A helicopter line-releasing traction and counterweight connection device and its operation method
By designing helicopter wire traction and counterweight connection devices, and using electric hooks and U-ring structures, the connection and resolution of the guide rope and counterweight system during helicopter wire traction construction is solved, and safe and efficient tension transfer and The torsional stress release improves construction safety and efficiency.
Patent Information
- Application Number
- CN201910064087.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-01-23
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-01-23
AI Technical Summary
During helicopter line construction, the main sling is prone to touch the helicopter tail rotor due to horizontal tension, causing the pilot to control the downward angle and increase the traction and counterweight system to improve safety and stability, but the existing technology is difficult to be safe and efficient Ground connection and release guide rope to counterweight system.
A traction and counterweight connection device including a helicopter sling, a first triple plate, a second triple plate and an electric hook is designed. The automatic decoupling of the guide rope and the counterweight system is realized through the electric hook, and the tension is transferred to the ground. Facing anchor rope, U-ring and rotary connectors release torsional stress, simplifying operation and improving safety.
The guide rope tension is quickly transferred from the helicopter counterweight system to the ground, which improves the operation safety and line lay-off efficiency, avoids the risks of human operation, and ensures the stability and safety of the traction process.
Smart Images

Figure CN109787154B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of laying out a guide rope for a power transmission line, and in particular to a helicopter laying out line, traction and counterweight connection device and an operation method thereof. Background Art
[0002] At present, the use of helicopters to release guide ropes is an advanced technology in the construction of transmission lines, especially for large-span line laying construction. It not only requires excellent helicopters and pilots with skilled driving skills, but also the main suspension rope is easily lifted up and touches the helicopter tail rotor due to the horizontal tension during flight traction. Therefore, the pilot needs to control the helicopter to increase the downward angle, and the stability and safety are poor, so it is necessary to add traction and counterweight systems. How to safely and efficiently connect the traction and counterweight systems, and disconnect the guide rope from the counterweight system to improve safety, stability, and line laying efficiency has become an important issue to consider. Summary of the invention
[0003] The technical problem to be solved and the technical task proposed by the present invention are to improve and perfect the existing technical solutions, and provide a helicopter line-laying traction and counterweight connection device and its operation method, so as to improve the operation safety and line-laying efficiency. To this end, the present invention adopts the following technical solutions.
[0004] A helicopter line-releasing traction and counterweight connection device comprises a helicopter sling, a first triple-joint plate, a second triple-joint plate and an electric hook. The upper end of the first triple-joint plate is connected to the helicopter sling, the lower end is detachably connected to the counterweight, and the side end is connected to the electric hook. The electric hook is connected to one side of the second triple-joint plate through a connecting rope, and the other side of the second triple-joint plate is connected to a guide rope. The lower end of the second triple-joint plate is connected to a temporary anchor rope to achieve connection with a ground anchor, and the electric hook can be controlled by the helicopter to achieve decoupling from the connecting rope. The device structure can conveniently achieve decoupling of the guide rope and the counterweight through the electric hook after the temporary anchor rope connected to the ground anchor is tightened, so that all the tension of the guide rope can be quickly transferred from the helicopter counterweight system to the ground anchor rope. The electric decoupling device is adopted, and no manual operation is required, so that the hook removal is safer and more convenient, the operation safety is improved, and the line-releasing efficiency is improved.
[0005] As a further improvement and supplement to the above technical solution, the present invention also includes the following additional technical features.
[0006] As the preferred technical means:
[0007] The first triple-joint plate is connected to the counterweight and the helicopter sling through a U-shaped ring; the electric hook is connected to the connecting rope through a series of closed rings and U-shaped rings; the second triple-joint plate is connected to the connecting rope, the temporary anchor rope and the guide rope through a U-shaped ring. With this connection structure, when the flight angle of the helicopter changes, the guide rope can freely adjust its angle, which can effectively release the torsional stress and will not cause additional stress locally.
[0008] A manual hook is provided between the counterweight and the U-shaped ring, so that the ground operator can separate the counterweight from the helicopter sling after the operation is completed.
[0009] The electric hook is rotatably connected to the side end of the first triple-joint plate through two connecting pieces on each of its two sides and the first triple-joint plate. The connection structure is firm and rotatable, so that the electric hook can automatically adjust the angle according to the actual situation of the guide rope.
[0010] The guide rope includes a main guide rope, a rotary connector and a guide connecting rope, one end of the guide connecting rope is connected to the U-shaped ring of the second triple plate, and the other end is connected to the rotary connector, and the rotary connector is connected to the main guide rope. Since the guide rope is long, the rotary connector can effectively release the torsional stress during the traction process, so that the guide rope maintains stress balance and prevents the guide rope from affecting the helicopter traction operation due to the accumulation of torque.
[0011] The electric hook is electrically connected to a controller on the helicopter through a control line, and the wired connection control has good reliability.
[0012] The ground anchor is connected with a lever hoist to achieve connection and tensioning of the adjacent anchor rope, and can conveniently transfer the tension of the guide rope on the helicopter counterweight system to the adjacent anchor rope, thereby achieving tensioning of the ground anchor.
[0013] An operating method of a helicopter line-laying, traction and counterweight connection device comprises the following steps:
[0014] 1) When the helicopter approaches the anchor line field, the flight altitude should be appropriately lowered. When the helicopter counterweight system is directly above the ground anchor system, the altitude should be further lowered until the counterweight lands and the helicopter hovers.
[0015] 2) Pull the temporary anchor rope hanging on the second triple plate, and connect the rope end to the hand-operated hoist pre-connected to the ground anchor in the anchor line field. The helicopter is still in a hovering state at this time and bears about 80% of the load;
[0016] 3) Quickly tighten the lever hoist, and gradually tighten the temporary anchor rope after it is stressed, until all the tension is transferred to the temporary anchor rope;
[0017] 4) The helicopter descends slightly, unloading all the loads, and the electric hook connected to the first triple plate moves to disconnect the guide rope from the counterweight;
[0018] 5) The helicopter slowly takes off, returns to the field, and the entire process of pulling and releasing the guide rope is completed. The operation method is simple and efficient.
[0019] Beneficial effects:
[0020] 1. The guide rope and the counterweight can be easily unhooked, and all the tension of the guide rope can be quickly transferred from the helicopter counterweight system to the ground anchor rope. The electric unhooking device does not require manual operation, making unhooking safer and more convenient, improving the safety of the operation and the efficiency of laying out the line.
[0021] 2. By using U-shaped rings, rotatable electric hooks and rotating connectors and other connecting parts, when the flight angle of the helicopter changes, the guide rope can freely adjust its angle, which can effectively release the torsional stress and will not cause additional stress locally.
[0022] 3. The hand hoist can be used to easily transfer the tension of the guide rope on the helicopter counterweight system to the adjacent anchor rope, thereby tightening the tension of the ground anchor. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the structure of the present invention.
[0024] Figure 2 It is a schematic diagram of step 1 of the operation method in an example of the present invention.
[0025] Figure 3 It is a schematic diagram of step 2 of the operation method in the example of the present invention.
[0026] Figure 4 It is a schematic diagram of step three of the operation method in the example of the present invention.
[0027] In the figure: 1-helicopter sling; 2-first triple plate; 3-second triple plate; 4-electric hook; 5-counterweight; 6-connecting rope; 7-temporary anchor rope; 8-ground anchor; 9-hand hoist; 10-guide connecting rope; 11-rotating connector; 12-U-shaped ring; 13-closed ring; 14-connecting plate; 15-main guide rope; 16-control line; 17-helicopter. DETAILED DESCRIPTION
[0028] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings.
[0029] like Figure 1As shown, a helicopter line-releasing traction and counterweight connecting device includes a helicopter sling 1, a first triple-jointed plate 2, a second triple-jointed plate 3 and an electric hook 4. The upper end of the first triple-jointed plate 2 is connected to the helicopter sling 1, the lower end is detachably connected to the counterweight 5, and the side end is connected to the electric hook 4. The electric hook 4 is connected to one side of the second triple-jointed plate 3 through a connecting rope 6, and the other side of the second triple-jointed plate 3 is connected to a guide rope. The lower end of the second triple-jointed plate 3 is connected to a temporary anchor rope 7 to achieve connection with a ground anchor 8, and the electric hook 4 can be controlled by a helicopter 17 to achieve decoupling from the connecting rope 6.
[0030] In order to eliminate local stress during traction, the first triple plate 2 is connected to the counterweight 5 and the helicopter sling 1 through a U-shaped ring 12; the electric hook 4 is connected to the connecting rope 6 through a series of closed rings 13 and U-shaped rings 12; the second triple plate 3 is connected to the connecting rope 6, the temporary anchor rope 7 and the guide rope through a U-shaped ring 12. With this connection structure, when the flight angle of the helicopter 17 changes, the guide rope can freely adjust its angle, which can effectively release the torsional stress without causing additional stress locally.
[0031] For the convenience of the vertical upgrade and the counterweight 5 are separated, a manual hook is provided between the counterweight 5 and the U-shaped ring 12. After the operation is completed, the ground operating personnel separate the counterweight 5 from the helicopter sling 1.
[0032] In order to facilitate the electric hook 4 to automatically adjust the angle, the electric hook 4 is rotatably connected to the side end of the first triple-joint plate 2 through the two connecting pieces 14 on its two sides. The connection structure is firm and rotatable, which facilitates the electric hook 4 to automatically adjust the angle according to the actual situation of the guide rope.
[0033] In order to effectively release the torsional stress of the guide rope, the guide rope includes a main guide rope 15, a rotary connector 11 and a guide connecting rope 10, one end of the guide connecting rope 10 is connected to the U-shaped ring 12 of the second triple plate 3, and the other end is connected to the rotary connector 11, and the rotary connector 11 is connected to the main guide rope 15. Since the guide rope is long, the rotary connector 11 can effectively release the torsional stress during the traction process, so that the guide rope maintains stress balance, and prevents the guide rope from affecting the traction operation of the helicopter 17 due to the accumulation of torque.
[0034] For the convenience of control, the electric hook 4 is electrically connected to a controller on the helicopter 17 through a control line 16. Wired connection control is convenient to control and has good reliability.
[0035] In order to achieve the tensioning of the temporary anchor rope 7, the ground anchor 8 is connected with a hand hoist 9 to achieve the connection and tensioning of the temporary anchor rope 7. The tension of the guide rope on the helicopter counterweight 5 system can be easily transferred to the temporary anchor rope 7, so as to achieve the tensioning of the ground anchor 8.
[0036] A method for operating a helicopter line-laying, traction and counterweight connection device comprises the following steps:
[0037] Step 1: Figure 2 As shown, when the helicopter 17 approaches the anchor line field, the flight altitude is appropriately lowered, and when the helicopter counterweight 5 system is vertically above the ground anchor 8 system, the altitude is further lowered until the counterweight 5 lands and hovers;
[0038] Step 2: Figure 3 As shown, the temporary anchor rope 7 suspended on the second triple plate 3 is pulled, and the rope end is connected to the lever hoist 9 on the ground anchor 8 pre-connected to the anchor line field. The helicopter 17 is still in a hovering state at this time and bears about 80% of the load;
[0039] Step 3: Figure 4 As shown, the lever hoist 9 is quickly tightened, and the temporary anchor rope 7 is gradually tightened after being stressed, until all the tension is transferred to the temporary anchor rope 7;
[0040] Step 4: The helicopter 17 descends slightly to unload all the loads, and the electric hook 4 connected to the first triple plate 2 operates to disconnect the guide rope from the counterweight 5;
[0041] Step 5: Helicopter 17 slowly takes off and returns to the field, and the entire process of pulling and releasing the guide rope is completed. The operation method is simple and efficient; after helicopter 17 is released, the guide rope is required to maintain a certain clearance distance from the sea surface, so it needs to be temporarily anchored in the tension field and the anchor line field to ensure the clearance height of the sea surface, and at the same time complete the line shifting work on both sides of the field, and prepare for the subsequent pulling and releasing of the guide rope.
[0042] The device and the operation method process conveniently realize the uncoupling of the guide rope and the counterweight 5 system, and realize the rapid transfer of all the tension of the guide rope from the helicopter counterweight 5 system to the ground anchor rope 7. The electric uncoupling device is adopted, and no manual operation is required, so that the uncoupling is safer and more convenient, the operation safety is improved, and the line-laying efficiency is improved.
[0043] In this example, the helicopter sling 1 adopts a -12t lifting belt with a length of 15m; the U-shaped ring 12 connecting the helicopter sling 1 and the first triple plate 2 is a 15t shackle; the U-shaped ring 12 connecting the first triple plate 2 and the manual hook is a 10t shackle; the U-shaped ring 12 connecting the counterweight 5 and the manual hook is of DG8 specification; the remaining U-shaped rings 12 adopt DG6.3 specifications; the manual hook is of 12t specification; the counterweight 5 is 4100KG; the electric hook 4 is of 12t specification; the closed ring 13 is of 12t specification; the connecting rope 6 and the guide connecting rope 10 are Ф15×3.5m steel wire ropes; the temporary anchor rope 7 is Ф22×2.5m galvanized pressed steel wire rope; the rotary connector 11 is of 80kN specification and painted red; the main guide rope 15 adopts Ф13×5000m steel wire rope.
[0044] above Figure 1-4 The helicopter line-releasing traction, counterweight connection device and its operation method shown are specific embodiments of the present invention, which have embodied the essential characteristics and progress of the present invention. According to actual use needs and under the guidance of the present invention, equivalent modifications in shape, structure, etc. can be made to them, which are all within the protection scope of this scheme.
Claims
1. A helicopter line-releasing, traction and counterweight connection device, characterized in that: The utility model comprises a helicopter sling (1), a first triple-jointed plate (2), a second triple-jointed plate (3) and an electric hook (4); the upper end of the first triple-jointed plate (2) is connected to the helicopter sling (1), the lower end is detachably connected to the counterweight (5), the side end is connected to the electric hook (4), the electric hook (4) is connected to one side of the second triple-jointed plate (3) through a connecting rope (6), the other side of the second triple-jointed plate (3) is connected to a guide rope, the lower end of the second triple-jointed plate (3) is connected to a temporary anchor rope (7) to achieve connection with a ground anchor (8), and the electric hook (4) can be controlled by a helicopter (17) to achieve decoupling from the connecting rope (6); The first triple-jointed plate (2) is connected to the counterweight (5) and the helicopter sling (1) via a U-shaped ring (12); the electric hook (4) is connected to the connecting rope (6) via a series-connected closed ring (13) and a U-shaped ring (12); the second triple-jointed plate (3) is connected to the connecting rope (6), the temporary anchor rope (7) and the guide rope via a U-shaped ring (12); The guide rope comprises a main guide rope (15), a rotary connector (11) and a guide connecting rope (10); one end of the guide connecting rope (10) is connected to the U-shaped ring (12) of the second triple-joint plate (3), and the other end is connected to the rotary connector (11); the rotary connector (11) is connected to the main guide rope (15); The ground anchor (8) is connected to a lever hoist (9) to achieve connection and tensioning of the anchor rope (7).
2. A helicopter line-releasing, traction and counterweight connection device according to claim 1, characterized in that: A manual hook is provided between the counterweight (5) and the U-shaped ring (12).
3. A helicopter line-releasing, traction and counterweight connection device according to claim 1, characterized in that: The electric hook (4) is rotatably connected to the side end of the first triple-jointed plate (2) via two connecting pieces (14) on each of its two sides and the first triple-jointed plate (2).
4. A helicopter line-releasing, traction and counterweight connection device according to claim 1, characterized in that: The electric hook (4) is electrically connected to a controller on the helicopter (17) via a control line (16).
5. An operating method of a helicopter line-laying, traction and counterweight connection device according to any one of claims 1 to 4, characterized in that The following steps are involved: 1) When the helicopter (17) approaches the anchor line field, the flight altitude is appropriately lowered. When the helicopter counterweight (5) system is directly above the ground anchor (8) system, the altitude is further lowered until the counterweight (5) lands and hovers; 2) Pull the temporary anchor rope (7) suspended on the second triple plate (3), and connect the rope end to the hand-operated hoist (9) on the ground anchor (8) pre-connected to the anchor line field. The helicopter (17) is still in a hovering state at this time and bears about 80% of the load; 3) Quickly tighten the lever hoist (9) and gradually tighten the anchor rope (7) until all the tension is transferred to the anchor rope (7); 4) The helicopter (17) descends slightly, unloading all the loads, and the electric hook (4) connected to the first triple plate (2) operates to disconnect the guide rope from the counterweight (5); 5) The helicopter (17) slowly takes off, returns to the field, and the entire process of pulling and releasing the guide rope is completed.