Splicing structure of module house
By using converter joints and bolt connection technology in modular house splicing structures, the high transportation cost and equipment dependence problems in the modular construction of steel structures are solved, single-component transportation and efficient splicing are realized, transportation costs and professional requirements of workers are reduced, and transportation costs are reduced, and workers are improved. Splicing strength and stability are achieved, and pollution and equipment dependence are avoided during welding.
Patent Information
- Application Number
- CN202420465548.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-11
AI Technical Summary
The use of welding forming method during the splicing process of the steel structure has high transportation costs, which limits the size and large-scale application of the module room. The welding process strictly requires equipment and personnel, and there are light pollution and gas pollution problems.
The combination of the converter joint, beam, first fixing bolt and first rubber pad is used to transport the module room by single components, and the construction site is spliced with all bolts, which improves the splicing strength through support plates, support rods, reinforcement ribs, installation plates and fixing bolts. and stability.
It reduces transportation costs and factory labor costs, improves processing and production efficiency, simplifies the demand for construction tools, reduces personnel professional technical requirements and pollution problems, and improves the stability and safety of the splicing structure.
Smart Images

Figure CN222044457U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of modular buildings, in particular to a splicing structure of a modular house. Background Art
[0002] Modular building is an emerging building structure system, which takes each room as a modular unit, is prefabricated in the factory, transported to the site after completion, and assembled into a whole building through reliable connection methods.
[0003] Modular steel structure construction is a construction method that is rapidly emerging in the construction industry. It prefabricates steel structure modules in factories, but often uses welding to form the modules for transportation as a whole during the splicing process. The modules are then spliced on site, which greatly increases transportation costs. Due to transportation restrictions, the size of the modular house is also limited. The second floor and above are all double-layer steel beams, which greatly increases the amount of steel used in the steel structure, which is very unfavorable for large-scale application of modular houses. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a splicing structure of a module house, which solves the problem that modular construction of steel structures is a construction method that has rapidly emerged in the construction industry. It prefabricates steel structure modules in a factory, but in the splicing process, they are often transported as a whole by welding and then spliced on the construction site, which greatly increases the transportation cost. Due to transportation restrictions, the size of the module house is also limited. The second floor and above are all double-layer steel beams, which greatly increases the amount of steel used in the steel structure, which is very unfavorable for the large-scale application of module houses.
[0005] To achieve the above-mentioned purpose, the utility model is implemented through the following technical solutions: a splicing structure of a modular house, including a conversion joint, a steel beam is inserted into the interior of the conversion joint, the outer wall of the steel beam is fixedly connected to the inner wall of the conversion joint by a first fixing bolt, and the outer wall of the steel beam is sleeved with a first rubber pad fixedly connected to the inner wall of the conversion joint.
[0006] Preferably, a support plate is attached to the outer wall of the steel beam, the outer wall of the support plate is fixedly connected to the outer wall of the steel beam by a second fixing bolt, and the outer wall of the support plate is fixedly connected to a support rod fixedly connected to the outer wall of the conversion joint.
[0007] Preferably, the outer wall of the support plate is fixedly connected to a mounting plate, and the outer wall of the mounting plate is fixedly connected to a reinforcing rib via a third fixing bolt.
[0008] Preferably, a supporting block is installed on the outer wall of the conversion joint, and a mounting block is installed on the outer wall of the conversion joint.
[0009] Preferably, a second rubber pad is installed on the top of the support block.
[0010] Beneficial Effects
[0011] The utility model provides a splicing structure of a module house. It has the following beneficial effects: the splicing structure of the module house adopts single-component transportation through the cooperation of the conversion joint, the crossbeam, the first fixing bolt and the first rubber pad, and the module house is fully bolted on the construction site to reduce transportation costs and factory labor costs, improve processing and manufacturing efficiency, and achieve cost reduction and efficiency improvement. During the bolt connection construction, workers only need to carry simple installation tools to complete it, while the traditional welding connection or bolt-welding mixed connection requires the use of special welding equipment and electrical equipment, and the dependence on the equipment will be stronger. At the same time, from the perspective of specification requirements, the operation requirements of bolt connection will be more relaxed. For example, bolt construction can be carried out at a temperature above -10°C, while welding construction requires preheating of the connected parts when the temperature is lower. Of course, for the construction unit, the biggest difference is still in the personnel requirements. During welding operations, construction personnel are required to have professional skills and pass the safety technology examination and hold a certificate of qualification before they can take up their posts, while bolt construction personnel do not have corresponding requirements, and welding will inevitably produce corresponding light pollution and gas pollution on site, while the bolt connection process will not have this problem;
[0012] Through the cooperation of the support plate, the support rod, the reinforcing rib, the mounting plate, the third fixing bolt and the second fixing bolt, the splicing strength of the splicing structure of the modular house can be further improved, thereby effectively improving the stability of use and greatly reducing the probability of accidents during use after the splicing is completed, thereby facilitating the use of the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the structure of the utility model;
[0014] Figure 2 for Figure 1 A cross-sectional view of
[0015] Figure 3 for Figure 2 Schematic diagram of the structure of the conversion joint, support plate and support rod.
[0016] In the figure: 1. conversion joint, 2. steel beam, 3. first fixing bolt, 4. first rubber pad, 5. support rod, 6. support plate, 7. second fixing bolt, 8. mounting plate, 9. reinforcing rib, 10. third fixing bolt, 11. support block, 12. mounting block, 13. second rubber pad. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] By those skilled in the art, the components in this case are connected in sequence. The specific connection and operation sequence should refer to the following working principle. The detailed connection means are well-known technologies in the art. The following mainly introduces the working principle and process.
[0019] Steel structure modular construction is a construction method that has quickly emerged in the construction industry. It prefabricates steel structure modules in factories, but often uses welding to form the modules and then transports them as a whole to the construction site for splicing, which greatly increases the transportation cost. Due to transportation restrictions, the size of the modular house is also limited. The second floor and above are all double-layer steel beams, which greatly increases the amount of steel used in the steel structure, which is very unfavorable for the large-scale application of modular houses.
[0020] In view of this, the utility model provides a splicing structure of a module house. Through the cooperation of a conversion joint, a crossbeam, a first fixing bolt and a first rubber pad, the module house is transported by a single component and spliced with full bolts on the construction site, so as to reduce transportation costs and factory labor costs, improve processing and manufacturing efficiency, and achieve cost reduction and efficiency improvement. During the bolt connection construction, workers only need to carry simple installation tools to complete it, while traditional welding connection or bolt-welding mixed connection requires the use of special welding equipment and electrical equipment, and the dependence on equipment will be stronger. At the same time, from the perspective of specification requirements, the operation requirements of bolt connection will be more relaxed. For example, bolt construction can be carried out at a temperature above -10°C, while welding construction requires preheating of the connected parts when the temperature is low. Of course, for the construction unit, the biggest difference is still in the requirements for personnel. During welding operations, construction personnel are required to have professional skills and pass the safety and technical examinations, and hold a certificate of qualification before they can take up their posts, while bolt construction personnel do not have corresponding requirements, and welding will inevitably produce corresponding light pollution and gas pollution on site, while the bolt connection process will not have this problem.
[0021] Embodiment 1: Figure 1 , 2 As can be seen from Figure 3, a modular house splicing structure includes a conversion joint 1, a steel beam 2 is inserted into the conversion joint 1, the outer wall of the steel beam 2 is fixedly connected to the inner wall of the conversion joint 1 through a first fixing bolt 3, and the outer wall of the steel beam 2 is sleeved with a first rubber pad 4 fixedly connected to the inner wall of the conversion joint 1;
[0022] In the specific implementation process, it is worth pointing out that this application is used for the construction and splicing of modular houses and the splicing of steel components between modules. The module mainly uses external box-shaped steel columns and steel beams 2 to be spliced and connected through conversion joints 1;
[0023] Specifically, when using the splicing structure of the modular house, the worker first inserts the steel beam 2 into the interior of the conversion joint 1, and then fixes the steel beam 2 and the conversion joint 1 with the first fixing bolt 3.
[0024] Embodiment 2: By Figure 1 , 2 As can be seen from Figure 3, the outer wall of the steel beam 2 is attached with a support plate 6, the outer wall of the support plate 6 is fixedly connected to the outer wall of the steel beam 2 by a second fixing bolt 7, and the outer wall of the support plate 6 is fixedly connected to a support rod 5 fixedly connected to the outer wall of the conversion joint 1;
[0025] In the specific implementation process, it is worth pointing out that the support plate 6 and the support rod 5 can improve the connection strength between the conversion joint 1 and the steel beam 2;
[0026] Furthermore, the outer wall of the support plate 6 is fixedly connected with a mounting plate 8, and the outer wall of the mounting plate 8 is fixedly connected with a reinforcing rib 9 via a third fixing bolt 10;
[0027] In the specific implementation process, it is worth pointing out that the mounting plate 8 and the reinforcing ribs 9 can limit the conversion joint 1 of the steel beam 2, thereby further improving the connection strength;
[0028] Specifically, on the basis of the above-mentioned embodiment 1, after the steel beam 2 is connected to the conversion joint 1, the staff can use the second fixing bolts 7 and the third fixing bolts 10 again to connect the steel beam 2, the support plate 6, the reinforcing rib 9 and other components, thereby improving the connection strength between the steel beam 2 and the conversion joint 1.
[0029] Embodiment 3: By Figure 1 and 2 It can be seen that a support block 11 is installed on the outer wall of the conversion joint 1, and a mounting block 12 is installed on the outer wall of the conversion joint 1;
[0030] In the specific implementation process, it is worth pointing out that the staff can use the support block 11, the installation block 12 and the conversion joint 1 to connect and fix with the external box-shaped steel column. The processing hole spacing and hole diameter of the installation block 12 and the external box-shaped steel column are exactly the same, thereby ensuring the installation strength;
[0031] Furthermore, a second rubber pad 13 is installed on the top of the support block 11;
[0032] In the specific implementation process, it is worth pointing out that the second rubber pad 13 can increase the friction between the support block 11 and the external box-shaped steel column, thereby increasing the connection strength;
[0033] Specifically, based on the above-mentioned embodiment 1, when the conversion joint 1 is connected to the external box-shaped steel column, the staff places the conversion joint 1 on the connection end of the external box-shaped steel column, and then connects it through the mounting block 12 using external mounting bolts.
[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".
[0035] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.
[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A modular house splicing structure, comprising a conversion joint (1), Features: A steel beam (2) is inserted into the interior of the conversion joint (1); the outer wall of the steel beam (2) is fixedly connected to the inner wall of the conversion joint (1) via a first fixing bolt (3); and the outer wall of the steel beam (2) is sleeved with a first rubber pad (4) fixedly connected to the inner wall of the conversion joint (1).
2. A modular house splicing structure according to claim 1, Features: The outer wall of the steel beam (2) is fitted with a support plate (6), the outer wall of the support plate (6) is fixedly connected to the outer wall of the steel beam (2) via a second fixing bolt (7), and the outer wall of the support plate (6) is fixedly connected to a support rod (5) fixedly connected to the outer wall of the conversion joint (1).
3. The splicing structure of a modular house according to claim 2, Features: The outer wall of the support plate (6) is fixedly connected to a mounting plate (8), and the outer wall of the mounting plate (8) is fixedly connected to a reinforcing rib (9) via a third fixing bolt (10).
4. The splicing structure of a modular house according to claim 1, Features: A supporting block (11) is installed on the outer wall of the conversion joint (1), and a mounting block (12) is installed on the outer wall of the conversion joint (1).
5. The splicing structure of a modular house according to claim 4, Features: A second rubber pad (13) is installed on the top of the support block (11).