Anchorage device end plugging structure

By using high-performance leak plugging materials and limit cover breathable structure, the problems of long anchor sealing time of concrete mortar and easy to erode in rainy days are solved, rapid solidification and efficient sealing are achieved, and construction efficiency is improved.

CN222043898UActive Publication Date: 2024-11-22CHONGQING ZHONGHUAN CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323516684.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-11-22
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

In the prior art, the solidification time of using concrete mortar for anchor sealing is slow, which affects the construction progress and is easily washed away on rainy days, resulting in trouble in operation.

Method used

The high-performance leak plugging material sold on the market is used as the sealing layer, and combined with the limit cover and breathable pore structure, the sealing layer is formed to improve sealing and solidification speed.

Benefits of technology

The rapid solidification and efficient sealing of the sealing layer are achieved, which shortens construction time and improves construction efficiency and sealing effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043898U_ABST
    Figure CN222043898U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of building structures, in particular to an anchorage device end plugging structure which comprises an anchorage device and a steel strand, the anchorage device is provided with a steel strand hole, a clamping piece is arranged in the steel strand hole, the steel strand penetrates out of the steel strand hole, the clamping piece is located between the steel strand hole and the steel strand, and the surface of the anchorage device is coated with plugging materials to form a plugging layer. The leaking stoppage material is leaking stoppage king; the device further comprises a limiting cover, the limiting cover covers the anchorage device, a containing space is formed between the limiting cover and the anchorage device, and the leaking stoppage material is located in the containing space. A feeding hole is formed in the side surface of the limiting cover; and a feeding funnel communicated with the feeding hole is fixedly arranged on the limiting cover. According to the scheme, the problem that the construction progress is slow due to the fact that concrete mortar is used for anchor sealing in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building structures, in particular to an anchor end blocking structure. Background Art

[0002] Anchors refer to permanent anchoring devices used in prestressed concrete. They are anchoring tools used in post-tensioned structures or components to maintain the tension of prestressed tendons and transfer it to the interior of concrete. They are commonly used in highway bridges, railway bridges and slope anti-slip.

[0003] Take a bridge as an example. During anchoring, the anchor is fixed on the surface of the bridge, and the steel strand is inserted into the bridge. The anchor is provided with a steel strand hole for the steel strand to pass through. A clip is provided in the steel strand hole, and the steel strand passes through the clip. After the tensioning work is completed, the longer steel strand exposed on the anchor is cut off.

[0004] Then the anchor sealing operation is carried out. The anchor sealing is to apply concrete mortar on the surface of the anchor. By applying concrete mortar, the concrete mortar will block and seal the gaps between the steel strands. After the concrete mortar on the surface of the anchor is air-dried and solidified, a certain pressure of mud is injected into the grouting holes of the bridge. In this way, the mud cannot flow out through the steel strand holes on the anchor and the gaps between the steel strands, which is conducive to ensuring the density of the injected mud.

[0005] However, the solidification time of concrete mortar is relatively slow. Generally, it takes until the next day for the concrete mortar to solidify to the required hardness. In this case, it is necessary to wait until the next day to carry out the grouting operation, which greatly affects the progress of the construction. During the drying period of the concrete mortar, if it rains, the applied concrete mortar may be washed away, and the concrete mortar needs to be reapplied later, which is troublesome. Utility Model Content

[0006] The utility model aims to provide an anchor end blocking structure to solve the problem of slow construction progress caused by using concrete mortar to seal anchors in the prior art.

[0007] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: an anchor end sealing structure, including an anchor and a steel strand, a steel strand hole is provided on the anchor, a clip is provided in the steel strand hole, the steel strand passes through the steel strand hole, the clip is located between the steel strand hole and the steel strand, and the surface of the anchor is coated with a plugging material to form a sealing layer.

[0008] The principle and advantages of this solution are: this solution uses ready-made plugging materials sold on the market, and the solidification speed, density and strength of the plugging materials are much higher than the current high-grade concrete. Therefore, this solution applies the plugging material on the surface of the anchor, and the plugging material forms a plugging layer after air drying. Compared with the use of concrete mortar for plugging, it has a good plugging effect and has a certain compressive resistance. At the same time, compared with the use of concrete mortar, it has a fast solidification speed, usually solidified in a few hours (1-3h), which greatly saves the solidification time, improves the efficiency of construction, and solves the problem of slow construction progress.

[0009] Preferably, as an improvement, it also includes a limiting cover, which covers the anchor, and a storage space is formed between the limiting cover and the anchor, and the plugging material is located in the storage space. Thus, the limiting cover limits the plugging material, so that when the plugging material is just applied to the anchor, the plugging material will not flow away from the anchor under the limiting effect of the limiting cover, which is conducive to the retention of the plugging material just after it is applied to the anchor. At the same time, after the plugging material solidifies, the limiting cover, the plugging material and the anchor are connected as a whole, and the plugging material plays a role in bonding and connecting the limiting cover and the anchor. The limiting cover covers the plugging material and also has a certain plugging and sealing effect, which improves the plugging and sealing performance of the anchor.

[0010] Preferably, as an improvement, a feed hole is provided on the side of the limit cover, and the feed hole is used for the plugging material to enter the accommodation space between the limit cover and the anchor.

[0011] Preferably, as an improvement, a feed funnel connected to the feed hole is fixedly provided on the limit cover. The provision of the feed funnel facilitates pouring the plugging material into the feed hole.

[0012] Preferably, as an improvement, a plurality of air holes are provided on the side of the limit cover, and the air holes are located around the feed hole. The plugging material is poured into the accommodation space, and the air in the accommodation space can be discharged outward through the air holes. After the plugging material is poured into the accommodation space, the air holes connect the accommodation space with the outside, which is conducive to the dissipation of moisture in the accommodation space, and avoids the limit cover completely sealing the plugging material and causing the plugging material to solidify very slowly. When in use, the air holes are facing upwards, and the plugging material will not flow out of the air holes.

[0013] Preferably, as an improvement, a chamfer is provided on the inner wall of the end inlet of the limit cover. The setting of the chamfer makes it easier for the limit cover to be installed on the anchor.

[0014] Preferably, as an improvement, an axial limiting structure is provided between the limiting cover and the anchor. After the limiting cover is installed on the anchor, the axial limiting structure can play a certain limiting role on the limiting cover, so that the limiting cover is relatively stable on the anchor, and avoids the limiting cover being pushed away from the anchor after the plugging material is poured into the accommodation space, so that the limiting cover is separated from the anchor.

[0015] Preferably, as an improvement, the axial limiting structure includes a clamping block or a clamping slot, and the clamping block is clamped in the clamping slot;

[0016] The card slot is located on the side of the anchor, and the card block is located on the inner wall of the limit cover; or, the card slot is located on the inner wall of the limit cover, and the card block is fixedly located on the side of the anchor. Thus, through the cooperation of the card block and the card slot, the limit cover and the anchor are fixedly limited, the structure is simple, and it is easy to manufacture and process.

[0017] Preferably, as an improvement, the limit cover is made of a transparent material. Thus, by using a transparent material, the pouring of the plugging material inside the limit cover can be seen.

[0018] Preferably, as an improvement, the limit cover is made of plastic material. Thus, the limit cover plays a role in limiting and containing the plugging material, and is disposable, so it does not need to be made of expensive materials such as metal, and the limit cover can be made of plastic material, which has low use cost.

[0019] Preferably, as an improvement, the plugging material is Leakage King. Leakage King is a high-performance, crack-resistant, impermeable and leak-proof product, which has the characteristics of rapid solidification and much higher density and strength than the current high-grade concrete. It is used as a plugging material with good plugging effect and fast solidification speed. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a front view of the anchor and plugging materials in the sealing and anchoring structure.

[0021] Figure 2 It is a structural schematic diagram of the anchor sealing structure.

[0022] Figure 3 for Figure 2 Partial sectional view from the left side of the center limit cover. DETAILED DESCRIPTION

[0023] The following is further described in detail through specific implementation methods:

[0024] The figure marks in the drawings of the specification include: anchor 1, sealing layer 2, clip 3, steel strand 4, limit cover 5, feed funnel 6, block 7, chamfer 8, air vent 9.

[0025] The embodiment is basically as shown in the attached Figure 1-Figure 3 As shown: An anchor end plugging structure includes an anchor 1 and a steel strand 4. The anchor 1 is provided with a steel strand hole ( Figure 1There are six steel strand holes, which can be set to five, seven, eight, etc. according to actual conditions). A clip 3 is provided in the steel strand hole, and the steel strand 4 passes through the steel strand hole. The clip 3 is located between the steel strand hole and the steel strand 4. The shape of the anchor 1 in this embodiment is a disc. The structures of the anchor 1, the clip 3, etc. are all existing structures.

[0026] The anchor sealing structure also includes a limit cover 5, which is made of plastic. Figure 2 As shown, the right end of the limiting cover 5 is provided with an opening, the left end of the limiting cover 5 is closed, and the wall thickness of the limiting cover 5 is 0.5-1 cm. A feeding hole is provided on the side wall of the limiting cover 5, and a feeding funnel 6 is provided at the feeding hole to be connected, and the feeding funnel 6 and the limiting cover 5 are integrally formed. In this embodiment, the material of the limiting cover 5 is a transparent material.

[0027] After the steel strand 4 on the anchor 1 on the bridge is tensioned, the limit cover 5 is covered on the anchor 1. After the limit cover 5 is covered on the anchor 1, the feed funnel 6 is facing upward. The structure of the limit cover 5 covering the anchor 1 is as follows: Figure 2 As shown, there is a containing space between the limit cover 5 and the anchor 1 (the width of the containing space is 1-2cm). Then the plugging material (the plugging material in this embodiment is the existing plugging king (plugging agent, plugging spirit, plugging treasure) sold on the market, such as the plugging king produced by Chongqing Zhenglin Paint Co., Ltd., Guihu plugging king produced in Sichuan, etc. Compared with concrete mortar, this plugging material solidifies and its density and strength are far higher than the current high-grade concrete, and has the advantage of fast solidification speed, and the solidification speed is usually 1-3h) is quickly stirred and mixed with clean water until a uniform and viscous putty-like powder without cohesion is formed. Pour the plugging material into the containing space between the limit cover 5 and the anchor 1 through the feeding funnel 6. The plugging material will not flow around under the action of the limit cover 5, and the plugging material is installed in the containing space between the limit cover 5 and the anchor 1.

[0028] After the plugging material solidifies, it forms a sealing layer 2 in the limiting cover 5. The sealing layer 2, the anchor 1 and the limiting cover 5 are connected as a whole. The sealing material enters the gap between the steel strand hole and the steel strand 4, thereby sealing the gap between the steel strand hole on the anchor 1 and the steel strand 4. Compared with sealing with concrete mortar, the sealing effect is good, the solidification speed is fast, and the progress of subsequent construction is improved.

[0029] In other embodiments, in combination Figure 3 As shown, a plurality of air holes 9 are provided on the side of the limit cover 5, and the air holes 9 are located around the feed hole. In this way, after the limit cover 5 is covered on the anchor 1, the air holes 9 are also facing upward, the plugging material is located in the limit cover 5, and the moisture in the plugging material in the limit cover 5 can be dissipated through the air holes 9, which is conducive to the solidification of the plugging material.

[0030] In addition, in other embodiments, a chamfer 8 is provided on the inner wall of the end entrance of the limit cover 5, so as to facilitate the limit cover 5 to cover the anchor 1 to the right. Figure 2 As shown, an axial limiting structure is provided between the limiting cover 5 and the anchor 1. The axial limiting structure in this embodiment includes a clamping block 7 and a clamping groove. The clamping block 7 is integrally formed on the inner wall of the limiting cover 5. The clamping block 7 may be annular. The clamping groove is located on the side of the anchor 1. The clamping groove may also be annular. In this way, the limiting cover 5 covers the anchor 1, and the clamping block 7 is clamped in the clamping groove, thereby realizing the clamping fixation of the limiting cover 5 and the anchor 1. In this way, after the plugging material is poured into the accommodating space, the limiting cover 5 is not easy to move to the left and detach from the anchor 1. Of course, in other embodiments, the clamping groove is located on the inner wall of the limiting cover 5, and the clamping block 7 is integrally formed on the side of the anchor 1. In this way, the limiting cover 5 covers the anchor 1, and the two can also be fixed by the cooperation of the clamping block 7 and the clamping groove.

[0031] The above is only an embodiment of the utility model, and the common knowledge such as the known specific technical solutions and / or characteristics in the solution is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the technical solution of the utility model, several deformations and improvements can be made, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. An anchor end plugging structure, comprising an anchor and a steel strand, wherein the anchor is provided with a steel strand hole, a clip is provided in the steel strand hole, the steel strand passes through the steel strand hole, and the clip is located between the steel strand hole and the steel strand, characterized in that: The surface of the anchor is coated with a plugging material to form a plugging layer; It also includes a limit cover, which is covered on the anchor, forming a accommodating space between the limit cover and the anchor, and the plugging material is located in the accommodating space; a feed hole is provided on the side of the limit cover; and a feed funnel connected to the feed hole is fixedly provided on the limit cover.

2. The anchor end plugging structure according to claim 1, characterized in that: A plurality of air holes are arranged on the side of the limiting cover, and the air holes are located around the feeding hole.

3. The anchor end sealing structure according to claim 1, characterized in that: The inner wall of the end entrance of the limiting cover is provided with a chamfered corner.

4. The anchor end sealing structure according to claim 3, characterized in that: An axial limiting structure is provided between the limiting cover and the anchor.

5. The anchor end sealing structure according to claim 4, characterized in that: The axial limiting structure includes a clamping block or a clamping slot, and the clamping block is clamped in the clamping slot; The card slot is located on the side of the anchor, and the card block is located on the inner wall of the limiting cover; or, the card slot is located on the inner wall of the limiting cover, and the card block is fixedly located on the side of the anchor.

6. The anchor end sealing structure according to claim 1, characterized in that: The limiting cover is made of plastic.

7. The anchor end plugging structure according to claim 1, characterized in that: The plugging material is plugging king.