A mud guard collection structure for heavy vehicles
By designing a multi-bent structure of the hollow sand collecting mechanism and a tubular unit with close contact connection, the problem of sand and gravel prone to popping out in the existing heavy-duty vehicle-based sludge collection structure is solved, and a more efficient sand and gravel collection effect is achieved.
Patent Information
- Application Number
- CN201810557334.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-06-01
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2038-06-01
AI Technical Summary
The existing heavy-duty vehicle-based mud-fighting collection structure is prone to pop out when collecting sand and gravel, resulting in low collection efficiency.
Design a heavy-duty vehicle-based sludge collection structure including a hollow sand collecting mechanism. The hollow sand collecting mechanism consists of a tubular unit with a multi-bent structure. The cross-section of the tubular unit is a regular hexagonal shape and is formed by bending and turning points. The closed storage cavity ensures that the sand and gravel will not rebound, and the tail sections of adjacent tubular units are closely connected in contact with each other, and share the tail tube to improve collection efficiency.
The collection efficiency of sand and gravel is improved, ensuring that sand and gravel can be effectively entered and stored stably when the wheels rotate, and solving the problem of low collection efficiency in the prior art.
Smart Images

Figure CN108725596B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of heavy-duty vehicle accessories, and in particular relates to a mud guard collecting structure for a heavy-duty vehicle. Background Art
[0002] The mudguard is a plate structure installed behind the outer frame of the wheel. Its function is to prevent mud from splashing onto the body of the vehicle or people, causing the body or people to be unsightly. A mud and gravel collecting structure is provided on the existing mud guard collecting structure for heavy vehicles and between the mud guard and the wheel. The purpose is to bring the mud and gravel on the wheel into the structure when the wheel rotates during the driving of the heavy vehicle, so as to prevent the heavy vehicle from bringing mud and gravel onto the road or highway and causing damage to the road surface. However, the existing mud guard collecting structure for heavy vehicles is not effective. Summary of the invention
[0003] The purpose of the present invention is to solve the technical problem that in the existing mud guard collection structure for heavy vehicles, sand and gravel are easily ejected when collecting sand and gravel, resulting in low collection efficiency.
[0004] The purpose of the invention is achieved in this way:
[0005] A mud guard collecting structure for heavy vehicles comprises a plate body. The front side of the plate body is provided with a hollow sand collecting mechanism formed by arranging at least one tubular unit, wherein the cross section of the tubular unit is a regular hexagon.
[0006] The above-mentioned hollow sand collecting mechanism includes a front end side surface and a rear end side surface. The front end surface of the tubular unit and the front end side surface of the hollow sand collecting mechanism are located on the same plane. The tubular body of the tubular unit is a multi-bending structure, which is bent at least once from the front end side surface to the rear end surface of the tubular unit.
[0007] From the front end side surface to the rear end surface of the tubular unit, after the tubular unit is bent for the last time, the tail section of the tubular unit is oriented horizontally or obliquely downward.
[0008] The tube walls of the tail sections of adjacent tubular units are in close contact and connection.
[0009] The tubular units are connected at their connections, and the tail ends of a plurality of adjacent tubular units share a set of tail pipes.
[0010] Two adjacent tubular units are connected at the connection.
[0011] Three tubular units arranged in a straight line are connected at adjacent joints.
[0012] Three triangularly arranged tubular units are connected at adjacent connections.
[0013] The plate body is connected to the fender via a fixing mechanism.
[0014] The bending turning part in the above-mentioned tubular unit is an arc segment structure.
[0015] The above technical solution can bring the following technical effects:
[0016] The plate body is closedly connected to the rear end side of the hollow sand collecting mechanism, and a closed accommodating cavity can be formed in the tubular unit. The cross-section of the tubular unit is a regular hexagonal structure, which can ensure seamless connection between the tubular units. More tubular units can be arranged on the plate body with the same surface area, thereby improving the sand and gravel collection efficiency. This solves the technical problem that the number of tubular units arranged on the existing mud guard collection structure for heavy vehicles does not meet actual needs, and when the wheels rotate to bring sand and gravel into the collection structure, they fall into the gaps between the tubular units, resulting in low collection efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:
[0018] Figure 1 It is the installation schematic diagram of the present invention;
[0019] Figure 2 This is a side view of the front end of the hollow sand collecting mechanism of the present invention;
[0020] Figure 3 and Figure 4 is a cross-sectional view of Example 1 of the hollow sand collecting mechanism of the present invention;
[0021] Figure 5 It is a partial view of the rear end side of the hollow sand collecting mechanism of the present invention;
[0022] Figure 6 and Figure 7 It is a cross-sectional view of Example 2 of the hollow sand collecting mechanism of the present invention. DETAILED DESCRIPTION
[0023] like Figure 1 As shown, a mud guard collection structure for heavy vehicles comprises a plate body 1, and a hollow sand collecting mechanism 3 formed by arranging at least one tubular unit 2 is provided on the front side of the plate body 1;
[0024] like Figure 2 As shown, the cross section of the tubular unit 2 is a regular hexagon, which can ensure seamless connection between the tubular units and more tubular units can be arranged on the plate with the same surface area, thereby improving the collection efficiency of sand and gravel, and solving the technical problem that the number of tubular units arranged on the existing mud guard collection structure for heavy vehicles does not meet the actual demand, and when the wheels rotate to bring sand and gravel into the collection structure, they fall into the gaps between the tubular units, resulting in low collection efficiency.
[0025] like Figure 3 and Figure 4 As shown; as an improvement, the hollow sand collecting mechanism 3 includes a front side surface 301 and a rear side surface 302, the front side surface of the tubular unit 2 and the front side surface 301 of the hollow sand collecting mechanism 3 are located on the same plane, and the tubular body of the tubular unit 2 is a multi-bend structure, which is bent at least once from the front side surface to the rear side surface of the tubular unit 2. In this way, after the wheel brings sand and gravel into the hollow sand collecting mechanism 3 at a high rotation speed, the sand and gravel will hit the bending turning part in the tubular unit, so that the sand and gravel will not bounce out, causing the collection of sand and gravel to fail, but will enter deeper into the tubular unit after impact and ejection, until it hits the plate body 1, so that it can be well collected.
[0026] Further improved, from the front end side surface to the rear end surface of the tubular unit 2, after the last bending of the tubular unit 2, the rear section of the tubular unit is horizontally oriented or obliquely downward; in this way, even if the vehicle encounters bumps during driving, the sand and gravel collected in the tubular unit can remain stable and will not be bumped out, further improving the sand and gravel collection effect of the device;
[0027] like Figure 3 As shown, the tube walls of the tail sections of adjacent tubular units 2 are closely connected, so that each tubular unit has its own independent channel. The wheel brings the sand and gravel into the front entrance of the tubular unit during high-speed rotation, and then continuously accumulates at the rear end of the tubular unit after entering the tubular unit, thereby realizing the collection of sand and gravel;
[0028] like Figure 4 As shown, when the tubular units are used as independent channels, more sand and gravel enter some tubular units, while less sand and gravel enter some other tubular units, which easily reduces the effect of sand and gravel collection. As an improvement, the connection between the tubular unit and the tail section of the tubular unit is an interconnected structure, and the tail ends of multiple adjacent tubular units share a set of tail pipes. This can solve the problem, facilitate processing and production, and save costs.
[0029] like Figure 5 As shown, there are two adjacent tubular units connected at the connection point on the rear end side of the hollow sand collecting mechanism, there are three tubular units arranged in a straight line connected at the adjacent connection points, and there are three tubular units arranged in a triangle connected at the adjacent connection points.
[0030] Optionally, the plate body 1 is connected to the fender 4 via a fixing mechanism.
[0031] The above-mentioned fixing mechanism is a slot connection mechanism.
[0032] like Figure 3 and Figure 4 As shown in FIG. 1 , the bending turning part in the tubular unit is an arc segment structure; or as shown in FIG. Figure 6 and Figure 7 As shown, the bending part in the tubular unit is a broken line segment structure. When sand and gravel enter the tubular unit, they will hit the bending part in the tubular unit. In this way, the sand and gravel will not bounce out, causing the collection of sand and gravel to fail. Instead, they will enter deeper into the tubular unit after impact and ejection until they hit the plate body 1, so that they can be well collected.
[0033] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A mud guard collection structure for a heavy-duty vehicle, comprising a plate body (1), a front side of the plate body (1) being provided with a hollow sand collecting mechanism (3) formed by arranging at least one tubular unit (2), Features: The cross section of the tubular unit (2) is a regular hexagon; the hollow sand collecting mechanism (3) comprises a front side surface (301) and a rear side surface (302); the front side surface of the tubular unit (2) and the front side surface (301) of the hollow sand collecting mechanism (3) are located on the same plane; the tubular body of the tubular unit (2) is a multi-bend structure, and is bent at least once from the front side surface to the rear side surface of the tubular unit (2); the connection between the tubular unit and the tail section of the tubular unit is a mutually interconnected structure, and the tail ends of a plurality of adjacent tubular units share a set of tail pipes; from the front side surface to the rear side surface of the tubular unit (2), after the last bend of the tubular unit (2), the tail section of the tubular unit is horizontally oriented or obliquely downward; the plate body (1) is connected to the fender (4) via a fixing mechanism, and the fixing mechanism is a slot connection mechanism.
2. The mud guard collection structure for heavy vehicles according to claim 1, Features: Two adjacent tubular units (2) on the rear end side of the hollow sand collecting mechanism (3) are connected at a connection, so that the connection between the tail sections of the two adjacent tubular units (2) is a mutually connected structure, and the tail ends of the two adjacent tubular units (2) share a set of tail pipes.
3. The mud guard collecting structure for heavy vehicles according to claim 1, Features: The three tubular units (2) arranged in a straight line on the rear end side of the hollow sand collecting mechanism (3) are connected at adjacent connections, so that the connection between the tail sections of the three tubular units (2) arranged in a straight line is a mutually connected structure, and the tail ends of the three tubular units (2) arranged in a straight line share a set of tail pipes.
4. The mud guard collecting structure for heavy vehicles according to claim 1, Features: The three triangularly arranged tubular units (2) on the rear end side of the hollow sand collecting mechanism (3) are connected at adjacent connections, so that the connections between the tail sections of the three triangularly arranged tubular units (2) are interconnected structures, and the tail ends of the three triangularly arranged tubular units (2) share a set of tail pipes.
5. The mud guard collecting structure for heavy vehicles according to claim 1, Features: The bending turning part in the tubular unit is an arc segment structure or a broken line segment structure.
