Pressure swing adsorption system for separating and recovering gas from mixed gas

By recycling and pressurized replacement of waste gas in the pressure-switch adsorption system and returning to raw material import, combined with a pressure-switch adsorption method, the problems of waste gas replacement and high energy consumption are solved, the recovery rate of product gas and system efficiency are improved, and investment and Energy consumption.

CN221846616UActive Publication Date: 2024-10-18CHENGDU HUAXI CHEM TECH CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420120056.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-10-18
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

In the existing pressure swing adsorption technology, waste of replacement waste gas and high energy consumption problems lead to a reduced recovery rate of product gas components, and the device investment and land area are large, and the operation energy consumption is high.

Method used

A pressure-switch adsorption system is designed to separate and recover gas from the mixed gas. By recycling and pressurizing the waste gas to return to the raw material import of the adsorption tower, combined with a pressure-switching adsorption method, the number of equipment and energy consumption are reduced and the recovery rate is improved.

Benefits of technology

It effectively improves the recovery rate of product gas, reduces the energy consumption of device investment and operation, and reduces the loss of product gas components, and reduces the system investment cost and land occupation compared with traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221846616U_ABST
    Figure CN221846616U_ABST
Patent Text Reader

Abstract

The utility model discloses a pressure swing adsorption system for separating and recovering gas from mixed gas. The system comprises a raw material gas feeding end, a first product gas discharging end, a second product gas discharging end, a vacuum pump, a first product gas buffer tank, a replacement waste gas buffer tank, a compressor, a final lift regulating valve and a plurality of pressure swing adsorption units, and each pressure swing adsorption unit comprises at least one adsorption tower. The first program control valve, the second program control valve, the third program control valve, the fourth program control valve, the fifth program control valve, the sixth program control valve and the seventh program control valve are used for controlling pipeline communication. With the adoption of the system, gas with higher purity can be separated by a one-section pressure swing adsorption method with replacement, and the product recovery rate is improved by recovering and replacing waste gas; under the condition of the same product purity and recovery rate, compared with a two-stage pressure swing adsorption method with replacement, a set of one-stage pressure swing adsorption equipment is reduced, and the device investment, land occupation, operation energy consumption and the like are obviously reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of chemical equipment, and in particular to a pressure swing adsorption system for separating and recovering gas from a mixed gas. Background Art

[0002] The pressure swing adsorption method utilizes the characteristics of porous solid adsorbents that selectively adsorb different components in a mixed gas under a certain pressure to achieve separation of the mixed gas. In the existing pressure swing adsorption technology for separating and recovering carbon dioxide, carbon monoxide, and hydrocarbon components in a mixed gas, such as separating and recovering ethylene, ethane, and components above C2 from catalytic / cracking dry gas in refineries, in order to increase the content of effective components in the product, a process of returning part of the product gas to replace the adsorption bed is adopted. In the replacement process, some product gas will inevitably be discharged from the replacement waste gas. Especially when the product gas purity is required to be higher, more product gas components are discharged from the replacement waste gas, resulting in a lower recovery rate of product gas components, affecting the economic benefits of the pressure swing adsorption device. In addition, in order to improve the recovery rate of the product, the existing two-stage pressure swing adsorption recovery process divides the adsorption process into two stages, wherein the raw gas adsorbed in the second stage is the replacement waste gas and adsorption waste gas adsorbed in the first stage. Although this method improves the recovery rate, the device investment is large, the land area is large, and the operating energy consumption is high; the replacement step of the existing device mostly adopts high-pressure replacement, and the high-pressure replacement process requires the replacement gas to be pressurized. Moreover, due to the high pressure of the replacement process, a large amount of replacement gas is required, and the energy consumption is high. Utility Model Content

[0003] In view of the shortcomings of the prior art mentioned above, the purpose of the present application is to provide a pressure swing adsorption system for separating and recovering gas from a mixed gas, thereby realizing the recycling of the replaced waste gas, avoiding the waste of replaced waste gas in the traditional one-stage pressure swing adsorption method with replacement, and effectively improving the recovery rate; when the product purity and recovery rate are the same, compared with the two-stage pressure swing adsorption method, the equipment investment, land occupation and operating energy consumption are reduced.

[0004] To achieve the above-mentioned purpose and other related purposes, the present application provides a pressure swing adsorption system for separating and recovering gas from a mixed gas, comprising a raw gas feed end, a first product gas discharge end, a second product gas discharge end, a vacuum pump, a first product gas buffer tank, a replacement waste gas buffer tank, a compressor, a final rise regulating valve and a plurality of pressure swing adsorption units, each of which comprises an adsorption tower, and a first program-controlled valve, a second program-controlled valve, a third program-controlled valve, a fourth program-controlled valve, a fifth program-controlled valve, a sixth program-controlled valve and a seventh program-controlled valve for controlling the connection of pipelines; the top and / or the bottom of the adsorption tower of each pressure swing adsorption unit are connected in pairs through pipelines;

[0005] The top of the adsorption tower, the replacement waste gas buffer tank, the compressor, the raw gas feed end, the bottom of the adsorption tower, the vacuum pump, the first product gas buffer tank and the first product gas discharge end are connected in sequence through pipelines, the vacuum pump is used to evacuate the adsorption tower to extract the first product gas from the bottom of the adsorption tower and send it into the first product gas buffer tank, and the first product gas buffer tank is used to buffer the first product gas; the replacement waste gas buffer tank is used to buffer the replacement waste gas, and the compressor is used to pressurize the gas in the replacement waste gas buffer tank and send it as raw gas from the bottom of the tower into the adsorption tower through the raw gas feed end;

[0006] The top of the adsorption tower is also connected to the second product gas discharge end through a pipeline;

[0007] The first program-controlled valve is arranged on a pipeline connecting the feed end of the raw gas and the bottom of the adsorption tower, and is used to control the feed of the raw gas;

[0008] The second program-controlled valve is arranged on a pipeline connecting the top of the adsorption tower and the second product gas discharge end, and is used to control the discharge of the second product gas;

[0009] The third program-controlled valve is arranged on the pipeline connecting the tops of the adsorption towers of each pressure swing adsorption unit in pairs, and is used to control the inlet and outlet of the pressure equalization and pressure reduction gas;

[0010] The fourth program-controlled valve is arranged on the pipeline connecting the tops of the adsorption towers of each pressure swing adsorption unit in pairs, and is used to control the inlet and outlet of the pressure equalization and pressure reduction gas;

[0011] The fifth program-controlled valve is arranged on the pipeline connecting the bottom of the adsorption tower and the first product gas buffer tank, and is used to control the first product gas to enter the adsorption tower from the first product gas buffer tank, and is used as the first replacement gas source;

[0012] The sixth program-controlled valve is arranged on the pipeline connecting the top of the adsorption tower and the replacement waste gas buffer tank, and is used to control the replacement waste gas to enter the replacement waste gas buffer tank from the adsorption tower;

[0013] The seventh program-controlled valve is arranged on the pipeline connecting the bottom of the adsorption tower and the vacuum pump, and is used to control the desorbed gas to enter the first product gas buffer tank from the adsorption tower through the vacuum pump;

[0014] The final rise regulating valve is arranged on the pipeline connecting the top of the adsorption tower and the second product gas discharge end, and is located between the third program-controlled valve and the second product gas discharge end, and is used to control the gas feed sent out from the top of other adsorption towers.

[0015] Furthermore, the fourth program-controlled valve is also connected to the replacement waste gas buffer tank, and is used to put the exhaust gas from the adsorption tower into the replacement waste gas buffer tank.

[0016] Furthermore, the top and bottom of the adsorption tower of each pressure swing adsorption unit are connected in pairs through pipelines, and the pressure swing adsorption unit also includes an eighth program-controlled valve and a ninth program-controlled valve;

[0017] The eighth programmable valve and the ninth programmable valve are both arranged on the pipeline connecting the top and the bottom of the adsorption tower of each pressure swing adsorption unit, and are used to control the replacement exhaust gas as the second replacement gas source from the top of the adsorption tower and the bottom of the tower into the original adsorption tower or other adsorption towers, and used as the second replacement gas source; the eighth programmable valve is close to the top of the adsorption tower, and the ninth programmable valve is close to the bottom of the adsorption tower.

[0018] Furthermore, the system includes at least three pressure swing adsorption units, each of which includes at least one adsorption tower, and at least one first program-controlled valve, a second program-controlled valve, a third program-controlled valve, a fourth program-controlled valve, a fifth program-controlled valve, a sixth program-controlled valve and a seventh program-controlled valve for controlling pipeline connectivity.

[0019] Further, the system includes at least three pressure swing adsorption units, each pressure swing adsorption unit includes at least one adsorption tower, and at least one first program-controlled valve, a second program-controlled valve, a third program-controlled valve, a fourth program-controlled valve, a fifth program-controlled valve, a sixth program-controlled valve, a seventh program-controlled valve, an eighth program-controlled valve and a ninth program-controlled valve for controlling pipeline connectivity.

[0020] Furthermore, the adsorption tower is filled with an adsorbent, and the adsorbent is selected from at least one of alumina, silica gel, activated carbon, and molecular sieve.

[0021] As described above, the pressure swing adsorption system for separating and recovering gas from a mixed gas of the present application has the following beneficial effects:

[0022] The system provided in the present application is designed to match the one-stage pressure swing adsorption method with a replacement step. The system is used to recover the replacement waste gas and the downstream exhaust gas (if any) and pressurize them, and then return them to the raw material inlet of the adsorption tower to mix with the raw gas before entering the adsorption tower, thereby realizing the recovery and utilization of the replacement waste gas and the downstream exhaust gas (if any), reducing the loss of product gas components, avoiding the waste of replacement waste gas in the traditional one-stage pressure swing adsorption method with replacement, and effectively improving the recovery rate of the product gas.

[0023] When the product purity and recovery rate are the same, the method provided in the present application reduces the required system of a single-stage pressure swing adsorption device compared to the two-stage pressure swing adsorption method with displacement, and also reduces the device investment cost, floor space and operating energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 Shown is a schematic process flow diagram of a method for separating and recovering gas from a mixed gas based on a one-stage pressure swing adsorption method in one embodiment of the present application.

[0025] Figure 2 Shown is a schematic process flow diagram of a method for separating and recovering gas from a mixed gas based on a one-stage pressure swing adsorption method in another embodiment of the present application.

[0026] Figure 3 Shown is a schematic diagram of the layout of a pressure swing adsorption system for separating and recovering gas from a mixed gas according to an embodiment of the present application, and a schematic diagram of the process flow for extracting carbon monoxide from synthetic purified gas in Example 1.

[0027] Figure 4 Shown is a schematic diagram of the layout of a pressure swing adsorption system for separating and recovering gas from a mixed gas according to an embodiment of the present application, and a schematic diagram of the process flow for extracting the C2 component from the catalytic dry gas in Example 2.

[0028] Description of reference numerals:

[0029] Vacuum pump 101, first product gas buffer tank 102, replacement waste gas buffer tank 103, compressor 104, adsorption tower 105, first program-controlled valve XV1, second program-controlled valve XV2, third program-controlled valve XV3, fourth program-controlled valve XV4, fifth program-controlled valve XV5, sixth program-controlled valve XV6, seventh program-controlled valve XV7, eighth program-controlled valve XV8, ninth program-controlled valve XV9, final rise regulating valve KV10. DETAILED DESCRIPTION

[0030] The following describes the implementation of the present application through specific examples, and those skilled in the art can easily understand other advantages and effects of the present application from the contents disclosed in this specification. The present application can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present application.

[0031] Combination Figure 1 As shown, an embodiment of the present application provides a method for separating and recovering gas from a mixed gas based on a one-stage pressure swing adsorption method, comprising: using the mixed gas as a raw gas, at least three adsorption towers adopt a one-stage pressure swing adsorption method to alternately perform adsorption and desorption operations to separate and recover the gas;

[0032] The one-stage pressure swing adsorption method includes several cycles, each cycle includes adsorption (A), at least one equalizing pressure reduction (ED), at least one displacement (RP), vacuuming (V), at least one equalizing pressure increase (ER), and final increase (FR) processes performed in sequence;

[0033] The adsorption process includes: under a preset adsorption pressure, the adsorbent in the adsorption tower T1 selectively adsorbs the raw gas components (i.e., the gas that is easily adsorbed by the adsorbent), and the unadsorbed components in the raw gas (i.e., the gas that is not easily adsorbed by the adsorbent) are sent out from the adsorption tower T1 as the second product gas;

[0034] The at least one pressure equalization and pressure reduction process includes several pressure equalization and pressure reduction steps performed in sequence, wherein the pressure equalization and pressure reduction step is to send the higher pressure gas in the adsorption tower T1 that has completed adsorption as the pressure equalization and pressure reduction gas Q1 along the adsorption direction to the other adsorption tower T2 that is in uniform pressure increase and has a lower pressure for pressure equalization, so as to reduce the pressure of the adsorption tower T1, increase the pressure of the adsorption tower T2, and recover part of the target gas in the pressure equalization and pressure reduction gas Q1;

[0035] The at least one replacement process includes several replacement steps performed in sequence, wherein the replacement step is to pass the replacement gas into the adsorption tower T1 that has completed pressure equalization and pressure reduction under a preset replacement pressure to perform replacement, thereby increasing the content of the target gas in the component adsorbed by the adsorbent and increasing the content of the target gas in the desorbed gas, and the replaced gas is sent out from the adsorption tower T1 as replacement waste gas and recovered; the replacement gas comes from the first replacement gas source and / or the second replacement gas source, the first replacement gas source comes from the desorbed gas, and the second replacement gas source comes from the replacement waste gas;

[0036] The vacuuming process includes: vacuuming the adsorption tower T1 that has completed the replacement, further reducing the pressure in the adsorption tower T1, desorbing the components adsorbed by the adsorbent, and obtaining desorbed gas, a part of which is sent out as the first product gas, and the other part is used as the first replacement gas source;

[0037] The at least one pressure equalization and pressure boosting process includes several pressure equalization and pressure boosting steps performed in sequence, wherein the pressure equalization and pressure boosting step uses a higher pressure gas from another adsorption tower T3 in pressure equalization and pressure reduction as the pressure equalization and pressure reduction gas Q2 to increase the pressure of the adsorption tower T1 in pressure equalization and pressure reduction, and recovers part of the target gas in the pressure equalization and pressure reduction gas Q2;

[0038] The final pressure rise process includes: using the gas sent from the top of other adsorption towers to increase the pressure of the adsorption tower T1 to reach a preset adsorption pressure; after the pressure of the adsorption tower T1 rises to the preset adsorption pressure, the next cycle can be entered.

[0039] Among them, the pressure reduction can recover the useful components and pressure in the adsorption tower and increase the content of the product gas components in the adsorption tower. The number of pressure reduction can be set according to factors such as the raw gas pressure and the preset adsorption pressure, and can be set to at least once.

[0040] The replacement process can increase the partial pressure of the product gas components in the adsorption tower, thereby improving the purity of the product gas. The replacement process can be a single-tower replacement (i.e., only one adsorption tower is in the replacement process at the same time) or a double-tower replacement (i.e., two adsorption towers are in the replacement process at the same time). Generally, the replacement steps are divided into three times during double-tower replacement, namely, primary replacement, secondary replacement, and tertiary replacement. The primary replacement uses the replacement waste gas after three replacements of other adsorption towers as the replacement gas source (i.e., the second replacement gas source) for replacement, and the second and third replacements use the gas extracted from the vacuum pump as the replacement gas source (i.e., the first replacement gas source) for replacement.

[0041] The pressure equalization step-up process corresponds to the pressure equalization step-down process. The number of pressure equalization step-downs can be set according to the adsorption pressure and can be set to at least once. In general, the number of pressure equalization step-ups is the same as the number of pressure equalization step-downs.

[0042] Combination Figure 2 As shown, in another embodiment of the present application, the one cycle also includes a PP process between at least one pressure equalization and pressure reduction process and at least one replacement process, wherein the PP process is to release the gas in the adsorption tower T1 that has completed the pressure equalization and pressure reduction as PP gas along the adsorption direction, so that the pressure of the adsorption tower T1 drops to a preset replacement pressure. Whether the PP process is performed can be determined according to the pressure equalization situation.

[0043] In some embodiments, in the above implementation, the downstream exhaust gas is mixed with the replacement waste gas and then fed into the adsorption tower T1 as the raw gas.

[0044] The method provided in the above-mentioned implementation mode / example of the present application adopts a one-stage pressure swing adsorption method. Compared with the two-stage pressure swing adsorption method, it has a shorter process, less equipment, less investment, lower operating energy consumption, smaller footprint, and simpler operation; the replacement waste gas and the vent gas (if any) are returned to the raw material inlet, which reduces the loss of product gas components and improves the recovery rate of the product gas.

[0045] In some embodiments, in the above implementation modes / embodiments, the replacement process is carried out at low pressure, and the pressure in the adsorption tower during the replacement process is kept constant. Specifically, the preset replacement pressure is 0 to 0.05 MpaG, and is not greater than the preset adsorption pressure. Exemplarily, the preset replacement pressure is 0.01, 0.015, 0.02, 0.025, 0.03, 0.035, 0.04, 0.045, 0.05 MpaG, etc. When the purity of the product gas is the same, the replacement step is carried out at low pressure, which requires less replacement gas than high-pressure replacement, and the replacement gas does not need to be pressurized, which further reduces the number of equipment and reduces the energy consumption of system operation.

[0046] In some embodiments, in the above implementation modes / embodiments, the preset adsorption pressure is greater than 0.02 MpaG and not less than the preset displacement pressure. Exemplarily, the preset adsorption pressure is 0.02, 0.05, 0.1, 0.3, 0.6, 0.9, 1.2, 1.5, 1.8, 2.1, 2.4, 2.7, 3.0, 3.2, 3.5 MpaG, etc.

[0047] In some embodiments, in the above embodiments / examples, the temperature inside the adsorption tower is 5-60°C, for example, 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 55, 60°C, etc.

[0048] In some embodiments, in the above implementation modes / examples, the raw gas is selected from any one of refinery catalytic dry gas, cracking dry gas, coking dry gas, gas separation dry gas, desulfurization saturated dry gas, medium-shift gas, pressure swing adsorption (PSA) hydrogen production desorption gas, flue gas, and synthetic purified gas, but is not limited thereto.

[0049] In some embodiments, in the above embodiments / examples, the target gas is selected from at least one of carbon dioxide, carbon monoxide and hydrocarbon gases with carbon atoms ≥ 2, but is not limited thereto. Exemplarily, hydrocarbon gases include but are not limited to ethane, ethylene, propane, propylene, butane, butene, etc. and hydrocarbon gases with carbon atoms greater than or equal to 3, etc.

[0050] In some embodiments, in the above embodiments / examples, the adsorbent is selected from at least one of alumina, silica gel, activated carbon and molecular sieves, but is not limited thereto.

[0051] In some embodiments, in the above implementation modes / examples, the unadsorbed component in the feed gas is selected from at least one of hydrogen, nitrogen and methane, but is not limited thereto.

[0052] In some embodiments, in the above implementation modes / examples, when the raw gas is dry gas, each cycle includes sequentially performed adsorption, at least one equalization and pressure reduction, sequential release, at least one replacement, vacuuming, at least one equalization and pressure increase, and final increase steps, the adsorbent includes alumina, silica gel, activated carbon, molecular sieve, the target gas includes ethane and ethylene, the first product gas includes ethane and ethylene, and the second product gas is hydrogen-rich. In a specific embodiment, when the raw gas is catalytic dry gas, each cycle includes sequentially performed adsorption, one equalization and pressure reduction, two equalization and pressure reduction, sequential release, one replacement, two replacements, three replacements, vacuuming, two equalization and pressure increase, one equalization and pressure increase, and final increase steps, the adsorbent includes alumina, silica gel, activated carbon, molecular sieve, the target gas includes ethane and ethylene, the first product gas includes ethane and ethylene, and the second product gas is hydrogen-rich.

[0053] In some embodiments, in the above implementation modes / examples, when the raw gas is synthetic purified gas, each cycle includes sequentially performed adsorption, at least one equalizing pressure reduction, at least one replacement, vacuuming, at least one equalizing pressure increase, and a final increase step, the adsorbent includes alumina, silica gel, activated carbon, and molecular sieves, the target gas includes carbon monoxide, the first product gas includes carbon monoxide, and the second product gas is hydrogen-rich. In a specific embodiment, when the raw gas is synthetic purified gas, each cycle includes sequentially performed adsorption, one equalizing pressure reduction, two equalizing pressure reductions, three equalizing pressure reductions, replacement, vacuuming, three equalizing pressure increases, two equalizing pressure increases, one equalizing pressure increase, and a final increase step, the adsorbent includes alumina, silica gel, activated carbon, and molecular sieves, the target gas includes carbon monoxide, the first product gas includes carbon monoxide, and the second product gas is hydrogen-rich.

[0054] In some embodiments, in the above implementation modes / examples, when the raw gas is medium-change gas, each cycle includes adsorption, at least one equalization and pressure reduction, at least one replacement, vacuuming, at least one equalization and pressure increase, and a final increase step performed in sequence, the adsorbent includes alumina, silica gel, activated carbon, molecular sieve, the target gas includes carbon dioxide, the first product gas includes carbon dioxide, and the second product gas is hydrogen-rich gas.

[0055] Combination Figure 3 and Figure 4 As shown, another embodiment of the present application provides a pressure swing adsorption system for separating and recovering gas from a mixed gas, including a raw gas feed end, a first product gas discharge end, a second product gas discharge end, a vacuum pump 101, a first product gas buffer tank 102, a replacement waste gas buffer tank 103, a compressor 104, a final rise regulating valve KV10 and at least three pressure swing adsorption units, each pressure swing adsorption unit includes at least one adsorption tower 105, and at least one first program-controlled valve XV1, a second program-controlled valve XV2, a third program-controlled valve XV3, a fourth program-controlled valve XV4, a fifth program-controlled valve XV5, a sixth program-controlled valve XV6 and a seventh program-controlled valve XV7 for controlling pipeline connectivity; the top and the bottom of the adsorption tower 105 of each pressure swing adsorption unit are connected in pairs by pipelines.

[0056] The top of the adsorption tower 105, the replacement waste gas buffer tank 103, the compressor 104, the raw gas feed end, the bottom of the adsorption tower 105, the vacuum pump 101, the first product gas buffer tank 102 and the first product gas discharge end are connected in sequence through pipelines. The vacuum pump 101 is used to evacuate the adsorption tower 105 to extract the first product gas from the bottom of the adsorption tower 105 and send it into the first product gas buffer tank 102. The first product gas buffer tank 102 is used to cache the first product gas; the replacement waste gas buffer tank 103 is used to cache the replacement waste gas, and the compressor 104 is used to pressurize the gas in the replacement waste gas buffer tank 103 and send it as raw gas from the bottom of the tower into the adsorption tower 105 through the raw gas feed end.

[0057] The top of the adsorption tower 105 is also connected to the second product gas discharge end through a pipeline.

[0058] The first program-controlled valve XV1 is arranged on the pipeline connecting the raw gas feed end and the bottom of the adsorption tower 105, and is used to control the raw gas feed. The second program-controlled valve XV2 is arranged on the pipeline connecting the top of the adsorption tower 105 and the second product gas discharge end, and is used to control the second product gas discharge.

[0059] During the adsorption process, the first program-controlled valve XV1 is opened, and the raw gas can enter the adsorption tower 105 from the bottom of the adsorption tower 105 through the first program-controlled valve XV1, and the components in the raw gas that are easily adsorbed by the adsorbent are adsorbed by the adsorbent loaded in the adsorption tower 105; the second program-controlled valve XV2 is opened, and the components in the raw gas that are not easily adsorbed by the adsorbent are sent out of the boundary area from the top of the adsorption tower 105 through the second program-controlled valve XV2.

[0060] The third program-controlled valve XV3 is arranged on the pipeline connecting the tops of the adsorption towers 105 of each pressure swing adsorption unit in pairs, and is used to control the inlet and outlet of the pressure-equalizing and decompression gas Q1 and the pressure-equalizing and decompression gas Q2 (from the original adsorption tower 105 to other adsorption towers 105); the fourth program-controlled valve XV4 is arranged on the pipeline connecting the tops of the adsorption towers 105 of each pressure swing adsorption unit in pairs, and is used to control the inlet and outlet of the pressure-equalizing and decompression gas Q1 and the pressure-equalizing and decompression gas Q2.

[0061] During the pressure equalization and decompression process, the third program-controlled valve XV3 and the fourth program-controlled valve XV4 are opened, and the adsorption tower 105 where the adsorption process is completed is connected to the adsorption tower 105 entering the pressure equalization and boosting process through a pipeline, so that the useful components and pressure in the adsorption tower 105 where the pressure equalization and decompression process is completed can be recovered, and the content of the product gas components in the adsorption tower 105 can be increased. The number of pressure equalization and decompression can be set according to the adsorption pressure, and at least set to once. Exemplarily, when performing a pressure equalization and decompression, the third program-controlled valve XV3 is opened, and the gas in the adsorption tower 105 with a higher pressure in the first pressure equalization and decompression step is placed in the adsorption tower 105 in the first pressure equalization and boosting step; when performing a second pressure equalization and decompression, the fourth program-controlled valve XV4 is opened, and the gas in the adsorption tower 105 with a higher pressure in the second pressure equalization and decompression step and the third pressure equalization and decompression step is placed in the adsorption tower 105 in the second pressure equalization and boosting step and the third pressure equalization and boosting step, respectively.

[0062] The pressure-equalizing process corresponds to the pressure-equalizing process. During the pressure-equalizing process, the third program-controlled valve XV3 and the fourth program-controlled valve XV4 are opened, and the adsorption tower 105 after the vacuuming process is completed is connected to the adsorption tower 105 in the pressure-equalizing process through a pipeline, so that the gas in the adsorption tower 105 in the pressure-equalizing process with a higher pressure enters the adsorption tower 105 in the pressure-equalizing process, so as to increase the pressure of the pressure-equalizing adsorption tower 105 and recover part of the product gas components in the pressure-equalizing gas. The number of pressure-equalizing can be set according to the adsorption pressure, and it can be set to at least once. The number of pressure-equalizing is the same as the number of pressure-equalizing. Illustratively, in the adsorption tower 105 after the vacuuming process is completed, when performing three equalizing pressure boosting and two equalizing pressure boosting steps, the fourth program-controlled valve XV4 is opened to put the gas with higher pressure in the adsorption tower 105 which is in the three equalizing pressure reducing and two equalizing pressure reducing steps into the adsorption tower 105 which is in the three equalizing pressure boosting and two equalizing pressure boosting steps; when performing one equalizing pressure boosting, the third program-controlled valve XV3 is opened to put the gas with higher pressure in the adsorption tower 105 which is in the one equalizing pressure reducing step into the adsorption tower 105 which is in the one equalizing pressure boosting step.

[0063] The fifth programmable valve XV5 is arranged on the pipeline connecting the bottom of the adsorption tower 105 and the first product gas buffer tank 102, and is used to control the first product gas from the first product gas buffer tank 102 to enter the adsorption tower 105, and is used as the first replacement gas source; the sixth programmable valve XV6 is arranged on the pipeline connecting the top of the adsorption tower 105 and the replacement waste gas buffer tank 103, and is used to control the replacement waste gas from the adsorption tower 105 to enter the replacement waste gas buffer tank 103.

[0064] During the replacement process, the fifth programmable valve XV5 and the sixth programmable valve XV6 are opened, and a part of the gas in the first product gas buffer tank 102 is used as the first replacement gas source to replace the adsorption tower 105. The replacement gas is introduced from the bottom of the adsorption tower 105 to perform low-pressure constant-pressure replacement on the adsorption tower 105; the replacement waste gas is sent from the top of the adsorption tower 105 to the replacement waste gas buffer tank 103, and after buffering, it is sent to the compressor 104 to be pressurized to the adsorption pressure, and then mixed with the raw gas and sent to the adsorption tower 105.

[0065] The seventh program-controlled valve XV7 is disposed on a pipeline connecting the bottom of the adsorption tower 105 and the vacuum pump 101 , and is used to control the desorption gas to enter the first product gas buffer tank 102 from the adsorption tower 105 through the vacuum pump 101 .

[0066] During the vacuuming process, the seventh programmable valve XV7 is opened, and the vacuum pump 101 is used to evacuate the adsorption tower 105 after the replacement, thereby further reducing the pressure of the adsorption tower 105, so that the components adsorbed in the adsorbent are desorbed, and the desorbed gas is obtained and buffered in the first product gas buffer tank 102. Part of the gas in the first product gas buffer tank 102 is sent out of the boundary area as the first product gas, and the other part is used as the first replacement gas source.

[0067] The final rise regulating valve KV10 is arranged on the pipeline connecting the top of the adsorption tower 105 and the second product gas discharge end, and is located between the third program-controlled valve XV3 and the second product gas discharge end, and is used to control the gas feed sent out from the top of other adsorption towers 105.

[0068] During the final rise process, open the final rise regulating valve KV10 and the third program-controlled valve XV3, and use the gas sent from the top of the adsorption tower 105 to increase the pressure of the adsorption tower 105 to reach the preset adsorption pressure. After the pressure of the adsorption tower 105 rises to the preset adsorption pressure, the adsorption tower 105 can enter the adsorption process of the next cycle.

[0069] Combination Figure 4 As shown, in another embodiment of the present application, the fourth programmable valve XV4 is also connected to the replacement waste gas buffer tank 103 to put the downstream gas from the adsorption tower 105 into the replacement waste gas buffer tank 103.

[0070] During the forward discharge process, the fourth program-controlled valve XV4 is opened, and the gas in the adsorption tower 105 is put into the replacement waste gas buffer tank 103 along the adsorption direction through the fourth program-controlled valve XV4 at the top of the adsorption tower 105, so that the pressure of the adsorption tower 105 drops to the replacement pressure.

[0071] Combination Figure 4As shown, in another embodiment of the present application, the top and the bottom of the adsorption tower 105 of each pressure swing adsorption unit are connected in pairs through pipelines, and the pressure swing adsorption unit also includes at least one eighth program-controlled valve XV8 and a ninth program-controlled valve XV9; the eighth program-controlled valve XV8 and the ninth program-controlled valve XV9 are both arranged on the pipelines connecting the top and the bottom of the adsorption tower 105 of each pressure swing adsorption unit, and are used to control the replacement waste gas as the second replacement gas source from the top of the adsorption tower 105 and from the bottom of the tower into the original adsorption tower 105 or other adsorption towers 105, and be used as the second replacement gas source; the eighth program-controlled valve XV8 is close to the top of the adsorption tower 105, and the ninth program-controlled valve XV9 is close to the bottom of the adsorption tower 105.

[0072] During the replacement process, the eighth program-controlled valve XV8 and the ninth program-controlled valve XV9 are opened to send the replacement waste gas in the adsorption tower 105 that has just completed the replacement from the top of the tower through the eighth program-controlled valve XV8, and then as the second replacement gas source, through the bottom of the tower through the ninth program-controlled valve XV9 into other adsorption towers 105 that are undergoing replacement for replacement.

[0073] In some embodiments, in the above implementation modes / examples, the adsorption tower 105 is filled with an adsorbent, and the adsorbent is selected from at least one of alumina, silica gel, activated carbon, and molecular sieves.

[0074] The following specific examples are given to explain the present application in detail. It should also be understood that the following examples are only used to explain the present application in detail and cannot be understood as limiting the scope of protection of the present application. Some non-essential improvements and adjustments made by technicians in this field based on the above content of the present application belong to the scope of protection of the present application. The specific process parameters and the like in the following examples are also only examples within a suitable range, that is, those skilled in the art can make a selection within a suitable range through the description of this article, and are not limited to the specific values ​​​​exemplified below.

[0075] Example 1

[0076] like Figure 3 As shown, this embodiment uses a one-stage pressure swing adsorption technology with displacement to 3 The CO gas component is recovered from the synthetic purified gas at a rate of / h, with an adsorption pressure of 3.2 MPaG and an adsorption temperature of 35°C. The composition of the synthetic purified gas is shown in Table 1.

[0077] Table 1

[0078] composition hydrogen Carbon monoxide carbon dioxide Methane Nitrogen AR total mol% 69.29 29.92 0.01 0.09 0.53 0.15 100.00

[0079] The synthetic purified gas enters the adsorption tower 105 from the bottom of the adsorption tower 105, and the adsorption tower 105 sequentially undergoes adsorption, primary pressure equalization and pressure reduction, secondary pressure equalization and pressure reduction, tertiary pressure equalization and pressure reduction, replacement, vacuuming, tertiary pressure equalization and pressure increase, secondary pressure equalization and pressure increase, primary pressure equalization and pressure increase, and final pressure increase steps, and finally the CO product gas is obtained by the vacuuming step, and the replacement waste gas generated in the replacement step is pressurized and returned to the raw gas feed end.

[0080] Adsorption A

[0081] The synthetic purified gas enters the adsorption tower 105 from the bottom of the adsorption tower 105 through the first program-controlled valve XV1. The adsorption tower 105 is filled with adsorbents such as alumina, silica gel, activated carbon, and molecular sieves. The easily adsorbed CO gas is adsorbed in the adsorption tower 105, and the non-adsorbable hydrogen, nitrogen, methane and other gases are sent out of the boundary area from the second program-controlled valve XV2 on the top of the adsorption tower 105.

[0082] Voltage equalization and voltage reduction E1D, E2D, E3D

[0083] According to factors such as the raw gas pressure, this embodiment adopts three equalizing and reducing pressure processes, which are one equalizing and reducing pressure E1D, two equalizing and reducing pressure E2D and three equalizing and reducing pressure E3D in sequence. E1D is completed by the third program-controlled valve XV3 at the top of the adsorption tower 105, and the gas with higher pressure in the adsorption tower 105 in the E1D step is put into the adsorption tower 105 in the E1R; E2D and E3D are completed by the fourth program-controlled valve XV4 at the top of the adsorption tower 105, and the gas with higher pressure in the adsorption tower 105 in the E2D and E3D steps is put into the adsorption tower 105 in the E2R and E3R.

[0084] Replace RP

[0085] This embodiment adopts single tower replacement, and the replacement pressure is 0.02MPaG. The replacement step uses a part of the desorbed gas as the first replacement gas source to pass from the bottom of the adsorption tower 105 through the fifth program-controlled valve XV5 to replace the adsorption tower 105, and the replacement waste gas is sent to the replacement waste gas buffer tank 103 through the sixth program-controlled valve XV6.

[0086] Vacuum V

[0087] After the replacement process is completed, the CO gas in the adsorption tower 105 is extracted through the seventh programmable valve XV7 at the bottom of the adsorption tower 105 by using the vacuum pump 101 and sent to the first product gas buffer tank 102, part of which is sent out of the boundary area as CO product gas, and part of it is used as the first replacement gas source.

[0088] Voltage balancing and boosting E1R, E2R, E3R

[0089] The equalizing pressure boosting process corresponds to the equalizing pressure reducing process one by one. The equalizing pressure boosting in this embodiment is also performed three times, namely three equalizing pressure boosting E3R, two equalizing pressure boosting E2R and one equalizing pressure boosting E1R. After the vacuuming process is completed in the adsorption tower 105, E3R and E2R are completed through the fourth program-controlled valve XV4 at the top of the adsorption tower 105, and the gas with higher pressure in the adsorption tower 105 in the E2D and E2D steps is put into the adsorption tower 105 in E3R and E2R; E1R is completed through the third program-controlled valve XV3 at the top of the adsorption tower 105, and the gas with higher pressure in the adsorption tower 105 in the E1D step is put into the adsorption tower 105 in E1R.

[0090] Final FR

[0091] After the three equalization pressure increases are completed, the gas produced at the top of the adsorption tower 105 is used to increase the pressure of the adsorption tower 105 to an adsorption pressure of 3.2 MPaG through the final pressure regulating valve KV10 and the third program-controlled valve XV3.

[0092] At this point, all steps in one cycle of the adsorption tower 105 are completed and the next cycle begins.

[0093] The composition of the separated and recovered CO product gas is shown in Table 2:

[0094] Table 2

[0095] composition hydrogen Carbon monoxide carbon dioxide Methane Nitrogen AR total mol% 6.54 91.69 0.03 0.25 1.25 0.23 100.00

[0096] In this embodiment, under the condition of the same raw gas content, the purity of the CO product gas recovered by the one-stage pressure swing adsorption method with displacement is 91.69%, and the recovery rate is greater than 95%; the purity of the CO product recovered by the traditional one-stage pressure swing adsorption method with displacement (referred to as "traditional method") is 91.69%, and the recovery rate is about 80%. By comparison, it can be seen that this embodiment effectively improves the recovery rate of the CO product gas.

[0097] Example 2

[0098] like Figure 4 As shown, this embodiment uses a one-stage pressure swing adsorption technology with displacement from 20000Nm 3 / h of catalytic dry gas to recover C2 gas components, adsorption pressure 0.6MPaG, adsorption temperature 40 ° C. The composition of catalytic dry gas is shown in Table 3.

[0099] Table 3

[0100]

[0101] The catalytic dry gas enters the adsorption tower 105 from the bottom of the adsorption tower 105, and the adsorption tower 105 sequentially undergoes the steps of adsorption, primary pressure equalization and pressure reduction, secondary pressure equalization and pressure reduction, discharge, primary replacement, secondary replacement, tertiary replacement, vacuuming, secondary pressure equalization and pressure increase, primary pressure equalization and pressure increase, and final increase, and finally the C2 product gas is obtained by the vacuuming step, and the replacement waste gas generated in the replacement step is mixed with the discharge gas and pressurized and then returned to the raw gas feed end.

[0102] Adsorption A

[0103] The catalytic dry gas enters the adsorption tower 105 from the bottom of the adsorption tower 105 through the first program-controlled valve XV1. The adsorption tower 105 is filled with adsorbents such as alumina, silica gel, activated carbon, and molecular sieves. The easily adsorbed C2+ gas is adsorbed in the adsorption tower 105, and the non-adsorbed hydrogen, nitrogen, methane and other gases (i.e. Figure 1 The hydrogen-rich gas (as shown) is sent out of the boundary area from the second programmable valve XV2 at the top of the adsorption tower 105.

[0104] Voltage equalization and voltage reduction E1D, E2D

[0105] According to factors such as the raw gas pressure, this embodiment adopts a secondary pressure equalization and pressure reduction process, which is sequentially a primary pressure equalization and pressure reduction E1D and a secondary pressure equalization and pressure reduction E2D. E1D is completed by the third program-controlled valve XV3 at the top of the adsorption tower 105, and the gas with a higher pressure in the adsorption tower 105 in the E1D step is placed in the adsorption tower 105 in the E1R; E2D is completed by the fourth program-controlled valve XV4 at the top of the adsorption tower 105, and the gas with a higher pressure in the adsorption tower 105 in the E2D step is placed in the adsorption tower 105 in the E2R.

[0106] PP

[0107] The forward release process is to release the gas in the adsorption tower 105 into the replacement waste gas buffer tank 103 along the adsorption direction through the fourth programmable valve XV4 on the top of the adsorption tower 105, so that the pressure of the adsorption tower 105 drops to the replacement pressure.

[0108] Replace RP1, RP2, RP3

[0109] This embodiment adopts double-tower replacement, and the replacement pressure is 0.02MPaG. The first replacement is to use the replacement waste gas from the top of the adsorption tower 105 that has just been replaced three times as the second replacement gas source to enter the adsorption tower 105 through the ninth program-controlled valve XV9 at the bottom of the adsorption tower 105, and replace the adsorption tower 105. The replacement waste gas is sent to the replacement waste gas buffer tank 103 through the sixth program-controlled valve XV6; the second replacement is to use a part of the desorbed gas as the first replacement gas source to pass through the fifth program-controlled valve XV5 from the bottom of the adsorption tower 105 to replace the adsorption tower 105, and the replacement waste gas is sent to the replacement waste gas buffer tank 103 through the sixth program-controlled valve XV6; the third replacement is to use a part of the desorbed gas as the first replacement gas source to pass through the fifth program-controlled valve XV5 from the bottom of the adsorption tower 105 to replace the adsorption tower 105, and the replacement waste gas is sent from the eighth program-controlled valve XV8 to other adsorption towers 105 that are undergoing a single replacement as their second replacement gas source.

[0110] Vacuum V

[0111] After the replacement process is completed, the C2 gas in the adsorption tower 105 is extracted through the seventh programmable valve XV7 at the bottom of the adsorption tower 105 by using the vacuum pump 101 and sent to the first product gas buffer tank 102, part of which is sent out of the boundary area as C2 product gas, and part of it is used as the first replacement gas source.

[0112] Voltage balancing and boosting E1R, E2R

[0113] The equalizing pressure boosting process corresponds to the equalizing pressure reducing process one to one. The equalizing pressure boosting in this embodiment is also performed twice, namely, the second equalizing pressure boosting E2R and the first equalizing pressure boosting E1R. In the adsorption tower 105 after the vacuuming process is completed, E2R is completed by the fourth program-controlled valve XV4 at the top of the adsorption tower 105, and the gas with higher pressure in the adsorption tower 105 in the E2D step is put into the adsorption tower 105 in the E2R; E1R is completed by the third program-controlled valve XV3 at the top of the adsorption tower 105, and the gas with higher pressure in the adsorption tower 105 in the E1D step is put into the adsorption tower 105 in the E1R.

[0114] Final FR

[0115] After the two equalization and pressure raising operations are completed, the gas produced at the top of the adsorption tower 105 is used to raise the pressure of the adsorption tower 105 to an adsorption pressure of 0.6 MPaG through the final raising regulating valve KV10 and the third program-controlled valve XV3.

[0116] At this point, all steps in one cycle of the adsorption tower 105 are completed and the next cycle begins.

[0117] The composition of the separated and recovered C2 product gas is shown in Table 4:

[0118] Table 4

[0119]

[0120] In this embodiment, under the condition of the same raw gas content, the purity of C2 product gas recovered by the one-stage pressure swing adsorption method with displacement is 90.4%, and the recovery rate is 95%; the purity of C2 product recovered by the traditional one-stage pressure swing adsorption method with displacement (referred to as "traditional method") is 90.4%, and the recovery rate is 63%. By comparison, it can be seen that this embodiment effectively improves the recovery rate of C2 product gas.

[0121] In summary, the first product gas recovered from the same raw gas using the method of the present application and the traditional method has the same composition, but the recovery rate is different. The recovery rate of the first product gas obtained by the method of the present application is significantly higher, which shows that the method provided by the present application effectively improves the recovery rate of the first product gas. The main reason is that the replacement waste gas is not recycled in the traditional method. In the traditional method, a stream of gas is drawn out from the first product gas as replacement gas, and after replacing the adsorption tower, the replacement waste gas is directly discharged to the flare system. This method causes waste of the first product gas and a decrease in the recovery rate; the method of the present application returns the replacement waste gas generated after the replacement gas replaces the adsorption tower to the inlet of the adsorption tower, mixes with the raw gas, and then enters the adsorption tower again for adsorption and purification. The recycling of the replacement gas effectively improves the recovery rate and reduces the waste of the first product gas.

[0122] In addition, the method of the present application has the following advantages: compared with high-pressure replacement under the same conditions, the present application adopts low-pressure replacement. When regenerated under low-pressure conditions, the adsorbent desorbs more fully, and the gas to be replaced has a higher purity. Under the condition of the same purity of the first product gas, the required replacement gas volume is less, and the replacement gas does not need to be pressurized twice, and the energy consumption is lower. For example, the replacement pressure in Example 2 is 0.02MPaG, and the required replacement gas volume is about 3500Nm 3 / h; if high pressure replacement is adopted, when the replacement pressure is 0.6MPaG, the required replacement gas volume is about 6000Nm 3 / h.

[0123] The above embodiments are merely illustrative of the principles and effects of the present application and are not intended to limit the present application. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present application. Therefore, all equivalent modifications or changes made by a person of ordinary skill in the art without departing from the spirit and technical ideas disclosed in the present application shall still be covered by the claims of the present application.

Claims

1. A pressure swing adsorption system for separating and recovering gas from a mixed gas, characterized in that: It includes a raw gas feed end, a first product gas discharge end, a second product gas discharge end, a vacuum pump, a first product gas buffer tank, a replacement waste gas buffer tank, a compressor, a final rise regulating valve and a plurality of pressure swing adsorption units, each of which includes an adsorption tower, and a first program-controlled valve, a second program-controlled valve, a third program-controlled valve, a fourth program-controlled valve, a fifth program-controlled valve, a sixth program-controlled valve and a seventh program-controlled valve for controlling the connection of pipelines; the top and / or bottom of the adsorption tower of each pressure swing adsorption unit are connected in pairs through pipelines; The top of the adsorption tower, the replacement waste gas buffer tank, the compressor, the raw gas feed end, the bottom of the adsorption tower, the vacuum pump, the first product gas buffer tank and the first product gas discharge end are connected in sequence through pipelines, the vacuum pump is used to evacuate the adsorption tower to extract the first product gas from the bottom of the adsorption tower and send it into the first product gas buffer tank, and the first product gas buffer tank is used to buffer the first product gas; the replacement waste gas buffer tank is used to buffer the replacement waste gas, and the compressor is used to pressurize the gas in the replacement waste gas buffer tank and send it as raw gas from the bottom of the tower into the adsorption tower through the raw gas feed end; The top of the adsorption tower is also connected to the second product gas discharge end through a pipeline; The first program-controlled valve is arranged on a pipeline connecting the feed end of the raw gas and the bottom of the adsorption tower, and is used to control the feed of the raw gas; The second program-controlled valve is arranged on a pipeline connecting the top of the adsorption tower and the second product gas discharge end, and is used to control the discharge of the second product gas; The third program-controlled valve is arranged on the pipeline connecting the tops of the adsorption towers of each pressure swing adsorption unit in pairs, and is used to control the inlet and outlet of the pressure equalization and pressure reduction gas; The fourth program-controlled valve is arranged on the pipeline connecting the tops of the adsorption towers of each pressure swing adsorption unit in pairs, and is used to control the inlet and outlet of the pressure equalization and pressure reduction gas; The fifth program-controlled valve is arranged on the pipeline connecting the bottom of the adsorption tower and the first product gas buffer tank, and is used to control the first product gas to enter the adsorption tower from the first product gas buffer tank, and is used as the first replacement gas source; The sixth program-controlled valve is arranged on the pipeline connecting the top of the adsorption tower and the replacement waste gas buffer tank, and is used to control the replacement waste gas to enter the replacement waste gas buffer tank from the adsorption tower; The seventh program-controlled valve is arranged on the pipeline connecting the bottom of the adsorption tower and the vacuum pump, and is used to control the desorbed gas to enter the first product gas buffer tank from the adsorption tower through the vacuum pump; The final rise regulating valve is arranged on the pipeline connecting the top of the adsorption tower and the second product gas discharge end, and is located between the third program-controlled valve and the second product gas discharge end, and is used to control the gas feed sent out from the top of other adsorption towers.

2. The system according to claim 1, characterized in that: The fourth program-controlled valve is also connected to the replacement waste gas buffer tank and is used to put the exhaust gas from the adsorption tower into the replacement waste gas buffer tank.

3. The system according to claim 1, characterized in that: The top and bottom of the adsorption tower of each pressure swing adsorption unit are connected in pairs through pipelines, and the pressure swing adsorption unit also includes an eighth program-controlled valve and a ninth program-controlled valve; The eighth programmable valve and the ninth programmable valve are both arranged on the pipeline connecting the top and the bottom of the adsorption tower of each pressure swing adsorption unit, and are used to control the replacement exhaust gas as the second replacement gas source from the top of the adsorption tower and the bottom of the tower into the original adsorption tower or other adsorption towers, and used as the second replacement gas source; the eighth programmable valve is close to the top of the adsorption tower, and the ninth programmable valve is close to the bottom of the adsorption tower.

4. The system according to claim 1, characterized in that: The system includes at least three pressure swing adsorption units, each of which includes at least one adsorption tower, and at least one first program-controlled valve, a second program-controlled valve, a third program-controlled valve, a fourth program-controlled valve, a fifth program-controlled valve, a sixth program-controlled valve and a seventh program-controlled valve for controlling pipeline connectivity.

5. The system according to claim 3, characterized in that: The system includes at least three pressure swing adsorption units, each of which includes at least one adsorption tower, and at least one first program-controlled valve, a second program-controlled valve, a third program-controlled valve, a fourth program-controlled valve, a fifth program-controlled valve, a sixth program-controlled valve, a seventh program-controlled valve, an eighth program-controlled valve and a ninth program-controlled valve for controlling pipeline connectivity.

6. The system according to claim 1, characterized in that: The adsorption tower is filled with an adsorbent, and the adsorbent is selected from at least one of alumina, silica gel, activated carbon, and molecular sieve.

Citation Information

Cited By

  • Method and system for separating and recovering gas from mixed gas based on one-stage pressure swing adsorption method

    CN117899609A

  • Petrochemical refinery byproduct hydrogen and pipe network hydrogen purification combined bed process for preparing fuel cell grade high-purity hydrogen

    CN120364649A