Gypsum treatment system
By designing drying equipment and heat exchange equipment in the gypsum treatment system, the waste heat generated during the calcination process is collected and used for gypsum dehumidification, the problem of waste heat not being used in the prior art is solved, and efficient utilization of resources is achieved.
Patent Information
- Application Number
- CN202420337418.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-02-22
AI Technical Summary
In the prior art, waste heat generated during gypsum calcination is not reasonably utilized, resulting in waste of steam resources.
A gypsum treatment system is designed, including drying equipment and heat exchange equipment, and the waste heat is recovered and reused by collecting waste heat during the calcination process and using it for dehumidification in the drying chamber.
It effectively avoids the waste of steam resources, improves resource utilization, and solves the problem that waste heat is not rationally utilized during calcination.
Smart Images

Figure CN222119101U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gypsum drying and calcining, and in particular to a gypsum processing system. Background Art
[0002] At present, natural gypsum can no longer meet the needs of users, and a large number of by-products have been derived, such as desulfurized gypsum, titanium gypsum, phosphogypsum, etc. Since various by-product gypsums have been piled up in large quantities, they not only occupy land and waste resources, but also contain acids and other harmful substances that easily pollute the surrounding environment. How to effectively utilize by-product gypsum has become a problem that needs to be solved urgently.
[0003] In the prior art, a desulfurized gypsum drying and calcining system is disclosed, which dries and calcines the desulfurized gypsum for resource utilization. However, during the calcination of the gypsum, the waste heat generated in the boiling furnace is directly discharged into the environment, resulting in a waste of steam resources. Utility Model Content
[0004] The main purpose of the utility model is to provide a gypsum processing system to solve the problem in the prior art that the waste heat generated during the calcination of gypsum is not reasonably utilized.
[0005] In order to achieve the above-mentioned purpose, the utility model provides a gypsum processing system, including: a feeding component, having a first discharge port; a drying component, including a drying device and a heat exchange device, the drying device has a drying chamber, a second discharge port, a steam pipe and a main shaft, the drying chamber is connected to the second discharge port, and the main shaft is connected to the steam pipe; the first discharge port is connected to the drying chamber, the heat exchange device has a first exhaust port, the first exhaust port is connected to the drying chamber, and the heat exchange device exchanges heat with the gas entering therein; a calcining component, including a boiling furnace, and the boiling furnace has a steam chamber; a discharge component, including a storage structure; a steam supply component, including a steam supply device, and the steam supply device is connected to both the main shaft and the steam chamber.
[0006] Furthermore, the calcination component also includes a ball mill, and the boiling furnace also has a reaction chamber, a first discharge port and a third discharge port, the reaction chamber is connected to the third discharge port; the reaction chamber is connected to the second discharge port, and the condensed water discharged from the first discharge port enters the steam pipe and / or heat exchange equipment after vaporization, and the third discharge port is connected to the ball milling chamber of the ball mill; the material storage structure is connected to the ball milling chamber.
[0007] Furthermore, the feeding component includes a mixing structure, and the calcining component also includes: a distributor, located between the boiling furnace and the ball mill, the distributor has a feeding port, a first distributing port and a second distributing port, the feeding port is connected to the third distributing port, and the first distributing port is connected to the ball mill chamber; a back-mixing and conveying device is arranged between the mixing structure and the distributor, and the back-mixing and conveying device is connected to the second distributing port.
[0008] Furthermore, the drying component also includes: a flash evaporation device, having a first liquid inlet, a second exhaust port and a second liquid discharge port, the first liquid inlet is connected to the first liquid discharge port, the second exhaust port is connected to the steam pipe and / or heat exchange equipment, and the second liquid discharge port is connected to the steam supply device.
[0009] Furthermore, the steam supply device has a third exhaust port, and the steam supply component also includes: a main pipeline, a first end of the main pipeline is connected to the third exhaust port; a first branch pipeline, two ends of the first branch pipeline are respectively connected to the second end of the main pipeline and the main shaft; a second branch pipeline, two ends of the second branch pipeline are respectively connected to the second end of the main pipeline and the steam chamber; wherein the gypsum processing system also includes: a cooling and pressure reducing device, which is arranged on the first branch pipeline.
[0010] Furthermore, the drying component also includes: a first discharge device, which is connected to the second discharge port; an air lock, which is arranged between the first discharge device and the second discharge port; and a first bucket elevator, through which the material discharged from the discharge port of the first discharge device is lifted and transported into the reaction chamber.
[0011] Furthermore, the drying equipment has a fourth exhaust port, and the drying component also includes: a first dust removal device, which is connected to the fourth exhaust port, and the material outlet of the first dust removal device is connected to the feed port of the mixing structure; a first fan, which is connected to the air outlet of the first dust removal device.
[0012] Furthermore, the boiling furnace has a fifth exhaust port and a return port, and the calcination component also includes: a second dust removal device, connected to the fifth exhaust port; a second fan, connected to the air outlet of the second dust removal device; a second discharge device, connected to the material outlet of the second dust removal device, and the material discharged from the discharge port of the second discharge device enters the boiling furnace through the return port.
[0013] Furthermore, the discharging component also includes: a second bucket elevator, and the material discharged from the discharge port of the ball mill is lifted and transferred to the storage structure by the second bucket elevator; wherein, the calcining component also includes: a third dust removal device, connected to the exhaust port of the ball mill; a third fan, connected to the air outlet of the third dust removal device; a third discharge device, connected to the material outlet of the third dust removal device, and the material discharged from the discharge port of the third discharge device enters the storage structure.
[0014] Furthermore, the calcination assembly also includes: a cooling device, the cooling device has a first air inlet, a sixth exhaust port and a cooling chamber, the first feed port is connected to the feed port of the cooling device, and the discharge port of the cooling device is connected to the ball mill chamber; wherein, the boiling furnace has a second air inlet, and the sixth exhaust port is connected to the second air inlet, and heat exchange is performed between the material entering the cooling chamber through the first feed port and the gas entering through the first air inlet, and the heated gas enters the boiling furnace via the sixth exhaust port and the second air inlet in turn.
[0015] Furthermore, the drying equipment is a disc dryer, or a paddle dryer, or a thin layer dryer, or a steam tube bundle dryer.
[0016] According to the technical solution of the utility model, the gypsum processing system includes a feeding component, a drying component, a calcining component, a discharging component and a steam supply component. The feeding component has a first discharging port, the drying component includes a drying device and a heat exchange device, the drying device has a drying chamber, a second discharging port, a steam pipe and a main shaft, the drying chamber is connected to the second discharging port, and the main shaft is connected to the steam pipe. The first discharging port is connected to the drying chamber, the heat exchange device has a first exhaust port, the first exhaust port is connected to the drying chamber, and the heat exchange device exchanges heat with the gas entering therein. The calcining component includes a fluidized bed furnace, and the fluidized bed furnace has a steam chamber. The discharging component includes a storage structure. The steam supply component includes a steam supply device, which is connected to both the main shaft and the steam chamber to provide steam to the main shaft and the steam chamber. In this way, the heat exchange device preheats the air in the environment where the gypsum processing system is located, and the preheated air enters the drying chamber to reduce the water content in the gypsum in the drying chamber. After the gypsum enters the gypsum processing system through the feeding assembly, the drying equipment first dehumidifies the gypsum, and the dehumidified gypsum enters the boiling furnace for calcination. The waste heat generated during the calcination process can be discharged through the first drain port and enter the steam pipe and / or heat exchange equipment after vaporization. That is, the waste heat generated during the calcination process can enter the drying chamber to dehumidify the gypsum, so as to recover and reuse the waste heat, thereby solving the problem in the prior art that the waste heat generated during the calcination of gypsum is not reasonably utilized, thereby avoiding wasting steam resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0018] Figure 1 A schematic structural diagram of a gypsum processing system according to a first embodiment of the present utility model is shown;
[0019] Figure 2A schematic structural diagram of a second embodiment of a gypsum processing system according to the utility model is shown;
[0020] Figure 3 A structural schematic diagram of a third embodiment of a gypsum processing system according to the utility model is shown.
[0021] The above drawings include the following reference numerals:
[0022] 10. Feeding assembly; 11. Mixing structure; 12. Feeding bin; 13. Belt scale; 20. Drying equipment; 21. Drying chamber; 22. Second discharge port; 23. Steam pipe; 24. Fourth exhaust port; 25. Spindle; 30. Heat exchange equipment; 31. First exhaust port; 40. Boiling furnace; 41. Reaction chamber; 42. First discharge port; 43. Third discharge port; 44. Fifth exhaust port; 45. Feed return port; 46. Second air inlet; 47. Steam chamber; 50. Ball mill; 51. Ball mill chamber; 52. Screw feeder; 60. Storage structure; 70. Steam supply device; 71. Third exhaust port; 80. Distributor; 81. Feed port; 82. First distributing port; 83. Second distributing port; 90. Return mixing and transporting Delivery device; 100, flash evaporation device; 101, first liquid inlet; 102, second exhaust port; 103, second liquid discharge port; 110, main pipeline; 120, first branch pipeline; 130, second branch pipeline; 140, cooling and pressure reduction device; 150, first discharge device; 160, air lock; 170, first bucket elevator; 180, first dust removal device; 190, first fan; 200, second dust removal device; 210, second fan; 220, second discharge device; 230, second bucket elevator; 240, third dust removal device; 250, third fan; 260, third discharge device; 270, cooling device; 271, first air inlet; 272, sixth exhaust port; 273, cooling chamber; 280, fourth fan. DETAILED DESCRIPTION
[0023] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0024] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.
[0025] In the present invention, unless otherwise specified, directional words such as "up" and "down" are usually used in reference to the directions shown in the drawings, or in reference to the vertical, perpendicular or gravity direction; similarly, for ease of understanding and description, "left" and "right" are usually used in reference to the left and right shown in the drawings; "inside" and "outside" refer to the inside and outside relative to the outline of each component itself, but the above directional words are not used to limit the present invention.
[0026] In order to solve the problem in the prior art that the waste heat generated during the calcination of gypsum is not reasonably utilized, the present application provides a gypsum processing system.
[0027] Embodiment 1
[0028] like Figure 1 As shown, the gypsum processing system includes a feed assembly 10, a drying assembly, a calcining assembly, a discharge assembly and a steam supply assembly. The feed assembly 10 has a first discharge port, the drying assembly includes a drying device 20 and a heat exchange device 30, the drying device 20 has a drying chamber 21, a second discharge port 22, a steam pipe 23 and a main shaft 25, the drying chamber 21 is connected to the second discharge port 22, and the main shaft 25 is connected to the steam pipe 23. The first discharge port is connected to the drying chamber 21, the heat exchange device 30 has a first exhaust port 31, the first exhaust port 31 is connected to the drying chamber 21, and the heat exchange device 30 exchanges heat with the gas entering it. The calcining assembly includes a fluidized bed furnace 40, and the fluidized bed furnace 40 has a steam chamber 47. The discharge assembly includes a storage structure 60. The steam supply assembly includes a steam supply device 70 , which is in communication with both the main shaft 25 and the steam chamber 47 for providing steam to the main shaft 25 and the steam chamber 47 .
[0029] By applying the technical solution of this embodiment, the heat exchange device 30 preheats the air in the environment of the gypsum processing system, and the preheated air enters the drying chamber 21 to reduce the water content of the gypsum in the drying chamber 21. After the gypsum enters the gypsum processing system through the feeding assembly 10, the drying device 20 first dehumidifies the gypsum, and the dehumidified gypsum enters the boiling furnace 40 for calcination. The residual heat generated during the calcination process can be discharged through the first drain port 42 and enter the steam pipe 23 after vaporization, that is, the residual heat generated during the calcination process can enter the drying chamber 21 to dehumidify the gypsum, so as to recover and reuse the residual heat, thereby solving the problem of the residual heat generated during the calcination of gypsum in the prior art that is not reasonably utilized, and avoiding the waste of steam resources.
[0030] Optionally, the calcining assembly further includes a ball mill 50, and the boiling furnace 40 further includes a reaction chamber 41, a first liquid discharge port 42, and a third discharge port 43, wherein the reaction chamber 41 is connected to the third discharge port 43; the reaction chamber 41 is connected to the second discharge port 22, and the condensed water discharged from the first liquid discharge port 42 enters the steam pipe 23 and / or the heat exchange device 30 after being vaporized, and the third discharge port 43 is connected to the ball milling chamber 51 of the ball mill 50. The material storage structure 60 is connected to the ball milling chamber 51.
[0031] In this embodiment, the fluidized bed furnace 40 uses existing equipment on the market, and the fluidized bed furnace 40 can evaporate and calcine the raw materials transferred from the drying equipment 20. The gypsum after calcination is transferred to the inside of the ball mill 50 for grinding and modification, and the ground and modified materials are lifted into the inside of the storage structure 60 for storage. After the materials are discharged from the lower discharge port of the storage structure 60, they can be transferred or packaged. The steam supply device 70 is a boiler and can generate high-temperature steam.
[0032] In other embodiments not shown in the drawings, the reaction chamber is connected to the second discharge port, the condensed water discharged from the first discharge port enters the steam pipe and the heat exchange device after vaporization, and the third discharge port is connected to the ball mill chamber of the ball mill. Specifically, the heat exchange device preheats the air in the environment of the gypsum processing system, and enters the preheated air into the drying chamber to reduce the water content of the gypsum in the drying chamber. After the gypsum enters the gypsum processing system through the feeding assembly, the drying device first dehumidifies the gypsum, and the gypsum after dehumidification enters the boiling furnace for calcination. The residual heat generated during the calcination process can be discharged through the first discharge port and enter the steam pipe and the heat exchange device after vaporization, that is, the residual heat generated during the calcination process can enter the drying chamber to dehumidify the gypsum, so as to recover and reuse the residual heat, thereby solving the problem that the residual heat generated during the calcination of gypsum in the prior art is not reasonably utilized, and avoiding the waste of steam resources.
[0033] like Figure 1 As shown, the feed assembly 10 includes a mixing structure 11, and the calcining assembly also includes a distributor 80 and a back-mixing and conveying device 90. The distributor 80 is located between the fluidized bed furnace 40 and the ball mill 50, and has a feed port 81, a first distributor port 82, and a second distributor port 83. The feed port 81 is connected to the third discharge port 43, and the first distributor port 82 is connected to the ball milling chamber 51 of the ball mill 50. The back-mixing and conveying device 90 is arranged between the mixing structure 11 and the distributor 80, and the back-mixing and conveying device 90 is connected to the second distributor port 83. In this way, the above-mentioned arrangement of the distributor 80 can deliver part of the calcined semi-hydrated gypsum to the mixing structure 11 through the back-mixing and conveying device 90, thereby increasing the effective volume of the drying equipment 20, improving the processing capacity of the drying equipment 20, and ensuring that the discharge of the drying equipment 20 meets the processing requirements of the fluidized bed furnace 40.
[0034] In this embodiment, the above arrangement of the back-mixing and conveying device 90 improves the processing capacity of the mixing structure 11 to ensure that the feeding component 10 can operate safely and stably.
[0035] Specifically, in order to ensure that the gypsum processed by the drying device 20 can meet the moisture content requirement of entering the fluidized bed furnace 40, a distributor 80 is provided between the fluidized bed furnace 40 and the ball mill 50, so that the semi-hydrated gypsum after partial calcination is sent to the mixing structure 11 through the return mixing and conveying device 90 through the distributor 80, and the material discharged from the mixing structure 11 is mixed with the gypsum with a moisture content of 15-25% captured by the first dust removal device 180 and then enters the drying device 20 for processing. Wherein, the distributor 80 can be closed when mixing is not required to stop feeding the material to the return mixing and conveying device 90.
[0036] Optionally, the mixing structure 11 is a screw conveyor.
[0037] like Figure 1 As shown, the feed assembly 10 also includes a feed bin 12 and a belt scale 13. The belt scale 13 is located below the feed bin 12. The feed bin 12 is used to store the gypsum material to be processed. The gypsum material to be processed falls on the upper end of the belt scale 13 through the lower end outlet of the feed bin 12. The belt scale 13 adopts the existing belt on the market, which can not only transport the gypsum material to be processed that falls on the upper part, but also can weigh it.
[0038] Optionally, the drying component further includes a flash evaporation device 100. The flash evaporation device 100 has a first liquid inlet 101, a second exhaust port 102 and a second liquid discharge port 103. The first liquid inlet 101 is connected to the first liquid discharge port 42, the second exhaust port 102 is connected to the steam pipe 23 and / or the heat exchange device 30, and the second liquid discharge port 103 is connected to the steam supply device 70. In this way, the high-temperature steam entering the boiling furnace 40 forms high-temperature steam condensate after heat exchange and enters the flash evaporation device 100. Due to the pressure reduction in the flash evaporation device 100, the high-temperature steam condensate is partially vaporized into low-temperature and low-pressure steam, and the low-temperature and low-pressure steam enters the steam pipe 23 and / or the heat exchange device 30 of the drying device 20 to achieve waste heat recovery.
[0039] like Figure 1As shown, the drying assembly further includes a flash evaporation device 100. The flash evaporation device 100 has a first liquid inlet 101, a second exhaust port 102 and a second liquid discharge port 103. The first liquid inlet 101 is connected to the first liquid discharge port 42, the second exhaust port 102 is connected to the steam pipe 23, and the second liquid discharge port 103 is connected to the steam supply device 70. In this way, the high-temperature steam entering the boiling furnace 40 forms high-temperature steam condensate after heat exchange and enters the flash evaporation device 100. Due to the pressure reduction in the flash evaporation device 100, the high-temperature steam condensate is partially vaporized into low-temperature and low-pressure steam, and the low-temperature and low-pressure steam enters the steam pipe 23 of the drying device 20 to achieve waste heat recovery.
[0040] In this embodiment, gypsum with a moisture content of 15-25% is sent to the drying device 20 for processing through the feeding assembly 10, and then enters the boiling furnace 40 for deep processing to prepare semi-hydrated gypsum, and then is sent to the storage structure 60 for storage after being processed by the ball mill 50. Among them, the high-temperature exhaust gas generated by the drying device 20, the boiling furnace 40 and the ball mill 50 is successively processed by the dust removal device and then discharged, and the material captured by the dust removal device is returned to the gypsum processing system for recycling. A heat exchange device 30 and a flash evaporation device 100 are also provided for recycling the residual heat of steam condensed water from the boiling furnace 40 to preheat the carrier gas, thereby reducing the energy consumption of the gypsum processing system. In addition, the gypsum processing system is provided with a back-mixing and conveying device 90, which is used to mix the gypsum with a moisture content of 15-25%, the material captured by the first dust removal device 180 and the semi-hydrated gypsum after partial calcination and enter the drying device 20 for processing.
[0041] In other embodiments not shown in the drawings, the drying component further includes a flash evaporation device. The flash evaporation device has a first liquid inlet, a second exhaust port, and a second liquid discharge port. The first liquid inlet is connected to the first liquid discharge port, the second exhaust port is connected to the steam pipe and the heat exchange device, and the second liquid discharge port is connected to the steam supply device. In this way, the high-temperature steam entering the boiling furnace forms high-temperature steam condensate after heat exchange and enters the flash evaporation device. Due to the pressure reduction in the flash evaporation device, the high-temperature steam condensate is partially vaporized into low-temperature and low-pressure steam. The low-temperature and low-pressure steam enters the steam pipe and heat exchange device of the drying device to achieve waste heat recovery.
[0042] like Figure 1As shown, the steam supply device 70 has a third exhaust port 71, and the steam supply assembly also includes a main pipeline 110, a first branch pipeline 120 and a second branch pipeline 130. The first end of the main pipeline 110 is connected to the third exhaust port 71, and the two ends of the first branch pipeline 120 are respectively connected to the second end of the main pipeline 110 and the main shaft 25. The two ends of the second branch pipeline 130 are respectively connected to the second end of the main pipeline 110 and the steam chamber 47. Among them, the gypsum processing system also includes a cooling and decompression device 140, and the cooling and decompression device 140 is arranged on the first branch pipeline 120. In this way, the steam generated by the steam supply device 70 is processed by the cooling and decompression device 140 to form saturated steam and enter the drying device 20 to provide heat for drying the gypsum. The gypsum with a moisture content of 15-25% exchanges heat with the absorbed saturated steam to evaporate the moisture in it, thereby realizing the drying function of the drying device 20 on the gypsum. At the same time, the above-mentioned arrangement improves the fluidity of the medium flow inside the gypsum processing system, thereby improving the processing efficiency of the gypsum processing system.
[0043] like Figure 1 As shown, the drying assembly also includes a first discharge device 150, an air lock 160 and a first bucket elevator 170. The first discharge device 150 is connected to the second discharge port 22, and the air lock 160 is arranged between the first discharge device 150 and the second discharge port 22. The material discharged from the discharge port of the first discharge device 150 is lifted and transported to the reaction chamber 41 by the first bucket elevator 170. In this way, after the drying equipment 20 completes the dehumidification of the gypsum, it is discharged into the first discharge device 150 through the second discharge port 22. The air lock 160 arranged between the first discharge device 150 and the second discharge port 22 only allows the gypsum to pass through, but does not allow air to pass through, so as to ensure that the gypsum processing system can operate normally.
[0044] like Figure 1 As shown, the drying device 20 has a fourth exhaust port 24, and the drying assembly further includes a first dust removal device 180 and a first fan 190. The first dust removal device 180 is connected to the fourth exhaust port 24, and the material outlet of the first dust removal device 180 is connected to the feed port of the mixing structure 11. The first fan 190 is connected to the air outlet of the first dust removal device 180. In this way, during the drying process of the drying device 20, the first dust removal device 180 is used to remove dust generated during the drying process, and the first fan 190 is used to suck the dust-removed gas into the environment where the gypsum processing system is located.
[0045] Optionally, the first dust removal device 180 is a high-temperature bag dust collector or a high-temperature pulse bag dust collector.
[0046] like Figure 1As shown, the fluidized bed furnace 40 has a fifth exhaust port 44 and a return port 45, and the calcining assembly further includes a second dust removal device 200, a second fan 210 and a second discharge device 220. The second dust removal device 200 is connected to the fifth exhaust port 44. The second fan 210 is connected to the air outlet of the second dust removal device 200. The second discharge device 220 is connected to the material outlet of the second dust removal device 200, and the material discharged from the discharge port of the second discharge device 220 enters the fluidized bed furnace 40 through the return port 45. In this way, during the process of calcining gypsum in the fluidized bed furnace 40, the second dust removal device 200 is used to remove dust generated during the calcination process, and the second fan 210 is used to suck the dust-removed gas into the environment of the gypsum processing system. At the same time, the second discharge device 220 returns the recovered gypsum material to the fluidized bed furnace 40 through the return port 45 for continued calcination to prevent material waste.
[0047] Optionally, the second dust removal device 200 is a high-temperature bag dust collector or a high-temperature pulse bag dust collector.
[0048] like Figure 1 As shown, the discharging assembly further includes a second bucket elevator 230, and the material discharged from the discharging port of the ball mill 50 is lifted and transported to the storage structure 60 by the second bucket elevator 230. The calcining assembly further includes a third dust removal device 240, a third fan 250 and a third discharge device 260. The third dust removal device 240 is connected to the exhaust port of the ball mill 50. The third fan 250 is connected to the air outlet of the third dust removal device 240, and the third discharge device 260 is connected to the material outlet of the third dust removal device 240. The material discharged from the discharging port of the third discharge device 260 enters the storage structure 60. In this way, after the ball mill 50 completes the grinding and modification of gypsum, the third dust removal device 240 is used to remove dust generated during the grinding process, and the third fan 250 is used to suck the dust-removed gas into the environment where the gypsum processing system is located. At the same time, the third discharging device 260 returns the recovered gypsum material to the storage structure 60 to prevent material waste.
[0049] Optionally, the third dust removal device 240 is a high-temperature bag dust collector or a high-temperature pulse bag dust collector.
[0050] Optionally, the drying device 20 is a disc dryer, a paddle dryer, a thin layer dryer, or a steam tube bundle dryer. In this way, the above configuration makes the type of drying device 20 more flexible to meet different usage requirements and working conditions, and also improves the processing flexibility of the staff.
[0051] In this embodiment, the drying device 20 is a disc dryer.
[0052] Specifically, the working principle of the gypsum processing system is as follows:
[0053] The gypsum with a moisture content of 15-25% is transported to the feed bin 12 for storage, and then transported to the mixing structure 11 through the belt scale 13 at the bottom, and then sent to the drying device 20 for processing. The steam generated by the steam supply device 70 is processed by the cooling and pressure reduction device 140 to form saturated steam and enter the drying device 20 to provide heat for drying the gypsum. The gypsum with a moisture content of 15-25% exchanges heat with the saturated steam to evaporate the water contained in the gypsum, and forms a mixed gas with the ambient air preheated by the heat exchange device 30, and then is discharged from the exhaust port into the first dust removal device 180 for dust removal. Since the main components of the mixed gas are water vapor and air, the remaining gas after dust removal can be directly discharged to the environment through the first fan 190. The dust captured by the first dust removal device 180 is sent to the mixing structure 11 to ensure that the material is not wasted. After drying, the gypsum is discharged from the discharge port of the drying equipment 20, and the moisture content of the discharge material is ≤2%. It is sent to the boiling furnace 40 for treatment through the air lock 160, the first discharge device 150, and the first bucket elevator 170. The steam generated by the steam supply device 70 is directly sent to the boiling furnace 40 through the main pipeline 110, and the ambient air is sent to the boiling furnace 40 through the fourth fan 280 to play the role of carrier gas and heating. The evaporated water vapor is mixed with air and discharged from the exhaust port into the second dust removal device 200 for dust removal. The dust-removed gas can be directly discharged through the second fan 210. The dust captured by the second dust removal device 200 is returned to the boiling furnace 40 through the second discharge device 220 located at the bottom. The heat exchange device 30 uses the saturated steam after temperature and pressure reduction and the low-temperature and low-pressure steam generated by the flash evaporation device 100 as heat sources to preheat the air. The preheated steam forms steam condensate, which is mixed with the remaining steam condensate in the flash evaporation device 100 and the steam condensate discharged by the drying device 20 and sent to the steam supply device 70 for recycling. The remaining semi-hydrated gypsum enters the ball mill chamber 51 through the screw feeder 52 for treatment, and the treated semi-hydrated gypsum is sent to the storage structure 60 for storage through the second bucket elevator 230. The exhaust gas generated by the ball mill 50 enters the third dust removal device 240 for dust removal treatment. The dust-removed gas can be directly discharged through the third fan 250, and the dust captured by the third dust removal device 240 is returned to the storage structure 60 through the third discharge device 260 at the bottom.
[0054] Optionally, the heat source steam of the drying equipment 20 is preferably saturated steam of 0.4-0.6 MPa and 140-160°C.
[0055] Optionally, the drying equipment 20, the boiling furnace 40 and the equipment connected thereto need to be thermally insulated.
[0056] Optionally, the rotation speed of the drying device 20 is 5 to 15 r / min, and the drying time is 20 to 40 minutes if mixing is required; when there is no mixing, the drying time is 1 to 1.5 hours.
[0057] Optionally, the operating temperature of the boiling furnace 40 is 160-220° C., and the discharge temperature is 110-120° C. The heat source of the boiling furnace 40 is superheated steam.
[0058] Embodiment 2
[0059] The gypsum treatment system in the second embodiment is different from that in the first embodiment in that the condensed water discharged from the first liquid discharge port 42 enters the heat exchange device 30 after being vaporized.
[0060] like Figure 2 As shown, the reaction chamber 41 is connected with the second discharge port 22, the condensed water discharged from the first discharge port 42 enters the heat exchange device 30 after being vaporized, and the third discharge port 43 is connected with the ball milling chamber 51 of the ball mill 50. In this way, after the gypsum enters the gypsum processing system through the feed assembly 10, the drying device 20 first dehumidifies the gypsum, and the gypsum after dehumidification enters the boiling furnace 40 for calcination. The residual heat generated during the calcination process can be discharged through the first discharge port 42 and enter the heat exchange device 30 after being vaporized, that is, the residual heat generated during the calcination process can enter the main shaft 25 to dehumidify the gypsum, so as to recover and reuse the residual heat, thereby solving the problem that the residual heat generated during the calcination of gypsum in the prior art is not reasonably utilized, and avoiding the waste of steam resources.
[0061] like Figure 2 As shown, the drying assembly further includes a flash evaporation device 100. The flash evaporation device 100 has a first liquid inlet 101, a second exhaust port 102 and a second liquid discharge port 103. The first liquid inlet 101 is connected to the first liquid discharge port 42, the second exhaust port 102 is connected to the heat exchange device 30, and the second liquid discharge port 103 is connected to the steam supply device 70. In this way, the high-temperature steam entering the boiling furnace 40 forms high-temperature steam condensate after heat exchange and enters the flash evaporation device 100. Due to the pressure reduction in the flash evaporation device 100, the high-temperature steam condensate is partially vaporized into low-temperature and low-pressure steam, and the low-temperature and low-pressure steam enters the heat exchange device 30 to achieve waste heat recovery.
[0062] Embodiment 3
[0063] The gypsum processing system in the third embodiment is different from that in the first embodiment in that the structure of the calcining component is different.
[0064] like Figure 3As shown, the calcining assembly further includes a cooling device 270, the cooling device 270 has a first air inlet 271, a sixth exhaust port 272 and a cooling chamber 273, the first material distribution port 82 is connected to the material inlet 81 of the cooling device 270, and the material outlet of the cooling device 270 is connected to the ball mill chamber 51. The fluidized bed furnace 40 has a second air inlet 46, the sixth exhaust port 272 is connected to the second air inlet 46, the material entering the cooling chamber 273 through the first material distribution port 82 and the gas entering through the first air inlet 271 are heat exchanged, and the heated gas enters the fluidized bed furnace 40 through the sixth exhaust port 272 and the second air inlet 46 in sequence. In this way, the cooling device 270 uses ambient air to indirectly exchange heat with the semi-hydrated gypsum discharged from the fluidized bed furnace 40 to cool the semi-hydrated gypsum, and then the heated ambient air is used for gas supply to the fluidized bed furnace 40 to achieve waste heat recovery.
[0065] From the above description, it can be seen that the above embodiments of the utility model achieve the following technical effects:
[0066] The gypsum processing system includes a feeding component, a drying component, a calcining component, a discharging component and a steam supply component. The feeding component has a first discharging port, the drying component includes a drying device and a heat exchange device, the drying device has a drying chamber, a second discharging port, a steam pipe and a main shaft, the drying chamber is connected to the second discharging port, and the main shaft is connected to the steam pipe. The first discharging port is connected to the drying chamber, the heat exchange device has a first exhaust port, the first exhaust port is connected to the drying chamber, and the heat exchange device exchanges heat with the gas entering it. The calcining component includes a fluidized bed furnace and a ball mill, the fluidized bed furnace has a reaction chamber, a first discharge port, a third discharge port and a steam chamber, and the reaction chamber is connected to the third discharge port. The reaction chamber is connected to the second discharging port, and the condensed water discharged from the first discharge port enters the steam pipe and / or the heat exchange device after vaporization, and the third discharge port is connected to the ball milling chamber of the ball mill. The discharging component includes a storage structure, and the storage structure is connected to the ball milling chamber. The steam supply assembly includes a steam supply device, which is connected to the main shaft and the steam chamber to provide steam to the main shaft and the steam chamber. In this way, the heat exchange device preheats the air in the environment of the gypsum processing system, and the preheated air enters the drying chamber to reduce the water content of the gypsum in the drying chamber. After the gypsum enters the gypsum processing system through the feeding assembly, the drying device first dehumidifies the gypsum, and the dehumidified gypsum enters the boiling furnace for calcination. The residual heat generated during the calcination process can be discharged through the first drain port and enter the steam pipe and / or the heat exchange device after vaporization, that is, the residual heat generated during the calcination process can enter the drying chamber to dehumidify the gypsum, so as to recover and reuse the residual heat, thereby solving the problem of the residual heat generated during the calcination of gypsum in the prior art that is not reasonably utilized, and avoiding the waste of steam resources.
[0067] Obviously, the embodiments described above are only some embodiments of the utility model, not all embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the utility model.
[0068] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0069] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.
[0070] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A gypsum processing system, It is characterized in that include: A feed assembly (10) having a first discharge port; A drying component, comprising a drying device (20) and a heat exchange device (30), wherein the drying device (20) comprises a drying chamber (21), a second discharge port (22), a steam pipe (23) and a main shaft (25), wherein the drying chamber (21) is connected to the second discharge port (22), and the main shaft (25) is connected to the steam pipe (23); the first discharge port is connected to the drying chamber (21), and the heat exchange device (30) comprises a first exhaust port (31), wherein the first exhaust port (31) is connected to the drying chamber (21), and the heat exchange device (30) exchanges heat with gas entering the drying chamber (21); A calcining assembly includes a fluidized bed furnace (40) having a steam chamber (47); A material discharging assembly, comprising a material storage structure (60); The steam supply assembly comprises a steam supply device (70), wherein the steam supply device (70) is connected to both the main shaft (25) and the steam chamber (47).
2. The gypsum processing system according to claim 1, It is characterized in that The calcining assembly also includes a ball mill (50), and the boiling furnace (40) also has a reaction chamber (41), a first liquid discharge port (42) and a third discharge port (43), wherein the reaction chamber (41) is connected to the third discharge port (43); the reaction chamber (41) is connected to the second discharge port (22), and the condensed water discharged from the first liquid discharge port (42) enters the steam pipe (23) and / or the heat exchange device (30) after being vaporized, and the third discharge port (43) is connected to the ball milling chamber (51) of the ball mill (50); and the material storage structure (60) is connected to the ball milling chamber (51).
3. The gypsum processing system according to claim 2, It is characterized in that The feed assembly (10) comprises a mixing structure (11), and the calcining assembly further comprises: A material distributor (80) is located between the boiling furnace (40) and the ball mill (50), and the material distributor (80) has a feed port (81), a first feed port (82) and a second feed port (83), the feed port (81) is connected to the third discharge port (43), and the first feed port (82) is connected to the ball mill chamber (51); A back-mixing and conveying device (90) is arranged between the mixing structure (11) and the distributor (80), and the back-mixing and conveying device (90) is connected to the second distributor port (83).
4. The gypsum processing system according to claim 2, It is characterized in that The drying component also includes: The flash evaporation device (100) comprises a first liquid inlet (101), a second exhaust port (102) and a second liquid discharge port (103), wherein the first liquid inlet (101) is connected to the first liquid discharge port (42), the second exhaust port (102) is connected to the steam pipe (23) and / or the heat exchange device (30), and the second liquid discharge port (103) is connected to the steam supply device (70).
5. The gypsum processing system according to claim 1, It is characterized in that The steam supply device (70) has a third exhaust port (71), and the steam supply assembly further comprises: A main pipeline (110), wherein a first end of the main pipeline (110) is in communication with the third exhaust port (71); a first branch pipeline (120), wherein two ends of the first branch pipeline (120) are respectively connected to the second end of the main pipeline (110) and the main shaft (25); a second branch pipeline (130), wherein two ends of the second branch pipeline (130) are respectively connected to the second end of the main pipeline (110) and the steam chamber (47); Wherein, the gypsum processing system further comprises: The temperature-reducing and pressure-reducing device (140) is arranged on the first branch pipeline (120).
6. The gypsum processing system according to claim 2, It is characterized in that The drying component also includes: A first discharge device (150) communicated with the second discharge port (22); An air lock (160) is arranged between the first discharge device (150) and the second discharge port (22); A first bucket elevator (170) is used to lift and transport the material discharged from the discharge port of the first discharge device (150) into the reaction chamber (41).
7. The gypsum processing system according to claim 3, It is characterized in that The drying device (20) has a fourth exhaust port (24), and the drying component further comprises: A first dust removal device (180) is connected to the fourth exhaust port (24), and a material outlet of the first dust removal device (180) is connected to a material inlet of the mixing structure (11); The first fan (190) is connected to the air outlet of the first dust removal device (180).
8. The gypsum processing system according to claim 1, It is characterized in that The boiling furnace (40) has a fifth exhaust port (44) and a return port (45), and the calcining assembly further comprises: a second dust removal device (200) connected to the fifth exhaust port (44); a second fan (210) connected to an air outlet of the second dust removal device (200); The second discharge device (220) is connected to the material outlet of the second dust removal device (200), and the material discharged from the discharge port of the second discharge device (220) enters the boiling furnace (40) through the return port (45).
9. The gypsum processing system according to claim 2, It is characterized in that The discharging assembly further comprises: A second bucket elevator (230), wherein the material discharged from the discharge port of the ball mill (50) is lifted and transported to the material storage structure (60) through the second bucket elevator (230); Wherein, the calcination assembly further comprises: a third dust removal device (240) connected to an exhaust port of the ball mill (50); a third fan (250), connected to an air outlet of the third dust removal device (240); The third discharge device (260) is connected to the material outlet of the third dust removal device (240), and the material discharged from the discharge port of the third discharge device (260) enters the material storage structure (60).
10. The gypsum processing system according to claim 3, It is characterized in that The calcining assembly also includes: A cooling device (270), the cooling device (270) having a first air inlet (271), a sixth air outlet (272) and a cooling chamber (273), the first material distribution port (82) being in communication with the material inlet (81) of the cooling device (270), and the material outlet of the cooling device (270) being in communication with the ball milling chamber (51); In which, the boiling furnace (40) has a second air inlet (46), and the sixth exhaust port (272) is connected to the second air inlet (46). Heat exchange is performed between the material entering the cooling chamber (273) through the first material distribution port (82) and the gas entering through the first air inlet (271), and the heated gas enters the boiling furnace (40) through the sixth exhaust port (272) and the second air inlet (46) in turn.
11. The gypsum processing system according to claim 1, It is characterized in that The drying equipment (20) is a disc dryer, a paddle dryer, a thin layer dryer, or a steam tube bundle dryer.