Pipeline anti-seismic support
By designing a pipe seismic support including a support mechanism, filling port and pipe clamping plate, the problems of cumbersome installation and poor sealing in the prior art are solved, and the effect of simplifying installation and improving seismic performance is achieved.
Patent Information
- Application Number
- CN202421210261.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-30
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-05-30
AI Technical Summary
The splicing structure of existing pipeline seismic brackets is complicated to operate during the installation process, making it difficult to ensure the sealing and stability of the device.
A pipe seismic support including a support mechanism, filling port and pipe clamping plate is designed. Through the fitting connection and the use of concrete placement bins, the tight integration of the support mechanism and the pipe clamping plate and the improvement of seismic performance are achieved.
The installation steps are simplified, the seismic resistance and sealing of the device are improved, and the support is able to adapt to pipes of different sizes, and the support is further enhanced through concrete reinforcement.
Smart Images

Figure CN222479675U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building water supply and drainage pipeline brackets, in particular to a pipeline earthquake-resistant bracket. Background Art
[0002] Building water supply and drainage pipes are an indispensable part of buildings. They carry multiple functions such as water supply, drainage, HVAC, etc. In the design and installation process of water supply and drainage pipes, factors such as the selection of pipe materials, reasonable layout, installation process, and maintenance need to be fully considered. The seismic brackets for building water supply and drainage pipes provide a solid protective barrier for the pipeline system. When natural disasters such as earthquakes occur, these brackets are mainly used to reduce the vibration and displacement of the pipeline. However, existing devices usually adopt a splicing structure. This structure needs to be spliced and assembled in the pre-buried pits of the pipeline during the actual installation process. Not only is the operation cumbersome, but it is often difficult to ensure the sealing and stability of the device.
[0003] The implementation of the utility model aims to provide a pipeline earthquake-resistant bracket to solve the problems raised in the above background technology. Utility Model Content
[0004] The utility model aims to solve the shortcomings of the prior art mentioned in the background technology and proposes a seismic-resistant support for pipelines.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A seismic support for a pipeline comprises a supporting mechanism, a filling port and a pipeline clamping plate, wherein the upper surface of the supporting mechanism is embedded with the filling port, and the inner side of the supporting mechanism is provided with a pipeline clamping plate, one side of the pipeline clamping plate is fixedly connected with a connecting block, and the inner side of the connecting block is fixedly connected with a sealing sleeve, the other end of the connecting block is fixedly connected to the supporting mechanism, the bottom of the connecting block is fixedly connected with a movable supporting rod, one side of the movable supporting rod is provided with a supporting rod, and the supporting rod and the connecting block are fixedly connected, the inner side of the supporting mechanism is provided with a concrete placing bin, and the interior of the concrete placing bin is provided with supporting steel bars, the supporting steel bars are fixedly connected to the inner wall of the concrete placing bin, and the inner side of the pipeline clamping plate is embedded with a pipeline body.
[0007] Preferably, a support rod slider is fixedly connected to the bottom of the support rod, and a slide groove is penetrated inside the lower end of the support mechanism, and the support rod slider is embedded in the slide groove.
[0008] Preferably, the connecting block is divided into two parts, and one part of the connecting block is fixedly connected to the pipe clamping plate, while the other part of the connecting block is fixedly connected to the supporting mechanism. A sealing sleeve is fixedly connected between the two connecting blocks, a spring is provided on the inner side of the sealing sleeve, and the spring is fixedly connected to the two parts of the connecting block. A second filling port is penetrated through the upper surface of the connecting block close to the pipe clamping plate.
[0009] Preferably, the sealing sleeve is an accordion-type sleeve made of rubber as a whole, and both left and right sides of the sealing sleeve are fixedly connected to the connecting block.
[0010] Preferably, a material delivery pipe is provided at the bottom of the second filling port, and the material delivery pipe runs through the connecting block as a whole, and the output port of the material delivery pipe is located at the inner wall of the connecting block.
[0011] Preferably, a raised support block is provided on the upper surface of the support mechanism, and the support block is located on a side of the filling port close to the pipe clamping plate.
[0012] Preferably, the pipe clamping plate is arc-shaped as a whole, and a friction pad is provided on the inner surface of the pipe clamping plate.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. In the utility model, by providing a support mechanism and a pipe clamping plate, the device closely combines the various components of the support mechanism and the pipe clamping plate to form a complete and compact whole. This design not only simplifies the installation steps and reduces the splicing work during the installation process, but also the support structure composed of reinforced concrete improves the seismic performance of the device compared to the spliced support structure.
[0015] 2. By setting the connection block and the second filling port, after the pipe clamping plate of the device clamps the pipe body, the staff can pour concrete into the second filling port. After the concrete fills the inside of the sealing sleeve and solidifies, the concrete can play a role in fixing the connection blocks on both sides. Through this operation, the pipe clamping plates on both sides are fixed, so that when the device clamps the pipe body, it can clamp pipes of different sizes through the spring. After the pipe is clamped, the low-heat pipe clamping plates on both sides can be reinforced by pouring concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a structural schematic diagram of a seismic-resistant support for pipelines proposed by the utility model;
[0017] Figure 2 It is a schematic diagram of the side structure of the utility model;
[0018] Figure 3 This is a schematic diagram of the cross-sectional structure of the utility model;
[0019] Figure 4 for Figure 3 A is an enlarged schematic diagram of the structure.
[0020] In the figure: 1. Support mechanism; 2. Filling port; 3. Pipe clamping plate; 4. Pipe body; 5. Connecting block; 6. Sealing sleeve; 7. Movable support rod; 8. Support rod; 9. Concrete placement bin; 10. Support steel bar; 11. Second filling port; 12. Spring; 13. Slide groove; 14. Support rod slider. DETAILED DESCRIPTION
[0021] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0022] In the description of the present invention, "plurality" means two or more than two, unless otherwise clearly and specifically defined.
[0023] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "set / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0025] Example
[0026] Reference Figure 1-4A seismic support for a pipeline comprises a supporting mechanism 1, a filling port 2 and a pipeline clamping plate 3. The upper surface of the supporting mechanism 1 is embedded with the filling port 2, and a pipeline clamping plate 3 is provided on the inner side of the supporting mechanism 1, a connecting block 5 is fixedly connected to one side of the pipeline clamping plate 3, and a sealing sleeve 6 is fixedly connected to the inner side of the connecting block 5, the other end of the connecting block 5 is fixedly connected to the supporting mechanism 1, a movable supporting rod 7 is fixedly connected to the bottom of the connecting block 5, a supporting rod 8 is provided on one side of the movable supporting rod 7, and the supporting rod 8 is fixedly connected to the connecting block 5, a concrete placing bin 9 is provided on the inner side of the supporting mechanism 1, and a supporting steel bar 10 is provided inside the concrete placing bin 9, and the supporting steel bar 10 is fixedly connected to the inner wall of the concrete placing bin 9, a pipeline body 4 is embedded with the inner side of the pipeline clamping plate 3, a supporting rod slider 14 is fixedly connected to the bottom of the supporting rod 8, and a slide groove 13 is penetrated inside the lower end of the supporting mechanism 1, and the supporting rod slider The block 14 is embedded and connected to the inside of the slide groove 13, so that when the device is actually used, the staff can place the support mechanism 1 at the pre-buried point of the pipeline, and then the staff can fix the pipeline body 4 on the inner side of the pipeline clamping plate 3. After the pipeline body 4 is fixed, the staff can pour concrete into the filling port 2 to allow the concrete to enter the concrete placement bin 9 until the concrete fills the internal space of the concrete placement bin 9. After the concrete solidifies, the concrete can enhance the overall compressive resistance of the support mechanism 1 with the support steel bars 10 inside the concrete placement bin 9. At the same time, through this design, the support mechanism 1 is a relatively hollow structure before filling, which reduces the overall weight of the support mechanism 1 and makes the support mechanism 1 more labor-saving when placed in the designated placement point. At the same time, the reinforced concrete structure formed after the concrete solidifies has stronger seismic resistance than the spliced structure.
[0027] The connecting block 5 is divided into two parts, and one part of the connecting block 5 is fixedly connected to the pipe clamping plate 3, and the other part of the connecting block 5 is fixedly connected to the supporting mechanism 1. A sealing sleeve 6 is fixedly connected in the middle of the two connecting blocks 5. A spring 12 is arranged on the inner side of the sealing sleeve 6, and the spring 12 is fixedly connected to the two parts of the connecting block 5. A second filling port 11 is penetrated through the upper surface of the connecting block 5 near the pipe clamping plate 3. A feed pipe is arranged at the bottom of the second filling port 11, and the feed pipe penetrates the connecting block 5 as a whole. At the same time, the output port of the feed pipe is located at the inner wall of the connecting block 5, so that when the staff uses the device to fix the pipeline body 4, the staff can move the pipeline clamping plates 3 on both sides outward to make the spring 12 retract inward, and then the staff can place the pipeline body 4 in the middle of the pipeline clamping plates 3, and then loosen the pipeline clamping plates 3 to make the pipeline clamping plates 3 retract under the action of the spring 12. The pipe body 4 is pushed and pressed against the pipe body 4 to complete the function of clamping the pipe body 4. When the pipe clamping plate 3 clamps the pipe body 4, the movable support rod 7 and the support rod 8 at the bottom of the pipe clamping plate 3 can provide supporting force from the bottom. At the same time, when the movable support rod 7 moves on the pipe clamping plate 3, the support rod slider 14 at the bottom of the movable support rod 7 can slide in the slide groove 13. Through this design, the movable support rod 7 moves synchronously with the pipe clamping plate 3. After the pipe clamping plate 3 clamps the pipe body 4, the staff can pour concrete into the second filling port 11 so that the concrete is input into the inner side of the sealing sleeve 6 along the feeding pipe at the bottom of the second filling port 11. When the concrete fills the inside of the sealing sleeve 6 and solidifies, the concrete can fix the connecting blocks 5 on both sides. Through this operation, the pipe clamping plates 3 on both sides are fixed, so that the pipe clamping plates 3 on both sides clamp the pipe body 4.
[0028] The sealing sleeve 6 is an accordion-type sleeve made of rubber as a whole, and the left and right sides of the sealing sleeve 6 are fixedly connected to the connecting block 5. The rubber material of the sealing sleeve 6 not only has excellent elasticity and wear resistance, but also can maintain stable performance in various harsh environments. The accordion-type sleeve structure allows the sealing sleeve 6 to be flexibly retracted.
[0029] The upper surface of the support mechanism 1 is provided with a raised support block, which is located on the side of the filling port 2 close to the pipe clamping plate 3. During the subsequent filling operation, the staff can use wooden boards or other boards to lean against the support blocks on both sides of the upper surface of the support mechanism 1 to form a temporary movable table, which is convenient for the staff to fill concrete.
[0030] The pipe clamping plate 3 is arc-shaped as a whole, and a friction pad is provided on the inner surface of the pipe clamping plate 3. The design of adding a friction pad on the inner surface of the pipe clamping plate 3 undoubtedly enhances the practicality and stability of the clamping plate. The friction pad enables the pipe clamping plate 3 to more effectively prevent the pipe from sliding or falling off when clamping the pipe, thereby ensuring the stability and safety of the clamping.
[0031] Working principle: When the device is actually used, the staff can place the support mechanism 1 at the pre-buried point of the pipeline, and then the staff can fix the pipeline body 4 on the inner side of the pipeline clamping plate 3. After the pipeline body 4 is fixed, the staff can pour concrete into the filling port 2 to allow the concrete to enter the concrete placement bin 9 until the concrete fills the internal space of the concrete placement bin 9. After the concrete solidifies, the concrete can enhance the overall compressive resistance of the support mechanism 1 with the support steel bars 10 inside the concrete placement bin 9. At the same time, through this design, the support mechanism 1 is a relatively hollow structure before filling, which reduces the overall weight of the support mechanism 1 and makes the process of placing the support mechanism 1 into the designated placement point more labor-saving.
[0032] The above embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited by the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principle of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.
[0033] In the description of the present invention, it is necessary to understand that the terms indicating orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
Claims
1. A seismic-resistant support for a pipeline, comprising a support mechanism (1), a filling port (2) and a pipeline clamping plate (3), characterized in that: The upper surface of the support mechanism (1) is engaged with a filling port (2), and a pipe clamping plate (3) is provided on the inner side of the support mechanism (1). A connecting block (5) is fixedly connected to one side of the pipe clamping plate (3), and a sealing sleeve (6) is fixedly connected to the inner side of the connecting block (5). The other end of the connecting block (5) is fixedly connected to the support mechanism (1). A movable support rod (7) is fixedly connected to the bottom of the connecting block (5). A support rod (8) is provided on one side of the movable support rod (7), and the support rod (8) and the connecting block (5) are fixedly connected. A concrete placement bin (9) is provided on the inner side of the support mechanism (1), and a supporting steel bar (10) is provided inside the concrete placement bin (9). The supporting steel bar (10) is fixedly connected to the inner wall of the concrete placement bin (9). The inner side of the pipe clamping plate (3) is engaged with a pipe body (4).
2. A seismic support for pipelines according to claim 1, characterized in that: The bottom of the support rod (8) is fixedly connected to a support rod slider (14), and a slide groove (13) is provided through the lower end of the support mechanism (1), and the support rod slider (14) is embedded in the slide groove (13).
3. The seismic support for pipelines according to claim 1, characterized in that: The connecting block (5) is divided into two parts, and one part of the connecting block (5) is fixedly connected to the pipe clamping plate (3), while the other part of the connecting block (5) is fixedly connected to the supporting mechanism (1). A sealing sleeve (6) is fixedly connected between the two connecting blocks (5), a spring (12) is provided on the inner side of the sealing sleeve (6), and the spring (12) is fixedly connected to the two parts of the connecting block (5). A second filling port (11) is penetrated through the upper surface of the connecting block (5) close to the pipe clamping plate (3).
4. The seismic support for pipelines according to claim 3, characterized in that: The sealing sleeve (6) is an accordion-type sleeve made of rubber as a whole, and both left and right sides of the sealing sleeve (6) are fixedly connected to the connecting block (5).
5. The seismic-resistant support for pipelines according to claim 3, characterized in that: A material delivery pipe is provided at the bottom of the second filling port (11), and the material delivery pipe runs through the connecting block (5) as a whole, while the output port of the material delivery pipe is located at the inner wall of the connecting block (5).
6. The seismic-resistant support for pipelines according to claim 1, characterized in that: A raised support block is provided on the upper surface of the support mechanism (1), and the support block is located on a side of the filling port (2) close to the pipe clamping plate (3).
7. The seismic-resistant support for pipelines according to claim 1, characterized in that: The pipe clamping plate (3) is arc-shaped as a whole, and a friction pad is provided on the inner surface of the pipe clamping plate (3).