A ship low voltage shore power pretreatment system

By configuring conventional shore power boxes and pre-embedded cables on the ship, the problem of insufficient power demand when the ship docks is solved, the convenience and economy of shore power on board are realized, the cost of modification is reduced, and the safety and practicality are improved. .

CN106911128BActive Publication Date: 2024-10-11SHANGHAI MERCHANT SHIP DESIGN & RES INST
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN201510979933.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2015-12-23
Publication Date
2024-10-11
Estimated Expiration
2035-12-23

AI Technical Summary

Technical Problem

In the existing technology, the power demand of ships during loading, unloading and berthing conditions cannot be fully met when the ship is docked at the dock, resulting in shore power on board with strong limitations, high use risk and poor economic efficiency, and the lack of complete low-voltage shore power technical standards. .

Method used

Design a low-voltage shore power pretreatment system for ships. By configuring conventional shore power boxes and air switches on the ship and pre-embedding cables, it ensures that the cable carrying capacity exceeds the shore power switch frame current on the main distribution board and avoids future structural modifications. Realize the convenience and economy of shore power on board ship.

Benefits of technology

It reduces the cost of ship modification, improves the safety and practicality of shore power on board, meets the current ship design standards, provides convenient application conditions for future low-voltage shore power technology, and reduces initial investment and labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN106911128B_ABST
    Figure CN106911128B_ABST
Patent Text Reader

Abstract

The present invention provides a guarantee for the use of low-voltage shore power by pre-buried cables and configured with shore power switches of required capacity, thus avoiding high-cost reconstruction of ships in the future. The present invention can reduce the pollution of exhaust gas emissions to the environment. When the ship is docked at the dock, the main generator on the ship can be stopped and the shore power supply device can be used to supply power to the ship for loading and unloading conditions and berthing conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of ship shore power, and in particular relates to a ship low-voltage shore power pretreatment system. Background Art

[0002] In order to build green ports and reduce environmental pollution caused by exhaust emissions, when a ship is docked at the terminal, the main generator on board can be stopped and power can be supplied to the ship using a shore power supply device for loading and unloading conditions and berthing conditions.

[0003] When a ship is built, it is usually equipped with a shore power box with a smaller capacity (usually no more than 600 amperes), which can be connected to the shore power at the dock, but can only meet the electricity needs of daily living facilities such as the ship's kitchen, lighting, communications, or basic electricity needs during shipyard repairs.

[0004] When the ship is docked at the port for loading and unloading conditions and berthing conditions, the power required for the ship's load under any condition comes from the main generator set installed on the ship. Usually, one or two main generators can be operated as needed.

[0005] Therefore, if it is necessary to connect to shore power to supply ship operation power, the capacity of the original shore power box can no longer meet the requirements.

[0006] Since shore power technology is still in its early stages in my country, especially the existing power supply facilities at the docks have not been transformed accordingly, and there are no classification society standards and corresponding products for dock power supply equipment, and the country has not enforced shore power technology, even if newly built ships are equipped with large-capacity shore power boxes and related equipment, it is actually impossible to connect shore power to the ship, which also increases the initial investment in the ship.

[0007] If the shore power is connected to the ship by increasing the capacity of the shore power box, Figure 1 As shown, the following work needs to be done: select a large-capacity shore power box; select a junction box with a socket; the shore power switch on the main distribution board must be consistent with the shore power box; lay the cable from the main distribution board to the shore power box; lay the cable from the shore power box to the junction box with a socket.

[0008] Disadvantages of existing technology: There are risks in use. Because the current terminal equipment does not have the conditions to power ships, the junction box with sockets installed on the ship may not be able to connect to the terminal in the future, resulting in re-ordering. Limitations increase. The current specifications for low-voltage shore power technology are not perfect enough, ships and terminals cannot be connected, and there is no standard for shore power box protection. If the specifications are improved in the future, the shore power box must be re-ordered. Poor economic efficiency. Because low-voltage shore power cannot be connected, it is necessary to add UPS to ensure the continuity of power supply for navigation equipment such as gyrocompasses. Summary of the invention

[0009] In view of the shortcomings of the current implementation of shore power on board ships, such as strong limitations, high risks of use, and poor economy, the present invention provides a ship low-voltage shore power pretreatment system, which provides a guarantee for the use of low-voltage shore power by ships in the future by pre-buried cables and configured with shore power switches of required capacity, thereby avoiding high-cost reconstruction projects of ships in the future.

[0010] A ship low-voltage shore power pretreatment system, a conventional shore power box is configured on board, the frame current of the conventional shore power box switch is consistent with the rated current, but neither is greater than 600 amperes; the shore power switch on the main switchboard selects an air switch, the frame current of the air switch is configured according to the required capacity of the ship low-voltage shore power, and the overcurrent trip value of the air switch is consistent with that of the conventional shore power box;

[0011] The conventional shore power box is connected to the main switchboard by a marine power cable.

[0012] The specifications, quantity and wiring of the marine power cable are determined according to the capacity of the conventional shore power box;

[0013] A pre-buried cable is laid between the distribution board and the conventional shore power box, the current carrying capacity of the pre-buried cable plus the current carrying capacity of the ship power cable is greater than the frame current of the shore power switch on the main distribution board, and the pre-buried cable is not connected in the conventional shore power box and the main distribution board.

[0014] The present invention provides a ship low-voltage shore power pretreatment system with low risk and strong practicality. The design of the shore power box and the main switchboard can meet the current ship design standards and provide convenience for the future application of low-voltage shore power technology in ships. It is economical because the pre-buried cables can avoid the structural modification for completing the cable laying between the main switchboard and the shore power box when the ship uses low-voltage shore power in the future. It is forward-looking and has low initial investment. The labor cost is low. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the shore power supply structure on board by increasing the capacity of the shore power box;

[0016] In the figure, 11 is the shore power box, 12 is the main bus, 13 is the ship power cable 1, 14 is the ship power cable 2, 15 is the main switchboard, 16 is the engine room control room, 17 is the junction box with sockets, 18 is the ship power cable 3, 19 is the dock socket box, 20 is the air switch

[0017] Figure 2 This is a schematic diagram of the structure of the ship's low-voltage shore power pretreatment system

[0018] In the figure, 1 is a conventional shore power box, 2 is a main bus, 3 is a shipboard power cable, 4 is an engine room control room,

[0019] 5—main distribution board, 6—pre-buried cables. DETAILED DESCRIPTION

[0020] The specific implementation modes of the present invention are described in detail below with reference to the accompanying drawings.

[0021] If the shore power is connected to the ship by increasing the capacity of the shore power box, Figure 1 As shown, the following work needs to be done: select a large-capacity shore power box 11; select a junction box 17 with a socket; the shore power switch on the main distribution board 15 must be consistent with the shore power box 11; lay the ship power cable 13 between the main distribution board 15 and the shore power box 11; lay the ship power cable 14 between the shore power box 11 and the junction box 17 with a socket.

[0022] Figure 2 A schematic diagram of the structure of a ship's low-voltage shore power pretreatment system is given. The ship's low-voltage shore power pretreatment system is configured with a conventional shore power box 1, whose switch frame current is consistent with the rated current, but neither of them exceeds 600 amperes. At the same time, a main distribution board 5 is configured in the engine room control room 4, and the shore power switch on the main distribution board 5 uses an air switch. The frame current of the air switch is configured according to the required capacity of the ship's low-voltage shore power, but the overcurrent trip value of the switch is consistent with the shore power box.

[0023] The main switchboard 5 and the conventional shore power box 1 are connected by a marine power cable 3. The cable specification, quantity and connection of the marine power cable 3 are selected according to the capacity of the shore power box, which is the same as that of conventional ships.

[0024] The number of the marine power cables 3 is no less than 2.

[0025] At the same time, a plurality of pre-buried cables 6 are arranged between the main switchboard 5 and the conventional shore power box 1, so that the current carrying capacity of the pre-buried cables 6 plus the current carrying capacity of the connected ship power cable 3 can be slightly greater than the frame current of the shore power switch on the main switchboard 5. The pre-buried cables 6 are not connected in the conventional shore power box 1 and the main switchboard 5, in preparation for future ship modification.

[0026] When the ship uses low-voltage shore power on board in the future, it only needs to re-order the shore power box, add a junction box with a socket, and connect the pre-buried cable 6 to the main distribution board 5 and the newly ordered shore power box.

[0027] The main bus adopts a main bus with a specification of AC380V / 60HZ or AC440V / 60HZ.

Claims

1. A ship low-voltage shore power pretreatment system, characterized in that: A conventional shore power box (1) is arranged on board the ship, and a main switchboard (5) is arranged in a control room (4) of the engine room. The conventional shore power box (1) and the main switchboard (5) are connected by a ship power cable (3), and a pre-buried cable (6) is laid between the conventional shore power box (1) and the main switchboard (5). The pre-buried cable (6) is not connected in either the conventional shore power box (1) or the main switchboard (5); The shore power switch on the main switchboard (5) selects an air switch, the frame current of the air switch is configured according to the required capacity of the ship's low-voltage shore power, and the overcurrent trip value of the air switch is consistent with that of the conventional shore power box (1); When the ship uses low-voltage shore power on board, the shore power box is re-customized, a junction box with a socket is added, and the pre-buried cable (6) is connected to the main switchboard (5) and the re-customized shore power box.

2. A ship low-voltage shore power pretreatment system according to claim 1, characterized in that: The switch frame current of the conventional shore power box (1) is consistent with the rated current, but does not exceed 600 amperes.

3. A ship low-voltage shore power pretreatment system according to claim 1, characterized in that: The specifications, quantity and wiring of the marine power cable (3) are determined according to the capacity of the conventional shore power box (1).

4. A ship low-voltage shore power pretreatment system according to claim 1, characterized in that: The current carrying capacity of the pre-buried cable (6) plus the current carrying capacity of the shipboard power cable (3) is greater than the frame current of the shore power switch on the main switchboard (5).

5. A ship low-voltage shore power pretreatment system according to claim 1, characterized in that: The number of the shipboard power cables (3) is no less than 2.

Citation Information

Patent Citations

  • Movable shore power variable frequency power supply unit

    CN101610036A

  • System, apparatus and method for power transfer to vessels

    CN102246377A

  • High-voltage frequency conversion marine shore power system

    CN104934975A

  • Low-voltage ship shore power system

    CN104934981A

  • Shore-based marine voltage and frequency-optional power supply device

    CN201784479U