Device and method for artificial bored pile construction
Through the integrated manual hole-drilling pile construction device, the excavation, unearth and wall-protecting casting processes are integrated, which solves the problems of low construction efficiency and safety hazards, and achieves efficient construction progress and safety improvement.
Patent Information
- Application Number
- CN201810441702.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-05-10
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2038-05-10
AI Technical Summary
The construction of artificial hole-drilling piles has safety hazards and low construction efficiency, and cannot meet the progress requirements.
Provide an integrated artificial hole-punch construction device, including support plates, hole wall brackets, unearthed structures, sliding mold structures and grouting pipes. Through these components, excavation, unearthing, wall-guard concrete pouring and other processes are integrated. , as the earth excavation is timely unearthed and the wall protection structure is poured, the safety hazards are reduced and construction efficiency is improved.
It effectively improves construction efficiency, meets construction progress requirements, and reduces safety hazards during manual hole-drilling pile construction.
Smart Images

Figure CN108360504B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of artificial bored pile construction, in particular to a device for artificial bored pile construction and a construction method thereof. Background Art
[0002] In the process of civil engineering construction, manual bored piles are often used for pile foundation construction. Manual bored piles have the advantages of simple construction, economical applicability, and high single pile bearing capacity. They are currently widely used in industrial and civil construction and transportation.
[0003] However, there are the following problems in the construction of artificial bored piles:
[0004] First of all, manual bored pile construction operations involve potential safety hazards such as collapse, hypoxia, and suffocation, and are somewhat dangerous.
[0005] Secondly, during the construction of bored piles, the progress of excavation work is limited due to the influence of the pouring time of the retaining wall concrete in the construction process, and sometimes it cannot meet the progress requirements.
[0006] Thirdly, in traditional bored pile construction, the excavation, excavation, ventilation, wall concrete pouring and other operating procedures are scattered, which seriously affects the efficiency of construction work. Summary of the invention
[0007] The purpose of the present invention is to overcome the defects of the prior art and provide a device and a construction method for manual bored pile construction to solve the problems that the existing manual bored pile construction has potential safety hazards and is dangerous, and the construction efficiency is low and cannot meet the progress requirements.
[0008] The technical solution to achieve the above purpose is:
[0009] The present invention provides a device for manually excavating pile construction, comprising:
[0010] A support plate is arranged on the soil around the pile opening of the bored pile, and a shielding portion covering part of the pile opening is arranged on the support plate corresponding to the periphery of the pile opening;
[0011] A hole wall bracket fixedly connected to the shielding portion and placed in the bored pile, wherein the hole wall bracket is spliced and extended downward as the bored pile is dug downward;
[0012] An excavated structure supported on the support plate and correspondingly arranged at the pile mouth, the excavated structure comprising a lifting mechanism that can move back and forth between the pile mouth and the pile bottom of the bored pile;
[0013] A slipform structure suspended on the excavated structure and placed in the bored pile, the slipform structure being located outside the hole wall bracket, and a casting space being formed between the slipform structure and the inner wall surface of the bored pile, and the slipform structure being movable back and forth between the pile mouth and the pile bottom of the bored pile; and
[0014] A grouting pipe is fixed on the support plate and extends into the bored pile. The grouting pipe is spliced and extended downward as the bored pile is dug downward. Concrete is poured into the pouring space through the grouting pipe to form a wall protection structure covering the inner wall surface of the bored pile.
[0015] The present invention provides an integrated device for manual bored pile construction, which integrates the excavation, excavation, and wall concrete pouring operations, and can timely excavate with the excavation of earthwork, and timely pour the wall concrete structure after excavating a certain depth, thereby effectively improving the construction efficiency and meeting the construction progress requirements. A support plate is set at the pile mouth, and a hole wall bracket is set in the bored pile to support the bored pile, which can reduce the safety hazards in the construction process of manual bored piles.
[0016] A further improvement of the device for manually excavated bored pile construction of the present invention is that the top of the hole wall bracket passes through the shielding portion of the support plate and is fixedly connected to the shielding portion.
[0017] A further improvement of the device for bored pile construction of the present invention is that the unearthed structure includes a base placed on the support plate and a support frame fixed on the base, the support frame is provided with a crossbeam located above the pile mouth corresponding to the pile mouth, and the lifting mechanism is installed on the crossbeam.
[0018] A further improvement of the device for artificial bored pile construction of the present invention is that the slipform structure includes a plurality of template blocks connected by splicing and a retractable mechanism connected to the template blocks for controlling the lifting and movement of the template blocks, and the retractable mechanism is fixed to the excavated structure.
[0019] A further improvement of the device for constructing bored piles of the present invention is that it also includes an air compressor placed at the pile mouth, the output port of the air compressor is connected to an air delivery pipe, and the air delivery pipe extends into the bored pile.
[0020] The present invention also provides a construction method of a device for manually excavating bored piles, comprising the following steps:
[0021] Excavating a set depth at a set position of the bored pile to form a pile opening and a pile hole section;
[0022] Installing the device at the pile opening and the pile hole section formed by excavation;
[0023] Before installing the slipform structure, a wall protection steel bar is arranged on the inner wall surface of the pile hole section, and then the slipform structure is installed in place, and concrete is poured between the slipform structure and the inner wall surface of the pile hole section through the grouting pipe to form a wall protection structure section;
[0024] Excavating earth downwards, and transporting the excavated earth out of the bored piles through the excavation structure;
[0025] After a certain depth of excavation is formed to form a new pile hole section, the hole wall support is spliced to the bottom of the new pile hole section; wall reinforcement bars are set on the inner wall surface of the new pile hole section, the slipform structure is lowered to the new pile hole section, and concrete is poured between the slipform structure and the inner wall surface of the new pile hole section through the grouting pipe to form a new wall structure section; the earthwork is continued to be excavated downward, and this step is repeated until the excavation reaches the designed depth of the bored pile, thereby completing the construction of the bored pile.
[0026] A further improvement of the method of the present invention is that when installing the hole wall bracket of the device, the top of the hole wall bracket passes through the supporting plate and is fixedly connected.
[0027] A further improvement of the method of the present invention is that the hole wall bracket includes a plurality of vertically arranged support rods, and splicing the hole wall bracket includes:
[0028] Providing a new support rod, and splicing and connecting the new support rod to the bottom of the support rod;
[0029] Stirrups are provided to connect the new struts and connect the new struts into one piece.
[0030] A further improvement of the method of the present invention is that the earthwork produced by excavation is transported out of the bored pile through the excavation structure, comprising:
[0031] moving the lifting mechanism to the current bottom of the bored pile;
[0032] The lifting mechanism is connected to a container for holding earth produced by excavation, and the lifting mechanism is moved to the pile opening, so as to transport the earth out of the bored pile.
[0033] A further improvement of the method of the present invention is that it also includes:
[0034] An air compressor is provided, and an air delivery pipe is connected to the output port of the air compressor. The air delivery pipe is extended into the bored pile, and air is delivered into the bored pile through the air delivery pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 The present invention is a perspective view of the device for manually excavated pile construction during use.
[0036] Figure 2 It is a schematic diagram of the structure of the device for constructing bored piles according to the present invention, located at the pile mouth.
[0037] Figure 3 The present invention is a schematic structural diagram of a hole wall support and a grouting pipe located in a pile hole in a device for constructing bored piles.
[0038] Figure 4 It is a structural schematic diagram of a slipform structure located in a pile hole in a device for constructing bored piles of the present invention. DETAILED DESCRIPTION
[0039] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0040] See also Figure 1 The present invention provides a device for manual bored pile construction and a construction method thereof, which are used to solve the problems that existing manual bored pile construction operations have safety hazards such as collapse, hypoxia, and suffocation; the excavation operation progress cannot meet the requirements; and the excavation, excavation, ventilation, wall concrete pouring and other operation processes are scattered, affecting the construction efficiency. The device of the present invention uses support plates and hole wall brackets as support structures in the process of bored pile construction, which can reduce the safety hazards in the process of manual bored pile construction. The device of the present invention is an integrated structure, which integrates the operation processes such as excavation, excavation, and wall concrete pouring. It can be excavated in time with the excavation of earthwork, and the wall concrete can be poured in time after a certain depth of excavation, thereby effectively improving the construction operation efficiency and meeting the construction progress requirements. The device for manual bored pile construction and the construction method thereof of the present invention are described below in conjunction with the accompanying drawings.
[0041] See also Figure 1 , showing a perspective view of the device for artificial bored pile construction of the present invention during use. Figure 1 , the device for artificial bored pile construction of the present invention is described.
[0042] like Figure 1 As shown, the device for constructing artificial bored piles of the present invention includes a support plate 21, a hole wall support 22, an excavation structure 23, a slipform structure 24 and a grouting pipe 25. The artificial bored pile forms a vertically arranged bored pile 11 on the ground 10 by artificial excavation, and the bored pile 11 forms a pile opening 111 on the ground. The support plate 21 is arranged on the soil around the pile opening 11 of the bored pile 11. The support plate 11 is laid on the ground 10, and an opening corresponding to the pile opening 11 is opened on the support plate 11, and the size of the opening is smaller than the size of the pile opening 11, so that a shielding portion covering part of the pile opening 111 is provided at the periphery of the support plate 11 corresponding to the pile opening 111, combined with Figure 2As shown, the portion of the support plate 21 near the opening covers part of the pile opening 111. The hole wall bracket 22 is fixedly connected to the shielding portion, and the hole wall bracket 22 is placed in the bored pile 11. The hole wall bracket 22 is arranged corresponding to the inner wall surface of the bored pile 11. The hole wall bracket 22 is arranged at the inner wall surface of the bored pile 11 to support the bored pile 11. The hole wall bracket 22 is spliced and extended downward as the bored pile 11 is excavated, which can ensure that the bored pile 11 is supported throughout the construction of the bored pile 11. The excavated structure 23 is supported on the support plate 21, and the excavated structure 23 is arranged corresponding to the pile opening 111. The excavated structure 23 includes a lifting mechanism 231 that can move back and forth between the pile opening 111 and the pile bottom of the bored pile 11. The earth excavated at the pile bottom is transported out of the bored pile by the lifting and moving of the lifting mechanism 231. The slipform structure 24 is suspended on the excavated structure 23. The slipform structure 24 is located on the outside of the hole wall bracket 22, and a casting space is formed between the slipform structure 24 and the inner wall surface of the bored pile 11. The slipform structure 24 can be moved back and forth between the pile mouth 111 and the pile bottom of the bored pile 11. Through the movement and adjustment of the slipform structure 24, the wall protection concrete can be continuously cast to form a wall protection structure as the bored pile 11 is excavated, which meets the continuous excavation of the bored pile 11, thereby improving the construction efficiency. The grouting pipe 25 is fixed on the support plate 21 and extends into the bored pile 11. The grouting pipe 25 is spliced and extended downward as the bored pile 11 is excavated. Concrete is cast into the casting space through the grouting pipe 25 to form a wall protection structure covering the inner wall surface of the bored pile 11. Casting the wall protection structure improves the structural safety of the wall surface of the bored pile 11, improves the structural stability of the bored pile 11, and reduces safety hazards.
[0043] As a preferred embodiment of the present invention, Figure 1 and Figure 3 As shown, the top of the hole wall bracket 22 passes through the shielding part of the support plate 21 and is fixedly connected to the shielding part. The hole wall bracket 22 includes a plurality of vertically arranged support rods 221 and a plurality of stirrups 222 arranged at intervals and connecting the plurality of support rods 221 into one. During the initial installation, the bored pile 11 is first excavated to a certain depth, preferably 1 meter, and then the support plate 21 is laid, and the hole wall bracket 22 is installed. The support rod 221 of the hole wall bracket 22 passes through the support plate 21 and extends into the bored pile 11. The support rod 221 is arranged in a circle corresponding to the inner wall surface of the bored pile 11, and a portion of the top of the support rod 221 is located above the support plate 21. The top of the support rod 221 is connected into one by stirrups 222, and a connector is installed on the support rod 221. The connector is placed on the support plate 21, and the stirrups 222 are connected and fixed to the support rod 221 through the connector.
[0044] Furthermore, a plurality of cross bars 223 are connected between two of the plurality of support bars 221, so that a ladder 224 connecting the pile opening 111 and the pile bottom is formed through the cross bars 223 and the two support bars 221. The ladder 224 forms a walking passage for construction workers to enter and exit the bored pile 11.
[0045] As the bored pile 11 is excavated downward, the support rods 221 are spliced so that the distance between the bottom of the support rod 221 and the bottom of the bored pile 11 remains unchanged. Preferably, the distance between the bottom of the support rod 221 and the bottom of the bored pile 11 is 100 mm. When splicing the support rods 221, stirrups 222 are arranged at intervals, and the support rods 221 are connected into one body through the skeleton 222 to improve the structural firmness and stability of the hole wall bracket 21. The crossbars 223 are added as the support rods 221 are spliced, so that the ladder 224 can be used to safely pass up and down.
[0046] Preferably, the support plate 21 is made of 15mm thick steel plate, which is processed according to the size of the pile diameter and the shape of the pile. The steel plate can be processed into a rectangle or square, and the four sides of the steel plate should be larger than the outer edge of the pile hole by 200mm. The support rod 221 of the hole wall bracket 22 is processed and assembled from scaffolding steel pipes of Φ48×3.0mm and 3 meters in length. The arrangement of the steel pipe is based on the size of the pile diameter and the shape of the pile, and a steel pipe support is set at an interval of 30 degrees at the radius of the pile. The length of the steel pipe is increased by connecting with the fasteners of the scaffolding according to the increase in the depth of the pile hole. The stirrup 222 is made of steel bars with a diameter of 16mm, and the diameter is 10mm smaller than the inner diameter of the hole wall bracket 22. According to the spacing of 1m, scaffolding members are used as connectors and installed on the steel pipe of the hole wall bracket 22 to fix and support the steel pipe.
[0047] As another preferred embodiment of the present invention, Figure 1 and Figure 2 As shown, the excavation structure 23 includes a base 232 placed on the support plate 21 and a support frame 233 fixed on the base 232. The support 233 is provided with a crossbeam 2331 located above the pile opening 111 corresponding to the pile opening 111, and the lifting mechanism 231 is installed on the crossbeam 2331. The crossbeam 2331 is supported above the pile opening 111 by the support frame 233 to facilitate the excavation operation of the lifting mechanism 231 installed on the crossbeam 2331.
[0048] Further, the lifting mechanism 231 includes a first pulley 2311 fixed on the excavation structure 23, a rope 2312 passing around the first pulley 2311, and a winch 2313 connected to one end of the rope 2312 and used to control the retraction and release of the rope 2312. One end of the rope 2312 is fixed on the winch 2313, and the other end passes around the first pulley 2311 and is located at the pile mouth 111 and can extend into the bored pile 11. The rope 2312 is partially wound on the winch 2313, and the retraction and release of the rope 2312 is controlled by the winch 2313. When excavation is required, the rope 2312 is lowered to the bottom of the bored pile 11 by the winch 2313, and the end of the rope 2312 at the bottom of the pile is connected to a container for holding earthwork, and then the rope 2312 is lifted up to the pile mouth 111 by the winch 2313, so that the earthwork in the container can be removed.
[0049] Furthermore, the base 232 includes a pair of supporting beams 2321 arranged opposite to each other and a connecting beam 2322 connected to the pair of supporting beams 2321. The supporting beams 2321 are placed on the supporting plate 21 and the two ends protrude from the supporting plate 21 and are placed on the soil outside the pile opening 111. The supporting beams 2321 are placed on the supporting plate 21 and the ends protrude from the supporting plate 21, so that the supporting beams 2321 play a role in reinforcing the supporting plate 21 and can firmly press the supporting plate 21 on the ground 10. Preferably, the hoist 2313 of the lifting mechanism 231 is fixed on the base 232.
[0050] As another preferred embodiment of the present invention, Figure 1 and Figure 4 As shown, the sliding formwork structure 24 includes a plurality of template blocks 241 connected by splicing and a retracting mechanism 242 connected to the module 241 for controlling the lifting and lowering movement of the template blocks 241, and the retracting mechanism 242 is fixedly arranged on the excavated structure 23. A connecting angle brace is fixedly arranged on the support frame 233 of the excavated structure 23, preferably, the angle brace is formed by welding of section steel, and the angle brace is welded and fixed on the support frame 233. The retracting mechanism 242 is fixed by the angle brace.
[0051] Furthermore, the retracting and releasing mechanism 242 includes a second pulley 2421 fixedly mounted on the excavated structure 23 and a suspension rope 2422 having one end fixedly connected to the corresponding template block 241, and the other end of the suspension rope 2422 passes around the second pulley 2421 to form an operating end, through which the lifting and lowering movement of the template block 241 is controlled. Preferably, the operating end of the rope 2422 is manually operated by the construction personnel, and the lowering operation of the template block 241 is manually controlled. After the template block 241 is lowered into place, the operating end is firmly fixed.
[0052] The template blocks 241 are spliced to form a cylindrical structure, the size of which is smaller than the inner diameter of the bored pile 11, so that a casting space is formed between the cylindrical structure and the inner wall surface of the bored pile 11. The wall protection structure is a concrete structure cast in sections from top to bottom. After each digging down a certain distance, the template block 241 is lowered to the bottom of the current bored pile 11, and then concrete is cast through the grouting pipe 25 to form the wall protection structure. When the earthwork is continued to be excavated, the template block 241 is not disassembled at this time, and will be disassembled when it is lowered next time. The sliding formwork structure 24 adopts an integrally sliding combined template, which makes assembly, disassembly, fixing and use convenient and efficient.
[0053] As another preferred embodiment of the present invention, Figure 1 As shown, the device of the present invention also includes an air compressor 26 placed at the pile mouth 111, and the output port of the air compressor 26 is connected to an air delivery pipe 261, which extends into the bored pile 11 and is used to deliver air to the bored pile 11. Preferably, the air delivery pipe 261 is inserted into a branch rod 221 in the hole wall bracket 22 at the pile mouth 111, and the air is delivered to the bottom of the bored pile 11 through the branch rod 221. With the splicing of the branch rod 221, the air is continuously delivered to the bottom of the pile, ensuring the construction safety of the pile bottom. After the bored pile 11 is excavated to a certain depth, the air compressor 26 is turned on to deliver air to the bottom of the bored pile 11, ensuring the flow of air under the pile hole and meeting the requirements of construction work under the pile hole.
[0054] The installation and use process of the device for artificial bored pile construction of the present invention is as follows:
[0055] The pile position is determined by measurement, and the first step of excavation is carried out. After that, the support plate is installed; then the arm support is installed; the grouting pipe is installed: the grouting pipe uses a cast iron pipe with a diameter of 80mm and a wall thickness of 3.5mm as the chute for concrete pouring, and a hose is used at the bottom of the chute to facilitate concrete pouring. Holes are reserved on the support plate, and the chute is connected and fixed to the support plate through the holes with bolts; then a cross bar is installed between the two support rods on the hole wall support to form a ladder. The cross bar uses a steel pipe with a diameter of Φ48×3.0mm and a length of 500mm with a spacing of 300mm. It is connected to the support rod with a scaffolding fastener device to form a ladder for personnel to go up and down the hole, so that the workers can go up and down the well device. Install the excavation device: install and fix the support frame on the support plate, fix the hoist of the lifting mechanism on the base, fix the pulley on the crossbeam of the support frame, install the rope, and use the excavation device to transport the soil at the bottom of the pile to the outside of the pile. Installation of slipform structure: The second pulley of the slipform structure adopts a finished pulley, which is used to lift and lower the combined formwork blocks; the lifting rope adopts a steel wire rope, the diameter of which is determined according to the weight of the formwork plate to meet the load requirements, and is used to connect the formwork blocks to assist in lifting and lowering; the formwork blocks are made of cast iron plates and are formed by combining four formwork blocks; the connection and fixing device of the formwork blocks adopts finished elastic fasteners, which are used to connect, fix and assemble the formwork blocks. With the excavation of the pile hole, the pouring of the retaining wall concrete is continuous, and the whole slides down to meet the pouring of the retaining wall concrete and the continuous excavation of the pile hole. Installation of air compressor: The finished air compressor provided by a professional equipment manufacturer is used, which is connected to the support rod through a hose to transport air to the bottom of the pile. As the support rod is lowered, the air is continuously transported to the bottom of the pile. Air delivery in the pile hole: After excavation to a certain depth, before the personnel go down the pile hole, turn on the air compressor to transport air to the bottom of the pile hole to ensure the flow of air under the pile hole and meet the requirements of the construction work of the personnel under the pile hole. The second step is earthwork excavation: After a certain period of air transportation under the pile hole (30 minutes), the construction personnel go down to the pile hole to continue excavating the pile hole. Excavation structure excavates the pile bottom: The earthwork generated by excavation is excavated efficiently and quickly through the excavation structure, using a winch as a power device and a pulley combination. The support rod of the hole wall bracket is lowered to 100mm from the bottom of the pile: After the pile is continuously excavated to a depth of 1 meter, the support rod is continued to be lowered 100mm from the bottom of the pile. Every time the support rod is lowered 1 meter, the stirrups of the hole wall bracket are installed simultaneously. Install the upper and lower well devices: After the pile is continuously excavated to a depth of 1 meter, every time the support rod is lowered 1 meter, the stirrups are installed simultaneously using the scaffolding fastener device and the cross bar. Install the wall reinforcement: After excavating 1 meter, install the wall reinforcement. After the wall reinforcement is processed and manufactured on the construction site, it is transported to the working surface by an electric pulley. The construction personnel install the wall reinforcement on the outside of the hole wall bracket. After the reinforcement is installed, the wall template is supported. The wall protection formwork adopts an automatic chain guide integral sliding fixed-shape combined formwork system, which is easy to install, fix and use, and is efficient. The combined formwork slides down: After the wall protection steel bars are installed, the sliding formwork structure slides down.The lowering operation is completed by the construction workers. The construction workers under the pile hole remove the fastener device of the template block to separate the template blocks. The workers on the top of the pile manually control the lowering length according to the excavation size through the second pulley and the lifting rope, and complete the lowering of the four template blocks in turn. Then, the workers in the pile hole complete the assembly of the combined template. Casting the retaining wall concrete: After the template blocks are lowered and assembled, the retaining wall concrete is cast through the grouting pipe to form a retaining wall structure. The next step is excavation: After the retaining wall concrete is poured, the template blocks are fixed and the workers under the pile hole continue to excavate the earth.
[0056] The construction method of the device for manually excavating bored piles provided by the present invention is described below.
[0057] The invention provides a construction method of a device for manually excavating bored piles, comprising the following steps:
[0058] like Figure 1 As shown, a set depth is excavated at a set position of the bored pile 11 to form a pile opening 111 and a pile hole section;
[0059] The device for constructing artificial bored piles of the present invention is installed at the pile opening 111 and the pile hole section formed by excavation;
[0060] Before installing the slipform structure 24, a wall protection steel bar is arranged on the inner wall surface of the pile hole section, and then the slipform structure 24 is installed in place, and concrete is poured between the slipform structure 24 and the inner wall surface of the pile hole section through the grouting pipe 25 to form a wall protection structure section;
[0061] Digging the earth downwards, and transporting the earth produced by the digging out of the bored pile 11 through the excavation structure 23;
[0062] After a certain depth of excavation is formed to form a new pile hole section, the hole wall bracket 22 is spliced to the bottom of the new pile hole section; wall reinforcement bars are set on the inner wall surface of the new pile hole section, the slipform structure 24 is lowered to the new pile hole section, and concrete is poured between the slipform structure 24 and the inner wall surface of the new pile hole section through the grouting pipe 25 to form a new wall protection structure section; the earthwork is continued to be excavated downward, and this step is repeated until the excavation reaches the designed depth of the bored pile 11, thereby completing the construction of the bored pile 11.
[0063] As a preferred embodiment of the present invention, when installing the hole wall bracket 22, the top of the hole wall bracket 22 passes through the supporting plate 21 and is fixedly connected.
[0064] Furthermore, the hole wall bracket 22 includes a plurality of vertically arranged support rods 221, and the hole wall bracket 22 is spliced, including:
[0065] Provide a new support pole, and splice and connect the new support pole to the bottom of the support pole;
[0066] Stirrups 222 are provided, and the stirrups 222 are connected to the new struts and connect the new struts into one body.
[0067] As another preferred embodiment of the present invention, the earthwork produced by excavation is transported out of the bored pile through the excavation structure, including:
[0068] Move the lifting mechanism 231 to the current bottom of the bored pile 11;
[0069] The lifting mechanism 231 is connected to a container for holding earth produced by excavation, and the lifting mechanism 231 is moved to the pile opening 111, so as to transport the earth out of the bored pile.
[0070] As another preferred embodiment of the present invention, it also includes:
[0071] An air compressor 26 is provided, and an air delivery pipe 261 is connected to the output port of the air compressor 26, and the air delivery pipe 261 is extended into the bored pile 11, and air is delivered to the bored pile 11 through the air delivery pipe 261. Preferably, the air delivery pipe 261 is inserted into a support rod 221 in the hole wall bracket 22 at the pile mouth 111, and air is delivered to the bottom of the bored pile 11 through the support rod 221. As the support rod 221 is spliced, air is continuously delivered to the pile bottom, thereby ensuring the construction safety of the pile bottom.
[0072] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.
Claims
1. A device for artificial bored pile construction, characterized in that: include: A support plate is arranged on the soil around the pile opening of the bored pile, and a shielding portion covering part of the pile opening is arranged on the support plate corresponding to the periphery of the pile opening; A hole wall bracket fixedly connected to the shielding portion and placed in the bored pile, wherein the hole wall bracket is spliced and extended downward as the bored pile is dug downward; An excavated structure supported on the support plate and correspondingly arranged at the pile mouth, the excavated structure comprising a lifting mechanism that can move back and forth between the pile mouth and the pile bottom of the bored pile; A slipform structure suspended on the excavated structure and placed in the bored pile, the slipform structure is located outside the hole wall bracket, and a casting space is formed between the slipform structure and the inner wall surface of the bored pile, and the slipform structure can be moved back and forth between the pile mouth and the pile bottom of the bored pile; through the movement and adjustment of the slipform structure, the retaining wall concrete can be continuously cast to form the retaining wall structure as the bored pile is excavated; A grouting pipe fixedly arranged on the support plate and extending into the bored pile, wherein the grouting pipe is spliced and extended downwardly as the bored pile is dug downward, and concrete is poured into the pouring space through the grouting pipe to form a protective wall structure covering the inner wall surface of the bored pile; The top of the hole wall bracket passes through the shielding part of the support plate and is fixedly connected to the shielding part; the hole wall bracket includes a plurality of vertically arranged support rods and a plurality of stirrups arranged at intervals and connecting the plurality of support rods into one body, a plurality of cross bars arranged at intervals are connected between two of the plurality of support rods, and a ladder connecting the pile mouth and the pile bottom is formed by the cross bars and the two support rods; The excavated structure includes a base placed on the supporting plate and a support frame fixed on the base, the supporting frame is provided with a crossbeam located above the pile mouth corresponding to the pile mouth, and the lifting mechanism is installed on the crossbeam; the base includes a pair of supporting beams arranged opposite to each other and a connecting beam connected between the pair of supporting beams, the supporting beam is placed on the supporting plate and its two ends protrude from the supporting plate and are placed on the soil outside the pile mouth; the supporting beam is placed on the supporting plate and its end protrudes from the supporting plate, so that the supporting beam plays a role of reinforcing the supporting plate and can firmly press the supporting plate on the ground; The slipform structure comprises a plurality of template blocks connected in a splicing manner and a retractable mechanism connected to the template blocks for controlling the lifting and movement of the template blocks, the retractable mechanism being fixedly arranged on the excavated structure, the retractable mechanism comprising a second pulley fixedly arranged on the excavated structure and a suspension rope having one end fixedly connected to the corresponding template block, the other end of the suspension rope passing around the second pulley forms an operating end, and the lifting and movement of the template block is controlled by the operating end, the operating end of the rope is manually operated by the construction personnel, and the lowering operation of the template block is manually controlled, and the operating end is firmly fixed after being lowered into place; the template blocks are spliced to form a cylindrical structure, the size of which is smaller than the inner diameter of the bored pile, so that a casting space is formed between the cylindrical structure and the inner wall surface of the bored pile, the retaining wall structure is a concrete structure cast in sections from top to bottom, each time a certain distance is excavated, the template block is lowered to the bottom of the current bored pile, and then concrete is cast through a grouting pipe to form a retaining wall structure, and the excavation of the earth continues, at this time the template block is not demolded, and will be demolded again when it is lowered next time.
2. The device for artificial bored pile construction as claimed in claim 1, characterized in that: It also includes an air compressor placed at the pile mouth, the output port of the air compressor is connected to an air delivery pipe, and the air delivery pipe extends into the bored pile.
3. A construction method for the device for manually excavated pile construction as claimed in claim 1, characterized in that: The steps include: Excavating a set depth at a set position of the bored pile to form a pile opening and a pile hole section; Installing the device at the pile opening and the pile hole section formed by excavation; Before installing the slipform structure, a wall protection steel bar is arranged on the inner wall surface of the pile hole section, and then the slipform structure is installed in place, and concrete is poured between the slipform structure and the inner wall surface of the pile hole section through the grouting pipe to form a wall protection structure section; Excavating earth downwards, and transporting the excavated earth out of the bored piles through the excavation structure; After a certain depth of excavation is formed to form a new pile hole section, the hole wall bracket is spliced to the bottom of the new pile hole section; wall reinforcement bars are arranged at the inner wall surface of the new pile hole section, the slipform structure is lowered to the new pile hole section, and concrete is poured between the slipform structure and the inner wall surface of the new pile hole section through the grouting pipe to form a new wall structure section; the earthwork is continued to be excavated downward, and this step is repeated until the excavation reaches the designed depth of the bored pile, thereby completing the construction of the bored pile; When installing the hole wall bracket of the device, the top of the hole wall bracket is passed through the supporting plate and fixedly connected; The hole wall bracket includes a plurality of vertically arranged support rods, and the hole wall brackets are spliced together, including: Providing a new support rod, and splicing and connecting the new support rod to the bottom of the support rod; Providing stirrups, connecting the stirrups to the new support rods and connecting the new support rods into one; The excavated earth is transported out of the bored pile through the excavation structure, comprising: moving the lifting mechanism to the current bottom of the bored pile; The lifting mechanism is connected to a container for holding earth produced by excavation, and the lifting mechanism is moved to the pile opening, so as to transport the earth out of the bored pile.
4. The method according to claim 3, characterized in that Also includes: An air compressor is provided, and an air delivery pipe is connected to the output port of the air compressor. The air delivery pipe is extended into the bored pile, and air is delivered into the bored pile through the air delivery pipe.