Water conservancy construction dredging equipment

By using the design of multi-filter zone filter barrel rack and belt transmission components in the water conservancy construction silt equipment, the blockage and damage problems of existing equipment when dealing with hard silt are solved, and efficient silt operation and automatic cleaning are achieved.

CN222575605UActive Publication Date: 2025-03-07POWERCHINA HUADONG ENG CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421079632.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-03-07
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

In water conservancy construction, existing silt equipment can easily lead to pipeline blockage and damage to mud pumps when dealing with silt mixed with hard objects such as stones and branches, which affects the silt efficiency.

Method used

A water conservancy construction silting equipment was designed, using a filter barrel rack with multiple filter areas. Each filter area was equipped with a filter mesh. The silt was transferred to the sludge discharge tube through a sludge suction hose, and the belt transmission component was used to rotate the filter barrel rack to ensure the smooth work of the filter mesh.

Benefits of technology

It effectively avoids hard blocks entering the pipeline, prevents blockage and damage to mud pumps, improves dredging efficiency, and automatically cleans hard objects on the filter through scraper plates, reducing the need for manual operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222575605U_ABST
    Figure CN222575605U_ABST
Patent Text Reader

Abstract

The utility model relates to dredging equipment for water conservancy construction. The dredging device is suitable for the technical field of dredging equipment. The technical problem to be solved by the utility model is to provide the dredging equipment for water conservancy construction. According to the technical scheme, the dredging equipment for water conservancy construction comprises a ship body; the ship body is provided with a mud pumping assembly; a filter barrel frame is arranged on the lower end surface of the ship body; the mud pumping assembly comprises a mud pump and a mud discharge pipe; a plurality of barrier strips are arranged on the outer circumference of the filter barrel frame in an annular array, the barrier strips divide the outer wall of the filter barrel frame into a plurality of filter areas, and each filter area is provided with a filter screen; a sludge suction hose is arranged on the filter barrel frame; and sludge in the sludge suction hose is conveyed to a sludge discharge pipe on the ship body through the filter screen.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of silt removal equipment, and more specifically, to silt removal equipment for water conservancy construction. Background Art

[0002] During water conservancy construction, if a river channel with a lot of silt is encountered, the water level of the river channel will rise due to the influence of the silt. Therefore, the silt needs to be cleared elsewhere before subsequent water conservancy construction can be carried out. Currently, the silt deposited on the riverbed is mainly removed by mechanical equipment or other equipment, thereby playing a role in dredging.

[0003] At present, during dredging, some people use sludge suction equipment to extract and discharge the riverbed sludge. When the suction equipment is in use, the suction end of the sludge pipe is placed in the river sludge, and then the sludge pump is started to suck and discharge. Although dredging operations can be achieved to a certain extent, the river channel may contain hard objects such as stones and branches. The use of suction will cause pipe blockage and even damage to the pump body, which greatly affects the dredging efficiency. Utility Model Content

[0004] The utility model aims to overcome the deficiencies in the prior art and provides a desilting device for water conservancy construction.

[0005] In a first aspect, a desilting device for water conservancy construction is provided, comprising: a hull; the hull is provided with a mud pumping assembly; a filter barrel rack is provided on the lower end surface of the hull; the mud pumping assembly comprises a mud pump and a mud discharge pipe;

[0006] A plurality of baffles are arranged in a circular array on the outer circumference of the filter barrel frame, and the baffles divide the outer wall of the filter barrel frame into a plurality of filter areas, each of which is equipped with a filter screen; a mud suction hose is arranged on the filter barrel frame; the mud in the mud suction hose is transmitted to the mud discharge pipe on the hull through the filter screen.

[0007] Preferably, the mud suction hose is installed at the first end of the filter barrel frame; the mud suction end is provided with a through opening, and a rotatable connecting circular plate is provided in the through opening; an annular slide is fixed to the outer circumference of the connecting circular plate; a slide groove is provided on the inner wall of the through opening; the end of the annular slide slide is slidably fitted in the slide groove, and the annular slide slide has a through hole for the pipeline to pass through; the outer wall of the connecting circular plate is connected to a connecting rod; the outer end of the connecting circular plate is connected to a mounting plate, and the end of the mounting plate is fixed to the hull.

[0008] Preferably, the hull further comprises a belt transmission assembly; the belt transmission assembly comprises a motor, a first pulley, a second pulley and a belt;

[0009] Wherein, the motor is installed at the upper end of the hull; the first pulley is installed at the output end of the motor; the second pulley is installed at the second end of the filter barrel frame; and the belt is installed between the first pulley and the second pulley.

[0010] Preferably, a scraper plate is installed at the middle section of the end of the hull, and the end of the scraper plate is close to the outer wall of the filter barrel frame.

[0011] Preferably, the scraper plate comprises a connecting portion, an oblique scraping portion and an arc guide groove portion which are connected in sequence, the connecting portion is fixed on the hull, the oblique scraping portion is inclined downward, and the arc guide groove portion is opened on the lower end surface of the oblique scraping portion near the end position.

[0012] Preferably, the mud pumping assembly also includes a mud pumping pipe; the mud pump is installed on the hull, the mud pumping pipe is connected to the mud inlet end of the mud pump, the mud discharge pipe is connected to the mud outlet end of the mud pump, and the mud pumping end of the mud pumping pipe extends from the mud pumping pipe to the inside of the filter barrel frame.

[0013] Preferably, the mud extraction pipeline comprises a first mud extraction pipe and a second mud extraction pipe which are connected to each other, wherein the first mud extraction pipe is connected to a mud pump, and mud extraction ends of the first mud extraction pipe and the second mud extraction pipe are both connected to a mud suction hose which passes through a through hole.

[0014] In a second aspect, a working method of the water conservancy construction dredging equipment as described in any one of the first aspects is provided, comprising:

[0015] Step 1: The filter barrel frame contacts the sludge, and the sludge is sucked out by starting the sludge pump and using the sludge suction hose inserted into the filter barrel frame;

[0016] Step 2, the sludge passes through the filter screen and is discharged from the sludge discharge pipe through the sludge extraction pipeline;

[0017] Step 3: When the bottom filter screen in contact with the sludge is clogged, start the motor and use the first pulley to drive the belt to rotate, thereby driving the filter barrel frame equipped with the second pulley to rotate, so that the filter screens on other surfaces can be rotated downward, allowing the filter screen on the clogged surface to be rotated out of the sludge.

[0018] Preferably, in step 3, when the bottom filter screen rotates upward, the end of the oblique scraping portion provided with an arc-shaped guide groove portion is used to fit the outer wall of the filter screen to quickly scrape off hard objects adhered to the outer wall of the filter screen.

[0019] The beneficial effects of the utility model are:

[0020] The utility model can prevent the hard blocks mixed in the sludge from entering the pipeline and causing pipeline blockage and mud pump damage by setting a filter barrel rack with multiple filter screens, thereby ensuring the dredging efficiency. The filter barrel rack can be rotatably set through a belt drive assembly, so that when the bottom filter screen contacting the sludge is blocked, the belt drive assembly can be used to drive the filter barrel rack to rotate, so that the filter screens on other surfaces can be rotated downward, so that the filter screen on the blocked surface can be turned out of the sludge, so as to ensure the smooth suction of the sludge suction hose. In conjunction with the scraper plate, when the bottom filter screen rotates upward, the end of the oblique scraping part with an arc-shaped guide groove part can be used to fit the outer wall of the filter screen to quickly scrape off the hard objects adhered to the outer wall of the filter screen, without manual cleaning, which is more convenient and labor-saving. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic diagram of the structure of a water conservancy construction dredging equipment provided for this application;

[0022] Figure 2 A schematic diagram of the structure of another water conservancy construction dredging equipment provided for this application;

[0023] Figure 3 A schematic diagram of the structure of the barrel rack and filter screen combined for this application;

[0024] Figure 4 A schematic diagram of the structure of the filter barrel frame provided for this application;

[0025] Figure 5 A schematic diagram of the structure of the scraper plate provided for this application;

[0026] Explanation of the reference numerals in the accompanying drawings: 1. hull; 2. filter barrel frame; 3. filter screen; 4. mounting plate; 5. motor; 6. first pulley; 7. mud pump; 8. first mud suction pipe; 9. second mud suction pipe; 10. mud discharge pipe; 11. belt; 12. baffle bar; 13. connecting circular plate; 14. second pulley; 15. annular slide plate; 16. mud suction hose; 17. connecting rod; 18. scraper plate; 181. connecting part; 182. oblique scraping part; 183. arc guide groove part; 19. slide groove. DETAILED DESCRIPTION

[0027] The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.

[0028] Embodiment 1:

[0029] Embodiment 1 of the present application provides a hydraulic construction desilting device, comprising: a hull 1; the hull 1 is provided with a mud pumping assembly; a filter barrel rack 2 is provided on the lower end surface of the hull 1; the mud pumping assembly comprises a mud pump 7 and a mud discharge pipe 10;

[0030] A plurality of baffles 12 are provided in a circular array on the outer circumference of the filter barrel frame 2, for example, four baffles 12 are provided, and the baffles 12 divide the outer wall of the filter barrel frame 2 into a plurality of filter areas, each of which is equipped with a filter screen 3; a mud suction hose 16 is provided on the filter barrel frame 2; the mud in the mud suction hose 16 is transmitted to the mud discharge pipe 10 on the hull 1 through the filter screen 3.

[0031] The embodiment of the present application does not limit the number of filter barrel racks 2. For example, filter barrel racks 2 are provided at both ends of the lower end surface of the hull 1.

[0032] like Figure 3 , 4 As shown, the first end of the filter barrel frame 2 is installed with the mud suction hose 16; the mud suction end is provided with a through opening, and a rotatable connecting circular plate 13 is provided in the through opening; at least three annular slide plates 15 are connected to the outer circumference of the connecting circular plate 13; a slide groove 19 is provided on the inner wall of the through opening; the end of the annular slide plate 15 is slidably matched with the slide groove 19, and the annular slide plate 15 has a through hole for the pipeline to pass through. By moving the end of the annular slide plate 15 in the slide groove 19, the independent rotation of the connecting circular plate 13 and the filter barrel frame 2 can be realized, so that when the filter barrel frame 2 is rotated, the entanglement of the mud suction hose 16 can be avoided. The outer wall of the connecting circular plate 13 is connected to a connecting rod 17; the outer end of the connecting circular plate 13 is connected to a mounting plate 4, and the end of the mounting plate 4 is fixed to the hull 1.

[0033] A scraper plate 18 is installed at the middle section of the end of the hull 1, and the end of the scraper plate 18 is close to the outer wall of the filter barrel frame 2.

[0034] like Figure 5 As shown, the scraper plate 18 includes a connecting portion 181, an oblique scraping portion 182 and an arc-shaped guide groove portion 183 which are connected in sequence, the connecting portion 181 is fixed on the hull 1, the oblique scraping portion 182 is inclined downward, and the arc-shaped guide groove portion 183 is opened on the lower end surface of the oblique scraping portion 182 near the end position.

[0035] The mud pumping assembly also includes a mud pumping pipeline; the mud pump 7 is installed on the hull 1, the mud pumping pipeline is connected to the mud inlet end of the mud pump 7, the mud discharge pipe 10 is connected to the mud outlet end of the mud pump 7, and the mud pumping end of the mud pumping pipeline extends from the mud pumping pipeline to the inside of the filter barrel frame 2.

[0036] When two filter barrel racks 2 are provided, the mud pumping pipeline includes a first mud pumping pipe 8 and a second mud pumping pipe 9 which are connected to each other. The first mud pumping pipe 8 is connected to the mud pump 7. The mud pumping ends of the first mud pumping pipe 8 and the second mud pumping pipe 9 are both connected to a mud suction hose 16, and the mud suction hose 16 passes through the through hole. The first mud pumping pipe 8 and the second mud pumping pipe 9 correspond to one filter barrel rack 2 respectively, and valves can be installed on the first mud pumping pipe 8 and the second mud pumping pipe 9.

[0037] Embodiment 2:

[0038] Based on Example 1, Example 2 of the present application provides another water conservancy construction dredging equipment, such as Figure 1 , 2 As shown, it comprises: a hull 1; the hull 1 is provided with a mud pumping assembly and a belt transmission assembly; and the lower end surface of the hull 1 is provided with a filter barrel frame 2.

[0039] A plurality of retaining bars 12 are provided in a circular array on the outer circumference of the filter barrel frame 2, and the retaining bars 12 divide the outer wall of the filter barrel frame 2 into a plurality of filtering areas, each of which is equipped with a filter screen 3; a mud suction hose 16 is provided on the filter barrel frame 2; the mud in the mud suction hose 16 is transferred to the mud discharge pipe 10 on the hull 1 through the filter screen 3.

[0040] When two filter barrel racks 2 are provided, two groups of belt transmission assemblies are provided, and each group of belt transmission assemblies controls the rotation of one filter barrel rack 2. The belt transmission assembly comprises a motor 5, a first pulley 6, a second pulley 14 and a belt 11. The motor 5 is mounted on the upper end face of the hull 1; the first pulley 6 is mounted on the output end of the motor 5; the second pulley 14 is mounted on the second end of the filter barrel rack 2; and the belt 11 is mounted between the first pulley 6 and the second pulley 14.

[0041] It should be noted that the parts in this embodiment that are the same or similar to those in Embodiment 1 can be referenced to each other and will not be described in detail in this application.

[0042] Embodiment 3:

[0043] Based on Example 2, Example 3 of the present application provides a working method of a water conservancy construction dredging device, including:

[0044] Step 1: The filter barrel frame 2 contacts the sludge, and the sludge is sucked out by starting the sludge pump 7 and using the sludge suction hose 16 extending into the filter barrel frame 2.

[0045] Step 2: The sludge passes through the filter screen 3 and is discharged from the sludge discharge pipe 10 through the sludge extraction pipeline.

[0046] In step 2, the sludge is discharged from the sludge discharge pipe 10 through the sludge extraction pipe, wherein the filter screen 3 at the filtering area blocks the sludge from entering the pipe and causing pipe blockage and damage to the sludge pump 7, thereby ensuring the dredging efficiency.

[0047] Step 3, when the bottom filter 3 in contact with the sludge is blocked, start the motor 5, use the first pulley 6 to drive the belt 11 to rotate, and then drive the filter barrel frame 2 equipped with the second pulley 14 to rotate, so that the filter screens 3 on other surfaces can be rotated downward, so that the filter screens 3 on the blocked surface can be turned out of the sludge, so as to ensure the smooth suction of the sludge suction hose 16.

[0048] In step 3, when the bottom filter 3 rotates upward, the end of the oblique scraping portion 182 provided with an arc-shaped guide groove portion 183 is used to fit the outer wall of the filter 3 to quickly scrape off the hard objects adhered to the outer wall of the filter 3, without the need for manual cleaning, which is more convenient and labor-saving.

[0049] Specifically, the method provided in this embodiment is a method corresponding to the device provided in Example 2. Therefore, the parts in this embodiment that are the same or similar to those in Example 2 can be referenced to each other and will not be repeated in this application.

Claims

1. A dredging equipment for water conservancy construction, characterized in that: include: A hull (1); the hull (1) is provided with a mud pumping assembly; a filter barrel frame (2) is provided on the lower end surface of the hull (1); the mud pumping assembly comprises a mud pump (7) and a mud discharge pipe (10); A plurality of retaining bars (12) are provided in a ring array on the outer circumference of the filter barrel frame (2), the retaining bars (12) dividing the outer wall of the filter barrel frame (2) into a plurality of filter areas, each of the filter areas being installed with a filter screen (3); a sludge suction hose (16) is provided on the filter barrel frame (2); and the sludge in the sludge suction hose (16) is transferred to the sludge discharge pipe (10) on the hull (1) through the filter screen (3).

2. The water conservancy construction dredging equipment according to claim 1, characterized in that: The mud pumping assembly further comprises a mud pumping pipeline; the mud pump (7) is mounted on the hull (1), the mud pumping pipeline is connected to the mud inlet end of the mud pump (7), the mud discharge pipe (10) is connected to the mud outlet end of the mud pump (7), and the mud pumping end of the mud pumping pipeline extends from the mud pumping pipeline to the inside of the filter barrel frame (2).

3. The water conservancy construction dredging equipment according to claim 2, characterized in that: The first end of the filter barrel frame (2) is equipped with the mud suction hose (16); the mud suction end is provided with a through opening, and a rotatable connecting circular plate (13) is provided in the through opening; an annular slide plate (15) is fixed to the outer circumference of the connecting circular plate (13); a slide groove (19) is provided on the inner wall of the through opening; the end of the annular slide plate (15) is slidably matched with the slide groove (19), and the annular slide plate (15) has a through hole for the pipeline to pass through; the outer wall of the connecting circular plate (13) is connected to a connecting rod (17); the outer end of the connecting circular plate (13) is connected to a mounting plate (4), and the end of the mounting plate (4) is fixed to the hull (1).

4. The water conservancy construction dredging equipment according to claim 3, characterized in that: The hull (1) further comprises a belt drive assembly; the belt drive assembly comprises a motor (5), a first pulley (6), a second pulley (14) and a belt (11); The motor (5) is mounted on the upper end of the hull (1); the first pulley (6) is mounted on the output end of the motor (5); the second pulley (14) is mounted on the second end of the filter barrel frame (2); and the belt (11) is mounted between the first pulley (6) and the second pulley (14).

5. The water conservancy construction dredging equipment according to claim 1, characterized in that: A scraper plate (18) is installed at the middle section of the end of the hull (1), and the end of the scraper plate (18) is in contact with the outer wall of the filter barrel frame (2).

6. The water conservancy construction dredging equipment according to claim 5, characterized in that: The scraper plate (18) comprises a connecting portion (181), an oblique scraping portion (182) and an arc-shaped guide groove portion (183) which are connected in sequence, wherein the connecting portion (181) is fixed to the hull (1), the oblique scraping portion (182) is inclined downward, and the arc-shaped guide groove portion (183) is opened at a lower end surface of the oblique scraping portion (182) near an end position.

7. The water conservancy construction dredging equipment according to claim 2, characterized in that: The mud extraction pipeline comprises a first mud extraction pipe (8) and a second mud extraction pipe (9) which are connected to each other. The first mud extraction pipe (8) is connected to a mud pump (7). Mud extraction ends of the first mud extraction pipe (8) and the second mud extraction pipe (9) are both connected to a mud suction hose (16). The mud suction hose (16) passes through the through hole.