Assembled ballastless track system and construction method of assembled ballastless track system
Through factory prefabrication and on-site pouring steps of the assembled ballastless track system, combined with prefabricated track plates, bases, limiting structures and elastic buffer cushions, the problems of low construction efficiency, poor durability and poor adaptability of the existing ballastless track system are solved , achieving more efficient construction and a more stable track structure.
Patent Information
- Application Number
- CN201910465559.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-05-30
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2039-05-30
AI Technical Summary
The existing ballastless track system has problems such as low construction efficiency, poor durability of the track structure, and poor ability to adapt to offline foundation deformation.
Adopt a prefabricated ballastless track system, including prefabricated track slabs, prefabricated bases, prefabricated limiting structures, isolation layers or supports, elastic cushioning layers and on-site pouring layers. They are assembled through factory prefabrication steps and on-site pouring steps to reduce on-site construction. workload, improve laying efficiency, and increase the durability of track structures through prefabricated structural assembly.
It improves the efficiency of on-site construction, enhances the adaptability and durability of the track system, reduces the probability of errors and mistakes during the construction process, and solves the problem of poor ability to adapt to offline foundation deformation.
Smart Images

Figure CN110172869B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail transit engineering, and in particular to an assembled ballastless track system and a construction method of the assembled ballastless track system. Background Art
[0002] The track structure of urban rail transit in my country mainly adopts short support block type or long sleeper embedded cast-in-place ballast bed. The national railway mainly adopts ballastless track types such as CRTSⅠ type plate type, CRTSⅡ type plate type and CRTSⅢ type plate type. Among them, the short support block type, long sleeper embedded type, elastic support block type and double block type ballastless track have a large amount of on-site concrete pouring, and there are shortcomings such as slow construction progress, cracking of the ballast bed and high labor intensity of workers; the concrete base, cement emulsion asphalt mortar layer / self-compacting concrete on-site construction of CRTSⅠ type plate type, CRTSⅡ type plate type and CRTSⅢ type plate type ballastless track have many processes that affect the construction efficiency, and the durability of the cement emulsion asphalt mortar layer is poor, and the base has cracks to varying degrees. In other words, the ballastless track system in the existing technology needs to further improve the on-site construction efficiency and the durability of the track structure.
[0003] In addition, practice shows that the line often deforms after operation. When the deformation is large, the existing ballastless track structure is difficult to adapt, which can easily cause the ballastless track to become damaged. Once the track bed is damaged, it is difficult to treat and the maintenance cost is high. In other words, the ballastless track system in the existing technology needs to further improve its ability to adapt to the deformation of the offline foundation.
[0004] As can be seen from the above, the track system in the prior art has the problems of poor adaptability to deformation of the offline foundation, low on-site construction efficiency and poor durability of the track structure. Summary of the invention
[0005] The main purpose of the present invention is to provide an assembled ballastless track system and a construction method of the assembled ballastless track system to solve the problems of poor adaptability to deformation of offline foundations, low on-site construction efficiency and poor durability of track structures in the prior art track systems.
[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present invention, there is provided an assembled ballastless track system, comprising: a prefabricated track slab, the center of which has one or more limiting holes; a prefabricated base, the prefabricated base is located below the prefabricated track slab; a prefabricated limiting structure, the prefabricated limiting structure extends into the limiting hole; an isolation layer or a support, an isolation layer or a support is arranged between the prefabricated track slab and the prefabricated base; an elastic buffer pad layer, an elastic buffer pad layer is arranged between the limiting hole and the prefabricated limiting structure; and an on-site cast layer, the on-site cast layer is located below the prefabricated base and is cast on-site.
[0007] Furthermore, the cross section of the limiting hole is circular, polygonal or elliptical; and / or the diameter of the limiting hole gradually decreases from top to bottom.
[0008] Furthermore, the prefabricated limiting structure gradually decreases from top to bottom and is formed integrally with the prefabricated base.
[0009] Furthermore, steel bars are arranged in the prefabricated base, and part of the structure of the steel bars is exposed below the prefabricated base and is cast together with the on-site cast layer, and the steel bars are truss steel bars or gate-shaped bars.
[0010] Furthermore, the thickness of the prefabricated base is greater than or equal to 50 mm.
[0011] Furthermore, the isolation layer is a geotextile layer or a rubber layer. When the geotextile layer is used as the isolation layer, one or two layers can be laid.
[0012] Furthermore, there are multiple supports divided into two groups, and each group has multiple supports. The two groups of supports are arranged in parallel and at intervals, and the multiple supports in the same group are arranged in sequence and at intervals along the extension direction of the assembled ballastless track system.
[0013] Furthermore, the prefabricated track slab, prefabricated limiting structure, prefabricated base, isolation layer, and elastic buffer pad are partially assembled or fully assembled into one in the factory; or the prefabricated track slab, prefabricated limiting structure, prefabricated base, support, and elastic buffer pad are partially assembled or fully assembled into one in the factory.
[0014] Furthermore, a curved outer rail superelevation is provided on the cast-in-place layer.
[0015] Furthermore, the prefabricated track slab is a reinforced concrete track slab or a prestressed concrete track slab.
[0016] Furthermore, the length of the prefabricated track slab is 3 meters to 7 meters.
[0017] According to another aspect of the present invention, a construction method of an assembled ballastless track system is provided, wherein the assembled ballastless track system is the above-mentioned assembled ballastless track system, and the construction method comprises a factory prefabrication step and an on-site casting step, wherein the factory prefabrication step comprises: manufacturing a prefabricated track slab and reserving a limiting hole on the prefabricated track slab; laying an isolation layer or installing a support under the prefabricated track slab; arranging an elastic buffer layer in the limiting hole; manufacturing a prefabricated base and a prefabricated limiting structure, so that the prefabricated base and the prefabricated limiting structure are connected with the prefabricated track slab, the elastic buffer layer and the isolation layer or the support to form a combined structure; and the on-site casting step comprises: placing the combined structure on the on-site casting layer and casting the on-site casting layer into shape.
[0018] Further, the steps of manufacturing the prefabricated track slab are:
[0019] S10: making a track slab steel bar skeleton and prestressed tendons and placing them in a track slab mold, and setting a hole forming device;
[0020] S11: tensioning prestressed tendons and pouring concrete;
[0021] S12: Laying the isolation layer;
[0022] S13: Perform concrete curing.
[0023] Furthermore, the step of providing an elastic buffer layer in the limiting hole is as follows:
[0024] S20: removing the hole former in the limiting hole;
[0025] S21: An elastic buffer layer is pasted around the limiting hole.
[0026] Furthermore, the steps of manufacturing the prefabricated base and the prefabricated limiting structure are as follows:
[0027] S30: making steel bars;
[0028] S31: making a common steel bar skeleton, placing the steel bar skeleton on the isolation layer, and placing the steel bars on the isolation layer;
[0029] S32: Setting pads to support the steel frame;
[0030] S33: pouring concrete;
[0031] S34: Carry out concrete curing.
[0032] By applying the technical solution of the present invention, the assembled ballastless track system in the present application includes: a prefabricated track plate, a prefabricated base, a prefabricated limiting structure, an isolation layer or a support, an elastic buffer layer and an on-site cast layer. The center of the prefabricated track plate has one or more limiting holes; the prefabricated base is located below the prefabricated track plate; the prefabricated limiting structure extends into the limiting hole; an isolation layer or a support is provided between the prefabricated track plate and the prefabricated base; an elastic buffer layer is provided between the limiting hole and the prefabricated limiting structure; the on-site cast layer is located below the prefabricated base and is cast on-site.
[0033] The above-mentioned prefabricated ballastless track system is mainly assembled in two steps during manufacturing, one step is the factory prefabrication step, and the other step is the on-site pouring step, which can greatly reduce the on-site construction workload and construction time, and improve the laying efficiency of the prefabricated ballastless track system. In the factory prefabrication step, the prefabricated track plate, prefabricated base, prefabricated limit structure, isolation layer or support, and elastic buffer layer are assembled together in advance. The use of prefabricated structure assembly can improve the durability of the track structure, reduce the probability of errors and mistakes during the construction process, and improve the construction quality of the prefabricated ballastless track system. In addition, the supports in the prefabricated ballastless track system have the ability to adjust the height, thereby effectively solving the problems of the track system in the prior art, such as poor ability to adapt to offline foundation deformation, low on-site construction efficiency, and poor durability of the track structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0035] Figure 1 A schematic longitudinal section diagram of an assembled ballastless track system in an optional embodiment of the present invention is shown;
[0036] Figure 2 Shows Figure 1 Schematic diagram of cross section of the medium-sized assembled ballastless track system;
[0037] Figure 3 A schematic longitudinal section diagram of an assembled ballastless track system in another optional embodiment of the present invention is shown;
[0038] Figure 4 Shows Figure 3 Schematic diagram of cross section of the medium-sized assembled ballastless track system;
[0039] Figure 5 A schematic cross-sectional view of a prefabricated track slab of a prefabricated ballastless track system in an optional embodiment of the present invention is shown;
[0040] Figure 6 A cross-sectional schematic diagram of a prefabricated base and a limiting structure of an assembled ballastless track system in an optional embodiment of the present invention is shown.
[0041] The above drawings include the following reference numerals:
[0042] 10. Prefabricated track slab; 11. Limiting hole; 20. Prefabricated base; 21. Prefabricated limiting structure; 30. Isolation layer; 31. Elastic buffer layer; 40. Support; 50. On-site cast layer; 60. Steel bars. DETAILED DESCRIPTION
[0043] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0044] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.
[0045] In the present invention, unless otherwise specified, the directional words used, such as "up, down, top, bottom", usually refer to the directions shown in the drawings, or to the components themselves in the vertical, perpendicular or gravity directions; similarly, for ease of understanding and description, "inside and outside" refer to the inside and outside relative to the outline of each component itself, but the above-mentioned directional words are not used to limit the present invention.
[0046] In order to solve the problems in the prior art of the track system having poor adaptability to deformation of the offline foundation, low on-site construction efficiency and poor durability of the track structure, the present application provides an assembled ballastless track system and a construction method for the assembled ballastless track system.
[0047] like Figures 1 to 6 As shown, the prefabricated ballastless track system in the present application includes: a prefabricated track slab 10, a prefabricated base 20, a prefabricated limiting structure 21, an isolation layer 30 or a support 40, an elastic buffer layer 31 and an on-site cast layer 50. The center of the prefabricated track slab 10 has one or more limiting holes 11; the prefabricated base 20 is located below the prefabricated track slab 10; the prefabricated limiting structure 21 extends into the limiting hole 11; an isolation layer 30 or a support 40 is arranged between the prefabricated track slab 10 and the prefabricated base 20; an elastic buffer layer 31 is arranged between the limiting hole 11 and the prefabricated limiting structure 21; the on-site cast layer 50 is located below the prefabricated base 20 and is cast on-site.
[0048] The above-mentioned prefabricated ballastless track system is mainly assembled in two steps during manufacturing, one step is the factory prefabrication step, and the other step is the on-site pouring step, which can greatly reduce the time of on-site construction and improve the laying efficiency of the prefabricated ballastless track system. In the factory prefabrication step, the prefabricated track plate 10, the prefabricated base 20, the prefabricated limiting structure 21, the isolation layer 30 or the support 40, and the elastic buffer layer 31 are assembled together in advance. The use of prefabricated structure assembly can improve the durability of the track structure, reduce the probability of errors and mistakes during the construction process, and improve the construction quality of the prefabricated ballastless track system. In addition, the supports in the prefabricated ballastless track system have the ability to adjust the height, thereby effectively solving the problems of the track system in the prior art, such as poor ability to adapt to offline foundation deformation, low on-site construction efficiency, and poor durability of the track structure.
[0049] Optionally, the cast-in-place layer 50 is a cast-in-place self-compacting concrete layer or a resin mortar injection layer.
[0050] It should be noted that the limiting hole 11 is opened in the center of the prefabricated track plate 10, so that the prefabricated base 20 and the prefabricated limiting structure 21 can be reliably fixed to the prefabricated track plate 10, preventing the track plate from floating and shifting laterally, and increasing the overall stability of the track structure. In addition, since an isolation layer 30 and an elastic buffer layer 31 are provided, the deformation and interaction between the prefabricated track plate 10, the prefabricated base 20 and the prefabricated limiting structure 21 can be coordinated and buffered, providing convenient conditions for later maintenance. In the on-site construction step, it is only necessary to pour the on-site casting layer 50, and assemble the product after the factory construction is completed with the on-site casting layer 50, thereby effectively improving the on-site construction efficiency and solving the problem of poor durability of the track structure in the track system.
[0051] In addition, the elastic buffer layer 31 can effectively prevent a gap from being formed between the limiting hole 11 and the prefabricated limiting structure 21, thereby effectively preventing water from accumulating in the vicinity of the limiting hole 11 and seeping into the bottom of the prefabricated track plate 10, and also facilitating maintenance during the operation phase.
[0052] It should be noted that the number of the limiting holes 11 can be multiple, and the multiple limiting holes 11 are arranged at intervals along the extension direction of the prefabricated track plate 10. The multiple limiting holes 11 cooperate with the multiple prefabricated limiting structures 21 to provide a better limiting function for the assembled ballastless track system and increase the stability of the assembled ballastless track system during operation. It should also be noted that the number of the limiting holes 11 is mainly designed according to the length of the prefabricated track plate 10.
[0053] In a specific embodiment, the number of the limiting holes 11 is two.
[0054] Optionally, the cross section of the limiting hole 11 is circular, polygonal or elliptical, which can be determined according to the actual use requirements and processing difficulty of the limiting hole 11 and the prefabricated limiting structure 21.
[0055] Optionally, the diameter of the limiting hole 11 gradually decreases from top to bottom. The limiting hole 11 is set to a shape with a diameter gradually decreasing from top to bottom, which can effectively suppress the floating displacement of the prefabricated track plate 10 and facilitate demoulding when the prefabricated track plate 10 is manufactured.
[0056] Optionally, the prefabricated limiting structure 21 gradually decreases from top to bottom and is integrally formed with the prefabricated base 20. By setting it in this way, the connection between the prefabricated limiting structure 21 and the prefabricated base 20 can be made tighter, thereby ensuring the compactness of the entire assembled ballastless track system structure and the reliability of limiting.
[0057] like Figure 6As shown, a steel bar 60 is arranged in the prefabricated base 20, and a part of the structure of the steel bar 60 is exposed below the prefabricated base 20 and cast into shape with the on-site cast layer 50. The steel bar 60 is a truss steel bar or a gate-shaped bar. With such an arrangement, when assembling the assembled ballastless track system, the prefabricated base 20 is connected to the on-site cast layer 50 through a part of the structure of the truss steel bar or a part of the structure of the gate-shaped bar, and the exposed part of the truss steel bar or the gate-shaped bar will extend into the on-site cast layer 50.
[0058] Optionally, the thickness of the prefabricated base 20 is greater than or equal to 50 mm. By setting it in this way, the structural strength of the assembled ballastless track system can be ensured. Of course, the specific thickness of the prefabricated base 20 needs to be determined according to the actual use and terrain characteristics.
[0059] Optionally, the isolation layer 30 is a geotextile layer or a rubber layer, and one or two geotextile layers can be laid when the isolation layer 30 is used. The provision of the isolation layer 30 can separate the prefabricated base 20 and the prefabricated track slab 10, thereby reducing the impact of temperature changes. In addition, it is also convenient to repair the track structure after the lower foundation settles or arches.
[0060] Optionally, the supports 40 are multiple and divided into two groups, and each group has multiple supports 40, the two groups of supports 40 are arranged in parallel and at intervals, and the multiple supports 40 in the same group are sequentially arranged at intervals along the extension direction of the assembled ballastless track system. Figure 3 and Figure 4 In the specific embodiment shown, Figure 1 and Figure 2 The embodiment shown in FIG. 1 is different in that a support 40 is used instead of the isolation layer 30 . In addition, the number of the support 40 can be multiple, and the number of the support 40 can be changed according to the length of the prefabricated track slab 10 .
[0061] Specifically, the prefabricated track plate 10, the prefabricated limiting structure 21, the prefabricated base 20, the isolation layer 30, the elastic buffer layer 31 and other structures are partially assembled or fully assembled in the factory; or the prefabricated track plate 10, the prefabricated limiting structure 21, the prefabricated base 20, the support 40, the elastic buffer layer 31 and other structures are partially assembled or fully assembled in the factory. Through such an arrangement, some structures in the assembled ballastless track system can be pre-produced in batches, and then in the process of assembling the assembled ballastless track system, the pre-produced assembly structure can be directly adjusted into place and the on-site casting layer 50 can be applied, thereby improving the on-site construction efficiency of the assembled ballastless track system.
[0062] Optionally, the cast-in-place layer 50 is formed by pouring self-compacting concrete on site to form the superelevation of the curved outer track, that is, the superelevation of the curved section is set on the cast-in-place layer 50 .
[0063] Optionally, the prefabricated track slab 10 is a reinforced concrete track slab or a prestressed concrete track slab. Preferably, a prestressed track slab is preferably used in an open-air environment, and a reinforced concrete track slab is preferably used in a tunnel.
[0064] Optionally, the length of the prefabricated track slab 10 is 3 meters to 7 meters. By setting it in this way, the assembled ballastless track system in the present application can be adapted to the laying of different track conditions.
[0065] In the present application, the assembled ballastless track system can be laid in tunnels, on the ground and on bridges. Therefore, the type and length of the prefabricated track slab 10 can be determined according to the laying location of the assembled ballastless track system and other conditions.
[0066] The present application also provides a construction method of an assembled ballastless track system, wherein the assembled ballastless track system is the above-mentioned assembled ballastless track system, and the construction method includes a factory prefabrication step and an on-site casting step, wherein the factory prefabrication step includes: manufacturing a prefabricated track plate 10, and reserving a limiting hole 11 on the prefabricated track plate 10; laying an isolation layer 30 or installing a support 40 under the prefabricated track plate 10; arranging an elastic buffer pad layer 31 in the limiting hole 11; manufacturing a prefabricated base 20 and a prefabricated limiting structure 21, so that the prefabricated base 20 and the prefabricated limiting structure 21 are connected with the prefabricated track plate 10 and the elastic buffer pad layer 31 and the elastic buffer pad layer 31 and the isolation layer 30 or the installing support 40 to form a combined structure; the on-site casting step includes: placing the combined structure on the on-site casting layer 50 and pouring the on-site casting layer 50 into shape.
[0067] Specifically, the steps of manufacturing the prefabricated track slab 10 are:
[0068] S10: making a track slab steel bar skeleton and prestressed tendons and placing them in a track slab mold, and setting a hole forming device;
[0069] S11: tensioning prestressed tendons and pouring concrete;
[0070] S12: Laying an isolation layer 30;
[0071] S13: Perform concrete curing.
[0072] Further, the step of providing an elastic buffer layer 31 in the limiting hole 11 is as follows:
[0073] S20: removing the hole former in the limiting hole 11;
[0074] S21 : pasting the elastic buffer layer 31 around the limiting hole 11 .
[0075] Specifically, the steps of manufacturing the prefabricated base 20 and the prefabricated limiting structure 21 are as follows:
[0076] S30: making steel bars 60;
[0077] S31: making a common steel skeleton, placing the steel skeleton on the isolation layer 30, and placing the steel bars 60 on the isolation layer 30;
[0078] S32: Setting pads to support the steel frame;
[0079] S33: pouring concrete;
[0080] S34: Carry out concrete curing.
[0081] It should also be noted that during the on-site construction process: the prefabricated track plate 10, prefabricated base 20 and track components such as the limiting structure assembled into one are transported to the construction site, their positions are adjusted according to the design requirements, and then self-compacting concrete is poured with the prefabricated base 20 to form an integral structure.
[0082] From the above description, it can be seen that the above embodiments of the present invention achieve the following technical effects:
[0083] 1. Improved the on-site construction efficiency of the prefabricated ballastless track system;
[0084] 2. It solves the problem that the track system in the prior art has poor ability to adapt to the deformation of the offline foundation;
[0085] 3. Solved the problem of poor durability of track structure.
[0086] Obviously, the above-described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0087] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0088] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.
[0089] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An assembled ballastless track system, It is characterized in that include: A prefabricated track plate (10), wherein the center of the prefabricated track plate (10) has one or more limiting holes (11); A prefabricated base (20), the prefabricated base (20) being located below the prefabricated track plate (10); A prefabricated limiting structure (21), wherein the prefabricated limiting structure (21) extends into the limiting hole (11); an isolation layer (30) or a support (40), wherein the isolation layer (30) or the support (40) is arranged between the prefabricated track plate (10) and the prefabricated base (20); An elastic buffer layer (31), wherein the elastic buffer layer (31) is arranged between the limiting hole (11) and the prefabricated limiting structure (21); A cast-in-place layer (50), the cast-in-place layer (50) is located below the prefabricated base (20) and is cast in situ.
2. The assembled ballastless track system according to claim 1, It is characterized in that The cross section of the limiting hole (11) is circular, polygonal or elliptical; and / or The diameter of the limiting hole (11) gradually decreases from top to bottom.
3. The assembled ballastless track system according to claim 1, It is characterized in that The prefabricated limiting structure (21) gradually decreases from top to bottom and is formed integrally with the prefabricated base (20).
4. The assembled ballastless track system according to claim 1, It is characterized in that A steel bar (60) is arranged inside the prefabricated base (20), and a part of the structure of the steel bar (60) is exposed below the prefabricated base (20) and is cast together with the on-site cast layer (50). The steel bar (60) is a truss steel bar or a gate-shaped steel bar.
5. The assembled ballastless track system according to claim 1, It is characterized in that The thickness of the prefabricated base (20) is greater than or equal to 50 mm.
6. The assembled ballastless track system according to claim 1, It is characterized in that The isolation layer (30) is a geotextile layer or a rubber layer. When the geotextile layer is used as the isolation layer (30), one or two layers can be laid.
7. The assembled ballastless track system according to claim 1, It is characterized in that The supports (40) are multiple and divided into two groups, and each group contains multiple supports (40). The two groups of supports (40) are arranged in parallel and at intervals, and the multiple supports (40) in the same group are arranged in sequence at intervals along the extension direction of the assembled ballastless track system.
8. The assembled ballastless track system according to claim 1, It is characterized in that The prefabricated track plate (10), the prefabricated limiting structure (21), the prefabricated base (20), the isolation layer (30), and the elastic buffer layer (31) are partially or completely assembled into one piece in a factory; or The prefabricated track plate (10), the prefabricated limiting structure (21), the prefabricated base (20), the support (40), and the elastic buffer layer (31) are partially or completely assembled into one piece in a factory.
9. The assembled ballastless track system according to claim 1, It is characterized in that The curved outer rail superelevation is arranged on the cast-in-place layer (50).
10. The assembled ballastless track system according to any one of claims 1 to 9, It is characterized in that The prefabricated track slab (10) is a reinforced concrete track slab or a prestressed concrete track slab.
11. The assembled ballastless track system according to any one of claims 1 to 9, It is characterized in that The length of the prefabricated track slab (10) is 3 to 7 meters.
12. A construction method for an assembled ballastless track system, It is characterized in that The assembled ballastless track system is the assembled ballastless track system according to any one of claims 1 to 11, and the construction method comprises a factory prefabrication step and an on-site casting step, wherein the factory prefabrication step comprises: Manufacturing a prefabricated track plate (10), and reserving a limiting hole (11) on the prefabricated track plate (10); Laying an isolation layer (30) or installing a support (40) below the prefabricated track slab (10); An elastic buffer layer (31) is arranged in the limiting hole (11); Manufacturing a prefabricated base (20) and a prefabricated limiting structure (21), so that the prefabricated base (20) and the prefabricated limiting structure (21) are connected with the prefabricated track plate (10), the elastic buffer layer (31), and the isolation layer (30) or the support (40) to form a combined structure; The pour-in-place step comprises: The composite structure is placed on a cast-in-place layer (50) and the cast-in-place layer (50) is poured into shape.
13. The construction method of the assembled ballastless track system according to claim 12, It is characterized in that The steps of manufacturing the prefabricated track slab (10) are: S10: manufacturing a track slab steel bar skeleton and prestressed tendons and placing the two in a track slab mold, and setting a hole forming device; S11: tensioning the prestressed tendons and pouring concrete; S12: laying the isolation layer (30); S13: Perform concrete curing.
14. The construction method of the assembled ballastless track system according to claim 13, It is characterized in that The step of arranging the elastic buffer layer (31) in the limiting hole (11): S20: removing the pore former in the limiting hole (11); S21: Pasting the elastic buffer layer (31) around the limiting hole (11).
15. The construction method of the assembled ballastless track system according to claim 12, It is characterized in that Steps for manufacturing the prefabricated base (20) and the prefabricated limiting structure (21): S30: making steel bars (60); S31: making a common steel bar skeleton, placing the steel bar skeleton on the isolation layer (30), and placing the steel bars (60) on the isolation layer (30); S32: Setting a pad to support the steel frame; S33: pouring concrete; S34: Carry out concrete curing.