Nuclear power plant schedule conflict detection method, system, storage medium
By constructing configuration files and isolation instruction tables, software algorithms are used to automatically detect the availability and redundancy of nuclear power equipment, solving the problem of time-consuming and labor-intensive traditional manual detection, and achieving efficient conflict detection and redundancy management.
CN122334812APending Publication Date: 2026-07-03TAISHAN NUCLEAR POWER JOINT VENTURE CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- TAISHAN NUCLEAR POWER JOINT VENTURE CO LTD
- Filing Date
- 2026-04-01
- Publication Date
- 2026-07-03
Smart Images

Figure CN122334812A_ABST
Abstract
This application discloses a conflict detection method, system, and storage medium for planned work scheduling of nuclear power equipment. The conflict detection method includes: acquiring configuration files pre-established for each master device, the configuration files including availability dependency information and redundancy information. The availability dependency information includes: the identifiers of upstream devices on which the availability of the master device depends, and the dependency logic relationship between the availability of the master device and the upstream devices. The upstream devices include at least one other master device and / or at least one end device; acquiring an isolation instruction table from the SAP system; determining the status of each master device according to the isolation instruction table and the availability dependency information corresponding to each master device; and identifying master devices that do not meet the corresponding redundancy requirements according to the status of each master device and the redundancy information corresponding to each master device. Implementing the technical solution of this application improves the efficiency of conflict detection in planned work scheduling and reduces the probability of human error.