Precast hanging plate for pouring type asphalt concrete
By using prefabricated concrete hangers and structural steel bars on the reservoir dam body, forming casting gaps and pouring asphalt concrete, the problems of complex cast asphalt concrete process and easy damage to the anti-seepage layer are solved, and construction efficiency and anti-seepage effect are improved .
Patent Information
- Application Number
- CN202420123705.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-18
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-01-18
AI Technical Summary
The existing cast asphalt concrete has complex processes, low construction efficiency and high cost. Floating objects and ice cubes in the reservoir will damage the anti-seepage layer, affecting durability and safety.
Before pouring, prefabricated concrete hangers are used as formwork, and connected to the reservoir dam body through structural steel bars to form casting gaps. Multiple concrete slabs are assembled into wall panels to reduce construction processes and improve anti-seepage effect.
It improves construction efficiency, saves costs, enhances anti-seepage and reinforcement effects, avoids objects in the reservoir from destroying the anti-seepage layer, and is suitable for mass production and complex engineering construction.
Smart Images

Figure CN222161113U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of reservoir hazard removal and reinforcement engineering, and in particular to a prefabricated asphalt concrete hanging board for pouring. Background Art
[0002] In order to ensure the safe operation of the reservoir and extend the service life of the dam, the dam body needs to be treated with anti-seepage and reinforcement. The anti-seepage reinforcement of the dam body adopts poured asphalt concrete, which can effectively solve the leakage problem at the horizontal construction joints and expansion joints of the dam body.
[0003] At present, the pouring asphalt concrete process is complicated, the construction efficiency is low, the cost is high, and during operation, floating objects and ice in the reservoir will collide and damage the asphalt concrete anti-seepage layer, seriously affecting the durability and safety of the asphalt concrete anti-seepage layer.
[0004] For this purpose, we propose a method for pouring asphalt concrete prefabricated hanging board. Utility Model Content
[0005] The embodiment of the present application provides a prefabricated hanging plate for pouring asphalt concrete. Before pouring the asphalt concrete, the prefabricated concrete hanging plate is first constructed. The assembled prefabricated concrete hanging plate can be used as a template for pouring asphalt concrete, which reduces the construction process, improves the construction efficiency, and saves construction costs. The prefabricated concrete hanging plate is integrated with the poured asphalt concrete, which improves the anti-seepage and reinforcement effects, and also avoids various objects in the reservoir from directly damaging the asphalt concrete anti-seepage layer. The present application solves the problem that the current pouring asphalt concrete process is complicated, the construction efficiency is low, the cost is high, and the floating objects and ice in the reservoir will impact and damage the asphalt concrete anti-seepage layer, seriously affecting the durability and safety of the asphalt concrete anti-seepage layer.
[0006] The embodiment of the present application provides a prefabricated asphalt concrete hanging board for pouring, including a concrete board and structural steel bars arranged on the concrete board;
[0007] The structural steel bar has a dam body connecting end extending out of the concrete slab, and the dam body connecting end is connected to the reservoir dam body so that a casting gap is formed between the concrete slab and the reservoir dam body;
[0008] A plurality of the concrete slabs are fixedly assembled by a plurality of the structural steel bars to form a wall panel matching the water-facing surface of the reservoir dam body, and a plurality of casting gaps between the wall panel and the reservoir dam body form an asphalt concrete casting area.
[0009] In a feasible implementation, the concrete slab includes water-facing concrete and water-receiving concrete;
[0010] The dam body connecting end of the structural steel bar extends out of the back water surface concrete and is connected to the reservoir dam body, so that the back water surface concrete and the reservoir dam body are relatively fixed; the front water surface concrete and the back water surface concrete are cast in one piece, and the front water surface concrete is located on the back water surface concrete side facing away from the reservoir dam body.
[0011] In a feasible implementation, the water-facing surface concrete and the water-receiving surface concrete have the same height dimensions and are staggered in the height direction, so that the two ends of the concrete slab in the height direction form a first water-facing surface connecting groove and a first water-receiving surface connecting groove, respectively.
[0012] In a feasible implementation, the widths of the water-facing surface concrete and the water-receiving surface concrete are equal and are staggered in the width direction, so that a second water-facing surface connecting groove and a second water-receiving surface connecting groove are formed at both ends of the concrete slab in the width direction, respectively.
[0013] In a feasible implementation, the structural steel bars include a steel bar skeleton and connecting eye steel bars;
[0014] The steel bar skeleton is cast in the concrete slab and is located between the water-facing concrete and the water-receiving concrete;
[0015] One end of the connecting lifting ring steel bar is a concrete connecting end, and the other end is the dam body connecting end. The concrete connecting end of the connecting lifting ring steel bar is fixedly connected to the steel bar skeleton, and the dam body connecting end of the connecting lifting ring steel bar is fixedly connected to the anchor bar drilled on the reservoir dam body.
[0016] In a feasible implementation, the steel bar skeleton includes a plurality of upper steel bars and a plurality of lower steel bars;
[0017] The plurality of upper steel bars are evenly distributed along the height direction of the concrete slab, and the plurality of lower steel bars are evenly distributed along the width direction of the concrete slab. The upper steel bars are located on the side of the lower steel bars facing away from the reservoir dam body, and the upper steel bars are perpendicular to the lower steel bars, and the upper steel bars and the lower steel bars are connected by binding.
[0018] The embodiment of the present application provides a prefabricated hanging plate for pouring asphalt concrete. The structural steel bars are arranged on the concrete plate. The dam body connecting end of the structural steel bars extends out of the concrete plate and is connected to the reservoir dam body, so that a casting gap is formed between the concrete plate and the reservoir dam body. A plurality of concrete plates are fixed and assembled by a plurality of structural steel bars to form a wall plate that matches the water-facing surface of the reservoir dam body. The plurality of casting gaps between the wall plate and the reservoir dam body form an asphalt concrete pouring area. Asphalt concrete is poured in the asphalt concrete pouring area, thereby reducing the construction process, improving the construction efficiency, and saving the construction cost. The prefabricated concrete hanging plate is integrated with the poured asphalt concrete, which improves the anti-seepage and reinforcement effects, and also avoids various objects in the reservoir from directly damaging the asphalt concrete anti-seepage layer. The prefabricated hanging plate for pouring asphalt concrete can be factory-produced and mass-produced, avoiding a large amount of resource investment, saving construction costs, and saving construction period. The construction operation is simple, easy to assemble, stable, and adaptable, providing valuable experience for similar engineering construction in the future. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the structure of the cast asphalt concrete prefabricated hanging board provided in this application;
[0020] Figure 2 It is a top view of the prefabricated cladding;
[0021] Figure 3 It is a side cross-sectional view of a prefabricated cladding panel;
[0022] Figure 4 It is a structural diagram of the prefabricated hanging board in use.
[0023] Description of reference numerals:
[0024] 1-concrete slab; 2-structural steel bars;
[0025] 11-water-facing surface concrete; 12-backwater surface concrete; 13-first water-facing surface connecting groove; 14-first backwater surface connecting groove; 15-second water-facing surface connecting groove; 16-second backwater surface connecting groove; 21-upper layer steel bars; 22-lower layer steel bars; 23-connecting eye steel bars. DETAILED DESCRIPTION
[0026] In order to enable those skilled in the art to better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work should fall within the scope of protection of the present application.
[0027] Pouring asphalt concrete to repair reservoirs is a common anti-seepage reinforcement measure that can improve the safety and stability of reservoirs. Asphalt concrete has good waterproof and mechanical properties, which can effectively prevent water from penetrating into the dam body. At the same time, it has certain crack resistance and deformation resistance, which can improve the bearing capacity of the dam body.
[0028] At present, the pouring asphalt concrete process is complicated, the construction efficiency is low, the cost is high, and during operation, floating objects and ice in the reservoir will collide and damage the asphalt concrete anti-seepage layer, seriously affecting the durability and safety of the asphalt concrete anti-seepage layer.
[0029] The present application first applies a prefabricated concrete hanging plate before pouring asphalt concrete. The assembled prefabricated concrete hanging plate can be used as a template for pouring asphalt concrete, which reduces the construction process, improves the construction efficiency, and saves the construction cost. The prefabricated concrete hanging plate is integrated with the poured asphalt concrete, which improves the anti-seepage and reinforcement effects, and also prevents various objects in the reservoir from directly damaging the asphalt concrete anti-seepage layer.
[0030] The specific structure of the cast asphalt concrete prefabricated hanging board provided in this application is described in detail below in conjunction with the accompanying drawings.
[0031] Reference Figure 1-Figure 4 As shown, the embodiment of the present application provides a prefabricated asphalt concrete hanging board for pouring, including a concrete board 1 and a structural steel bar 2 arranged on the concrete board 1;
[0032] The concrete slab 1 can be a square slab, the structural steel bar 2 is cast integrally with the concrete slab 1, the structural steel bar 2 has a dam body connection end extending out of the concrete slab 1, and the dam body connection end is connected to the reservoir dam body, so that the concrete slab 1 is parallelly fixed relative to the water-facing surface of the reservoir dam body, so that a casting gap is formed between the concrete slab 1 and the reservoir dam body, and the width of the casting gap can be adjusted according to the casting thickness of the asphalt concrete and the size of the structural steel bar 2;
[0033] Multiple concrete slabs 1 are fixed to the water-facing surface of the reservoir dam body through multiple structural steel bars 2. Multiple concrete slabs 1 are neatly and seamlessly assembled to form a wall panel that matches the water-facing surface of the reservoir dam body. Multiple casting gaps between the wall panel and the reservoir dam body form an asphalt concrete pouring area. The asphalt concrete is poured in the pouring area, thereby reducing construction procedures, improving construction efficiency, and saving construction costs. The prefabricated concrete hanging plate is integrated with the poured asphalt concrete, which improves the anti-seepage and reinforcement effects and also prevents various objects in the reservoir from directly damaging the asphalt concrete anti-seepage layer.
[0034] Reference Figure 2-Figure 4As shown, in some embodiments, the concrete slab 1 includes a water-facing concrete 11 and a water-receiving concrete 12, and both the water-facing concrete 11 and the water-receiving concrete 12 are square concrete slabs;
[0035] The dam body connecting end of the structural steel bar 2 extends out of the back surface concrete 12 and is connected to the reservoir dam body, so that the back surface concrete 12 and the reservoir dam body are relatively fixed, and the front surface concrete 11 and the back surface concrete 12 are cast in one piece, and the front surface concrete 11 is located on the back surface concrete 12 facing away from the reservoir dam body.
[0036] The water-facing concrete 11 and the water-receiving concrete 12 have the same height dimensions and are staggered in the height direction, so that the two ends of the concrete slab 1 in the height direction form a first water-facing connecting groove 13 and a first water-receiving connecting groove 14 respectively;
[0037] like Figure 3 As shown, the height dimensions of the water-facing surface concrete 11 and the back-facing surface concrete 12 are equal, but the two are staggered in the height direction, with the water-facing surface concrete 11 being located at the top and the back-facing surface concrete 12 being located at the bottom, so that the top end of the concrete slab 1 forms a first back-facing surface connecting groove 14, and the bottom end of the concrete slab 1 forms a first water-facing surface connecting groove 13.
[0038] The width of the water-facing concrete 11 and the water-receiving concrete 12 are equal, and they are staggered in the width direction, so that the two ends of the concrete slab 1 in the width direction form a second water-facing connecting groove 15 and a second water-receiving connecting groove 16 respectively;
[0039] like Figure 2 As shown, the width of the water-facing concrete 11 and the back-facing concrete 12 are equal, but they are staggered in the width direction, with the water-facing concrete 11 on the left and the back-facing concrete 12 on the right, so that the left end of the concrete slab 1 forms a second back-facing connection groove 16, and the right end of the concrete slab 1 forms a second water-facing connection groove 15;
[0040] In addition, the first water-facing surface connecting groove 13 and the second water-facing surface connecting groove 15 are connected to form an L-shaped connecting groove, and the first water-receiving surface connecting groove 14 and the second water-receiving surface connecting groove 16 are connected to form an L-shaped connecting groove. The L-shaped connecting groove design facilitates seamless assembly of adjacent concrete slabs 1.
[0041] Reference Figure 2 and Figure 3 As shown, in some embodiments, the structural reinforcement 2 includes a reinforcement skeleton and a connecting ring reinforcement 23, and the connecting ring reinforcement 23 can be ring-shaped or U-shaped;
[0042] The steel bar skeleton is cast in the concrete slab 1 and is located between the water-facing concrete 11 and the water-receiving concrete 12;
[0043] One end of the connecting ring steel bar 23 is a concrete connecting end, and the other end is a dam body connecting end. The concrete connecting end of the connecting ring steel bar 23 is fixedly connected to the steel frame, and the dam body connecting end of the connecting ring steel bar 23 is fixedly connected to the anchor bar drilled on the reservoir dam body.
[0044] The steel bar skeleton includes a plurality of upper steel bars 21 and a plurality of lower steel bars 22, and both the upper steel bars 21 and the lower steel bars 22 are straight steel bars;
[0045] A plurality of upper steel bars 21 are evenly distributed along the height direction of the concrete slab 1, and a plurality of lower steel bars 22 are evenly distributed along the width direction of the concrete slab 1. The upper steel bars 21 are located on the side of the lower steel bars 22 facing away from the reservoir dam body, and the upper steel bars 21 and the lower steel bars 22 are perpendicular to each other. The connected upper steel bars 21 and the lower steel bars 22 are tied and connected, so that the plurality of upper steel bars 21 and the plurality of lower steel bars 22 form a steel mesh.
[0046] According to the above technical features, the working principle of the cast asphalt concrete prefabricated hanging board provided by this application in the actual application scenario is:
[0047] Manufacturing prefabricated hanging panels: Place the upper steel bars 21 on the mold at the specified distance and position, tie the lower steel bars 22 to the upper steel bars 21 at the specified distance and position, and tie the connecting ring steel bars 23 to the upper steel bars 21 and the lower steel bars 22 at the specified distance and position; pour concrete on the basis of the tied structural steel bars, and ensure that the surface of the poured water-facing concrete 11 and the back-water concrete 12 is flat, regular, and uniform in size after prefabrication.
[0048] Trial assembly: When the prefabricated concrete panels are anti-seepage and reinforced for the reservoir dam, trial assembly is first carried out. During the trial assembly of the prefabricated concrete panels, the first water-facing surface connecting grooves 13 and the first water-receiving surface connecting grooves 14 of the two upper and lower adjacent concrete panels 1 are butt-jointed to form a whole, and the second water-facing surface connecting grooves 15 and the second water-receiving surface connecting grooves 16 of the two left and right adjacent concrete panels 1 are butt-jointed to form a whole, to ensure that multiple concrete panels 1 can be seamlessly assembled.
[0049] Assembly and fixation: Figure 4 As shown, after the trial assembly of the precast concrete hanging panels is completed, anchor bars are drilled on the dam body according to the preset positions, the connecting eye reinforcements 23 are welded and fixed to the anchor bars drilled on the dam body one by one, the precast concrete hanging panels are assembled one by one, and after welding and fixing, asphalt concrete is poured between the reservoir dam body and the precast concrete hanging panels.
[0050] The present application sets structural steel bars 2 on the concrete slab 1, and the dam body connecting end of the structural steel bars 2 extends out of the concrete slab 1 and is connected to the reservoir dam body, so that a casting gap is formed between the concrete slab 1 and the reservoir dam body. Multiple concrete slabs 1 are fixedly assembled by multiple structural steel bars 2 to form a wall panel that matches the water-facing surface of the reservoir dam body. Multiple casting gaps between the wall panel and the reservoir dam body form an asphalt concrete pouring area, and asphalt concrete is poured in the asphalt concrete pouring area, thereby reducing the construction process, improving the construction efficiency, and saving the construction cost. Moreover, the prefabricated concrete hanging plate is integrated with the poured asphalt concrete, which improves the anti-seepage and reinforcement effects, and also avoids various objects in the reservoir from directly damaging the asphalt concrete anti-seepage layer. The cast-type asphalt concrete prefabricated hanging plate can be factory-produced and mass-produced, avoiding a large amount of resource investment, saving construction costs, and saving construction period. In addition, the construction operation is simple, easy to assemble, stable, and adaptable, providing valuable experience for similar engineering construction in the future.
[0051] It is easy to understand that those skilled in the art can combine, split, reorganize, etc. the embodiments of the present application to obtain other embodiments based on the several embodiments provided in the present application, and these embodiments do not exceed the protection scope of the present application.
[0052] The above specific implementation methods further explain in detail the purpose, technical solutions and beneficial effects of the embodiments of the present application. It should be understood that the above are only specific implementation methods of the embodiments of the present application and are not used to limit the protection scope of the embodiments of the present application. Any modifications, equivalent substitutions, improvements, etc. made on the basis of the technical solutions of the embodiments of the present application should be included in the protection scope of the embodiments of the present application.
Claims
1. A prefabricated asphalt concrete hanging board for pouring, characterized by: It comprises a concrete slab (1) and structural steel bars (2) arranged on the concrete slab (1); The structural steel bar (2) has a dam body connection end extending out of the concrete slab (1), and the dam body connection end is connected to the reservoir dam body so that a casting gap is formed between the concrete slab (1) and the reservoir dam body; A plurality of the concrete slabs (1) are fixedly assembled by means of a plurality of the structural steel bars (2) to form a wall panel matching the water-facing surface of the reservoir dam body, and a plurality of casting gaps between the wall panel and the reservoir dam body form an asphalt concrete casting area.
2. The prefabricated asphalt concrete hanging board for pouring according to claim 1 is characterized in that: The concrete slab (1) comprises water-facing surface concrete (11) and water-receiving surface concrete (12); The dam body connecting end of the structural steel bar (2) extends out of the back water surface concrete (12) and is connected to the reservoir dam body, so that the back water surface concrete (12) and the reservoir dam body are relatively fixed; the front water surface concrete (11) and the back water surface concrete (12) are cast in one piece, and the front water surface concrete (11) is located on the back water surface concrete (12) side facing away from the reservoir dam body.
3. The prefabricated asphalt concrete hanging board for pouring according to claim 2 is characterized in that: The water-facing surface concrete (11) and the water-receiving surface concrete (12) have the same height dimensions and are staggered in the height direction, so that the two ends of the concrete slab (1) in the height direction respectively form a first water-facing surface connecting tooth groove (13) and a first water-receiving surface connecting tooth groove (14).
4. The prefabricated asphalt concrete hanging board for pouring according to claim 3 is characterized in that: The water-facing surface concrete (11) and the water-receiving surface concrete (12) have the same width dimensions and are staggered in the width direction, so that the two ends of the concrete slab (1) in the width direction respectively form a second water-facing surface connecting tooth groove (15) and a second water-receiving surface connecting tooth groove (16).
5. The prefabricated asphalt concrete hanging board for pouring according to any one of claims 2 to 4, characterized in that: The structural steel bar (2) comprises a steel bar skeleton and connecting eye steel bars (23); The steel reinforcement skeleton is cast in the concrete slab (1) and is located between the water-facing surface concrete (11) and the water-receiving surface concrete (12); One end of the connecting lifting ring steel bar (23) is a concrete connecting end, and the other end is the dam body connecting end. The concrete connecting end of the connecting lifting ring steel bar (23) is fixedly connected to the steel bar skeleton, and the dam body connecting end of the connecting lifting ring steel bar (23) is fixedly connected to an anchor bar drilled on the reservoir dam body.
6. The prefabricated asphalt concrete hanging board for pouring according to claim 5 is characterized in that: The steel bar skeleton comprises a plurality of upper steel bars (21) and a plurality of lower steel bars (22); The plurality of upper steel bars (21) are evenly spaced along the height direction of the concrete slab (1), and the plurality of lower steel bars (22) are evenly spaced along the width direction of the concrete slab (1). The upper steel bars (21) are located on the side of the lower steel bars (22) facing away from the reservoir dam body, and the upper steel bars (21) and the lower steel bars (22) are perpendicular to each other, and the upper steel bars (21) and the lower steel bars (22) are tied and connected.
Citation Information
Cited By
Dangerous reinforcement anti-seepage structure of gravity dam
CN121205135A
Reinforcement of gravity dam anti-seepage structure
CN121205135B
