A construction element

Prefabricated concrete construction elements with a tongue and groove joint system and reinforcement members facilitate efficient assembly, addressing the inefficiencies of traditional methods by enabling rapid, cost-effective, and robust multi-storey building construction with improved performance ratings.

WO2024221035A1PCT designated stage expired Publication Date: 2024-10-31FARRINGTON STEPHEN

Patent Information

Application Number
PCT/AU2024/050347
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-27
Filing Date
2024-04-12
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

Traditional construction methods for multi-storey buildings, such as casting concrete in situ, are labor-intensive and time-consuming, and while prefabricated concrete panels offer ease, they still require additional framework for robustness, necessitating a more efficient and cost-effective solution.

Method used

Prefabricated concrete construction elements with a tongue and groove joint system and reinforcement members that can be quickly assembled on a footing, using a method involving a concrete slab pour to secure the elements, allowing for rapid and robust building assembly.

Benefits of technology

Enables rapid and cost-effective construction of multi-storey buildings with enhanced vertical and horizontal bracing, meeting high fire, acoustic, and thermal ratings, while reducing construction time and labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure AU2024050347_31102024_PF_FP_ABST
    Figure AU2024050347_31102024_PF_FP_ABST
Patent Text Reader

Abstract

A prefabricated concrete construction element, the construction element having a first wall portion, a second wall portion, and a ceiling portion; wherein the construction element has at least one connection portion; and wherein the construction element is joinable with at least one other construction element.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] A CONSTRUCTION ELEMENT

[0002] FIELD OF INVENTION

[0003] The present invention relates to a construction element. The present invention has particular but not exclusive application for constructing multi-storey buildings. The patent specification describes this use, but it is by way of example only and the invention is not limited to this use.

[0004] BACKGROUND OF THE INVENTION

[0005] There is a significant demand for affordable and well-constructed infrastructure projects. In particular, the need for multi-storey buildings for housing and commercial use is rising.

[0006] Traditional construction methods include forming concrete into structural elements by casting the concrete in situ. Casting concrete in situ requires complex customised formwork and labour-intensive processes. Time must also be allowed for the concrete to cure until the structure is self-supporting. Conventionally, floors made from reinforced concrete in multi-storey buildings are cast in situ.

[0007] Also known in the art are prefabricated concrete panels which are common in the industry due to their ease of use and relative simplicity when compared with traditional construction methods. Despite the benefits of prefabricated concrete slabs, it is still time consuming constructing a multistorey building with them. Further, additional framework is required to construct a suitably robust structure.

[0008] OBJECT OF THE INVENTION

[0009] It is an object of the present invention to overcome or at least alleviate one or more of the above-mentioned problems with building construction and / or provide the consumer with a useful or commercial choice.

[0010] SUMMARY OF THE INVENTION

[0011] In one aspect, the present invention broadly resides in a construction element, the construction element having a first wall portion, a second wall portion, and a ceiling portion substantially perpendicular to and extending between the first wall portion and the second wall portion; wherein the construction element has at least one connection portion adapted to operably connect the construction element to an adjacent construction element.

[0012] Preferably, the construction element has a first end on one side of the construction element and a second end on an opposite side of the construction element. Preferably, the first end is comprised of a side edge of the first wall portion, a side edge of the second wall portion and a side edge of the ceiling portion. Preferably, the second end is comprised of a side edge of the first wall portion, a side edge of the second wall portion and a side edge of the ceiling portion.

[0013] In one embodiment, the first end of a first construction element has a protrusion. Preferably, the second end of a second construction element has a recess configured to receive the protrusion.

[0014] In a preferred embodiment, the first end of a first construction element has a tongue. Preferably, the second end of a second construction element has a groove configured to receive the tongue. Preferably, the groove has a corresponding shape to the tongue such that the tongue is receivable within the groove. In a preferred embodiment, the construction element is configured to operably engage with an adjacent construction element with a tongue and groove joint.

[0015] Preferably, the tongue extends substantially along an edge of the first wall portion at the first end. Preferably, the tongue extends substantially along an edge of the second wall portion at the first end. Preferably, the tongue extends substantially along an edge of the ceiling portion at the first end.

[0016] Preferably, the groove extends substantially along an edge of the first wall portion at the second end. Preferably, the groove extends substantially along an edge of the second wall portion at the second end. Preferably, the groove extends substantially along an edge of the ceiling portion at the second end.

[0017] Preferably, the construction element is installable on a footing. In a preferred embodiment, the construction element has at least one connection portion adapted to operably connect the construction element to the footing. In one embodiment, the first wall portion at least one connection portion adapted to operably connect the construction element to the footing, the at least one connection portion including at least one open hole arranged at a lower end of the construction element adjacent the footing. Preferably, the at least one open hole is configured to receive a first reinforcement member. Preferably, the at least one first reinforcement member is fastened to the corresponding open hole. More preferably, the at least one first reinforcement member is bonded to the open hole with an epoxy adhesive. Preferably, the at least one first reinforcement member is an elongate steel reinforcing bar. Preferably, the at least one first reinforcement member has a substantially horizontal orientation.

[0018] Preferably, at least one second reinforcement member is installable on the footing. Preferably, the at least one second reinforcement member is an elongate steel reinforcing bar. Preferably, the at least one second reinforcement member has a substantially horizontal orientation.

[0019] Preferably, a slab reinforcement mesh is installable on top of and securable to the at least one first reinforcement member.

[0020] Preferably, when a concrete slab is poured the at least one first reinforcement member, the at least one second reinforcement member, and the slab reinforcement mesh bond with the concrete slab securing the construction element to the footing.

[0021] In a preferred embodiment, the connection portion is a first fastener cavity in the ceiling portion.

[0022] In a preferred embodiment, the connection portion is a second fastener cavity in the first wall portion.

[0023] Preferably, the construction element is installable on top of another construction element. Preferably, the construction element is securable to the other construction element with at least one connector.

[0024] Preferably, the connector is a threaded rod.

[0025] Preferably, the connector is receivable within the at least one first fastener cavity.

[0026] Preferably, the connector is receivable within the at least one second fastener cavity.

[0027] Probably, the connector is secured using at least one nut attachable to the threaded rod.

[0028] Preferably, the at least one first fastener cavity has an opening on a top face of the construction element. In a preferred embodiment, the at least one second fastener cavity has an opening on a bottom face of the construction element. Preferably, the at least one second fastener cavity has an opening on a bottom face of the first wall portion.

[0029] In a preferred embodiment, the at least one second fastener cavity has an opening on a side face of the first wall portion.

[0030] Preferably, the at least one first fastener cavity is substantially cylindrical.

[0031] In one embodiment, the at least one second fastener cavity is substantially cylindrical.

[0032] Preferably, the second fastener cavity has a larger cross-sectional area than the first fastener cavity.

[0033] In a preferred embodiment, the second fastener cavity has a lower portion and an upper portion. Preferably, the lower portion is substantially cylindrical. Preferably, the upper portion has a tapered substantially rectangular shape. Preferably, one side of the upper portion is open to a side face of the first wall portion. Preferably, the connector is feedable through the upper potion into the lower portion and the first fastener cavity.

[0034] Preferably, the ceiling portion of at least one construction element forms a roof. Preferably, the ceiling portion of at least one construction element is waterproof so as to prevent ingress of water into the building from the roof. Preferably, adjacent ceiling portions of at least two construction elements can be sealed to waterproof the building so as to prevent ingress of water into the building from the roof.

[0035] In one embodiment, the construction element has at least one third fastener cavity arranged at the top of the construction element. Preferably at least one construction element positioned at the top of a multistorey building has at least one third fastener cavity arranged at the top of the construction element. Preferably, the at least one third fastener cavity has an opening on a top face of the construction element.

[0036] Preferably, a roof is securable to at least one construction element. Preferably, the roof includes a roof frame. In one embodiment, a roof frame is securable attachable to at least one construction element at the at least one first fastener cavity. In another embodiment, a roof frame is securable attachable to at least one construction element at the at least one third fastener cavity.

[0037] Preferably, a tie-down connector is receivable within the third fastener cavity. Preferably, the tie-down connector is threaded rod. In one embodiment, the tie-down connector secures a roof beam to a footing. Preferably, the at least one third fastener cavity has an opening on a bottom face of the construction element. In one embodiment, the at least one third fastener cavity extending substantially vertically through the first wall portion.

[0038] In a preferred embodiment, a multistorey building has at least one arrangement wherein a first fastener cavity of a lower construction element, a second fastener cavity of an upper construction element, and a fastener cavity of the upper construction element are arranged coaxial with a vertical axis. This arrangement can form a continuous vertical cyclone tie down.

[0039] Preferably, the first wall portion is connected to the ceiling portion.

[0040] Preferably, the second wall portion is connected to the ceiling portion.

[0041] Preferably, the first wall portion is substantially at an angle of 90° to the ceiling portion. Preferably, in use the first wall portion is substantially vertical.

[0042] Preferably, the second wall portion is substantially at an angle of 90° to the ceiling portion. Preferably, in use the second wall portion is substantially vertical.

[0043] Preferably, in use the second wall portion is substantially parallel to the first wall portion.

[0044] Preferably, in use the ceiling portion is substantially horizontal.

[0045] Preferably, the first wall portion and the second wall portion are connected to the ceiling portion on opposite ends of the ceiling portion.

[0046] Preferably, the construction element has a chamfered edge between the first wall portion and ceiling portion.

[0047] Preferably, the construction element has a chamfered edge between the second wall portion and ceiling portion.

[0048] Preferably, the construction element is prefabricated. Preferably, the construction element has a penetration formed when the construction element was fabricated. The penetration can be for a door, a window, a port, an access point, building services, a stairwell, an elevator shaft, a skylight, a ramp, a chimney, or any other suitable building feature known in the art.

[0049] Preferably, the construction element has a substantially n-shaped crosssection.

[0050] Preferably, the construction element is formed substantially from concrete. More preferably, the construction element is formed substantially from a reinforced autoclaved aerated concrete (AAC) material. Preferably, the construction element has a length of substantially between 1 m to 10m. More preferably, the construction element has a length of substantially between 1.5m to 3m.

[0051] Preferably, the construction element has a width of substantially between 2m to 12m. More preferably,

[0052] Preferably, the construction element has a height of substantially between 2m to 6m. More preferably, the construction element has a height of substantially between 2.5m to 3.5m.

[0053] Preferably, the first wall portion has a thickness of substantially between 150mm to 250mm.

[0054] Preferably, the second wall portion has a thickness of substantially between 150mm to 250mm.

[0055] Preferably, the ceiling portion has a thickness of substantially between 150mm to 350mm.

[0056] In another aspect, the present invention broadly resides in a building assembly constructed of a plurality of concrete construction elements as described in this specification.

[0057] In one embodiment, at least one pair of construction elements operably engaged with a tongue and groove joint have the same height.

[0058] In one embodiment, at least one pair of construction elements operably engaged with a tongue and groove joint have an identical cross-section.

[0059] Preferably, the building assembly has a concrete floor.

[0060] In one embodiment, the building assembly is a multi-storey building.

[0061] In one embodiment, the multi-storey building is constructed by arranging a plurality of construction elements such that a first pair of construction elements are placed on a footing and subsequently a second pair of construction elements are placed on top of the first pair of construction elements. Preferably, the first pair of construction elements are operably connected. Preferably, the second pair of construction elements are operably connected. Preferably, this arrangement is repeatable with a further pair of construction elements being placed on the footing and then another pair of construction elements being placed on top of the further pair of construction elements. Preferably, the multi-storey building is constructed by commencing arrangement of the plurality of construction elements at the back of a lot and then continuing to the front of the lot.

[0062] Preferably, prior to a pair of construction elements being operably engaged with a tongue and groove joint a sealant is applied to a leading edge of the tongue. Preferably, prior to a pair of construction elements being operably engaged with a tongue and groove joint a fire-resistant sealant is applied to a leading edge of the tongue.

[0063] In one embodiment, when a first construction element is positioned on top of a second construction element, an opening of one of the at least one third fastener cavity on a top face of the of the second construction element is aligned with an opening of one of the at least one third fastener cavity on a bottom face of the of the first construction element. Preferably, a tie-down connector is receivable within the pair of aligned third fastener cavities. Preferably, the tie-down connector is threaded rod. Preferably, the tie-down connector secures a roof beam to a footing.

[0064] In one embodiment, when a first construction element is positioned on top of a second construction element, an opening of one of the at least one first fastener cavity on a top face of the of the second construction element is aligned with an opening of one of the at least one second fastener cavity on a bottom face of the of the first construction element. Preferably, a connector is receivable within an aligned first fastener cavity and second fastener cavity pair.

[0065] In further aspect, the present invention broadly resides in a method of constructing a building from at least one construction element as described in this specification, the method including, preparing a footing; placing a first construction element on the footing; and securing the first construction element to the footing by installing at least one first reinforcement member on the first construction element, installing at least one second reinforcement member on the footing, installing a slab reinforcement mesh on top of the at least one first reinforcement member, pouring a concrete slab such that the at least one first reinforcement member, the at least one second reinforcement member, and the slab reinforcement mesh bond with the concrete slab securing the construction element to the footing.

[0066] Preferably, preparing the footing includes the marking the footing with the intended positions of the construction elements.

[0067] In a preferred embodiment, the method includes installing at least two first construction elements on the footing and operably engaging the at least two first construction elements together with a tongue and groove joint.

[0068] In a preferred embodiment, the method includes installing a second construction element on top of the first construction element. Preferably, the method further includes securing the second construction element to the first construction element by installing a connector in at least one corresponding pair of a first fastener cavity and a second fastener cavity.

[0069] In a preferred embodiment, the method includes installing a roof on top of the second construction element. Preferably, the roof comprises at least one roof beam. Preferably, the method further includes securing at least one of the at least one roof beam to the footing by installing a tie-down connector into a third fastener cavity of the second construction element.

[0070] In a preferred embodiment, the building is a multistorey building constructed of a plurality of first construction elements and a plurality of second construction elements. Preferably, the method includes placing at least two first construction elements is on the footing in an operably connected configuration. Preferably, the method includes securing the at least two first construction elements to the footing. Preferably, the method includes placing at least two second construction elements on top of the at least two first construction elements in an operably connected configuration. Preferably, the method includes securing the at least two second construction elements to the at least two first construction elements.

[0071] Preferably, the at least two first construction elements are operably engaged with a tongue and groove joint. Preferably, prior to the at least two first construction elements being operably engaged with a tongue and groove joint a sealant is applied to a leading edge of the tongue. Preferably, the at least two second construction elements are joined with a tongue and groove joint. Preferably, prior to the at least two second construction elements being joined a sealant is applied to a leading edge of the tongue. In further aspect, the present invention broadly resides in a method of constructing a building from a first construction element and a second construction element as described in this specification, the method including, placing the first construction element; placing the second construction element on top of the first construction element; and securing the second construction element to the first construction element by installing a connector in at least one corresponding pair of a first fastener cavity and a second fastener cavity.

[0072] Preferably, the first construction element is placed on a footing.

[0073] Preferably, the first construction element is secured to the footing by, installing at least one first reinforcement member on the first construction element, installing at least one second reinforcement member on the footing, installing a slab reinforcement mesh on top of the at least one first reinforcement member, and pouring a concrete slab such that the at least one first reinforcement member, the at least one second reinforcement member, and the slab reinforcement mesh bond with the concrete slab securing the construction element to the footing.

[0074] The terms "building", "buildings" and the like as used herein are intended to be construed broadly, as encompassing virtually any form of building or civil engineering structure, regardless of the intended purpose and whether single or multi-level in configuration.

[0075] The features described with respect to one aspect also apply where applicable to all other aspects of the invention. Furthermore, different combinations of described features are herein described and claimed even when not expressly stated.

[0076] BRIEF DESCRIPTION OF THE DRAWINGS

[0077] In order that the present invention can be more readily understood reference will now be made to the accompanying drawings which illustrate a preferred embodiment of the invention and wherein:

[0078] Figure 1 is a perspective view of a first construction element according to an embodiment of the present invention; Figure 2 is a perspective view of a second construction element according to an embodiment of the present invention;

[0079] Figure 3 is a perspective view of a partially constructed building constructed from the construction elements shown in Figures 1 and 2;

[0080] Figure 4 is a is a perspective view of a connection arrangement between the first construction element of Figure 1 and building footings;

[0081] Figure 5 is a cross-sectional side view of the connection arrangement of Figure 4;

[0082] Figure 6 is a cross-sectional perspective view a connection arrangement between the first construction element of Figure 1 and the second construction element of Figure 2; and

[0083] Figure 7 is a cross-sectional side view of tongue and groove operably engaging two adjacent first construction elements of Figure 1.

[0084] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT

[0085] A detailed description follows, with reference to Figures 1 to 7, of a preferred embodiment of a multi-storey building assembly constructed from a plurality of prefabricated concrete construction elements.

[0086] With reference to Figure 1, there is shown a first construction element 10. The first construction element 10 having a first wall portion 12, a second wall portion 14, and a ceiling portion 16. The first construction element 10 is installable on a footing 90.

[0087] The first construction element 10 has a substantially n-shaped cross-section. The first construction element 10 has a chamfered edge between the first wall portion and ceiling portion. The first construction element 10 has a chamfered edge between the second wall portion and ceiling portion.

[0088] The first wall portion 12 has a rectangular penetration 18 suitable for a window or door. The rectangular penetration 18 was formed when the first construction element 10 was fabricated.

[0089] The first construction element 10 is configured to operably engage with at least one other construction element with a tongue and groove joint. The first construction element 10 has a first end and a second end. The first end of the first construction element 10 has a tongue 17 on a longitudinal edge of the ceiling portion 16 and a tongue 19 on a longitudinal edge of the first wall portion 12. The first construction element 10 has a plurality of open holes 20 arranged at a lower end of the second wall portion 14. Each hole 20 can receive a corresponding first reinforcement member 22.

[0090] The first construction element 10 has two first connection portions 30,30 arranged at the top of the first construction element 10 above the second wall portion 14. Each first connection portion 30,30 is a substantially cylindrical threaded cavity that can receive a corresponding threaded rod 70. Each first connection portion 30,30 is open at a top face of the first construction element 10.

[0091] With reference to Figure 2, there is shown a second construction element 40. The first construction element 40 having a first wall portion 42, a second wall portion 44, and a ceiling portion 46. The second construction element 40 is installable on top of a first construction element 10.

[0092] The second construction element 40 has a substantially n-shaped crosssection. The second construction element 40 has a chamfered edge between the first wall portion and ceiling portion. The second construction element 40 has a chamfered edge between the second wall portion and ceiling portion.

[0093] The first wall portion 42 has a rectangular penetration 48 suitable for a window or door. The rectangular penetration 18 was formed when the second construction element 40 was fabricated.

[0094] The second construction element 40 is configured to operably engage with at least one other construction element with a tongue and groove joint. The second construction element 40 has a first end and a second end. The first end of the second construction element 40 has a tongue 47 on a longitudinal edge of the ceiling portion 46 and a tongue 49 on a longitudinal edge of the first wall portion 42.

[0095] The second construction element 40 has two second connection portions 50,50 arranged at a lower end of the second wall portion 44. Each second connection portion 50,50 has a fastener cavity 52 and an access cavity 54. Each fastener cavity 52 is a substantially cylindrical cavity which extends from an opening to the access cavity through to an opening at a bottom face of the second construction element. Each fastener cavity 52 can receive a corresponding threaded rod 70.

[0096] When a second construction element 40 is installed on top of a first construction element 10 at least one of the first connection portions 30,30 aligns with at least one of the second connection portions 50,50. Each fastener cavity 52 has a larger cross-section than a corresponding first connection portion 30,30.

[0097] Each access cavity 54 has an opening on a side face of the second wall portion 44. Each access cavity 54 allows sufficient room for the installation of a threaded rod 70 into each fastener cavity 52 and first connection portion 30,30.

[0098] Each threaded rod 70 has a corresponding nut 72. Each access cavity 54 allows sufficient room for installation and manipulation of a corresponding nut 72 onto a corresponding threaded rod 70.

[0099] The second construction element 40 has two third connection portions 60,60 arranged at the top of the second construction element 40 above the second wall portion 44. The third connection portions 60,60 are adapted to receive a tie-down connector to secure a roof to the second construction element 40.

[0100] With reference to Figure 3, there is shown a partially constructed multi-storey building with a footing 90, a first lower construction element 10A, a second lower construction element 10B, a first upper construction element 40A, and a second upper construction element 40B. The first lower construction element 10A and the second lower construction element 10B are identical. The first upper construction element 40A, and the second upper construction element 40B are identical.

[0101] The first lower construction element 10A and second lower construction element 10B are installed on the footing 90. The first lower construction element 10A is operably connect to a second lower construction element 10B.

[0102] The first upper construction element 40A and second upper construction element 40B are installed on the first lower construction element 10A and second lower construction element 10B respectively. The first upper construction element 40A is operably connect to a second upper construction element 40B.

[0103] With reference to Figures 4 and 5, there is shown an arrangement of reinforcement members prior to and after a concrete pour to form a concrete slab 96.

[0104] The second wall portion 14 is positioned on the footing 90.

[0105] A plurality of first reinforcement members 22 bonded into the plurality of open holes 20 with epoxy adhesive. Each first reinforcement members 22 is an elongate steel reinforcing bar.

[0106] A plurality of second reinforcement members 92 are installed on the footing 90. Each second reinforcement member 22 is an elongate steel reinforcing bar. A slab reinforcement mesh 94 is installed on top of and secured to the at least one first reinforcement member 22.

[0107] With reference to Figure 7, there is shown a tongue and groove joint between two adjacent first construction elements 10A and 10B.

[0108] The first lower construction element 10A has a tongue 17 on a longitudinal edge of an end thereof.

[0109] The second lower construction element 10B has a groove 80 on a longitudinal edge of an end thereof. The groove 80 corresponds with the tongue 17.

[0110] Sealant 82 is applied to the tongue 17 so as to form a seal when the first lower construction element 10A and the second lower construction element 10B are operably connected. Preformed mastic or butyl gaskets, or even mortar, can be used to help seal the tongue and groove joints.

[0111] In a preferred construction sequence a multi-storey building is constructed out of a plurality of construction elements by initially preparing the footing 90.

[0112] The footing 90 is then marked with the intended positions of lower (ground floor) construction elements 10A,10B. The first lower construction element 10A is placed on the footing 90. The second lower construction element 10B is placed on the footing 90 and operably connected with the first lower construction element 10A. When operably connecting the lower construction elements 10A / 10B with a tongue and groove joint a sealant is applied to a leading edge of the tongue.

[0113] The first lower construction element and second lower construction element are secured to the footing by, installing at least one first reinforcement member 22 into at least one corresponding hole 20, installing at least one second reinforcement member 92 on the footing 90, installing a slab reinforcement mesh 94 on top of the at least one first reinforcement member 22, pouring a concrete slab such that the at least one first reinforcement member 22, the at least one second reinforcement member 92, and the slab reinforcement mesh 94 bond with the concrete slab securing the lower construction elements 10A / 10B to the footing 90. The first upper construction element 40A is placed on top of the second lower construction element 10B such that at least one of the first connection portions 30,30 aligns with at least one of the second connection portions 50,50.

[0114] The first upper construction element 40A is secured to the first lower construction element 10A by, inserting a connector 70 through an access cavity 54 and a fastener cavity 52 into a first connection portion 30, screwing the connector 70 to the first connection portion 30, inserting a nut 72 into the access cavity 54 and fastening the nut 72 to the connector 70.

[0115] The second upper construction element 40B is placed on top of the second lower construction element 10B and operably connect with the first upper construction element 40A. When operably connecting the upper construction elements 40A / 40B with a tongue and groove joint a sealant is applied to a leading edge of the tongue.

[0116] The second upper construction element 40B is secured to the second lower construction element 10B by the same process as to how the first upper construction element 40A was secured to the first lower construction element 10A.

[0117] ADVANTAGES

[0118] An advantage of the prefabricated concrete construction elements is that buildings can be constructed rapidly and cost effectively.

[0119] Another advantage of the construction elements is that buildings constructed from the construction elements offer substantially vertical and horizontal bracing.

[0120] A further advantage of the construction elements is that they met high fire rating, acoustic rating and thermal rating. This advantage is further enhanced when the construction elements are operably connect with a tongue and groove join.

[0121] VARIATIONS

[0122] While the foregoing has been given by way of illustrative example of this invention, all such and other modifications and variations thereto as would be apparent to persons skilled in the art are deemed to fall within the broad scope and ambit of this invention as is herein set forth. Throughout the description and claims of this specification the word “comprise” and variations of that word such as “comprises” and “comprising”, are not intended to exclude other additives, components, integers or steps.

Claims

CLAIMS1. A prefabricated construction element, the construction element having a first wall portion, a second wall portion, and a ceiling portion; wherein the construction element has at least one connection portion; and wherein the construction element is joinable with at least one other construction element.

2. A construction element as claimed in claim 1, wherein the construction element is configured to join with at least one other construction element, and wherein the first end of a first construction element has a protrusion, and the second end of a second construction element has a recess configured to receive the protrusion.

3. A construction element as claimed in claims 1 or 2, wherein the construction element has at least one connection portion adapted to operably connect the construction element to a footing.

4. A construction element as claimed in claim 3, wherein the at least one connection portion includes at least one open hole arranged at a lower end of the construction element adjacent the footing.

5. A construction element as claimed in claim 4, wherein a first reinforcing member is receivable within the at least one open hole.

6. A construction element as claimed in claim 5, wherein the construction element is securable to the footing with a concrete slab, and the first reinforcing member is bondable with the concrete slab.

7. A construction element as claimed in any one of the preceding claims, wherein a first construction element is installable on top of a second construction element.

8. A construction element as claimed in any one of the preceding claims, wherein the first construction element is securable to the second construction element with at least one connector.

9. A construction element as claimed in claim 8, wherein the first construction element has at least one first fastener cavity in the ceiling portion, the first fastener cavity having an opening on a top face of the first construction element.

10. A construction element as claimed in claim 9, wherein the second construction element has at least one second fastener cavity in the ceiling portion, the second fastener cavity having an opening on a bottom face of the second construction element.

11. A construction element as claimed in claim 10, wherein the second fastener cavity has an opening on a side face of the first wall portion of the second construction element.

12. A construction element as claimed in claim 11, wherein the at least one connector is receivable through the opening and within the at least one first fastener cavity and the at least one second fastener cavity.

13. A construction element as claimed any one of the preceding claims, wherein the construction element is prefabricated, and the construction element has an opening formed when the construction element was fabricated14. A method of constructing a building from at least one construction element, the method including, preparing a footing; placing a first construction element on the footing; and securing the first construction element to the footing by installing at least one first reinforcement member on the first construction element, installing at least one second reinforcement member on the footing,installing a slab reinforcement mesh on top of the at least one first reinforcement member, pouring a concrete slab such that the at least one first reinforcement member, the at least one second reinforcement member, and the slab reinforcement mesh bond with the concrete slab securing the construction element to the footing.

15. A method as claimed in claim 14, wherein the method includes installing at least two first construction elements on the footing and operably engaging the at least two first construction elements together with a tongue and groove joint.

16. A method as claimed in claims 14 or 15, wherein the method includes securing the second construction element to the first construction element by installing a connector in at least one corresponding pair of a first fastener cavity and a second fastener cavity.

17. A method as claimed in claim 16, wherein the method includes installing a roof on top of the second construction element.

18. A method as claimed in claim 17, wherein the method further includes securing at least one roof beam to the footing by installing a tie-down connector into a third fastener cavity of the second construction element.

19. A method as claimed in claim one of claims 14 to 18, wherein preparing the footing includes the marking the footing with the intended positions of the construction elements.

20. A method of constructing a building from a first construction element and a second construction element, the method including, placing the first construction element; placing the second construction element on top of the first construction element; and securing the second construction element to the first construction element by installing a connector in at least one corresponding pair of a first fastener cavity and a second fastener cavity.

Citation Information

Patent Citations

  • Improvements relating to Building Elements and to Buildings made from such Elements

    GB1158708A

  • Plural story building comprising superimposed box-shaped dwelling units

    US3550334A

  • Prefabricated self-supporting modular room elements

    US4228623A

  • Prefabricated panel for a building

    WO2013110618A1

  • System for architectural modular building construction

    WO2021186481A1

Cited By

  • Modular construction system

    US20250043564A1