Anchoring system and underground engineering construction method

By adopting a linked anchoring system in the construction of underground chambers and utilizing the immediate support of the first anchor system and the reinforcement measures of the second anchor system, the problems of anchor system failure and slow construction progress under high ground stress and weak surrounding rock conditions are solved. Improved safety and efficiency of construction sites.

CN109339835BActive Publication Date: 2024-10-11HANGZHOU TUQIANG ENG MATERIAL CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811326790.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-11-08
Publication Date
2024-10-11
Estimated Expiration
2038-11-08

AI Technical Summary

Technical Problem

Under the conditions of high ground stress and weak surrounding rock, after the underground chamber is excavated, the surrounding rock will deform rapidly and with a large amount of deformation. The existing anchor system will easily fail, and the support will take a long time, which will affect the construction progress.

Method used

A linked anchoring system including a first anchor system and a second anchor system is adopted. The first anchor is combined with the porous pad to form immediate support. After the rock mass is stabilized, a second anchor is added to strengthen the support, forming a system that takes into account both deep and shallow layers. layer-anchored system.

Benefits of technology

It effectively improves the bearing capacity of the surrounding rock, shortens the excavation gap time, speeds up the construction progress, ensures the safety of the construction site, and prevents later deformation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109339835B_ABST
    Figure CN109339835B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of underground chamber construction support, and specifically to an anchoring system and an underground engineering construction method. The underground construction method adopts an anchoring system, which includes a first anchoring system for immediate support and a second anchoring system for later reinforced support. The first anchoring system includes a first anchor and a porous pad, and the second anchoring system includes a second anchor added on the basis of the first anchoring system; adjacent porous pads are partially overlapped, and the first anchor and the second anchor correspond to the openings on the porous pads and are staggered, and the length of the first anchor extending into the rock mass is less than the second anchor. The anchoring system of the present invention is suitable for the situation where the space for the first sub-division is limited during the partial excavation process. It is not easy to fail, the anchoring system has good connectivity, and the supporting force gradually increases; the excavation working surface, the initial support surface and the later support surface of the construction method are sequentially advanced, which can ensure the safety of the site, shorten the excavation time, and speed up the construction progress.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of underground chamber construction support, and in particular to an anchoring system and an underground engineering construction method. Background Art

[0002] Under the conditions of high ground stress and soft and broken surrounding rock, after the underground chamber is excavated, the surrounding rock deforms quickly and the deformation is large. If anchor rods or anchor cables are used immediately for support, it is very easy to be affected by the large deformation and cause the failure of the anchoring system. In addition, the construction of anchor rods or anchor cables takes a long time, and it is difficult to support the surrounding rock immediately, which affects the continued excavation and slows down the construction progress. Summary of the invention

[0003] The present invention aims to provide an anchoring system for solving the problems in the prior art of easy failure of the anchoring system, long support time, long excavation interval time and slow construction progress under high ground stress and soft surrounding rock conditions.

[0004] Another object of the present invention is to provide an underground engineering construction method, which adopts the above-mentioned anchoring system to ensure the safety of the construction site under high ground stress and weak surrounding rock conditions, shorten the interval time of the excavation section, and speed up the construction progress.

[0005] The embodiment of the present invention is achieved as follows:

[0006] An embodiment of the present invention provides an anchoring system, which includes a first anchoring system for immediate support and a second anchoring system for later reinforced support, wherein the first anchoring system includes a first anchor and a porous pad, and the second anchoring system includes a second anchor added on the basis of the first anchoring system;

[0007] The adjacent porous pads partially overlap, the first anchor and the second anchor respectively correspond to the openings on the porous pads and are arranged alternately, and the length of the first anchor extending into the rock mass is shorter than that of the second anchor.

[0008] The anchoring system includes a first anchoring system and a second anchoring system. The first anchor is driven into the surrounding rock of the section immediately after the section is excavated, and a porous pad is used to be set between the first anchor and the rock mass. Multiple first anchors are integrated into one by using overlapping porous pads. A small amount of anchors is driven to form a system with stronger anchoring ability. When setting the first anchoring system, a certain prestress can be applied to the first anchor to improve the bearing capacity of the surrounding rock, speed up the speed and strength of immediate support, thereby protecting the safety of the construction site, shortening the interval time of excavation, facilitating the continuation of section excavation, and accelerating the construction progress.

[0009] After the internal pressure in the rock mass is released and the deformation of the rock mass is stabilized, the surrounding rock is further supported and the second anchor is driven into the rock mass from the corresponding second opening. The length of the second anchor is greater than that of the first anchor. The second anchor penetrates further into the rock layer and is integrated with the first anchoring system to form a second anchoring system that takes into account both deep anchoring and shallow anchoring. This strengthens the support for the surrounding rock whose internal pressure has been released and has tended to be stable, thereby stabilizing the rock mass and preventing later deformation.

[0010] The present invention arranges a first anchoring system and a second anchoring system so that a single anchor is combined through a pad to form a linkage anchoring system, thereby solving the problems in the prior art of easy failure of the anchoring system, long support time, long excavation interval time and slow construction progress under high ground stress and soft surrounding rock conditions.

[0011] In one embodiment of the present invention, in order to appropriately improve the anchoring force of the first anchoring system, further, the openings at the overlapping portions of the porous pads are aligned.

[0012] In one embodiment of the present invention, further, the porous pad is provided with a groove on one side close to the rock mass and a convex strip on the side away from the rock mass, and the convex strips at the overlapping parts of adjacent porous pads cooperate with the grooves, thereby limiting the relative sliding of adjacent porous pads.

[0013] In one embodiment of the present invention, further, the porous pad is in a strip shape, the openings include a first opening and a second opening that are spaced apart, the first anchor is correspondingly arranged at the first opening, the second anchor is correspondingly arranged at the second opening, and the first opening and the second opening are spaced apart in a line along the length of the porous pad.

[0014] In one embodiment of the present invention, further, the number of the first openings is one more than the number of the second openings, the first openings are located at both ends of the strip-shaped porous pad, the ends of adjacent porous pads overlap and the first openings are aligned.

[0015] In an embodiment of the present invention, further, the first anchor comprises a yield anchor rod, and the second anchor comprises an anchor cable.

[0016] In one embodiment of the present invention, further, a gasket for preventing slipping is respectively arranged between the first anchor, the second anchor and the porous pad, and an annular groove for accommodating the gasket is provided on the first anchor and the second anchor. The gasket is an open ring, and double ears and a single ear are respectively arranged along the circumference on both sides of the opening, and the single ear can slide along the double ears to change the diameter of the gasket.

[0017] In one embodiment of the present invention, further, the porous pad includes an L-shape, the L-shaped porous pad fits with the rock wall and rock top of the section, and openings are respectively arranged on both sides of the turning point of the L-shaped pad.

[0018] In one embodiment of the present invention, further, the first anchoring system also includes a first concrete layer arranged between the rock mass and the porous pad, and the second anchoring system also includes a steel mesh fixed between the first anchor and the second anchor, and a second concrete layer is arranged on the surface of the steel mesh, and the second concrete layer is fiber concrete.

[0019] A method for underground engineering construction includes an excavation working face, an initial support face and a later support face which are sequentially advanced along the excavation direction. The section excavated by the excavation working face is immediately supported by the first anchoring system mentioned above, and after the surrounding rock of the section is stabilized, the second anchoring system mentioned above is used to strengthen the support.

[0020] The underground engineering construction method provided by the present invention ensures the safety of the construction site and shortens the excavation interval time by setting an excavation working face, an initial support face and a later support face that are sequentially advanced along the excavation direction. By setting an initial support face with a first anchoring system and a later support face with a second anchoring system, the first anchoring system performs immediate support after excavation to ensure the safety of the construction site, shorten the excavation interval time, and continue to excavate the section. The second anchoring system plays a reinforcement and prevention effect after the surrounding rock is stable. The excavation working face, the initial support face and the later support face, the three working faces are sequentially advanced along the excavation direction, which can ensure the safety of the construction site under high ground stress and weak surrounding rock conditions, shorten the interval time of the excavation section, and speed up the construction progress.

[0021] The beneficial effects of the present invention include:

[0022] The anchoring system provided by the present invention is suitable for situations where the space for the first section is limited during partial excavation, so that a single anchor is combined with a pad to form a linkage anchoring system, thereby solving the problems in the prior art of high ground stress and soft surrounding rock conditions, such as the easy failure of the anchoring system, the long support time, the long excavation interval time, and the slow construction progress.

[0023] The underground engineering construction method provided by the present invention provides an initial support surface with a first anchoring system and a later support surface with a second anchoring system. The first anchoring system performs immediate support after excavation to ensure the safety of the construction site, shorten the excavation interval time, and continue to excavate the section. The second anchoring system plays a reinforcement and prevention effect after the surrounding rock is stable. The excavation working surface, the initial support surface and the later support surface are sequentially advanced along the excavation direction to gradually increase the support force. The anchoring system has good connectivity and can ensure the safety of the construction site under high ground stress and weak surrounding rock conditions, shorten the interval time of the excavation section, and speed up the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0025] Figure 1 A schematic structural diagram of a construction working surface provided in an embodiment of the present invention.

[0026] Figure 2 A schematic diagram of the structure of an anchoring system provided in an embodiment of the present invention;

[0027] Figure 3 A layout diagram of a porous pad provided in an embodiment of the present invention;

[0028] Figure 4 for Figure 3 AA section of the medium porous pad;

[0029] Figure 5 A schematic diagram of an installation method of a porous pad provided in an embodiment of the present invention;

[0030] Figure 6 A schematic diagram of another installation method of a porous pad provided in an embodiment of the present invention;

[0031] Figure 7 A schematic diagram of another installation method of the porous pad provided in an embodiment of the present invention;

[0032] Figure 8 A schematic diagram of the structure of a gasket provided in an embodiment of the present invention;

[0033] Fig. 9 for Figure 8 BB section view of the center hoop;

[0034] Icons: 1-excavation working face; 2-first concrete layer; 3-porous pad; 4-first anchor; 5-second anchor; 6-second concrete layer; 7-hoop; 71-double ears; 72-single ear; 8-initial support surface; 9-later support surface. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0036] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0038] In the description of the present invention, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the product of the invention is usually placed when in use. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, if the terms "first", "second" and the like appear in the description of the present invention, they are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0039] In addition, if the terms "horizontal" or "vertical" appear in the description of the present invention, it does not mean that the components are required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0040] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0041] Example

[0042] A method for underground engineering construction ensures the safety of the construction site under conditions of high ground stress and weak surrounding rock, shortens the interval time of the excavation section, and speeds up the construction progress.

[0043] The above underground engineering construction method includes three processes: excavation, initial support, and later support. The three processes are carried out sequentially. Please refer to the attached Figure 1 As shown, the excavation working surface 1, the initial support surface 8 and the later support surface 9 exist simultaneously during the construction process and advance sequentially along the excavation direction.

[0044] After the section is excavated, the first anchoring system is immediately set in the surrounding rock mass for immediate anchoring to form an initial support surface 8; after the surrounding rock stress is released, the first anchoring system is reinforced to form a later support surface 9. The three working surfaces can be constructed at the same time, and the first anchoring system has a margin to allow the surrounding rock deformation, so that the anchoring system is not easily damaged and failed, and the second anchoring system strengthens the anchoring force, which is conducive to maintaining the long-term stability of the surrounding rock mass.

[0045] Please refer to the attached Figure 2 The first anchoring system includes a first anchor 4 and a porous pad 3.

[0046] Please refer to the attached Figure 2 The second anchoring system includes a second anchor 5 added on the basis of the first anchoring system.

[0047] Please refer to the attached Figure 2 As shown, the second anchor 5 is shorter than the first anchor 4, and the first anchor 4 can be installed faster.

[0048] Please refer to the attached Figure 1 and attached Figure 5 As shown, the porous pad 3 is provided with a first opening and a second opening, wherein the first opening corresponds to the first anchor 4, and the second opening corresponds to the second anchor 5, and the first opening and the second opening are arranged at intervals.

[0049] It should be noted that the difference between the first opening and the second opening in the present invention is only the difference in the corresponding anchors, which can be adjusted according to the required initial anchoring force. Figure 5 As shown, the porous pad 3 has three openings. If the required initial anchoring force is large, the openings at both ends of the porous pad 3 serve as the first openings; if the required initial anchoring force is small, the porous pad 3 with the first openings at both ends and the pad with the first opening in the middle are cross-spaced; if the initial anchoring force needs to be further reduced, the first opening of each porous pad 3 is located in the middle.

[0050] Please refer to the attached Figure 1 and attached Figure 2 As shown, after the section is excavated, the first concrete layer 2 is sprayed on the surface of the surrounding rock mass to temporarily stabilize the rock mass.

[0051] Next, anchor holes are drilled in the rock mass, and the floating dust in the anchor holes is cleaned using a high-pressure blower, and then the first anchoring system is set up for immediate support.

[0052] See attached Figure 5 As shown, porous pads 3 are installed on the surface of the rock mass, and adjacent porous pads 3 partially overlap.

[0053] In order to facilitate installation and construct an orderly support system, the porous pad 3 is further in a strip shape, and the first openings and the second openings are arranged in a straight line along the length of the porous pad 3 at intervals.

[0054] Furthermore, in order to make the first anchoring system more stable, the number of the first opening is one more than the number of the second opening, and the first opening is located at both ends of the strip-shaped porous pad 3 .

[0055] See attached Figure 1 , Attachment Figure 2 and attached Figure 5 As shown, the first anchor 4 is driven into the anchor hole corresponding to the first opening and fixed. In this embodiment, the first anchor 4 adopts an anchor rod. In order to further prevent the first anchoring system from failing, the first anchor 4 adopts a yield anchor rod.

[0056] The above-mentioned first anchoring system is set up immediately after the section is excavated. A porous pad 3 is set between the first anchor 4 and the rock mass. The overlapping porous pads 3 are used to integrate multiple first anchors 4 into one. A small amount of anchors is driven into the system to form a system with stronger anchoring ability. When setting the first anchoring system, a certain prestress can be applied to the first anchor 4 to improve the bearing capacity of the surrounding rock, speed up the speed and strength of immediate support, thereby protecting the safety of the construction site, shortening the interval time of excavation, facilitating the continuation of section excavation, and accelerating the construction progress.

[0057] Then, after the internal pressure of the rock mass is released and the rock mass deformation is stabilized, a second anchor 5 is added on the basis of the first anchoring system. Figure 5As shown, in this embodiment, the porous pad 3 has three openings, wherein the first opening is located at both ends and the second opening is located in the middle. The porous pad 3 integrates the first anchor 4 and the second anchor 5 into one to provide enhanced support for the surrounding rock.

[0058] Drive the second anchor 5 into the anchor hole corresponding to the second opening and fix it. Figure 2 The second anchor 5 is longer than the first anchor 4, and the second anchor 5 is further inserted into the rock mass, and is integrated with the first anchor system to form a second anchor system that takes into account both deep anchoring and shallow anchoring, which strengthens the support for the surrounding rock that has released internal pressure and tends to be stable, plays a role in stabilizing the rock mass and preventing late deformation. The second anchor 5 in this embodiment adopts an anchor cable.

[0059] In order to further protect the rock mass and achieve long-term stability and prevent deformation, please refer to the attached Figure 2 As shown, a steel mesh is fixedly arranged between the first anchor 4 and the second anchor 5. The steel mesh can be welded to the first anchor 4 and the second anchor 5. Through the connection of the steel mesh, the integrity of the second anchoring system is strengthened, and the anchoring and supporting forces are improved.

[0060] In order to better protect the rock mass and the support system, a second concrete layer 6 is sprayed on the surface of the steel mesh. In order to enhance the tensile and bending strength of the support system, the second concrete layer 6 uses fiber concrete, which has strong toughness and can effectively inhibit the development of cracks on the rock mass surface. When the concrete layer works with cracks, its durability is better.

[0061] In order to enhance the tensile and bending strength of the first concrete layer 2 and the second concrete layer 6 of the support system, before fixing the steel mesh, the carbon fiber strips are first pasted on the first concrete layer 2, and then the steel mesh is set and the second concrete layer 6 is sprayed.

[0062] Please refer to the attached Figure 1 , Attachment Figure 2 , Attachment Figure 3 As shown, a plurality of the porous pads 3 are arranged end to end into a strip group, and a plurality of strip groups are arranged in sequence along the cross-section excavation direction to form a skeleton supporting the rock wall and the rock top. Furthermore, the carbon fiber strips and the porous pad 3 strip groups form a mesh structure, thereby further enhancing the integrity of the second anchoring system and improving the support capacity.

[0063] In order to properly enhance the anchoring force of the first anchoring system, the openings of the overlapping parts of the porous pad 3 are aligned, that is, as shown in the attached Figure 6 As shown in , the overlapping length of the porous pads 3 is increased, the first openings of the two porous pads 3 are aligned, and the first anchor 4 is driven in, which strengthens the initial anchoring force while satisfying the compression deformation margin.

[0064] In the weak part of the rock mass, the overlapping length of the porous pad 3 can be increased to strengthen the initial anchoring force, or the porous pad 3 can also be overlapped in multiple ways to strengthen the initial anchoring force. Figure 7 In this embodiment, three porous pads 3 are overlapped at the weak part of the rock mass, the first openings of the three porous pads 3 are aligned, and the first anchor 4 is driven into the anchor hole corresponding to the first opening to be fixed.

[0065] For the intersection of the rock top and the rock wall, the porous pad 3 is set to be L-shaped, and the L-shaped porous pad 3 fits the rock wall and rock top of the section. The first openings are respectively set on both sides of the turning point of the L-shaped pad, so as to perform initial anchoring on the two surfaces of the rock wall and the rock top respectively.

[0066] In order to further improve the connection force of the porous pad 3, prevent the porous pad 3 from slipping, and enhance the anti-bending effect of the porous pad 3, please refer to the attached Figure 4 As shown, the porous pad 3 has a groove on one side close to the rock mass and a convex strip on the side facing away from the rock mass. The convex strips at the overlapping parts of adjacent porous pads 3 cooperate with the grooves, thereby limiting the relative slippage of adjacent porous pads 3 and causing them to be misaligned.

[0067] In order to further improve the anti-slip capability of the porous pad 3 and provide better anchoring, the grooves and the convex strips separate adjacent openings and surround the openings.

[0068] Furthermore, in order to make the anchor installation more secure, washers 7 for preventing slipping are respectively provided between the first anchor 4, the second anchor 5 and the porous pad 3, and annular grooves for accommodating the washers 7 are provided on the first anchor 4 and the second anchor 5.

[0069] Please refer to the attached Figure 8 and attached Fig. 9 The gasket 7 is an open ring, and double ears 71 and a single ear 72 are respectively arranged along the circumference of both sides of the opening. The single ear 72 can slide along the double ears 71 to change the diameter of the gasket 7.

[0070] The underground engineering construction method and anchoring system provided by the present invention are provided with an initial support surface 8 having a first anchoring system and a later support surface 9 having a second anchoring system. The first anchoring system performs immediate support after excavation to ensure the safety of the construction site, shorten the excavation interval time, and continue to excavate the section. The second anchoring system plays a reinforcement and prevention effect after the surrounding rock is stable. The excavation working surface 1, the initial support surface 8 and the later support surface 9 are sequentially advanced along the excavation direction, which solves the problems in the prior art that the anchoring system is prone to failure, the site is unsafe, the support time is long, the excavation interval time is long, and the construction progress is slow under the conditions of high ground stress and weak surrounding rock.

[0071] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An anchoring system, Features: It includes a first anchoring system for immediate support and a second anchoring system for later reinforced support, wherein the first anchoring system includes a first anchor and a porous pad, and the second anchoring system includes a second anchor added on the basis of the first anchoring system; The adjacent porous pads partially overlap, the first anchors and the second anchors respectively correspond to the openings on the porous pads and are arranged alternately, and the length of the first anchor extending into the rock mass is shorter than that of the second anchor; The porous pad has a groove on one side close to the rock mass and a convex strip on the side facing away from the rock mass. The convex strips at the overlapping parts of adjacent porous pads cooperate with the grooves, thereby limiting the relative sliding of adjacent porous pads. The porous pad is in a strip shape, the openings include a first opening and a second opening arranged at intervals, the first anchor is correspondingly arranged at the first opening, the second anchor is correspondingly arranged at the second opening, and the first opening and the second opening are arranged at intervals in a straight line along the length of the porous pad; The first anchor includes a yield anchor rod, and the second anchor includes an anchor cable.

2. An anchoring system according to claim 1, Features: The openings at the overlapping portions of the porous pads are aligned.

3. An anchoring system according to claim 1, Features: The number of the first opening is one more than the number of the second opening. The first opening is located at both ends of the strip-shaped porous pad. The ends of adjacent porous pads overlap and the first openings are aligned.

4. An anchoring system according to claim 1, Features: Washers for preventing slipping are respectively arranged between the first anchor, the second anchor and the porous pad. Annular grooves for accommodating the washers are provided on the first anchor and the second anchor. The washers are open rings, and double ears and a single ear are respectively arranged along the circumference on both sides of the opening. The single ear can slide along the double ears to change the diameter of the washers.

5. An anchoring system according to claim 1, Features: For the intersection of the rock top and the rock wall, the porous pad is set to be L-shaped, and the L-shaped porous pad fits the rock wall and rock top of the section. The first openings are respectively set on both sides of the turning point of the L-shaped porous pad, so as to perform initial anchoring on the two surfaces of the rock wall and the rock top respectively.

6. An anchoring system according to claim 1, Features: The first anchoring system also includes a first concrete layer arranged between the rock mass and the porous pad, and the second anchoring system also includes a steel mesh fixed between the first anchor and the second anchor, and a second concrete layer is arranged on the surface of the steel mesh, and the second concrete layer is fiber concrete.

7. A method for underground engineering construction, Features: It includes an excavation working face, an initial support face and a later support face which are sequentially advanced along the excavation direction. The section excavated by the excavation working face is immediately supported by the first anchoring system described in any one of claims 1 to 6, and after the surrounding rock of the section is stabilized, the second anchoring system described in any one of claims 1 to 6 is used to strengthen the support.