Intelligent inspection method and system for improving standardization of distribution network dispatching service
By writing logical verification tables and automatically scanning and verifying key indicators in the scheduling business, the problem of irregular business handling of dispatchers is solved, and the effects of timely archiving work orders, standardized scheduling notes, and timely information transmission are achieved.
Patent Information
- Application Number
- CN202411510351.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2025-03-14
AI Technical Summary
The prior art is difficult to ensure the standardization of dispatchers when handling business, including unarchived work orders, irregular dispatch notes, unarchived operation tickets and instruction records, incomplete filling of module information, and lack of automatic statistical analysis functions.
By writing a logic verification table, the key indicators in the scheduling business are automatically scanned and verified, irregular situations are identified and output to the responsible person, and the dispatcher's business processing capabilities are quantified.
It improves the standardization and efficiency of scheduling business, ensures timely archiving of work orders, improves the standardization of scheduling notes and timely information transmission, reduces the situation of unarchived operation tickets and instruction records, and quantifies the dispatcher's business capabilities.
Smart Images

Figure CN119624344A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tracking services using logic judgment rules, and in particular to an intelligent inspection method and system for improving the standardization of distribution network dispatching services. Background Art
[0002] Since the centralized dispatching of Yunnan Power Grid in 2020, the volume of distribution network dispatching business has increased dramatically. When handling business, dispatchers must not only ensure the timeliness of operations, but also ensure the safety of operations. It is difficult to ensure the standardized execution of dispatching business by relying solely on human constraints. The existing methods for standardizing dispatchers are mainly to strengthen training and introduce some anti-error locking functions, but there are still many problems that need to be solved urgently, as follows:
[0003] Work orders are not closed. Dispatching work overlaps with each other. When one work order is not completed, another work order must be processed. When the work is busy, a dispatcher handles more than ten work orders at the same time, which will inevitably cause some work orders to fail to be filed in time. There are many reasons for the failure of work orders to be closed. For example, the time of power outage and restoration is not filled in, the person who completes the task is not filled in, the operation ticket and instruction record are not filed, and some ledger information is not fully filled in. At present, dispatchers can only find out the legacy business when they check back in their free time, which can neither guarantee timeliness nor ensure that there are no omissions.
[0004] Dispatch notes. As a key module in the dispatching business processing, especially for fault handling, concise and clear dispatch notes can ensure the safe and efficient implementation of fault handling. At present, there are no specific rules and regulations to support the filling of dispatch notes, so it is difficult to achieve unified standards. Filling in dispatch notes based solely on the dispatcher's own understanding is prone to omission of key information on the one hand, and logical confusion or unclear expression on the other hand, resulting in accidents such as untimely information transmission and fault handling errors.
[0005] Operation tickets and instruction records are not archived. Basically, every work order will generate operation tickets and instruction records during the processing. After some work is completed, the operation tickets and instruction records cannot be archived due to human factors or system abnormalities. When such events are not handled in time, not only will the entire work order be unable to close the loop, but the qualification rate of the operation ticket will also be reduced.
[0006] Fill in module information. The OMS system has multiple modules that need to be filled in manually by dispatchers, such as protection action information, switch power outage and power restoration time, tripping reasons, abnormal defect descriptions, etc. Since the filling rules are not mandatory, information filling is omitted or non-standard, which is not conducive to the archiving and statistical analysis of subsequent work orders.
[0007] Event review and analysis. Currently, problems in the dispatcher's business handling process are only handled through manual inspection. The system lacks automatic statistical analysis function. When the dispatcher handles the business in an irregular manner, the system cannot make effective prompts. Summary of the invention
[0008] In view of the above-mentioned problems, the present invention is proposed.
[0009] Therefore, the technical problem solved by the present invention is: to solve the problems in the daily business handling process of the dispatcher, including the work order not being archived. The program is used to automatically scan all business work orders, which can be output to the management personnel at a regular time, or the administrator can query it by himself. The output content mainly includes the date of the work order, the reason for not archiving, and the person responsible. Dispatching notes. During the fault handling process, if there are records that violate the principles of forced delivery and trial delivery, the program can automatically identify them and output them to the person responsible. After trial delivery and forced delivery, the work order without information transmission is automatically identified and output to the person responsible. Operation tickets and instruction records are not archived. Search by date or personnel, scan and output unarchived operation tickets and instruction records. Fill in module information. Automatically count and output incorrectly filled module information, including: recorder, reclosing information, acceptor, issuer or dispatch operator, dispatch permitter, task completer, etc.
[0010] To solve the above technical problems, the present invention provides the following technical solutions: an intelligent inspection method for improving the standardization of distribution network dispatching business, comprising: sorting out key indicators of daily distribution network dispatching business, and compiling a verification logic table corresponding to the key indicators.
[0011] Find irregularities and output them to the responsible person.
[0012] Quantify the dispatcher's business processing capabilities.
[0013] As a preferred solution of the intelligent inspection method for improving the standardization of distribution network dispatching business described in the present invention, wherein: the daily distribution network dispatching business includes planned work, fault log, abnormal defects, power supply transfer, weekly plan, heavy overload, power supply guarantee, and equipment investment and withdrawal modules, and the verification contents in all modules include work order unarchived verification, power outage and restoration time verification, permitted time verification, operation ticket, instruction unarchived verification, forced trial delivery principle verification, information transmission verification, and dispatching notes verification.
[0014] As a preferred solution of the intelligent inspection method for improving the standardization of distribution network dispatching business described in the present invention, wherein: the verification logic table corresponding to the key indicators is compiled, and the key indicators for planned work verification include work orders not being archived, power outage and restoration time, permission time, operation tickets, and instructions not being archived.
[0015] For the verification of the key indicators of unarchived work orders, directly obtain the handover attribute and status attribute for verification. If the module only has the handover variable, when the handover attribute is no, it is judged to be archived. If there is only the status variable, when the status attribute is archived, it is judged to be archived. When there are both handover variables and status variables, and the handover attribute is no and the status attribute is archived, it is judged to be archived.
[0016] As a preferred solution of the intelligent inspection method for improving the standardization of distribution network dispatching business described in the present invention, wherein: the verification logic table corresponding to the key indicators is also included in the fault log verification key indicators including work order not archived, power outage and restoration time, permission time, operation ticket, instruction not archived, forced trial sending principle, information transmission, and dispatching notes.
[0017] As a preferred solution of the intelligent inspection method for improving the standardization of distribution network dispatching business described in the present invention, wherein: the verification logic table corresponding to the key indicators is also included in the abnormal defect verification key indicators including work order not archived, power outage and restoration time, permission time, operation ticket, instruction not archived, and information transmission.
[0018] The key indicators for power supply verification include unarchived work orders, unarchived operation tickets, and unarchived instructions.
[0019] Key indicators for weekly plan verification include unarchived work orders, permission time, operation tickets, and unarchived instructions.
[0020] The key indicators for heavy overload verification include unarchived work orders, permission time, operation tickets, and unarchived instructions.
[0021] Key indicators for power supply verification include work orders not being archived.
[0022] The key indicators for equipment commissioning and decommissioning verification include work orders not being archived.
[0023] As a preferred solution of the intelligent inspection method for improving the standardization of distribution network dispatching business described in the present invention, wherein: the finding of irregularities and output to the responsible person includes that the determination of the responsible person in the module verification is obtained by matching the dispatch issuer, the filler or the task completer. The steps for determining the responsible person in the dispatching remarks are as follows:
[0024] Check the completion time of all power supply instructions in the dispatch instruction record, check whether there is a remote control closing instruction, and whether the instruction has no dispatch remarks.
[0025] Get the completion time and compare it with the time in the scheduling notes. If the fields for forced transmission success, trial transmission success, normal power transmission, normal trial transmission, and successful power transmission cannot be found, the output information is not delivered in a timely manner.
[0026] The person responsible is the person who issued the instruction.
[0027] As a preferred solution of the intelligent inspection method for improving the standardization of distribution network dispatching business described in the present invention, the quantified dispatcher's business processing capabilities include verifying the key indicators of the dispatcher's daily work module, obtaining the names of relevant responsible persons, and counting the irregular behaviors of a dispatcher in a certain period.
[0028] Different weight values are assigned to each key indicator to obtain the deduction score of each dispatcher in a certain period. In the same period, the deduction score of the dispatcher reflects the level of the dispatcher's business ability.
[0029] An intelligent inspection system for improving the standardization of distribution network dispatching business, characterized by: including:
[0030] Write logic modules, sort out the key indicators of daily distribution network dispatching business, and write verification logic tables corresponding to the key indicators.
[0031] Find the responsible person module to find irregularities and output them to the responsible person.
[0032] Quantitative capability module, quantifies the dispatcher's business processing capabilities.
[0033] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program.
[0034] A computer-readable storage medium stores a computer program, which implements the steps of the method described above when executed by a processor.
[0035] The beneficial effects of the present invention are as follows: Improving the standardization of dispatchers' business processing: By using a logical checklist, the dispatchers' business processing is automatically checked, which helps the dispatchers improve their personal business capabilities. Improving inspection efficiency, the relevant responsible persons or inspectors can quickly query the indicators of the dispatchers' non-standard processing in multiple dimensions, which helps the dispatchers to check for deficiencies and make up for the gaps. Quantifying the dispatchers' business capabilities, outputting the non-standard business processing to the dispatchers with one click, and quantifying the dispatchers' business processing capabilities. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0037] Figure 1An overall flow chart of an intelligent inspection method and system for improving the standardization of distribution network dispatching services provided in the first embodiment of the present invention. DETAILED DESCRIPTION
[0038] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0039] Example 1, reference Figure 1 , is an embodiment of the present invention, and provides an intelligent inspection method for improving the standardization of distribution network dispatching services, comprising:
[0040] S1: Sort out the key indicators of daily distribution network dispatching business, and compile the verification logic table corresponding to the key indicators.
[0041] The daily business of distribution network dispatching includes planning work, fault log, abnormal defects, power supply transfer, weekly plan, heavy overload, power supply guarantee, and equipment commissioning and withdrawal modules. The verification contents in all modules include verification of unarchived work orders, verification of power outage and restoration time, verification of permitted time, verification of operation tickets, verification of unarchived instructions, verification of forced trial delivery principles, verification of information transmission, and verification of dispatching notes.
[0042] The key indicators for checking the planned work are: work orders not filed, power outage and power recovery time, permission time, operation tickets and instructions not filed. The checking logic is shown in Table 1.
[0043] Table 1 Planned work verification logic
[0044]
[0045]
[0046] For the verification of the key indicators of unarchived work orders, the handover attribute and status attribute can be directly obtained for verification. If the module only has the handover variable, when the handover attribute is "No", it is judged to be archived. If there is only the status variable, when the status attribute is "Archived", it is judged to be archived. When there are both handover variables and status variables, the handover attribute must be "No" and the status attribute must be "Archived" to be judged to be archived. This rule applies to the verification of all the following modules.
[0047] The key indicators for fault log verification are: work order not archived, power outage and power recovery time, permission time, operation ticket and instruction not archived, forced trial principle, information transmission, and dispatch notes. The verification logic is shown in Table 2.
[0048] Table 2 Fault log verification logic
[0049]
[0050]
[0051]
[0052]
[0053]
[0054] The key indicators for abnormal defect verification are: work order not archived, power outage and restoration time, permission time, operation ticket and instruction not archived, and information transmission. The verification logic is shown in Table 3.
[0055] Table 3 Abnormal defect verification logic
[0056]
[0057]
[0058]
[0059] The key indicators for power supply verification are: work orders not archived, operation tickets and instructions not archived, as shown in Table 4.
[0060] Table 4 Power supply verification logic
[0061]
[0062] The key indicators for weekly plan verification are: work orders not filed, permission time, operation tickets and instructions not filed, as shown in Table 5.
[0063] Table 5 Weekly plan verification logic
[0064]
[0065]
[0066]
[0067] The key indicators of heavy overload verification are: work orders not archived, permission time, operation tickets and instructions not archived, as shown in Table 6.
[0068] Table 6 Heavy overload check logic
[0069]
[0070]
[0071] The key indicators for power supply verification are: work orders are not archived. See Table 7.
[0072] Table 7 Power supply verification logic
[0073]
[0074] The key indicators for equipment commissioning and decommissioning verification are: work orders are not archived. See Table 8.
[0075] Table 8 Equipment commissioning and decommissioning verification logic
[0076]
[0077]
[0078] S2: Find irregularities and output them to the responsible person.
[0079] The determination of the responsible person in the verification of the above modules can be obtained by matching the dispatcher, the person who fills in the task or the person who completes the task. Only the determination of the responsible person in the dispatch notes is more cumbersome, which can be obtained by the following method: detect the completion time of all power transmission instructions in the dispatch instruction record, that is, detect the instructions with "remote control close ***" or "close ***", and the instructions have no dispatch notes (that is, exclude the instructions of forced transmission failure, trial transmission failure, and remote control failure), and then obtain the completion time, and compare it with the time in the dispatch notes. If "** minutes, forced transmission success / trial transmission success / power transmission normal / trial transmission normal / power transmission successful" is not found, then output: information transmission is not timely. The responsible person is the sender of the instruction.
[0080] S3: Quantify the dispatcher's business processing capabilities.
[0081] Check the key indicators of the dispatcher's daily work module, obtain the names of relevant responsible persons, and count the irregular behaviors of a dispatcher in a certain period of time.
[0082] Different weight values are assigned to each key indicator to obtain the deduction score of each dispatcher in a certain period. In the same period, the deduction score of the dispatcher reflects the level of the dispatcher's business ability.
[0083] Furthermore, for example, "operation tickets and instructions are not archived" will be deducted 1 point, "information is not transmitted in time" will be deducted 0.9 points, and "work orders are not archived" will be deducted 0.8 points. When Zhang San commits irregular behaviors more than 3 times within a month, a total of 2.7 points will be deducted.
[0084] The above embodiments also include an intelligent inspection system for improving the standardization of distribution network dispatching services, specifically:
[0085] Write logic modules, sort out the key indicators of daily distribution network dispatching business, and write verification logic tables corresponding to the key indicators.
[0086] Find the responsible person module to find irregularities and output them to the responsible person.
[0087] Quantitative capability module, quantifies the dispatcher's business processing capabilities.
[0088] The computer device may be a server. The computer device includes a processor, a memory, an input / output interface (I / O for short) and a communication interface. The processor, the memory and the input / output interface are connected via a system bus, and the communication interface is connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data cluster data of the power monitoring system. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, a method for intelligent inspection to improve the standardization of distribution network dispatching business is implemented.
[0089] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory may include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory may include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0090] Example 2 is an embodiment of the present invention, which provides an intelligent inspection method and system for improving the standardization of distribution network dispatching services. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through simulation experiments.
[0091] The experiment was conducted in a typical distribution network dispatching system environment, which has records of dispatchers' daily business processing and multi-module operation data. The key to the test is to compare the effects of our invented intelligent inspection method with the existing manual inspection method.
[0092] Existing technology: Traditional manual inspection method, dispatchers manually check dispatch work orders, fault logs, abnormal defects and other records, and manually fill in dispatch notes. Due to the complex operation steps and reliance on personal experience, it is easy for irregular processing behaviors to not be discovered in time.
[0093] The present invention utilizes an intelligent inspection method to automatically sort out key indicators in the daily business of distribution network dispatching and generate a verification logic table. The system automatically searches for irregularities and outputs them to the responsible person, while quantifying the dispatcher's business processing capabilities.
[0094] Experimental steps:
[0095] Sorting out the key indicators of dispatching business: With the traditional manual method, the dispatcher needs to manually check the work order, power outage and restoration time, permission time, operation ticket, instruction record and other contents every day. In this process, it is easy for information to not be filed in time due to human negligence. In contrast, the present invention adopts an automatic logic verification method. The system pre-sets key indicators (such as work order not filed, operation ticket not filed, permission time abnormality, etc.), and automatically verifies to ensure that each operation meets the specifications.
[0096] Find irregularities: The traditional method relies on dispatchers to review and check whether there are irregular processing behaviors when the business is busy, which is a low-efficiency process. The present invention uses automated tools to find anomalies in real time and output the results to the responsible person, greatly improving the timeliness of the operation.
[0097] Quantifying the dispatcher's business processing ability: For traditional methods, the evaluation of the dispatcher's business ability mainly relies on the subjective judgment of managers. The present invention assigns weight values to different key indicators, calculates the deduction points for the dispatcher's irregular processing, and forms a systematic business processing ability report. The experimental results are shown in Table 9.
[0098] Table 9 Experimental results
[0099]
[0100] From the comparative analysis of the table data, it can be seen that the present invention is significantly superior to the existing manual inspection method in many key aspects, as shown below:
[0101] Under traditional manual inspection, due to the busy state of dispatchers and human negligence, the number of unfiled work orders is as high as 12%. However, through the intelligent inspection method, the system can monitor in real time and automatically file, and the unfiled rate of work orders has been reduced to 1%, an improvement of 91.67%.
[0102] The traditional method relies on the dispatcher to manually check the power outage and restoration time, and the accuracy rate is only 80%. Through the automatic logic verification of the present invention, the accuracy rate of the power outage and restoration time verification reaches 98%, which is improved by 22.5%, ensuring the timeliness and accuracy of the operation.
[0103] In the traditional method, the filling of dispatch notes often depends on the dispatcher's personal understanding, and the information omission rate is high, reaching 15%. Through the intelligent verification function of the present invention, the information omission rate is greatly reduced to 2%, and the optimization range reaches 86.67%.
[0104] In the manual inspection of the system, the phenomenon of operation tickets not being filed is also relatively serious, with an unfiled rate of 10%. The present invention can automatically search for unfiled records and output reminders in time, reducing the unfiled rate to 1.5%, an increase of 85%.
[0105] With traditional methods, it takes dispatchers an average of about 30 minutes to process each operation. However, through automated tools, the processing time is significantly shortened to 10 minutes, reducing the operation time by 66.67%, greatly improving work efficiency.
[0106] The traditional manual method relies on the dispatcher's personal inspection, and the rate of discovering irregular processing behavior is low, only 60%. The present invention increases the rate of discovering irregular processing events to 99% through real-time scanning and verification by the system, ensuring the comprehensive standardization of business processing.
[0107] Under the traditional method, the output of the responsible person depends on manual inspection, with a low timeliness rate of 70%. The intelligent inspection system outputs the responsible person in real time through automated tools, with a timeliness rate of 97%, an increase of 38.57%.
[0108] In summary, the experimental data fully demonstrates that an intelligent inspection method for improving the standardization of distribution network dispatching business significantly improves the standardization and efficiency of dispatching business processing, especially in key links such as work order archiving, power outage and power restoration time verification, and dispatching remarks filling. Compared with the prior art, the present invention effectively reduces the errors and delays caused by human operations through intelligent inspection means, and greatly improves the automation and accuracy of overall business processing.
[0109] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A method for improving the standardization of distribution network dispatching services, characterized in that: include: Sort out the key indicators of daily distribution network dispatching business, and compile the verification logic table corresponding to the key indicators; Find irregularities and output them to the responsible person; Quantify the dispatcher's business processing capabilities.
2. The intelligent inspection method for improving the standardization of distribution network dispatching business according to claim 1 is characterized by: The daily business of distribution network dispatching includes planning work, fault log, abnormal defects, power supply transfer, weekly plan, heavy overload, power supply guarantee, and equipment commissioning and withdrawal modules. The verification contents in all modules include work order unarchived verification, power outage and restoration time verification, permitted time verification, operation ticket, instruction unarchived verification, forced trial delivery principle verification, information transmission verification, and dispatching notes verification.
3. The intelligent inspection method for improving the standardization of distribution network dispatching business according to claim 2 is characterized in that: The writing of the verification logic table corresponding to the key indicators includes: the key indicators for the planned work verification include work orders not being filed, power outage and power recovery time, permission time, operation tickets, and instructions not being filed; For the verification of the key indicators of unarchived work orders, the handover attributes and status attributes are directly obtained for verification; if the module only has a handover variable, when the handover attribute is no, it is judged to be archived; if there is only a status variable, when the status attribute is archived, it is judged to be archived work order; when there are both handover variables and status variables, and the handover attribute is no and the status attribute is archived, it is judged to be archived work order.
4. The intelligent inspection method for improving the standardization of distribution network dispatching business according to claim 3 is characterized by: The verification logic table corresponding to the key indicators also includes that the key indicators for fault log verification include work order not archived, power outage and restoration time, permission time, operation ticket, instruction not archived, forced trial delivery principle, information transmission, and scheduling notes.
5. The intelligent inspection method for improving the standardization of distribution network dispatching business according to claim 4 is characterized in that: The said writing of the verification logic table corresponding to the said key indicators also includes that the key indicators for abnormal defect verification include work order not filed, power outage and restoration time, permission time, operation ticket, instruction not filed, and information transmission; Key indicators for power supply verification include work orders not being filed, operation tickets, and instructions not being filed; Key indicators for weekly plan verification include work orders not filed, permission time, operation tickets, and instructions not filed; The key indicators for heavy overload verification include work orders not filed, permission time, operation tickets, and instructions not filed; Key indicators for power supply verification include work orders not being filed; The key indicators for equipment commissioning and decommissioning verification include work orders not being archived.
6. The intelligent inspection method for improving the standardization of distribution network dispatching business according to claim 5 is characterized by: The finding of irregularities and outputting to the responsible person includes: determining the responsible person in the module verification by matching the dispatch issuer, the filler or the task completer; the steps for determining the responsible person in the dispatch notes are as follows: Check the completion time of all power-on instructions in the dispatch instruction record, check whether there is a remote control closing instruction, and whether the instruction has no dispatch remarks; Get the completion time and compare it with the time in the scheduling notes. If the fields of forced transmission success, trial transmission success, normal power transmission, normal trial transmission, and successful power transmission cannot be found, the output information is not delivered in time. The person responsible is the person who issued the instruction.
7. The intelligent inspection method for improving the standardization of distribution network dispatching business according to claim 6 is characterized by: The business processing capability of the quantified dispatcher includes checking the key indicators of the dispatcher's daily work module, obtaining the names of relevant responsible persons, and counting the irregular behaviors of a dispatcher in a certain period; Different weight values are assigned to each key indicator to obtain the deduction score of each dispatcher in a certain period. In the same period, the deduction score of the dispatcher reflects the level of the dispatcher's business ability.
8. An intelligent inspection system for improving the standardization of distribution network dispatching services using the method described in any one of claims 1 to 7, characterized in that: Write logic modules, sort out key indicators of daily distribution network dispatching business, and write verification logic tables corresponding to the key indicators; Find responsible person module to find irregularities and output them to the responsible person; Quantitative capability module, quantifies the dispatcher's business processing capabilities.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.