Power distribution regulation device and power distribution regulation method

By setting connection points and current collectors on the branches of each phase of the distribution transformer and the target load, real-time monitoring and providing compensation current solve the problem of seasonal overload and three-phase current imbalance of the distribution transformer, and improve the reliability of power supply. performance and equipment life.

CN110190613BActive Publication Date: 2024-10-29SHENZHEN TIEON ENERGY TECH +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN201910596290.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-03
Publication Date
2024-10-29
Estimated Expiration
2039-07-03

AI Technical Summary

Technical Problem

Existing technology cannot effectively solve the overload problem and three-phase current imbalance problem of distribution transformers during seasonal changes. The capacity expansion strategy results in too low load factor, and the three-phase grid-connected energy storage feed compensation cannot balance each phase current.

Method used

Design a power distribution regulating device. By setting a connection point on the branch formed by each phase of the distribution transformer and the target load, the connection point is connected to the energy storage device and the current collector, and the current information is collected in real time and compared with the preset current value. , if overloaded, a compensation current will be provided to ensure the current balance of each phase.

Benefits of technology

It effectively solves the seasonal overload and three-phase current imbalance problems of distribution transformers, improves power supply reliability and extends the service life of equipment, has low cost and achieves current balance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110190613B_ABST
    Figure CN110190613B_ABST
Patent Text Reader

Abstract

The power distribution regulation device and the power distribution regulation method provided by the embodiments of the present invention relate to the field of power electronics technology. The power distribution regulation device includes multiple energy storage devices and multiple current collectors, one end of each of the multiple energy storage devices is electrically connected between the distribution transformer and the target load, and each phase of the distribution transformer and the branch formed by the target load are provided with a connection point, the connection point is electrically connected to one of the multiple energy storage devices, one of the multiple current collectors is provided on the line between the connection point and the target load, and the multiple current collectors are electrically connected to the multiple energy storage devices in a one-to-one correspondence; the current collector collects the current information provided by one phase of the distribution transformer to the target load in real time; if the current value corresponding to the current information is not lower than the first preset current value, the energy storage device provides a compensation current to the target load. The power supply reliability and service life of the distribution transformer can be improved by the power distribution regulation device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power electronics technology, and in particular to a power distribution regulation device and a power distribution regulation method. Background Art

[0002] Due to seasonal changes, residents' electricity demands vary, which will cause seasonal overload problems on distribution transformers. The current seasonal overload management strategy is generally to expand the capacity of distribution transformers or three-phase grid-connected energy storage feeding compensation. The strategy of expanding the capacity of distribution transformers will result in too low load rates at normal load power, and cannot solve the problem of unbalanced three-phase current in distribution transformers. When using the strategy of three-phase grid-connected energy storage feeding compensation to feed compensation to the distribution transformer, the current compensated for each phase is of the same amplitude, which cannot solve the problem of unbalanced three-phase current in the distribution transformer. Summary of the invention

[0003] The objectives of the present invention include, for example, providing a distribution regulation device and a distribution regulation method, which can solve the problem of three-phase current imbalance of the distribution transformer while solving the problem of seasonal overload of the distribution transformer.

[0004] The embodiments of the present invention can be implemented as follows:

[0005] In a first aspect, an embodiment of the present invention provides a power distribution regulation device, comprising a plurality of energy storage devices and a plurality of current collectors, wherein one end of the plurality of energy storage devices is electrically connected between a distribution transformer and a target load, and a connection point is provided on a branch formed by each phase of the distribution transformer and the target load, the connection point is used to be electrically connected to one of the plurality of energy storage devices, one of the plurality of current collectors is provided on a line between the connection point and the target load, and the plurality of current collectors are electrically connected to the plurality of energy storage devices in a one-to-one correspondence; the current collector is used to collect current information provided by one phase of the distribution transformer to the target load in real time, and transmit the current information to the energy storage device; the energy storage device is used to compare a current value corresponding to the current information with a first preset current value, and if the current value corresponding to the current information is not lower than the first preset current value, a compensation current is provided to the target load.

[0006] In an optional embodiment, the connection point is located on the branch at a preset distance from the target load.

[0007] In an optional implementation, the energy storage device is an energy storage converter.

[0008] In an optional implementation, the current collector uses an open current collection transformer.

[0009] In a second aspect, an embodiment of the present invention provides a distribution regulation method, which is applied to an energy storage device, wherein one end of each of the energy storage devices is electrically connected between a distribution transformer and a target load, and a connection point is provided on a branch formed by each phase of the distribution transformer and the target load, and the connection point is used to electrically connect to one of the multiple energy storage devices. A current collector is provided on the line between the connection point and the target load, and the multiple current collectors are electrically connected to the multiple energy storage devices in a one-to-one correspondence. The current collector is used to collect in real time the current information provided by one phase of the distribution transformer to the target load. The method comprises: receiving the current information sent by the current collector, and obtaining a current value corresponding to the current information; if the current value corresponding to the current information is not lower than a first preset current value, providing a compensation current to the target load.

[0010] In an optional implementation, the step of the energy storage device providing the compensation current to the target load includes: calculating the compensation current according to the current value corresponding to the current information and the first preset current value.

[0011] In an optional implementation manner, the compensation current is calculated using the following formula:

[0012] Imse=ImL-Imset;

[0013] Among them, the ImL represents the current value corresponding to the current information, and the Imset represents the first preset current value.

[0014] In an optional implementation manner, the first preset current value is calculated based on the rated current of a branch formed by any phase of the distribution transformer and the target load and the rated current of an energy storage device electrically connected to the branch.

[0015] In an optional implementation manner, the first preset current value is calculated using the following formula:

[0016] Imset = e*Ime-Imc;

[0017] Wherein, the e represents a margin parameter, the Ime represents a rated current of a branch formed by any phase of the distribution transformer and the target load; and the Imc represents a rated current of an energy storage device electrically connected to the branch.

[0018] In an optional implementation, the power distribution regulation method further includes: if the current value corresponding to the current information is lower than the first preset current value, then being in a standby state or in a charging state.

[0019] The power distribution regulation device and the power distribution regulation method of the embodiment of the present invention have the following beneficial effects: a connection point is provided on each phase of the distribution transformer and the branch formed by the target load, and the connection point is used to be electrically connected to one of the multiple energy storage devices, and one of the multiple current collectors is provided on the line between the connection point and the target load; the current collector is used to collect the current information provided by one phase of the distribution transformer to the target load in real time, and transmit the current information to the energy storage device; the energy storage device is used to compare the current value corresponding to the current information with the first preset current value, and if the current value corresponding to the current information is not lower than the first preset current value, a compensation current is provided to the target load. It can be seen that when a phase of the distribution transformer supplies power to the target load, if an overload occurs, the energy storage device electrically connected to the branch formed by the phase and the target load provides a compensation current, which can solve the problem of seasonal overload of the distribution transformer. At the same time, since each phase of the distribution transformer and the branch for powering the target load are electrically connected to energy storage devices respectively, the energy storage device electrically connected to each branch can provide different compensation currents according to the actual overload situation of the correspondingly connected branch, so that the three-phase current of the distribution transformer can be in a balanced state. A set of distribution regulation devices can solve both the seasonal overload problem of the distribution transformer and the three-phase current imbalance problem of the distribution transformer. It is not only low-cost, but also improves the power supply reliability and extends the service life of the distribution transformer. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0021] Figure 1 A schematic diagram of an application environment of a power distribution regulating device provided by an embodiment of the present invention;

[0022] Figure 2 A schematic diagram of the structure of a power distribution regulating device provided in an embodiment of the present invention;

[0023] Figure 3 Another structural schematic diagram of the power distribution adjustment device provided by an embodiment of the present invention;

[0024] Figure 4 A schematic diagram of a flow chart of a power distribution adjustment method provided by an embodiment of the present invention;

[0025] Figure 5 Another schematic flow chart of the power distribution regulation method provided in an embodiment of the present invention.

[0026] Icons: 10-distribution regulation system; 100-distribution regulation device; 110-energy storage device; 120-current collector; 130-branch; 140-connection point; 200-distribution transformer; 300-load; 310-target load. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0028] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0030] In the description of the present invention, it should be noted that if the terms "upper", "lower", "inside", "outside", etc. appear to indicate an orientation or position relationship, they are based on the orientation or position relationship shown in the accompanying drawings, or are the orientation or position relationship in which the product of the invention is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0031] In addition, the terms “first”, “second”, etc., if used, are merely used to distinguish between the descriptions and should not be understood as indicating or implying relative importance.

[0032] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.

[0033] Please refer to Figure 1, is a schematic diagram of the environment of the power distribution regulating device 100 provided in this embodiment, and the power distribution regulating device 100 is applied to the power distribution regulating system 10, and the power distribution regulating system 10 also includes a distribution transformer 200. The power distribution regulating device 100 is arranged between the distribution transformer 200 and the load 300, and the distribution transformer 200 can supply power to multiple loads 300 at the same time, that is, the three-phase transmission line of the distribution transformer 200 and the multiple loads 300 form multiple branches, and the multiple branches formed by the three-phase transmission line of the distribution transformer 200 and the multiple loads 300 are all provided with the power distribution regulating device 100. Through the power distribution regulating device 100, the actual overload condition of each branch can be monitored in real time, and different compensation currents can be provided for each branch. Through a set of power distribution regulating devices 100, the seasonal overload problem of the distribution transformer 200 can be solved, and the problem of three-phase current imbalance of the distribution transformer 200 can also be solved. Not only is the cost low, but also the power supply reliability is improved and the service life of the distribution transformer 200 is extended.

[0034] Since the distribution regulation device 100 has the same working principle for each branch formed by the three-phase transmission line of the distribution transformer 200 and the multiple loads 300, in this embodiment, only the three branches formed by the three-phase transmission line of the distribution transformer 200 and the target load are described in detail, where the target load is one of the multiple loads 300. Figure 2 and Figure 3 , is a schematic diagram of a power distribution regulation device 100, which includes a plurality of energy storage devices 110 and a plurality of current collectors 120, one end of each of the plurality of energy storage devices 110 is electrically connected between a distribution transformer 200 and a target load 310, and a connection point 140 is provided on a branch 130 formed by each phase of the distribution transformer 200 and the target load 310, and the connection point 140 is used to be electrically connected to one of the plurality of energy storage devices 110, and one of the plurality of current collectors 120 is provided on the line between the connection point 140 and the target load 310, and the plurality of current collectors 120 are electrically connected to the plurality of energy storage devices 110 in a one-to-one correspondence.

[0035] In this embodiment, the current collector 120 is used to collect the current information provided by one phase of the distribution transformer 200 to the target load 310 in real time, and transmit the current information to the energy storage device 110. The energy storage device 110 is used to compare the current value corresponding to the current information with the first preset current value, and provide a compensation current to the target load 310 if the current value corresponding to the current information is not lower than the first preset current value.

[0036] It can be understood that the A phase, B phase and C phase of the distribution transformer 200 and the target load 310 will respectively form three branches 130, the multiple energy storage devices 110 include a first energy storage device, a second energy storage device and a third energy storage device, and the multiple current collectors 120 include a first current collector, a second current collector and a third current collector. A first connection point is provided on the branch 130 formed by the A phase of the distribution transformer 200 and the target load 310, and the first connection point is used to be electrically connected to one end of the first energy storage device, and a first current collector is provided on the line between the first connection point and the target load 310; a second connection point is provided on the branch 130 formed by the B phase of the distribution transformer 200 and the target load 310, and the second connection point is used to be electrically connected to one end of the second energy storage device, and a second current collector is provided on the line between the second connection point and the target load 310; a third connection point is provided on the branch 130 formed by the C phase of the distribution transformer 200 and the target load 310, and the third connection point is used to be electrically connected to one end of the third energy storage device, and a third current collector is provided on the line between the third connection point and the target load 310.

[0037] Among them, the first current collector is used to collect the first current information provided by the A phase of the distribution transformer 200 to the target load 310 in real time, and transmit the first current information to the first energy storage; the first energy storage is used to compare the current value corresponding to the first current information with the first preset current value, if the current value corresponding to the first current information is not lower than the first preset current value, the first energy storage provides the first compensation current to the target load 310. The second current collector is used to collect the second current information provided by the B phase of the distribution transformer 200 to the target load 310 in real time, and transmit the second current information to the second energy storage; the second energy storage is used to compare the current value corresponding to the second current information with the first preset current value, if the current value corresponding to the second current information is not lower than the first preset current value, the second energy storage provides the second compensation current to the target load 310. The third current collector is used to collect in real time the third current information provided by the C phase of the distribution transformer 200 to the target load 310, and transmit the third current information to the third energy storage device; the third energy storage device is used to compare the current value corresponding to the third current information with the first preset current value. If the current value corresponding to the third current information is not lower than the first preset current value, the third energy storage device provides a third compensation current to the target load 310.

[0038] It can be understood that the current information includes the first current information, the second current information and the third current information, and the compensation current includes the first compensation current, the second compensation current and the third compensation current. Since the power demand provided by the target load 310 to the A phase of the distribution transformer 200, the power demand provided by the target load 310 to the B phase of the distribution transformer 200 and the power demand provided by the target load 310 to the C phase of the distribution transformer 200 are generally not completely the same. Therefore, the first current information collected by the first current collector, the second current information collected by the second current collector and the third current information collected by the third current collector will not be the same, and then the first compensation current provided by the first energy storage device, the second compensation current provided by the second energy storage device and the third compensation current provided by the third energy storage device will not be the same.

[0039] It can be seen that by electrically connecting the energy storage device 110 to each branch 130 and providing each branch 130 with a current collector 120, the actual overload condition of each branch 130 can be monitored in real time, and a corresponding compensation current can be provided for each branch 130. While solving the seasonal overload problem of the distribution transformer 200, the three-phase current of the distribution transformer 200 can also be kept in a balanced state.

[0040] In this embodiment, the energy storage device 110 calculates the compensation current according to the current value corresponding to the current information and the first preset current value. It can be understood that the first energy storage device calculates the first compensation current according to the first current information and the first preset current value provided by the A phase of the distribution transformer 200 to the target load 310, the second energy storage device calculates the second compensation current according to the second current information and the first preset current value provided by the B phase of the distribution transformer 200 to the target load 310, and the third energy storage device calculates the third compensation current according to the third current information and the first preset current value provided by the C phase of the distribution transformer 200 to the target load 310.

[0041] Specifically, the compensation current can be calculated using the following formula:

[0042] Imse=ImL-Imset;

[0043] Among them, ImL represents the current value corresponding to the current information, and Imset represents the first preset current value.

[0044] It can be understood that when the first energy storage device calculates the first compensation current based on the first current information provided by the A phase of the distribution transformer 200 to the target load 310 and the first preset current value, ImL represents the current value corresponding to the first current information; when the second energy storage device calculates the second compensation current based on the second current information provided by the B phase of the distribution transformer 200 to the target load 310 and the first preset current value, ImL represents the current value corresponding to the second current information; when the third energy storage device calculates the third compensation current based on the third current information provided by the C phase of the distribution transformer 200 to the target load 310 and the first preset current value, ImL represents the current value corresponding to the third current information.

[0045] In this embodiment, the first preset current value may be calculated based on the rated current of the branch 130 formed by any phase of the distribution transformer 200 and the target load 310 and the rated current of the energy storage device 110 electrically connected to the branch 130 .

[0046] It can be understood that when the first energy storage device calculates the first compensation current according to the first current information and the first preset current value provided by the A phase of the distribution transformer 200 to the target load 310, the first preset current value is calculated according to the rated current of the branch 130 formed by the A phase of the distribution transformer 200 and the target load 310 and the rated current of the first energy storage device. When the second energy storage device calculates the second compensation current according to the second current information and the first preset current value provided by the B phase of the distribution transformer 200 to the target load 310, the first preset current value is calculated according to the rated current of the branch 130 formed by the B phase of the distribution transformer 200 and the target load 310 and the rated current of the second energy storage device. When the third energy storage device calculates the third compensation current according to the third current information and the first preset current value provided by the C phase of the distribution transformer 200 to the target load 310, the first preset current value is calculated according to the rated current of the branch 130 formed by the C phase of the distribution transformer 200 and the target load 310 and the rated current of the third energy storage device.

[0047] Specifically, the first preset current value can be calculated using the following formula:

[0048] Imset = e*Ime-Imc;

[0049] Wherein, e represents a margin parameter, Ime represents a rated current of a branch 130 formed by any phase of the distribution transformer 200 and the target load 310 ; and Imc represents a rated current of the energy storage device 110 electrically connected to the branch 130 .

[0050] It can be understood that when the first preset current value is calculated based on the rated current of the branch 130 formed by the A phase of the distribution transformer 200 and the target load 310 and the rated current of the first energy storage, Ime represents the rated current of the branch 130 formed by the A phase of the distribution transformer 200 and the target load 310, and Imc represents the rated current of the first energy storage. When the first preset current value is calculated based on the rated current of the branch 130 formed by the B phase of the distribution transformer 200 and the target load 310 and the rated current of the second energy storage, Ime represents the rated current of the branch 130 formed by the B phase of the distribution transformer 200 and the target load 310, and Imc represents the rated current of the second energy storage. When the first preset current value is calculated based on the rated current of the branch 130 formed by the C phase of the distribution transformer 200 and the target load 310 and the rated current of the third energy storage, Ime represents the rated current of the branch 130 formed by the C phase of the distribution transformer 200 and the target load 310, and Imc represents the rated current of the third energy storage.

[0051] The rated current of the branch 130 formed by the A phase of the distribution transformer 200 and the target load 310, the rated current of the branch 130 formed by the B phase of the distribution transformer 200 and the target load 310, and the rated current of the branch 130 formed by the C phase of the distribution transformer 200 and the target load 310 may be the same or different. The rated current of the first energy storage device, the rated current of the second energy storage device, and the rated current of the third energy storage device may be the same or different.

[0052] In this embodiment, in order to ensure that the energy storage device 110 has a certain reaction time when each branch 130 is overloaded, the margin parameter e can be set to 80%. Of course, the margin parameter e can be set according to actual conditions and is not limited here.

[0053] Furthermore, in this embodiment, when the energy storage device 110 is used to compare the current value corresponding to the current information with the first preset current value, if the current value corresponding to the current information is lower than the first preset current value, the energy storage device 110 is in a standby state or a charging state.

[0054] It can be understood that the first energy storage device is used to compare the first current information provided by the A phase of the distribution transformer 200 to the target load 310 collected by the first current collector with the first preset current value. If the current value corresponding to the first current information is lower than the first preset current value, the first energy storage device is in a standby state or a charging state. The first energy storage device being in a standby state can be understood as: the first energy storage device neither provides the first compensation current to the target load 310 nor receives the electric energy provided by the A phase of the distribution transformer 200. The first energy storage device being in a charging state can be understood as: the first energy storage device receives the electric energy provided by the A phase of the distribution transformer 200 for charging.

[0055] The second energy storage device is used to compare the second current information provided by the B phase of the distribution transformer 200 to the target load 310 collected by the second current collector with the first preset current value. If the current value corresponding to the second current information is lower than the first preset current value, the second energy storage device is in a standby state or a charging state. The second energy storage device being in a standby state can be understood as: the second energy storage device neither provides the second compensation current to the target load 310 nor receives the electric energy provided by the B phase of the distribution transformer 200. The second energy storage device being in a charging state can be understood as: the second energy storage device receives the electric energy provided by the B phase of the distribution transformer 200 for charging.

[0056] The third energy storage device is used to compare the third current information provided by the C phase of the distribution transformer 200 to the target load 310 collected by the third current collector with the first preset current value. If the current value corresponding to the third current information is lower than the first preset current value, the third energy storage device is in a standby state or a charging state. The third energy storage device being in a standby state can be understood as: the third energy storage device neither provides the third compensation current to the target load 310 nor receives the electric energy provided by the C phase of the distribution transformer 200. The third energy storage device being in a charging state can be understood as: the third energy storage device receives the electric energy provided by the C phase of the distribution transformer 200 for charging.

[0057] In this embodiment, the current collector 120 is arranged on the line between the connection point 140 and the target load 310, so that the current information collected by the current collector 120 is provided by one of the phases of the distribution transformer 200 to the target load 310. If the current collector 120 is arranged on the line between the connection point 140 and the distribution transformer 200, the current information collected by the current collector 120 may be provided by one of the phases of the distribution transformer 200 to multiple loads 300, or may be provided by one of the phases of the distribution transformer 200 to the target load 310 and the energy storage device 110 electrically connected to the branch 130.

[0058] In this embodiment, the connection point 140 on the branch 130 is at a preset distance from the target load 310. The preset distance may be 500m or 200m, which is not limited here. However, in this embodiment, it is preferably 200m, that is, the connection point 140 on each branch 130 is 200m away from the load 300. The distance between the connection point 140 on each branch 130 and the load 300 is set to 200m, so that the distribution regulation device 100 has the best effect on solving the seasonal overload and three-phase current imbalance of the distribution transformer 200.

[0059] Further, in this embodiment, the energy storage device 110 can adopt a power storage converter (Power Conversion System, PCS), which is composed of a DC / AC bidirectional converter (not shown), a control unit (not shown), etc. The control unit is used to receive the current information sent by the current collector 120, which is provided by one phase of the distribution transformer 200 to the target load 310 in real time, and compare the current value corresponding to the current information with the first preset current value. If the current value corresponding to the current information is not lower than the first preset current value, the control unit controls the DC / AC bidirectional converter to provide a compensation current to the target load 310. If the current value corresponding to the current information is lower than the first preset current value, the control unit controls the DC / AC bidirectional converter to be in a standby state or a charging state. Among them, the standby state means that the DC / AC bidirectional converter neither provides a compensation current to the target load 310 nor receives the electric energy provided by the distribution transformer 200 for charging; the charging state means that the DC / AC bidirectional converter receives the electric energy provided by the distribution transformer 200 for charging.

[0060] Further, in this embodiment, the current collector 120 can use an open current collection transformer or a Hall sensor. In this embodiment, an open current collection transformer is preferred. When the current collector 120 uses an open current collection transformer, the current collection transformer is set on the line between the connection point 140 on each branch 130 and the target load 310.

[0061] In this embodiment, in order to solve the problem of seasonal overload of the distribution transformer 200, the problem of three-phase current imbalance of the distribution transformer 200 can also be solved. Figure 4 The power distribution regulation method provided in an embodiment of the present invention is described in detail. The power distribution regulation method is applied to the energy storage device 110. The method mainly includes:

[0062] Step S101, receiving current information sent by a current collector, and obtaining a current value corresponding to the current information.

[0063] Step S102, determining whether the current value corresponding to the current information is lower than a first preset current value.

[0064] Step S103: if the current value corresponding to the current information is not lower than the first preset current value, providing a compensation current to the target load.

[0065] In this embodiment, steps S101 to S103 may correspond to the functional description of the current collector 120 and the energy storage device 110 , so for the parts not mentioned, reference may be made to the corresponding contents of the functional description of the current collector 120 and the energy storage device 110 .

[0066] For further information, please refer to Figure 5 In this embodiment, the power distribution adjustment method further includes the following steps:

[0067] Step S104: if the current value corresponding to the current information is lower than the first preset current value, the battery is in a standby state or a charging state.

[0068] In this embodiment, the step S104 may correspond to the functional description of the energy storage device 110 , so for the parts not mentioned, reference may be made to the corresponding contents of the functional description of the energy storage device 110 .

[0069] In summary, the embodiment of the present invention provides a distribution regulation device and a distribution regulation method, by providing a connection point on each phase of the distribution transformer and the branch formed by the target load, the connection point is used to be electrically connected to one of the multiple energy storage devices, and one of the multiple current collectors is provided on the line between the connection point and the target load; the current collector is used to collect the current information provided by one phase of the distribution transformer to the target load in real time, and transmit the current information to the energy storage device; the energy storage device is used to compare the current value corresponding to the current information with the first preset current value, and if the current value corresponding to the current information is not lower than the first preset current value, the target load is provided with a compensation current. It can be seen that when a phase of the distribution transformer supplies power to the target load, when an overload occurs, the energy storage device electrically connected to the branch formed by the phase and the target load provides a compensation current, which can solve the problem of seasonal overload of the distribution transformer. At the same time, since each phase of the distribution transformer and the branch for powering the target load are electrically connected to energy storage devices respectively, the energy storage device electrically connected to each branch can provide different compensation currents according to the actual overload situation of the correspondingly connected branch, so that the three-phase current of the distribution transformer can be in a balanced state. A set of distribution regulation devices can solve both the seasonal overload problem of the distribution transformer and the three-phase current imbalance problem of the distribution transformer. It is not only low-cost, but also improves the power supply reliability and extends the service life of the distribution transformer.

[0070] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A power distribution regulating device, characterized in that: It includes multiple energy storage devices and multiple current collectors; the energy storage device includes a DC / AC bidirectional converter and a control unit; One end of each of the multiple energy storage devices is electrically connected between the distribution transformer and the target load, and a connection point is provided on a branch formed by each phase of the distribution transformer and the target load, and the connection point is used to be electrically connected to one of the multiple energy storage devices, and one of the multiple current collectors is provided on the line between the connection point and the target load, and the multiple current collectors are electrically connected to the multiple energy storage devices in a one-to-one correspondence; The current collector is used to collect the current information provided by one phase of the distribution transformer to the target load in real time, and transmit the current information to the control unit; The control unit is used to compare the current value corresponding to the current information with a first preset current value, and if the current value corresponding to the current information is not lower than the first preset current value, control the DC / AC bidirectional converter to provide a compensation current to the target load; if the current value corresponding to the current information is lower than the first preset current value, control the DC / AC bidirectional converter to be in a standby state or a charging state; The compensation current is calculated using the following formula: Imse=ImL-Imset; Wherein, ImL represents the current value corresponding to the current information, and Imset represents the first preset current value; The first preset current value is calculated using the following formula: Imset=e*Ime-Imc; Among them, e represents the margin parameter, Ime represents the rated current of the branch formed by any phase of the distribution transformer and the target load; Imc represents the rated current of the energy storage device electrically connected to the branch; the margin parameter is set to ensure that the energy storage device has a certain reaction time when each branch is overloaded.

2. The power distribution regulating device according to claim 1, characterized in that: The connection point is located on the branch at a preset distance from the target load.

3. The power distribution regulating device according to claim 1, characterized in that: The current collector adopts an open current collection transformer.

4. A power distribution regulation method, characterized in that: Applicable to an energy storage device; the energy storage device includes a DC / AC bidirectional converter and a control unit; One end of each of the plurality of energy storage devices is electrically connected between the distribution transformer and the target load, and a connection point is provided on a branch formed by each phase of the distribution transformer and the target load, and the connection point is used to be electrically connected to one of the plurality of energy storage devices, and a current collector is provided on the line between the connection point and the target load, and the plurality of current collectors are electrically connected to the plurality of energy storage devices in a one-to-one correspondence, and the current collector is used to collect in real time the current information provided by one phase of the distribution transformer to the target load, and transmit the current information to the control unit; The method comprises: The control unit receives the current information sent by the current collector, and obtains a current value corresponding to the current information; The control unit compares the current value corresponding to the current information with a first preset current value; If the current value corresponding to the current information is not lower than a first preset current value, the control unit controls the DC / AC bidirectional converter to provide a compensation current to the target load; If the current value corresponding to the current information is lower than the first preset current value, controlling the DC / AC bidirectional converter to be in a standby state or a charging state; The compensation current is calculated using the following formula: Imse=ImL-Imset; Wherein, ImL represents the current value corresponding to the current information, and Imset represents the first preset current value; The first preset current value is calculated using the following formula: Imset=e*Ime-Imc; Among them, e represents the margin parameter, Ime represents the rated current of the branch formed by any phase of the distribution transformer and the target load; Imc represents the rated current of the energy storage device electrically connected to the branch; the margin parameter is set to ensure that the energy storage device has a certain reaction time when each branch is overloaded.

Citation Information

Patent Citations

  • Outdoor active power filter device with three-level inverter

    CN106374487A

  • Unified power quality regulator for medium-voltage distribution networks

    CN108964026A

  • A power distribution adjusting device and power distribution adjusting system

    CN209982084U