove 13 adapted to the seepage membrane 11 is opened on the upper portion of the drainage ditch 6, a rotating shaft 14 is rotatably connected to the seepage port 12 on the opposite side of the drainage ditch 6, and a plurality of cleaning plates 15 are fixedly connected to the outer wall of the rotating shaft 14, and one side of the cleaning plate 15 is against the side of the seepage membrane 11.

[0028] Specifically, the seepage port 12 is located on the upper side of each upper retaining beam 5. When the surface water between the two upper retaining beams 5 flows down to the seepage port 12, the excess surface water seeps into the drainage ditch 6. The seepage membrane 11 can adopt a one-way permeable membrane. When there is a lot of surface water, the surface water flows downward in the drainage ditch 6. The surface water flowing in the drainage ditch 6 will push the cleaning plate 15 to rotate along the rotating axis 14. Since the side of the cleaning plate 15 is against the side of the seepage membrane 11, the rotating cleaning plate 15 will clean the seepage membrane 11 to prevent the seepage membrane 11 from being blocked, and the seepage membrane 11 can be replaced through the plug-in slot 13. Excess surface water can be drained into the drainage ditch 6 to reduce the probability of surface water infiltration.

[0029] As a technical optimization scheme of the present invention, the quick installation unit 9 includes a plurality of adjusting bolts 16 arranged on both sides of the upper part of the drainage ditch 6, stepped holes 17 adapted to the adjusting bolts 16 are provided on both sides of the upper part of the drainage ditch 6, and moving cavities 18 are provided on the opposite sides of the drainage ditch 6. A moving frame 19 with a parallelogram cross-section is slidably connected in the moving cavity 18, a card interface 20 adapted to one end of the moving frame 19 is provided in the upper retaining beam 5, a sliding block 21 is slidably connected in the middle of the moving frame 19, the adjusting bolts 16 penetrate the sliding block 21 and are threadedly connected to the sliding block 21, and a sealing rubber cover 35 is embedded in the top of the stepped hole 17.

[0030] Specifically, the drainage ditch 6 is manufactured in a prefabricated manner, transported to a designated location, and installed through a quick installation unit 9, which does not require on-site manufacturing and is convenient for construction. When the drainage ditch 6 needs to be installed, the movable cavity 18 on the side of the drainage ditch 6 is aligned with the card interface 20 on the upper retaining beam 5, the drainage ditch 6 is carded on the upper retaining beam 5, and the adjusting bolt 16 is rotated. When the adjusting bolt 16 rotates, the sliding block 21 is driven to move upward in the movable cavity 18, and the sliding block 21 drives the movable frame 19 to move upward, and the sliding block 21 can move in the movable frame 19. When the movable frame 19 moves upward, one end of the movable frame 19 is squeezed by the side of the movable cavity 18, and the movable frame 19 moves toward the position of the card interface 20 until the adjusting bolt 16 is tightened. At this time, one end of the movable frame 19 is carded in the card interface 20, and the installation of the drain ditch 6 can be completed, which is convenient for the installer to install it and convenient for the later replacement of the drain ditch 6. When it needs to be replaced, it is only necessary to rotate the adjusting bolt 16 in the reverse direction to disengage one end of the movable frame 19 from the card interface 20. After the installation of the drain ditch 6 is completed, the sealing rubber cover 35 is covered in the stepped hole 17 to seal the inside of the stepped hole 17.

[0031] As a technical optimization scheme of the present invention, the drainage unit 10 includes a ditch 22 arranged at the lower part of the slope body 1, the side of the ditch 22 is connected to the foundation beam 2, the opposite side walls of the ditch 22 are provided with a clamping platform 23, a hollow cover plate 24 is installed between the two clamping platforms 23, and an arc-shaped water blocking plate 33 is provided on the upper part of the side of the ditch 22 away from the foundation beam 2. The impurity collection unit 34 includes an impurity filter frame 36 arranged in the ditch 22, and an impurity storage box 37 connected to the impurity filter frame 36 is provided on one side of the impurity filter frame 36. A square hole connected to the drainage ditch 6 is opened on the side of the impurity filter frame 36 close to the slope body 1, and an opening located above the square hole is opened on the impurity filter frame 36. A rotating shaft 38 is provided in the impurity filter frame 36, and the end of the rotating shaft 38 is rotatably connected to a support frame 39 fixedly installed on the inner wall of the impurity filter frame 36. The outer wall of the rotating shaft 38 is fixedly connected to a conveying auger 40, and a plurality of pushing bars 41 are fixedly connected to the conveying auger 40. A clamping bar 42 is rotatably connected to the side of the impurity filter frame 36. A mounting groove 51 adapted to the clamping bar 42 is provided on one side of the water collecting ditch 22. Fixed bars 43 are fixedly connected to both sides of the impurity storage box 37. A fixing groove 45 adapted to the fixing bar 43 is provided on the inner wall of the water collecting ditch 22. Two symmetrical support plates 44 are fixedly connected to the bottom of the impurity storage box 37. A fixing plate 46 is fixedly connected to the lower side of the impurity filter frame 36. A plurality of arc-shaped guide rods 49 are passed through the fixing plate 46. Baffles 48 are fixedly connected to both ends of the arc-shaped guide rods 49. Springs 47 are sleeved on the side of the arc-shaped guide rods 49. The springs 47 are located between the fixing plate 46 and one of the baffles 48. A water guide plate 50 is fixedly connected to one side of the bottom of the drainage ditch 6.

[0032] Specifically, the water collecting ditch 22 collects and transports the surface water. The water collecting ditch 22 and the foundation surrounding beam 2 are cast as one body to improve the strength of the water collecting ditch 22. At the same time, the water collecting ditch 22 has a supporting effect on the slope body 1. The hollow cover plate 24 is installed at the position of the clamping platform 23 to filter the large volume of garbage contained in the surface water. The surface water flows under the hollow cover plate 24. After the hollow cover plate 24 is installed, it is clamped in the installation groove 51 through the clamping strip 42, and then the impurity filter frame 36 is hung on the inner wall of the water collecting ditch 22, and the arc guide rod 4 The baffle plate 48 at one end of the 9 is tightly attached to the inner wall of the water collection ditch 22, and the impurity filter frame 36 is supported by the spring 47. The impurity storage box 37 is installed in the water collection ditch 22 by inserting the fixing strip 43 into the fixing groove 45, and the fixing plate 46 is supported on the hollow cover plate 24. When surface water flows down the drainage ditch 6 and the planting soil layer 7, the surface water will flow into the impurity filter frame 36. The surface water in the drainage ditch 6 is concentrated and guided to the impurity filter frame 36 through the water guide plate 50, and the surface water and the impurities floating on the water flow into the impurity filter frame 36. The surface water impacts the push bar 41, and then the rotating shaft 38 rotates. When the rotating shaft 38 rotates, the conveying auger 40 is driven to rotate. The outer wall of the conveying auger 40 abuts against the inner wall of the impurity filter frame 36. When the conveying auger 40 rotates, the impurities floating in the surface water are guided to the impurity storage box 37 for storage. The impurity filter frame 36 and the impurity storage box 37 are provided with a plurality of filter holes. The surface water is discharged into the water collection ditch 22 through the filter holes. Later, the impurity storage box 37 can be taken out and the impurities collected therein can be poured out for centralized treatment. When the surface water impacts When the impurity filter frame 36 is in the filter frame 36, the spring 47 plays an elastic supporting role, reducing the impact force of surface water on the impurity filter frame 36, using the potential energy of the surface water flow to filter the surface water and collect impurities, reducing the use cost of the entire device and improving the cleanliness of the surface water in the ditch 22; if the slope body 1 is located in a river or other location, the ditch 22 can also be used to block the scouring of the slope body 1 by the flowing water, and the arc-shaped water blocking plate 33 is used to reversely guide the water flow in the river or other location to prevent a large amount of fast-flowing water from flowing back into the ditch 22.

[0033] As a technical optimization solution of the present invention, a plurality of supporting piles 25 are provided on the upper part of the slope body 1 , and a plurality of grouting anchor rods 26 are provided on the inclined surface of the slope body 1 . Both the supporting piles 25 and the grouting anchor rods 26 are connected to the foundation surrounding beam 2 .

[0034] Specifically, the support piles 25 and the grouting anchor rods 26 improve the strength of the overall foundation surrounding beam 2 in supporting the slope body 1. The support piles 25 and the grouting anchor rods 26 are installed using existing well-known technologies, and will not be described in detail again.

[0035] As a technical optimization scheme of the present invention, a plurality of fixed anchor rods 28 are pre-buried on the upper surface of the foundation perimeter beam 2, the fixed anchor rods 28 penetrate the protective mesh 3 and the waterproof concrete layer 4 and are connected to the upper retaining beam 5 and the planting soil layer 7, the protective mesh 3 and the waterproof concrete layer 4 are both connected to the fixed anchor rods 28, and a plurality of lower retaining beams 27 are integrally cast on the lower surface of the foundation perimeter beam 2, and the plurality of lower retaining beams 27 are all connected to the slope body 1.

[0036] Specifically, the fixed anchor rods 28 are pre-buried before pouring the foundation perimeter beam 2. After the pouring, the protective mesh 3, the waterproof concrete layer 4, the upper retaining beam 5, the lower retaining beam 27 and the foundation perimeter beam 2 form a whole, further improving the stability of the overall slope body 1.

[0037] As a technical optimization solution of the present invention, a plurality of first clamping grooves 29 are provided on the upper side surface of each upper retaining beam 5, and a second clamping groove 30 adapted to the first clamping groove 29 is provided on the lower side surface of each drainage ditch 6. The second clamping groove 30 extends toward the inner wall of the drainage ditch 6 to form a plurality of protrusions on the inner lower wall of the drainage ditch 6.

[0038] Specifically, when the drainage ditch 6 is installed, the second clamping groove 30 is clamped in the first clamping groove 29. Since the surface water flowing downward has a strong impact force, the water flow will be blocked when passing through the second clamping groove 30. After being blocked by each second clamping groove 30, the potential energy of the water flow is reduced to prevent the fast-flowing water from damaging the water collection ditch 22 below. The cooperation between the second clamping groove 30 and the first clamping groove 29 improves the stability of the drainage ditch 6 after installation.

[0039] As a technical optimization solution of the present invention, both sides of the sliding block 21 are fixedly connected to the limiting blocks 31, and the opposite side walls of the moving frame 19 are provided with limiting grooves 32 adapted to the limiting blocks 31. When the adjusting bolt 16 is rotated, the moving frame 19 is squeezed and displaced by the moving cavity 18, and at the same time, the sliding block 21 moves in the limiting groove 32 through the limiting block 31.

[0040] A method for preventing surface water from seeping into a slope structure, comprising the following steps: S1: The support piles 25 and the grouting anchor rods 26 are installed on the upper part and the inclined surface of the slope body 1 respectively by using hoisting equipment; S2: excavating the upper part and the slope of the slope body 1, and the excavation position is adapted to the position of the support piles 25 and the grouting anchor rods 26, and the fixed anchor rods 28 are pre-buried through formwork and steel bar binding, and the foundation surrounding beam 2, the lower retaining beam 27 and the water collection ditch 22 are poured with concrete; S3: After the foundation surrounding beam 2 has passed the concrete curing period, fill the foundation surrounding beam 2 with soil, install the protection mesh 3 on the foundation surrounding beam 2, and fix the protection mesh 3 to the fixing anchor rod 28; S4: Forming the position of the upper retaining beam 5 on the protective mesh 3, tying steel bars, and pouring a waterproof concrete layer 4 and the upper retaining beam 5 on the protective mesh 3; S5: Install the drainage ditch 6 on several upper retaining beams 5 through the quick installation unit 9, and backfill the planting soil layer 7 between the upper retaining beams 5 and plant vegetation, then install the hollow cover plate 24 at the position of the clamping platform 23, and install the impurity filter frame 36 and the impurity storage box 37 in the ditch 22.

[0041] Finally, it should be noted that in the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention.

[0042] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A slope surface water infiltration prevention structure, comprising a slope body (1), characterized in that: A foundation beam (2) is cast on the slope body (1); a protective mesh (3) is laid and fixed on the upper surface of the foundation beam (2); a waterproof concrete layer (4) is cast on the upper surface of the protective mesh (3); a plurality of upper retaining beams (5) are cast together with the waterproof concrete layer (4) on the upper surface of the waterproof concrete layer (4); a planting soil layer (7) for planting vegetation is laid between each of the upper retaining beams (5); a plurality of drainage ditches (6) are pre-buried on the planting soil layer (7); The opposite sides of each drainage ditch (6) are provided with a water seepage unit (8) adapted to the upper retaining beam (5), the water seepage unit (8) being used to discharge rainwater in the planting soil layer (7) into the drainage ditch (6), a quick installation unit (9) being provided between the drainage ditch (6) and the upper retaining beam (5), the drainage ditch (6) being installed and fixed by the quick installation unit (9), the lower part of the slope body (1) being provided with a drainage unit (10), the drainage unit (10) being provided with an impurity collection unit (34); The water seepage unit (8) comprises a plurality of water seepage membranes (11) arranged on opposite sides of the drainage ditch (6), the opposite sides of the drainage ditch (6) are penetrated with water seepage openings (12), the upper part of the drainage ditch (6) is provided with a plug-in groove (13) adapted to the water seepage membrane (11), the water seepage openings (12) on the opposite sides of the drainage ditch (6) are rotatably connected with a rotating shaft (14), the outer wall of the rotating shaft (14) is fixedly connected with a plurality of cleaning plates (15), and one side of the cleaning plate (15) is against the side of the water seepage membrane (11); The quick installation unit (9) comprises a plurality of adjusting bolts (16) arranged on both sides of the upper part of the drainage ditch (6); both sides of the upper part of the drainage ditch (6) are provided with stepped holes (17) adapted to the adjusting bolts (16); opposite sides of the drainage ditch (6) are provided with moving cavities (18); a moving frame (19) adapted to the moving cavity (18) is slidably connected to the moving cavity (18); a card interface (20) adapted to one end of the moving frame (19) is provided in the upper retaining beam (5); a sliding block (21) is slidably connected to the middle of the moving frame (19); the adjusting bolts (16) penetrate the sliding block (21) and are threadedly connected to the sliding block (21); and a sealing rubber cover (35) is embedded at the top of the stepped hole (17); The drainage unit (10) comprises a water collecting ditch (22) arranged at the lower part of the slope body (1), the side of the water collecting ditch (22) being connected to the foundation surrounding beam (2), the impurity collecting unit (34) comprising an impurity filtering frame (36) arranged in the water collecting ditch (22), one side of the impurity filtering frame (36) being provided with an impurity storage box (37) connected to the impurity filtering frame (36), a square hole connected to the drainage ditch (6) being provided on the side of the impurity filtering frame (36) close to the slope body (1), and an opening located above the square hole being provided on the impurity filtering frame (36), a rotating shaft (38) being provided in the impurity filtering frame (36), the end of the rotating shaft (38) being rotatably connected to a support frame (39) fixedly mounted to the inner side wall of the impurity filtering frame (36), the outer wall of the rotating shaft (38) being fixedly connected to a conveying auger (40), the conveying auger (40) being fixedly connected to a plurality of push bars (41), the impurity collecting unit (34) comprising an impurity collecting unit (34) and a conveying auger (40) being fixedly connected to the impurity collecting unit (34), A clamping strip (42) is rotatably connected to the side of the filter frame (36); a mounting groove (51) adapted to the clamping strip (42) is provided on one side of the water collecting ditch (22); fixing strips (43) are fixedly connected to both sides of the impurity storage box (37); a fixing groove (45) adapted to the fixing strip (43) is provided on the inner wall of the water collecting ditch (22); two symmetrical support plates (44) are fixedly connected to the bottom of the impurity storage box (37); a fixing plate (46) is fixedly connected to the lower side of the impurity filter frame (36); a plurality of arc-shaped guide rods (49) penetrate the fixing plate (46); baffles (48) are fixedly connected to both ends of the arc-shaped guide rods (49); a spring (47) is sleeved on the side of the arc-shaped guide rod (49); the spring (47) is located between the fixing plate (46) and one of the baffles (48); and a water guide plate (50) is fixedly connected to one side of the bottom of the drainage ditch (6).

2. A slope surface water anti-seepage structure according to claim 1, characterized in that: A plurality of support piles (25) are provided on the upper part of the slope body (1), a plurality of grouting anchor rods (26) are provided on the inclined surface of the slope body (1), and the support piles (25) and the grouting anchor rods (26) are both connected to the foundation surrounding beam (2).

3. A slope surface water anti-seepage structure according to claim 2, characterized in that: A plurality of fixed anchor rods (28) are pre-buried on the upper surface of the foundation surrounding beam (2); the fixed anchor rods (28) penetrate the protective mesh (3) and the waterproof concrete layer (4) and are connected to the upper retaining beam (5) and the planting soil layer (7); the protective mesh (3) and the waterproof concrete layer (4) are both connected to the fixed anchor rods (28); a plurality of lower retaining beams (27) are integrally cast on the lower surface of the foundation surrounding beam (2); and the plurality of lower retaining beams (27) are all connected to the slope body (1).

4. A slope surface water anti-seepage structure according to claim 3, characterized in that: A plurality of first clamping grooves (29) are provided on the upper side surface of each upper retaining beam (5), and a second clamping groove (30) adapted to the first clamping groove (29) is provided on the lower side surface of each drainage ditch (6).

5. The slope surface water anti-seepage structure according to claim 4, characterized in that: Both sides of the sliding block (21) are fixedly connected to limit blocks (31), and opposite side walls of the moving frame (19) are provided with limit grooves (32) adapted to the limit blocks (31).

6. The slope surface water anti-seepage structure according to claim 5, characterized in that: Opposite side walls of the water collecting ditch (22) are provided with clamping platforms (23), a hollow cover plate (24) is installed between the two clamping platforms (23), and an arc-shaped water blocking plate (33) is provided on the upper part of the side of the water collecting ditch (22) away from the foundation surrounding beam (2).

7. The anti-seepage method for a slope surface water anti-seepage structure according to claim 6, characterized in that: The specific steps include: S1: The support piles (25) and the grouting anchor rods (26) are respectively installed on the upper part and the inclined surface of the slope body (1) by using hoisting equipment; S2: excavating the upper part and the inclined surface of the slope body (1), with the excavation position being adapted to the position of the support piles (25) and the grouting anchor rods (26), using formwork and steel bar binding, and pre-embedding the fixed anchor rods (28), and pouring concrete on the foundation surrounding beam (2), the lower retaining beam (27) and the water collection ditch (22); S3: After the foundation surrounding beam (2) has passed the concrete curing period, the foundation surrounding beam (2) is filled with soil, the protective mesh (3) is installed on the foundation surrounding beam (2), and the protective mesh (3) is fixed to the fixing anchor rod (28); S4: Forming the position of the upper retaining beam (5) on the protective mesh (3), tying steel bars, and pouring a waterproof concrete layer (4) and the upper retaining beam (5) on the protective mesh (3); S5: The drainage ditch (6) is installed on a plurality of upper retaining beams (5) by means of a quick installation unit (9), and the planting soil layer (7) is backfilled between the upper retaining beams (5) and vegetation is planted, and then the hollow cover plate (24) is installed at the position of the clamping platform (23), and the impurity filtering frame (36) and the impurity storage box (37) are installed in the water collection ditch (22).

Citation Information

Patent Citations

  • Water seepage prevention structure for side slope

    CN219343253U

  • River slope ecological protective structure system and construction method thereof

    CN109680650A

  • Green ecological slope integrated reinforcement method

    CN111485565A

  • Road slope protection structure and construction method thereof

    CN113789795A

  • Slope protection structure

    CN116065607A