Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

575results about How to "Guaranteed long-term stability" patented technology

Method for restoring mine entironment

A method of repairing mine ecological environment comprises the treatment of mine environment contamination, wherein the tailings, the barren rock, the smelting slag, the waste water from ore cleaning, the waste water from smelting, the acid mine drainage and the ore yard leachwater which are generated from mine development are collected into the tailings storage, at the same time, sludge and organic matter capable of being degradated by microbiology are added therein, and then the tailings storage is given an anaerobic environment artificially, so that, under the action of microbiology and sulfate reducing bacteria, sulfur ion is generated and the pH value of the tailings storage is increased, a plurality of heavy metal ions are cured and settled by sulfur ion to avoid migration, a biomembrane layer-sulfate reducing bacteria reducing-induction biomineralization precipitation composite geochemical barrier is generated in the tailings storage. The repairing of mine ecological environment is realized by the treatment of mine environment contamination. The present invention can be used for tailings storage pollution prevention in tour, and can be used for closing the repairing of mine ecological environment, or can be used for designing new tailings storage by using the technology of the present invention.
Owner:ELION ECOLOGICAL RESTORATION

Full-anchor partition pressure transferring grouting anchor rod and application method thereof

ActiveCN103643977AActively control the rate of rupture developmentHigh initial preloadAnchoring boltsEngineeringRock bolt
The invention discloses a full-anchor partition pressure transferring grouting anchor rod and an application method thereof. The anchor rod comprises a hollow anchor rod body, an anchor rod tray and a lockset nut. The hollow anchor rod body is cut into long section bodies, and rod body pressure transferring devices which are connected together through hollow connecting bolts, wherein one hollow connecting bolt is arranged between every two adjacent long section bodies. Each rod body pressure transferring device comprises a sleeve, wherein a pressure transferring grouting pipe section is sleeved with the sleeve, a flat type pressure sensor and a compression spring abutting against a blocking nut are arranged inside the sleeve in sequence, and all flat type pressure sensors are connected with a partition grouting indicator through wires. According to the full-anchor partition pressure transferring grouting anchor rod, automatic multi-point pressure transferring can be carried out on a plurality of fracture partitions of a deep surrounding rock, the non-coordination deformation breakdown pressure inside the surrounding rock can be effectively released, the anchor rod body can be prevented from being pulled broken and being out of operation, the optimal grouting time points of surrounding rock fracture partitions can be accurately grasped, independent grouting reinforcement is carried out on all fracture partitions timely in a targeted mode, and the stability of the deep roadway partition fracture surrounding rock is effectively improved.
Owner:CHINA UNIV OF MINING & TECH

Double anchoring section prestressed anchoring system with three-layer protection and anchoring method thereof

The invention relates to a double anchoring section prestressed anchoring system with three-layer protection and anchoring method thereof. The anchoring system is composed of an inner anchoring section, a free section, an outer anchoring section and an anchor section. Outer layer binder, corrugated pipe and inner layer binder form three-layer protection for the inner and outer anchoring sections of the anchoring system, the outer layer binder, the corrugated pipe, a sleeve and the inner binder form four-layer protection for the free section, thus greatly improving resistance to corrosion of anchoring structure. Double anchoring sections form an anchoring force holding end and a prestress holding end. Compared with common single anchoring section anchoring method, the invention has the advantages that the outer anchoring section in specific design can effectively inhibit influence of creep, weathering, corrosion, blasting and earthquake of mantle rock soil body on anchoring system and the aim of avoiding or reducing prestress loss can be achieved. The invention has simple implementation and strong operability, procedure change is less compared with the existing anchoring method, and the invention has obvious advantage compared with the permanent anchoring system and can be applicable to reinforcement of geotechnical engineering such as side slope and foundation pit.
Owner:UNIV OF SCI & TECH BEIJING

Metal support half-cell of solid oxide fuel cell and preparation method thereof

The invention discloses a metal support half-cell of a solid oxide fuel cell and a preparation method thereof. The half-cell comprises a porous metal supporting layer thick membrane, a porous cermet gradient transition layer film, a porous anode layer and a compact electrolyte layer film from down to up. The porous gradient transition layer composed of a mixed oxide and a oxide with a fluorite structuring can avoid the direct contact of the porous metal supporting layer and the porous anode layer, and the mutual diffusion of Fe/Cr elements in the metal supporting layer and Ni element in the porous anode layer can be reduced under high temperature sintering condition. The mixed oxide is reduced to an alloy under the work condition of the cell; a high anode active material is formed at a side interface of the anode, a high conductivity composite material which takes the alloy as a main phase is formed on the side interface of a metal support body, so that higher conductivity is presented, ohmic resistance is reduced, electrocatalytic activity is not reduced, long-term stability for operation of the cell can be ensured, and good combination of the porous metal supporting layer and the porous anode layer can be simultaneously realized.
Owner:中弗(无锡)新能源有限公司

Silicon pressure transducer chip and method based on silicon-silicon linking and silicon-on-insulating layer

The invention relates to a pressure sensor chip based on silicon direction bonding and silicon on insulator and a manufacturing method thereof, and belongs to the field of sensor chips. The invention is characterized in that a shallow slot and a gas port on a supporting silicon wafer are formed through anisotropy corrosion, and appropriate shallow slot depth obtained by controlling the corrosion time can realize over pressure protection of parts. A silicon direct bonding technology bonds the supporting wafer and a reversed SOI wafer, realizes a beam-membrane structure on the SOI after lapping and polishing to improve the sensitivity and linearity of the parts; manufactures force sensing resistance elements on the processed beam; adopts the oxidation buried layer of the SOI to solve insulation and isolation of the sensing elements and elastic elements; and improves the long-termed reliability and adaptability under high temperature of the parts. The SOP high-sensitivity pressure sensor chip based on the bonding technology has the advantages of controllable process, excellent repeatability and high finished product rate.
Owner:SHANGHAI INST OF MICROSYSTEM & INFORMATION TECH CHINESE ACAD OF SCI

Optical fiber time frequency hybrid transmission method

The invention discloses an optical fiber time frequency hybrid transmission method. The method comprises the following steps that: a master station normally transmits a 10MHz frequency signal to a slave station, a narrow negative pulse is interpolated into a previous periodic signal high level within a whole second, and the frequency signal is calibrated in the whole second; the slave station restores the frequency signal by employing combinational logic and restores a timing signal through a trigger after identifying special calibration; the slave station simultaneously returns the received time frequency hybrid transmission signal to the master station in an original sample mode, wherein the hybrid transmission signal is used for the loopback time delay measurement of the master station; the master station restores the timing signal from the returned signal according to the method of the slave station, dynamically measures the time delay of the restored timing signal and a local timing signal, and combines with the fixed time delay of the equipment to calculate the phase precompensation of a frequency scale signal in one second; and the master station realizes uniform phase compensation in the next second by utilizing the calculated phase compensation, so that the restored frequency and timing signal of the slave station are synchronous with those of the master station. The optical fiber time frequency hybrid transmission method has the advantages of time service precision, low cost, convenient cascade connection and plug and play function.
Owner:PLA UNIV OF SCI & TECH

Ultrasonic intensified self-descaling micro-current electrolysis device for sterilizing and removing alga

The invention provides an ultrasonic intensified self-descaling micro-current electrolysis device for sterilizing and removing alga, consisting of a detection system, a control system, an ultrasonic intensified micro-current electrolysis system. A processing mode of the ultrasonic intensified micro-current electrolysis system is controlled according to the conductivity of water detected by the detection system. The intensified ultrasonic of the ultrasonic reflector is utilized to crush the cell wall of the bacteria, to lighten the scaling phenomenon of the cathode and to prompt the oxidation of the oxidized active matters (ClO<->, OH, H2O2, (O)) generated by micro-current electrolysis to the RNA and DNA of bacteria and microorganism cell in the water, thus inactivating or killing the bacteria and the microorganism cell and achieving the effects of sterilizing and removing alga; and a reticulate auxiliary electrode can lead the device to descale by rearrangeable electrolysis without reducing the activity of the anode and can ensure the reliable and stable running of the device. No medicament is added during the whole process; no secondary pollution is generated; the running and maintenance are simple and convenient; the energy consumption is low; and the device is suitable for quick sterilization and alga-removing process of large-flux fresh water systems and seawater systems.
Owner:北京京盛国泰科技有限公司

Extremely-high geostress soft rock large-deformation tunnel multistage pressure-yielding and pressure-resisting support structure and construction method thereof

The invention relates to an extremely-high geostress soft rock large-deformation tunnel multistage pressure-yielding and pressure-resisting support structure and a construction method thereof. The construction method comprises the following steps: excavating a tunnel with a nearly circular section, then driving long anchor cables and short anchor rods into surrounding rock, erecting ring-shaped profile steel frames at tail ends of the long anchor cables and the short anchor rods and spraying concrete, additionally driving reinforcement lengthened or encrypted anchor cables into the surroundingrock, then erecting steel frames and spraying concrete again to form multilayer extension support; constructing a reinforced concrete lining structure on the inner side of the multilayer extension support, and forming the multistage pressure-yielding and pressure-resisting support structure through the long anchor cables, the short anchor rods, multilayer support and the reinforced concrete lining structure. According to the extremely-high geostress soft rock large-deformation tunnel multistage pressure-yielding and pressure-resisting support structure, the pressure is actively released by reserved deformation; the long anchor cables and the short anchor rods are used for anchoring in time with high pre-tightening force, enabling the pressure of the surface surrounding rock to be transferred to the deep part of the surrounding rock and expanding the surrounding rock bearing ring; the pressure-yielding support structure is used for providing high resistance and continuous deformation capacity; the reinforced concrete structure is used for resisting rheomorphism; the deformation of the surrounding rock can be effectively controlled; long-term stability of the structure can be ensured.
Owner:CCCC FIRST HIGHWAY CONSULTANTS

Method for reinforcing underground mine main chute

A method for reinforcing a main ore-pass of an underground mine belongs to the field of the mining engineering. The reinforcing processes are that: 1. in the process of mining of the main ore-pass, a bolt-bond anti-scissor roof bolt (5) and a sprayed concrete sprayed layer (6) reinforce the main ore-pass. 2. an reinforced concrete supporting column (1) of which the diameter of a centre funnel mouth is 3 meters and the height is 8 to 10 meters is constructed upwards at the lower part which is 25 to 35 meters away from the bottom plate of a unloading cavern; on the base of the platform of the supporting column, an reinforced concrete protecting wall of which the thickness is 300 millimeters to 500 millimeters and the height is not lower than that of the reinforced concrete protecting wall of the bottom plate of the unloading cavern is poured upwards along the felled well wall; 3. at the center of the mine ore-pass, the funnel structure which is held by using the high-pressure prestressed anchorage grouting technology, and together with the reinforced concrete supporting column form a forced supporting structure which supports outside and reinforces inside, thereby guaranteeing the lasting stability of the main mine ore-pass; the bottom plate of the unloading cavern can be repaired by adopting a loading beam 7 with the box-typed reinforced concrete structure; the present invention not only can change the strainedcondition of the main mine ore-pass and reduce the pressure of the mine ore-pass coming from ore, but also can save the construction period, reduce the construction cost and improve the capability of the mine ore-pass and the ability of the transportation.
Owner:UNIV OF SCI & TECH BEIJING

Marine gas hydrate and mortar replacement exploitation method and device

The invention discloses a marine gas hydrate and mortar replacement exploitation method and device. According to the exploitation method, the sand blocking accuracy of a mechanical screen pipe is properly lowered to enable stratum mud and sand fine particles to flow into a shaft production pipe column and be discharged under the controllable condition, in the meantime, coarse-particle mortar is injected into a hydrate reservoir continuously, and through matching of a hydrate reservoir sand outlet management technology and mortar injection technology, replacement of the coarse-particle mortar and the stratum fine particles as well as the coarse-particle mortar and a hydrate space is achieved. The exploitation device comprises a production sleeve pipe, a production oil pipe, a shaft water injection pipe and a mortar back-injection pipe, the lower end of the production sleeve pipe is connected with the mechanical screen pipe, and the upper end and the lower end in the mechanical screen pipe are further provided with an upper mechanical packer and a lower mechanical packer correspondingly. The inlet end of the production oil pipe is provided with a gas separating device, and the position, above the upper mechanical packer, of the shaft water injection pipe communicates with the production oil pipe. The mortar back-injection pipe penetrates through the upper mechanical packer and the lower mechanical packer, extends to the bottom border of the production layer section of the hydrate reservoir and is connected with a gravel filling tool. Through the method and the device, the purpose of continuous and efficient production is achieved.
Owner:QINGDAO INST OF MARINE GEOLOGY

Device and method for compensating for detection polarization fluctuation errors of rotation angles of linearly polarized light in online manner

ActiveCN107063308AEliminate detection random errorsMeasurement stabilityMeasurement devicesBeam splittingData acquisition
The invention discloses a device and a method for compensating for detection polarization fluctuation of rotation angles of linearly polarized light in an online manner. The device comprises an optical module and a measurement control module. The optical module comprises a reference light path and a signal detection light path and mainly comprises a laser device, a polarizer, a liquid crystal variable-phase retarder, a photoelastic modulator, a 1/4 wave plate, a to-be-measured atom gas chamber sample, polarization beam splitting prisms and the like; the measurement control module comprises balance differential detectors, a liquid crystal driver, a photoelastic controller, a phase lock amplifier and a data acquiring and processing unit. The device and the method have the advantages that error sources of various devices do not need to be differentiated for optical detection systems with the multiple complicated polarization devices, only characteristics of input ends and 'black box' type processing modes for signals of output ends need to be considered, accordingly, compensation and correction for eliminating detection random errors of the rotation angles of the light in real time can be implemented on the basis of photoelastic modulation, and the signals can be stably detected in a high-precision manner for a long time.
Owner:杭州诺驰生命科学有限公司

Water-rich fault fracture zone collapsed roadway repairing method based on angle-variable umbrella-shaped advancing grouting

The invention discloses a water-rich fault fracture zone collapsed roadway repairing method based on angle-variable umbrella-shaped advancing grouting. The method includes the following steps of firstly, forming water detection and water guiding drilled holes; secondly, conducting grouting; thirdly, forming water blocking and reinforcing sealing drilled holes row after row in advance; fourthly, sequentially conducting drilled hole grouting row after row; fifthly, arranging a pipe-shed support in advance; sixthly, withdrawing a broken support, conducting excavation on caved gangue; seventhly, temporarily supporting a deformation area through U-shaped steel; eighthly, conducting reinforced concrete lining pouring construction, and embedding a grouting pipe; ninthly, additionally arranging hole patching grouting rows, and sequentially conducting advancing supporting, temporary supporting and one-time supporting till passing through a collapsed area; tenthly, conducting high-pressure grouting filling reinforcing behind the wall through the embedded grouting pipe. The method is an effective method for reinforcing collapsed roadway surrounding rock through grouting and water blocking, and a system control and continuing method is adopted based on the method. On the basis, due to the surrounding rock control engineering practices, on-site roadway repairing blindness can be reduced, and long-term stability of the roadway can be ensured.
Owner:CHONGQING UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products