Transportation management device, transportation management method, and transportation management system
The transportation management device optimizes the use of unmanned and manned vehicles by creating a movement plan that considers weather, traffic, and loading/unloading equipment, enhancing the efficiency of cargo delivery by selecting the right machine for the job, thus improving overall system performance.
Patent Information
- Application Number
- JP2023097956
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-06-14
- Publication Date
- 2024-12-26
- Estimated Expiration
- 2043-06-14
AI Technical Summary
Existing transportation systems using unmanned aircraft and vehicles struggle to optimize operating efficiency when transporting multiple items, as direct delivery from aircraft to vehicles does not account for the larger load capacity and efficiency of vehicles.
A transportation management device and method that creates a movement plan for a group of transport machines, including unmanned and manned vehicles, by selecting the appropriate machine for cargo handling, calculating optimal routes and times, and considering weather, traffic, and loading/unloading equipment availability to enhance overall system efficiency.
Improves the operational efficiency of transportation systems by optimizing the use of multiple machines, reducing delays, and ensuring timely delivery through flexible planning that accounts for weather, traffic, and personnel requirements.
Smart Images

Figure 2024179249000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a transportation management device and a transportation management method for controlling each transportation machine such as a drone that constitutes a transportation system. [Background technology]
[0002] A transportation system using unmanned transport vehicles such as drones has been proposed for the purpose of reducing the cost of transportation operations and shortening transportation times, etc. As a system of this kind, a combination of multiple transport vehicles, such as a drone and a truck, rather than a single transport vehicle, has been proposed from the perspective of improving convenience and solving the problem that it is difficult to deliver to homes, etc., using drones alone due to landing site restrictions.
[0003] For example, Patent Document 1 discloses a system that guides an unmanned aerial vehicle loaded with luggage onto a vehicle driven by a recipient, lands it on the vehicle, and delivers the luggage by coordinating the unmanned aerial vehicle with the vehicle.
[0004] Furthermore, Patent Document 2 discloses that in a system consisting of an unmanned aerial vehicle and a vehicle responsible for deliveries in a specific area, when an unmanned aerial vehicle carrying luggage approaches a delivery area for the luggage, it retrieves the position of the vehicle responsible for deliveries in that area and indicates the handover point. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Patent Publication No. 2022-66043 [Patent Document 2] Patent No. 6775091 Summary of the Invention [Problem to be solved by the invention]
[0006] In the technology described in Patent Documents 1 and 2, the unmanned aerial vehicle directly delivers the luggage to the vehicle. However, since a vehicle can generally transport a larger amount and weight of luggage than an unmanned aerial vehicle, it may be more efficient to temporarily store luggage transported by multiple unmanned aerial vehicles at a loading and unloading point and transport the luggage together using one vehicle. In this case, simply guiding the unmanned aerial vehicle and the vehicle to a luggage storage area does not allow the operational efficiency of each transport machine to be optimized.
[0007] The present invention has been made in consideration of the above, and has an object to provide a transportation management device and a transportation management method that can improve the overall operating efficiency of a transportation system including an unmanned transportation machine. [Means for solving the problem]
[0008] In order to achieve the above-mentioned object, the present invention provides a transportation management device that manages the transportation of transported goods, and has a computer that creates a movement plan, which is control information for a plurality of transport machines including at least one unmanned transport machine, wherein the computer can access a storage device that stores a plurality of loading and unloading points and respective positions for loading and unloading the transported goods onto the transport machine, and based on the inputted shipment point, shipment time, and destination of the cargo, selects a responsible machine, which is at least one transport machine responsible for transporting the cargo, according to the plurality of transport machines and their current positions, and selects a loading point where the responsible machine will load and unload the cargo, calculates the loading point and the time when the responsible machine departs and arrives at the loading point to create the movement plan, and provides a transportation management device that controls the responsible machine based on the movement plan. Effect of the Invention
[0009] According to the present invention, the overall operating efficiency of a transportation system including an unmanned transportation vehicle can be improved. [Brief description of the drawings]
[0010] [Figure 1]1 is a diagram illustrating a schematic configuration of a transportation management device according to an embodiment of the present invention. [Diagram 2] 1 is an image diagram of a movement plan transmitted to a manned transport machine in a transport management device according to an embodiment of the present invention. FIG. [Diagram 3] 4 is a flowchart showing a procedure for creating and outputting a movement plan by a transportation management device according to an embodiment of the present invention. [Figure 4] FIG. 13 is an image diagram of movement plan creation. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0012] Fig. 1 is a schematic diagram showing the schematic configuration of a transportation management device according to one embodiment of the present invention. The transportation management device 1 shown in Fig. 1 has a computer that creates a movement plan, which is control information for a fleet of transportation machines 2, and is a device that manages the transportation of transport items.
[0013] -Transport machinery group- The group of transport machines 2 is a collective term for a plurality of transport machines constituting a transport system that is the object of control by the transport management device 1. The group of transport machines 2 includes at least one unmanned transport machine 21, such as a drone, that operates without human operation (operation by boarding or remote control). The unmanned transport machine 21 is not limited to a drone, and may include other transport machines that do not require a driver (a person on board or a remote operator), such as an unmanned vehicle with an automatic driving function. The group of transport machines 2 may also include one or more manned transport machines 22 operated by a driver (a person on board or a remote operator). The manned transport machine 22 may include vehicles such as trucks, motorcycles, and bicycles, as well as aircraft such as airplanes and helicopters, and ships.
[0014] A monitor 23 is provided in the driver's cab of some or all of the manned transport machines 22 (e.g., trucks). Also, instead of the monitor 23, a mobile terminal 24 carried by the driver of the manned transport machine 22 can be used as the monitor. The mobile terminal 24 is typically a smartphone, and may also include other devices such as a tablet PC, a notebook PC, a mobile phone, and a PDA.
[0015] In addition, the mobile terminal 24 may be carried not only by the driver of the manned transport machine 22, but also by personnel involved in the operation of the transport machine group 2, such as personnel who load and unload cargo onto the unmanned transport machine 21 and the manned transport machine 22, and personnel who replace and charge batteries, refuel, and perform other maintenance on the unmanned transport machine 21 and the manned transport machine 22.
[0016] In addition, the unmanned transport machine 21, the manned transport machine 22, and the mobile terminal 24 are each equipped with a GNSS mobile station, and the current positions of the unmanned transport machine 21, the manned transport machine 22, and the mobile terminal 24 are acquired by the GNSS system.
[0017] Further, the unmanned transport machine 21 and the manned transport machine 22 that is driven by power are each equipped with a computer. These computers are capable of communicating with the transport management device 1, and transmit remaining battery charge, remaining fuel charge, the current position of the vehicle, and the like to the transport management device 1, and receive a movement plan from the transport management device 1. In the unmanned transport machine 21, the computer controls the vehicle to move autonomously according to the received movement plan. In the manned transport machine 22, the computer displays and outputs the received movement plan on the monitor 23. Similarly, the mobile terminal 24 also displays and outputs the received movement plan.
[0018] -Transportation management device- The transportation management device 1 shown in FIG. 1 includes a storage device 11, a computer 12, and a communication device 13.
[0019] The storage device 11 is configured using, for example, a HDD, and stores a plurality of loading and unloading points and their respective positions for loading and unloading transported items (baggage) for the unmanned transport machine 21 and the manned transport machine 22. In addition, information (data) such as the ID and type of each of the unmanned transport machines 21 and the manned transport machines 22 belonging to the transport system may also be stored in the storage device 11.
[0020] Further, information (data) such as the current position and current cruising distance of each transport machine calculated by the transport management device 1 based on the current position, remaining battery charge, and remaining fuel charge received from the unmanned transport machine 21 and the manned transport machine 22 may be stored in the storage device 11. Although a single storage device 11 is illustrated in Fig. 1, a plurality of storage devices 11 may be provided.
[0021] The storage device 11 preferably also stores equipment information (type, quantity, etc. of loading and unloading equipment) related to equipment for loading and unloading cargo installed at the loading and unloading point. The loading and unloading equipment is equipment for loading and unloading cargo onto and from transport machinery. This loading and unloading equipment includes, for example, a device consisting of one or more devices that automatically and unmannedly loads and unloads cargo onto the unmanned transport machinery 21, such as a robot arm or a conveyor, as well as cargo handling machinery that is driven or operated by an operator, such as a forklift or a crane.
[0022] Furthermore, preferably, information on the storage status of luggage for each loading and unloading point is stored in the storage device 11. The storage status of luggage includes, for example, information such as the ratio of the currently stored luggage volume to the storage capacity of the loading and unloading point, the current acceptable luggage volume, etc.
[0023] The storage device 11 may be incorporated inside the housing of the computer 12, or may be connected to a terminal of the computer 12. The storage device 11 may also be configured to be connected to the computer 12 via a wired or wireless network.
[0024] The computer 12 has a processor such as a CPU, a ROM for storing various programs, a RAM for temporarily storing data in the calculation process, and the like, and executes software for realizing functions related to the creation of the movement plan. The computer 12 can access the storage device 11. The computer 12 selects at least one transport machine in charge of transporting the luggage according to each transport machine and their current positions based on the luggage dispatch point, dispatch time, and destination inputted from an input device such as a keyboard or mouse or other terminal and inputted via a network, and selects a loading point where the loading machine will load and unload the luggage. The computer 12 also calculates the loading point and the time when the loading machine will depart and arrive at the loading point, and creates a movement plan for the loading machine. The luggage information inputted by the input device can also include the quantity, weight, size, and type of contents (fragile items, clothing, food, etc.) of the luggage.
[0025] The computer 12 can write and store the created movement plan in the storage device 11 or other storage medium 14. As the storage medium 14, various storage devices such as semiconductor memory, external HHD, network memory, and CD-ROM connected to the computer 12 by wire or wirelessly can be used.
[0026] The communication device 13 is a wired or wireless communication device that can be connected to, for example, the Internet or an intranet. The computer 12 transmits the created movement plan for each transport machine to the corresponding unmanned transport machine, manned transport machine 22, or mobile terminal 24 via the communication device 13, and controls the transport machine selected as the responsible machine. The movement plan transmitted to the unmanned transport machine 21 becomes an operation command for the unmanned transport machine 21, and the movement plan transmitted to the manned transport machine 22 becomes a display command for the monitor 23 of the manned transport machine 22 or the mobile terminal 24.
[0027] Furthermore, via the communication device 13, the computer 12 can receive weather information 15 and traffic information 16 from the network.
[0028] -Movement Plan- The movement plan created by the computer 12 is a type of control information for the group of transport machines 2, and is created sequentially for each unmanned transport machine 21 and manned transport machine 22 according to the situation. Specifically, the movement plan includes, for each transport machine, a loading and unloading point (e.g., ID, name, location information, etc. of the loading and unloading point) where the cargo is loaded and unloaded, and the scheduled time of departure and arrival at the loading and unloading point. The loading and unloading point is a storage location for cargo that is set in advance within the delivery area of the cargo by the transport system, and is, for example, an office or warehouse of the operator of the transport system. In addition, when the cargo is scheduled to be delivered to and from another transport machine at the loading and unloading point, the movement plan for each transport machine may include the transport machine (e.g., ID, type, scheduled time of departure and arrival, etc. of the transport machine) that is the counterpart of the cargo delivery.
[0029] Fig. 2 is an image diagram of a movement plan transmitted to the manned transport machine 22. In the example of Fig. 2, information such as a loading point P2 where the manned transport machine 22 loads the cargo, a destination point G, a scheduled time of arrival at the loading point P2, a loading and unloading operation time of loading the cargo, an estimated required travel time estimated as the travel time from the loading and unloading point P2 to the destination point, a scheduled time of arrival at the destination point G, and a loading and unloading operation time of unloading the cargo are displayed on the monitor 23 as a movement plan 200.
[0030] At this time, the computer 12 receives at least one of weather information 15 and traffic information 16 from the network via the communication device 13, judges whether the transport machine selected as the responsible machine can reach the loading point, or the delay time, and reflects the result in the movement plan. For example, if bad weather such as strong winds or heavy rain interferes with the navigation of the drone, the drone is removed from the candidates for the responsible machine, and a vehicle such as a truck is selected as the responsible machine, and the weather information 15 can be reflected in the creation of the movement plan. In addition, for example, if multiple candidates for the transport route from the dispatch point to the destination are listed according to the dispatch point and destination of the luggage, it is possible to check whether congestion has occurred on the land route included in any of the candidate transport routes. If the occurrence of congestion is confirmed, the expected delay time due to congestion is calculated, and the scheduled required time for transporting the luggage is corrected for each candidate transport route, and the most rational transport route (for example, the one with the shortest transport time or the lowest transport cost) is selected, and the traffic information 16 can be reflected in the creation of the movement plan.
[0031] Further, based on the above-mentioned facility information of the loading and unloading points stored in the storage device 11, the computer 12 can determine whether or not loading and unloading facilities can be used for loading and unloading the cargo to and from the responsible machine at the loading and unloading point. In this case, the computer 12 can determine whether or not the loading and unloading facilities can be used to load and unload the cargo to and from the responsible machine in a short time and at low cost, or whether the loading and unloading facilities are unavailable and multiple personnel are required to load and unload the cargo. In this way, the computer 12 can also reflect the facility information in the movement plan by, for example, comparing the time and cost required for loading and unloading the cargo for each loading and unloading point.
[0032] Furthermore, the computer 12 can calculate the number of people required to load and unload the cargo at the selected loading and unloading point based on, for example, the quantity and weight of the cargo, as basic information for creating a movement plan. In this case, the computer 12 can exclude the loading and unloading point from the selection candidates if the number of people required to load and unload the cargo to be loaded is not met even when the number of people at the loading and unloading point and the number of passengers on the manned transport machine 22 heading to the loading and unloading point are added. The number of people required can be calculated, for example, by predetermining the loadable weight per person, dividing the weight of the cargo to be loaded by this loadable weight, and rounding up the fraction. In this way, the computer 12 creates a movement plan taking into account the required number of people, and transmits and displays the created movement plan to the monitor 23 of the manned transport machine 22 selected as the responsible machine, or to the mobile terminal 24 carried by the worker belonging to the loading and unloading point, thereby encouraging the guidance of personnel so that the required number of people for loading and unloading the cargo, including the occupants of the manned transport machine 22 and the workers at the loading and unloading point, gather at the loading and unloading point at the time of unloading.
[0033] -Creating a moving plan- FIG. 3 is a flowchart showing the procedure for creating and outputting a movement plan by the transportation management device 1, and FIG. 4 is an image diagram of the movement plan creation.
[0034] (Process 50) When information regarding a package to be transported, such as the shipping point 110, shipping time, destination point 113, package ID, etc., is entered and registered in the computer 12, the computer 12 starts the flow of FIG.
[0035] (Process 51) When the flow of Fig. 3 is started, first, in process 51, the computer 12 selects a transport machine capable of receiving the package at the dispatch point 110. For example, based on the current position of each transport machine, candidates for transport machines capable of arriving at the dispatch point 110 before the dispatch time are extracted. At this time, even if a transport machine is capable of arriving at the dispatch point 110 before the dispatch time based on the relationship between the dispatch point 110 and the current position, a transport machine for which a movement plan has already been created and for which the existing movement plan must be changed is excluded from the candidates, and a transport machine for which no movement plan has been created or a transport machine that has a movement plan but can arrive at the dispatch point 110 before the dispatch time without changing the existing movement plan is preferentially extracted.
[0036] Figure 4 illustrates the case where in process 51, drone 101, which is the unmanned transport vehicle 21, is selected as the vehicle in charge because it can reach the dispatch point 110 (possible arrival time is 11:58) before the loading time (12:10) calculated backwards from the dispatch time.
[0037] (Process 52) Next, in process 52, the computer 12 obtains location information of the loading and unloading point from the memory device 11, and extracts at least one candidate loading and unloading point as necessary based on information such as the positional relationship between the shipping point 110 and the destination point 113 and the range of the drone 101.
[0038] FIG. 4 illustrates a case in which two loading and unloading points 111 and 112 are extracted in process 52. In FIG.
[0039] In addition, the computer 12 determines whether unloading is possible at the loading and unloading points 111 and 112 based on the current cargo capacity and facility information, etc. at the loading and unloading points 111 and 112, and if possible, calculates the scheduled arrival time of the drone 101 at the loading and unloading points 111 and 112, and determines the scheduled unloading time at the loading and unloading points 111 and 112 based on the calculated scheduled arrival time.
[0040] FIG. 4 illustrates a case in which, in process 52, drone 101 is able to unload at loading point 111 and loading point 112, and the scheduled unloading times calculated for loading point 111 and loading point 112 are 12:10 and 12:20, respectively.
[0041] (Process 53) Next, in process 53, the computer 12 records and registers the route by which the machine in charge arrives at the destination point 113 as a transportation route in the storage device 11 or other storage device.
[0042] In the example of FIG. 4, first, it is determined whether the loading and unloading point 111 or the loading and unloading point 112 selected in process 52 is the destination point 113. If the loading and unloading point 111 or the loading and unloading point 112 is the destination point 113, that is, if the drone 101 can transport the cargo to the destination point 103, the route (the drone 101 unloads the cargo at the destination point 113) is registered in the storage device 11 or other storage device as a transportation route. In FIG. 4, the loading and unloading points 111 and 112 are not the destination point 113, and the drone 101 cannot unload the cargo at the destination point 113, so at the present time (when determining the arrival point of the drone 101), there is no corresponding transportation route and registration is not performed.
[0043] (Process 54) Next, in process 54, the computer 12 judges whether to end the search for the transport route, and if the search is to be continued, the procedure proceeds to process 55, and if the search is to be ended, the procedure proceeds to process 56. As an example of process 54, it is possible to end the search for the transport route when the number of transport routes reaches a specified value, or when the elapsed time since the start of the flow of FIG. 3 in process 50 reaches a specified time. In FIG. 4, since there is no corresponding transport route at the present time (when the determination is made regarding the arrival destination of the drone 101), the judgment of process 54 is not established, a "NO" judgment is made, and the procedure proceeds to process 55.
[0044] (Process 55) If it is determined in process 54 that the search for movement plan candidates is to be continued, the computer 12 then proceeds to process 55, where a transport machine capable of loading the cargo at the loading point 111 and the loading point 112 after the scheduled unloading time calculated in process 52 (i.e., another responsible machine that takes over the cargo from the responsible machine that unloaded the cargo at the loading point 111 and the loading point 112) is selected, and the process returns to process 52. As an example of process 54, for example, a case where the transport machine arrives at the loading point 111 and the loading point 112 before the scheduled unloading time and waits at the loading point 111 and the loading point 112 until the scheduled unloading time to load the cargo, or a case where the transport machine arrives at the loading point 111 and the loading point 112 after the scheduled unloading time and promptly loads the cargo, is assumed, and a transport machine that can respond without changing the existing movement plan is selected as the responsible machine to take over, as in the case of selecting the drone 101 in process 51.
[0045] 4 illustrates a case in which, in process 55, it is calculated that the truck 102, which is the manned transport machine 22, can arrive at the loading point 111 and the loading point 112 after / before the scheduled unloading time of the drone 101 and load the cargo, and further, in processes 52 and 53, it is calculated that the truck 102 can arrive at the destination point 113 at 12:50 and 12:40, respectively, and these two transport routes are registered. When the conditions are satisfied in the following process 54 by registering the transport route in this way, the computer 12 judges "YES" and moves the procedure to process 56.
[0046] (Process 56) When it is determined in process 54 that the search for transport routes is to be terminated, the computer 12 then evaluates each transport route in process 56, and determines a movement plan based on the evaluation results. As an example of process 56, for example, a transport cost based on the binding time and travel distance of each transport machine, and an efficiency cost calculated from the time required to transport cargo are calculated as evaluation items, and the transport route with the smallest sum of the transport cost and the efficiency cost is identified as the basis for the movement plan.
[0047] For example, in FIG. 4, a first transportation route via routes 120, 121, and 125 and a second transportation route via routes 120, 122, and 126 are registered. The first transportation route is characterized in that it arrives at the destination point 113 later than the second transportation route, but there is no waiting time for the truck 102 (passengers) at the loading and unloading point 111. On the other hand, the second transportation route is characterized in that it arrives at the destination point 113 earlier than the first transportation route, but there is waiting time at the loading and unloading point 112. Therefore, in order to take these trade-offs into consideration, a method of defining a function based on the time and cost required for transportation as described above and selecting a transportation route that is an optimal solution is considered as a selection method for these. Here, it is assumed that the second transportation route is selected.
[0048] (Process 57) Next, in process 57, the computer 12 transmits the moving plan for the selected second transport route, including the dispatch point 110, the loading point 112, the destination point 113 through which each responsible machine, i.e., the drone 101 and the truck 102, should pass, and the departure and arrival times and loading and unloading times at each of these points, via the communication device 13 to each transport machine (drone 101, truck 102) and, if necessary, to the mobile terminal 24 carried by the passenger of the truck 102 or the personnel at the loading point 112, etc., and ends the flow of FIG. 3 for the baggage accepted in process 50. At that time, the computer 12 outputs and saves the moving plan in the storage device 11, the storage medium 14, etc. Saving the moving plan in the storage medium 14 can also be performed in response to a request operation on the computer 12.
[0049] As described above, the movement plan may also reflect weather information 15 and traffic information 16. In addition, when personnel are needed to load and unload cargo onto and from the drone 101 or truck 102 at the dispatch point 110, the loading and unloading points 111 and 112, and the destination point 113, the movement plan is displayed on the monitor 23, the mobile terminal 24, or the like as described above, so that the necessary personnel can be secured.
[0050] The movement plan is transmitted to the transport machine in accordance with the command form normally required to operate the unmanned transport machine, in the case of an unmanned transport machine, and in the case of a manned transport machine, the movement plan may be transmitted as an image to a monitor 23 or mobile terminal 24 that is visually viewed by the passenger operating the manned transport machine.
[0051] -effect- According to this embodiment, it is possible to appropriately schedule the handover of cargo between multiple responsible machines, including the unmanned transport machine 21, at the loading and unloading point, and it is possible to realize an efficient transport system in which multiple responsible machines are linked together as necessary. This makes it possible to improve the overall operation efficiency of the transport system including the unmanned transport machine 21 such as the drone 101.
[0052] As described above, the movement plan can appropriately reflect weather information 15 and traffic information 16 in the area surrounding the loading and unloading point. For example, if a delay is expected due to congestion or the like, the estimated arrival time can be calculated by delaying the delay time, or if strong winds make it difficult for the drone to arrive at the loading and unloading point, land transportation can be prioritized, thereby reducing the risk of the movement plan not being realized due to unexpected delays or non-delivery. In this way, it is possible to flexibly create appropriate movement plans according to weather and traffic conditions, including the selection of the machine in charge and the extraction of the transportation route.
[0053] In addition, for each loading and unloading point, the availability of loading and unloading equipment for unloading the cargo to the responsible machine can be determined based on the equipment information of the loading and unloading point, and this can be reflected in the movement plan. For example, when multiple loading and unloading points with different loading and unloading equipment are listed as candidates, such as a loading and unloading point where automatic loading and unloading of cargo to the unmanned transport machine 21 is possible, and a loading and unloading point where unloading from the unmanned transport machine 21 is possible but loading requires a worker, a movement plan can be created taking into account the constraints of such loading and unloading equipment. This can also contribute to the flexible creation of an appropriate movement plan.
[0054] The computer 12 can also calculate the number of people required for the responsible machine to load and unload the cargo at each loading point. At that time, if the number of people required for loading and unloading the cargo to be loaded is not met even if the number of people at the loading point and the number of passengers of the manned transport machine 22 heading to the loading point are added, the computer 12 can exclude the loading point from the selection candidates. In this way, the movement plan created in consideration of the number of people is displayed on the monitor 23 of the manned transport machine 22 selected as the responsible machine and on the mobile terminal 24 carried by the personnel at the loading point included in the transportation route, so that the required number of people to load and unload the cargo, including the passengers of the manned transport machine 22 and the workers at the loading point, can be guided to gather at the loading point at the time of unloading.
[0055] In addition, even if a loading / unloading point does not have facilities for loading and unloading cargo for the unmanned transport machine 21 and is not originally selected as a route, if the loading / unloading point is expected to have the necessary number of personnel, it can be included in the options for the transport route, and the cost of capital investment at the loading / unloading point can be reduced. These points can also contribute to improving the operation efficiency of the transport system.
[0056] In addition, since the movement plan is stored in the storage device 11, the storage medium 14, etc., the history can be used for subsequent confirmation of the movement plan or for machine learning, etc. [Explanation of symbols]
[0057] 1...transportation management device, 11...storage device, 12...computer, 14...storage medium, 15...weather information, 16...traffic information, 21...unmanned transport vehicle, 22...manned transport vehicle, 23...monitor, 24...mobile terminal, 110...shipping point, 111, 112...loading point, 113...destination point, 200...movement plan
Claims
1. A transport management device having a computer that creates a movement plan, which is control information for a plurality of transport machines including at least one unmanned transport machine, and that manages the transport of transport items, The computer includes: a storage device that stores a plurality of loading points and respective locations for loading and unloading the goods on the transport machine; Based on the input shipment point, shipment time, and destination of the luggage, a responsible machine which is at least one transport machine responsible for transporting the luggage is selected according to the plurality of transport machines and their current positions, and a loading and unloading point where the responsible machine will load and unload the luggage is selected; The movement plan is created by calculating the loading point and the time when the machine in charge departs from and arrives at the loading point, Based on the movement plan, the machine in charge is controlled. A transportation management device characterized by:
2. The transportation management device according to claim 1, The computer receives at least one of weather information and traffic information for the area surrounding the selected loading and unloading point, determines whether the responsible machine can reach the loading and unloading point and the delay time, and reflects this in the movement plan.
3. The transportation management device according to claim 1, The storage device stores equipment information related to equipment for loading and unloading the luggage installed at the loading and unloading point, A transportation management device characterized in that the computer determines whether or not the loading and unloading equipment can be used for loading and unloading the cargo onto the responsible machine at the loading and unloading point based on the equipment information and reflects this in the movement plan.
4. The transportation management device according to claim 1, The transportation management device is characterized in that the computer calculates the number of people required to load and unload the cargo at the selected loading and unloading point, and outputs the movement plan to the monitor of the manned transport machinery selected as the responsible machine or to a mobile terminal carried by the worker.
5. The transportation management device according to claim 1, A transportation management device, characterized in that the computer stores the movement plan in the storage device or other storage medium.
6. A transportation management method for creating a movement plan, which is control information for a plurality of transportation machines including at least one unmanned transportation machine, and managing transportation of an object, comprising the steps of: A plurality of loading and unloading points and respective positions for loading and unloading the transported goods are set for the transport machine; Selecting at least one transport machine in charge of transporting the luggage, based on the shipment point, shipment time, and destination of the luggage, according to the plurality of transport machines and their current positions, and selecting a loading and unloading point where the transport machine in charge will load and unload the luggage; The movement plan is created by calculating the loading point and the time when the machine in charge departs from and arrives at the loading point, Based on the movement plan, the machine in charge is controlled. A transportation management method comprising:
Citation Information
Patent Citations
Vehicle operation plan creation device
JP2021060850A
Electronic device and method of operation thereof
JP2022013938A
Information processing device, information processing system, program, and vehicle
JP2022066043A
Autonomous supply and distribution chain
US20190347614A1
Delivery method, information processing device, and delivery system
JP6775091B2