Reconstruction structure of the inspection tunnel converted into an ecological water supply tunnel
By converting the maintenance hole into an ecological water supply hole, using structures such as shaft gate chamber, shore tower gate chamber and outlet sealing body, the problems of diversion tunnel sealing in the early stage of ultra-high rock pile dam and excavation of multiple holes in water conservancy and hydropower projects were solved. Achieve versatility and cost reduction effects.
Patent Information
- Application Number
- CN201910483074.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-06-04
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-06-04
AI Technical Summary
During the construction process, the diversion tunnel of the ultra-high rock pile dam is prone to blockage due to erosion and quality transfer, resulting in project safety hazards and economic losses. At the same time, the maintenance holes and ecological water supply holes need to be excavated separately in water conservancy and hydropower projects, which has added Project quantity and cost.
The maintenance hole is converted into an ecological water supply hole. By setting up a vertical shaft gate chamber and a shore tower gate chamber in the maintenance hole body, the outlet sealing body and arc-shaped gates are used to achieve flow adjustment and water level control to meet the needs of maintenance and ecological water supply.
It realizes the multifunctionality of maintenance and ecological water supply, reduces project costs and risks, simplifies the construction process, and is suitable for high water level environments of ultra-high rock pile dams.
Smart Images

Figure CN110258475B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of water conservancy and hydropower engineering, and in particular to a reconstruction structure for converting a maintenance tunnel into an ecological water supply tunnel and a reconstruction method thereof. Background Art
[0002] At present, many 200m-class extra-high rockfill dam hydropower projects are being built and planned in southwest my country, such as Shuangjiangkou 312m, Lianghekou 295m, Rumei 315m, Changheba 240m, Maerdang 210m, etc. These extra-high rockfill dams are located in high mountain canyons, with steep slopes on both sides of the riverbed. The construction diversion adopts the tunnel diversion scheme of digging corresponding diversion tunnels in the mountain, so that the upstream river channel is diverted to flow into the downstream river channel through the diversion tunnel; the diversion tunnel generally includes the initial diversion tunnel and the later diversion tunnel.
[0003] The construction of ultra-high rockfill dams is affected by many factors, the construction period is very long, and there is great uncertainty. The initial diversion tunnel often exceeds the service life in the project. Moreover, when there is a lot of river bedload, such as construction waste slag in the upstream during the construction period, the bedload, driven by the high-speed water flow, wears the concrete bottom plate of the initial diversion tunnel year after year. Under the combined action of cavitation and bedload, it is very easy to cause erosion and damage to the bottom plate structure of the initial diversion tunnel chamber and the initial diversion tunnel body, which brings great safety hazards to the closure and plugging of the initial diversion tunnel. Once a problem occurs, it is not only difficult to deal with, but also easy to delay the power generation period of the power station, resulting in huge economic and social benefits. Therefore, before the closure and plugging of the initial diversion tunnel of the ultra-high rockfill dam, the gate chamber and the initial diversion tunnel body structure must be thoroughly and comprehensively inspected, and a special inspection tunnel for the inspection of the initial diversion tunnel is usually built.
[0004] With the continuous improvement of environmental protection requirements for water conservancy and hydropower projects, the issue of ecological flow discharged from reservoir projects has become a focus of attention for environmental protection authorities. At the same time, the water level rise rate of ultra-high rockfill dams needs to be controlled during the impoundment period to ensure the safety of the earth-rock dam body, that is, the ecological water supply tunnel needs to have the functional requirements of ecological water supply and water storage and discharge control.
[0005] As a result, inspection tunnels and ecological water supply tunnels will be excavated separately, resulting in an increase in construction workload and construction costs. Summary of the invention
[0006] The present invention provides a reconstruction structure for converting a maintenance tunnel into an ecological water supply tunnel, which solves the problem of increased engineering workload and construction cost caused by the need to separately excavate the maintenance tunnel and the ecological water supply tunnel.
[0007] The technical solution adopted by the present invention to solve its technical problems is: a reconstruction structure of a maintenance tunnel into an ecological water supply tunnel, including a maintenance tunnel body, the maintenance tunnel body is respectively connected to the upstream river channel and the downstream river channel of the rockfill dam body, a vertical shaft lock chamber is provided in the middle of the maintenance tunnel body, a maintenance gate is provided in the vertical shaft lock chamber, the maintenance gate is a flat gate, a bank tower lock chamber is provided at the outlet of the maintenance tunnel body, an outlet plugging body is provided inside the outlet end of the maintenance tunnel body, holes are penetrated in the outlet plugging body, and the holes are correspondingly matched and connected with the orifices of the bank tower lock chamber.
[0008] Furthermore, a shore tower gate is arranged in the shore tower gate chamber, and the shore tower gate is a curved gate.
[0009] Furthermore, an outlet open channel section is provided at the outlet of the inspection tunnel body immediately downstream, a bank tower lock chamber bottom plate is provided at the bottom of the upstream end of the outlet open channel section, and the bank tower lock chamber is arranged on the bank tower lock chamber bottom plate.
[0010] Furthermore, the bottom plate of the hole adopts the bottom plate of the maintenance hole body, and the outlet blocking body includes a reinforced concrete layer surrounding the two sides and the top of the hole, and a blocking concrete body filled between the reinforced concrete layer and the wall surface of the maintenance hole body.
[0011] Furthermore, the hole is a square hole.
[0012] Furthermore, the elevation of the inlet bottom plate of the maintenance tunnel is consistent with the elevation of the inlet bottom plate of the initial diversion tunnel, and the cross-sectional shape of the maintenance tunnel is a city gate tunnel type.
[0013] Furthermore, the diameter of the maintenance tunnel body is taken as the larger value of the tunnel diameters required to meet the requirements of the maintenance flow during the initial diversion tunnel maintenance process and the requirements of the ecological water supply flow during the water storage period.
[0014] In addition, the present invention also provides a reconstruction method for converting a maintenance tunnel into an ecological water supply tunnel. After the reconstruction, a reconstruction structure of converting the maintenance tunnel into an ecological water supply tunnel is formed. The reconstruction method comprises the following steps:
[0015] The first step is to open the maintenance gate during the maintenance period of the initial diversion tunnel to allow upstream water to flow through the maintenance tunnel to provide maintenance conditions for the initial diversion tunnel;
[0016] Step 2: After the initial diversion tunnel maintenance work is completed, the gate is lowered to seal the tunnel, and then an outlet sealing body is constructed inside the outlet end of the tunnel, and holes are set through the outlet sealing body;
[0017] The third step is to build a shore tower lock chamber at the exit of the inspection tunnel, set a shore tower gate in the shore tower lock chamber, and the orifice of the shore tower lock chamber is matched and connected with the hole;
[0018] Step 4: After the construction of the outlet plugging body and the bank tower lock chamber is completed and ready for operation, the initial diversion tunnel will be closed and water will be stored;
[0019] Step 5: During the initial diversion tunnel water storage period, the gate is closed to block the corresponding initial diversion tunnel, and the inspection gate and shore tower gate are opened simultaneously to release ecological water supply to the downstream through the inspection tunnel;
[0020] Step 6: After the water level rises to the target level, lower the gate for inspection to seal the inspection tunnel, and then carry out the construction of permanent plugging inside the inspection tunnel.
[0021] Furthermore, the bank tower gate is a radial gate; in the fifth step, the radial gate is used to adjust the downward flow in the maintenance tunnel while meeting the requirements of the downward ecological water supply flow and the water level rising speed.
[0022] Furthermore: the bottom plate of the hole adopts the bottom plate of the maintenance hole body, and the outlet blocking body includes a reinforced concrete layer surrounding the two sides and the top of the hole, and a blocking concrete body filled between the reinforced concrete layer and the wall surface of the maintenance hole body; in the second step, when constructing the outlet blocking body, the reinforced concrete layer is constructed first, and then the blocking concrete body is constructed using the reinforced concrete layer as a template.
[0023] The beneficial effects of the present invention are:
[0024] 1. The reconstruction structure of the inspection tunnel converted into the ecological water supply tunnel of the present invention is reconstructed on the basis of the inspection tunnel, and then a tunnel structure capable of decentralizing ecological flow is formed to be used as an ecological water supply tunnel. The structural arrangement of the present invention is simple to implement and the construction is convenient. The tunnels before and after the reconstruction respectively have the functions required for the inspection operation and the functions required for decentralizing ecological flow, achieving the purpose of one tunnel for multiple uses and meeting the needs of the ultra-high rockfill dam project.
[0025] 2. In the reconstruction process, the present invention effectively changes the outlet shape of the inspection tunnel body into a shape matching the corresponding shore tower lock chamber through the outlet blocking body, thereby ensuring the feasibility and effectiveness of the reconstruction; at the same time, a hole smaller than the outlet size of the inspection tunnel is used to reduce the orifice size of the matching shore tower lock chamber, thereby reducing the size of the shore tower gate, which can bring the following benefits: ① The size of the shore tower gate can be flexibly designed according to the requirements of the metal structure design, without being restricted by the outlet shape of the inspection tunnel body; ② The scale of the shore tower gate is reduced, and the scale of the hoist equipment corresponding to the shore tower gate is reduced, saving costs; ③ The reduction in the orifice size of the shore tower lock chamber improves the structural reliability of the shore tower gate at high water levels when controlling discharge, reduces engineering risks, and is particularly suitable for high water levels of ultra-high rockfill dams, thereby achieving the purpose of reducing engineering investment and reducing engineering risks.
[0026] 3. When constructing the outlet open channel section, the present invention can pre-build the bottom plate of the bank tower lock chamber synchronously, avoiding the need to dismantle the built outlet open channel bottom plate during later reconstruction, thereby saving engineering costs.
[0027] 4. The bank tower gate in the present invention adopts an arc gate, and the discharge flow is controlled by the arc gate, which can easily meet the corresponding water level rise requirements, ecological flow required for environmental protection and other requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a plan view of the ecological water supply tunnel structure used for the ultra-high rockfill dam according to the present invention.
[0029] Figure 2 This is the longitudinal section of the maintenance tunnel after reconstruction.
[0030] Figure 3 This is a partial schematic diagram of the area near the exit of the maintenance tunnel before reconstruction.
[0031] Figure 4 for Figure 3 The cross-sectional view of section AA is the cross-sectional view of the maintenance tunnel body.
[0032] Figure 5 This is a partial schematic diagram of the area near the exit of the tunnel after reconstruction.
[0033] Figure 6 for Figure 5 Cross-sectional view of section BB.
[0034] Marked in the figure are: maintenance tunnel body 1, rockfill dam body 2, shaft lock chamber 3, maintenance gate 4, bank tower lock chamber 5, outlet plugging body 6, reinforced concrete layer 61, plugging concrete body 62, hole 7, bank tower gate 8, outlet open channel section 9, bank tower lock chamber bottom plate 10, initial diversion tunnel 11, later diversion tunnel 12, permanent plug 13. DETAILED DESCRIPTION
[0035] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0036] like Figures 1 to 5 As shown, the inspection tunnel of the present invention is rebuilt into an ecological water supply tunnel. The structure of the inspection tunnel before the reconstruction is as follows: the inspection tunnel includes an inspection tunnel body 1, which is connected to the upstream river channel and the downstream river channel of the rockfill dam body 2 respectively. A shaft lock chamber 3 is provided in the middle of the inspection tunnel body 1. A maintenance gate 4 is provided in the shaft lock chamber 3. The maintenance gate 4 is a flat gate. When the initial diversion tunnel 11 is inspected, the inspection tunnel is used to provide maintenance conditions for the initial diversion tunnel 11, that is, during the corresponding maintenance period, the gate is lowered to block the initial diversion tunnel 11, and then the inspection tunnel is opened to allow the upstream water to flow through the inspection tunnel to avoid excessively high upstream water levels.
[0037] Based on the inspection tunnel of the above structure, after the inspection work of the initial diversion tunnel 11 is completed and the inspection tunnel is no longer needed, the inspection tunnel body 1 is rebuilt to make it an ecological water supply tunnel that can be used as an ecological flow downstream. The rebuilt structure is as follows: a bank tower lock chamber 5 is provided at the outlet of the inspection tunnel body 1, and an outlet plugging body 6 is provided inside the outlet end of the inspection tunnel body 1. A hole 7 is provided through the outlet plugging body 6, and the hole 7 is connected to the orifice of the bank tower lock chamber 5 in a corresponding matching manner.
[0038] The present invention changes the structure, shape and size of the original outlet of the inspection tunnel body 1 through the outlet blocking body 6, so that it can be effectively connected and coordinated with the shore tower lock chamber 5, ensuring the feasibility and effectiveness of the reconstruction; at the same time, the outlet blocking body 6 is provided with a hole 7 smaller than the outlet size of the inspection tunnel, reducing the orifice size of the shore tower lock chamber 5 matched therewith, and then reducing the size of the shore tower gate 8 in the shore tower lock chamber 5, which can bring the following benefits: ① The size of the shore tower gate 8 can be flexibly designed according to the design requirements of the metal structure, and is not restricted by the outlet shape of the inspection tunnel body; ② The scale of the shore tower gate 8 is reduced, and the scale of the hoisting machine equipment corresponding to the shore tower gate 8 is reduced, saving costs; ③ The reduction in the orifice size of the shore tower lock chamber 5 improves the structural reliability of the shore tower gate 8 at high water level when controlling discharge, reduces engineering risks, and is particularly suitable for high water levels of ultra-high rockfill dams, achieving the purpose of reducing engineering investment and reducing engineering risks.
[0039] A shore tower gate 8 is provided in the shore tower gate chamber 5. Since the ecological flow needs to be discharged downstream through the shore tower gate 8, the shore tower gate 8 is preferably an arc-shaped gate. The arc-shaped gate is more convenient for regulating and controlling the downstream flow, which is beneficial to the control of the downstream flow and the control of the rising speed of the water storage level.
[0040] In addition, under normal circumstances, an outlet open channel section 9 is provided immediately downstream at the outlet of the inspection tunnel body 1. In this case, the present invention provides a bank tower lock chamber bottom plate 10 at the bottom of the upstream end of the outlet open channel section 9, and the bank tower lock chamber 5 is arranged on the bank tower lock chamber bottom plate 10. Among them, the bank tower lock chamber bottom plate 10 can be cast and constructed simultaneously with the bottom plate of the outlet open channel section 9 during the construction of the outlet open channel section 9, so as to avoid the need to remove the built outlet open channel bottom plate during the later reconstruction. During the later reconstruction, the bank tower lock chamber 5 can be directly constructed on the bank tower lock chamber bottom plate 10. The thickness of the bank tower lock chamber bottom plate 10 is usually thicker than the bottom plate thickness of other parts of the outlet open channel section 9 to support the construction of the bank tower lock chamber 5. Specifically, as shown in the accompanying drawings, the bank tower lock chamber bottom plate 10 is provided with tooth groove structures at the upstream and downstream ends, and the bottom plate thickness thereof is significantly greater than the bottom plate thickness of other parts of the outlet open channel section 9.
[0041] In addition, the hole 7 in the present invention is a structure that penetrates the outlet plugging body 6. A hole 7 of a reasonable size is conducive to its cooperation with the bank tower lock chamber 5. Specifically, before the reconstruction, in order to meet the structural strength and water flow requirements of the maintenance tunnel body 1, the cross section of the maintenance tunnel body 1 is preferably set to a city gate tunnel type, such as Figure 4 However, the gate-type inspection tunnel is not conducive to matching and communicating with the orifice of the rebuilt shore tower lock chamber 5. Figure 6 The hole 7 formed after the reconstruction is matched and communicated with the orifice of the bank tower lock chamber 5, so that the shape and size of the hole 7 can be determined according to needs. In the present invention, the hole 7 is preferably a square hole, such as Figure 6 shown.
[0042] Reference Figure 5 and Figure 6 The bottom plate of the hole 7 preferably adopts the bottom plate of the maintenance hole body 1, that is, the bottom plate of the hole 7 uses the bottom plate of the original maintenance hole body 1. Specifically, the outlet plugging body 6 includes a reinforced concrete layer 61 surrounding the two sides and the top of the hole 7, and a plugging concrete body 62 filled between the reinforced concrete layer 61 and the wall surface of the maintenance hole body 1. In this way, in the later construction process, the reinforced concrete layer 61 can be constructed first, and then the plugging concrete body 62 can be constructed using the reinforced concrete layer 61 as a template, which can improve the construction efficiency.
[0043] In addition, since the inspection tunnel in the present invention needs to be used for ecological water supply after reconstruction, in order to achieve uninterrupted flow of ecological water supply after the initial diversion tunnel 11 is closed by the sluice, the present invention further controls the inlet bottom plate elevation of the inspection tunnel body 1 to be consistent with the inlet bottom plate elevation of the initial diversion tunnel 11.
[0044] In addition, since the maintenance tunnel body 1 in the present invention needs to pass flow for the maintenance process of the initial diversion tunnel 11 before reconstruction, and needs to supply ecological water to the downstream during the dam water storage period after the maintenance, the diameter of the maintenance tunnel body 1 is required to meet the above two work requirements respectively. Therefore, the diameter value requirement of the maintenance tunnel body 1 in the present invention is: the larger value of the tunnel diameter required to meet the maintenance flow requirements during the maintenance of the initial diversion tunnel 11 and the ecological water supply flow requirements during the water storage period.
[0045] In addition, the reconstruction method of the inspection hole to be converted into an ecological water supply hole of the present invention forms a reconstruction structure of the inspection hole to be converted into an ecological water supply hole after the reconstruction, and the reconstruction method comprises the following steps:
[0046] The first step is to open the maintenance gate 4 during the maintenance period of the initial diversion tunnel 11, and allow the upstream water to flow through the maintenance tunnel body 1 to provide maintenance conditions for the initial diversion tunnel 11;
[0047] Step 2: After the initial maintenance construction of the diversion tunnel 11 is completed, the maintenance gate 4 is lowered to block the maintenance tunnel body 1, and then an outlet blocking body 6 is constructed inside the outlet end of the maintenance tunnel body 1, and a hole 7 is set through the outlet blocking body 6;
[0048] Step 3: Build a shore tower lock chamber 5 at the exit of the inspection tunnel body 1, set a shore tower gate 8 in the shore tower lock chamber 5, and the orifice of the shore tower lock chamber 5 is matched and connected with the hole 7;
[0049] Step 4: After the construction of the outlet plugging body 6 and the bank tower lock chamber 5 is completed and ready for operation, the initial diversion tunnel 11 is closed to store water;
[0050] Step 5: During the period of water storage in the initial diversion tunnel 11, the corresponding initial diversion tunnel 11 is blocked by closing the gate, and the inspection gate 4 and the shore tower gate 8 are opened simultaneously to release ecological water supply to the downstream through the inspection tunnel body 1;
[0051] Step 6: After the water level rises to the target water level, the gate 4 is lowered to block the inspection hole 1, and then the permanent plug 13 in the inspection hole 1 is constructed.
[0052] The above target water level should be sufficient to discharge ecological flow to the downstream through other tunnels. For example, in the case of a later diversion tunnel 12, the elevation of the later diversion tunnel 12 is higher than the elevation of the initial diversion tunnel 11. When the water level reaches the point where the ecological flow can be discharged to the downstream through the later diversion tunnel 12, the permanent plug 13 in the tunnel body 1 is repaired to avoid interruption of the ecological flow discharged to the downstream.
Claims
1. A method for converting a maintenance tunnel into an ecological water supply tunnel, characterized in that: After the reconstruction, the inspection tunnel is converted into an ecological water supply tunnel. The reconstruction method includes the following steps: The first step is to open the maintenance gate (4) during the maintenance period of the initial diversion tunnel (11) to allow upstream water to flow through the maintenance tunnel body (1) to provide maintenance conditions for the initial diversion tunnel (11); The maintenance tunnel body (1) is connected to the upstream river channel and the downstream river channel of the rockfill dam body (2) respectively. A shaft lock chamber (3) is provided in the middle of the maintenance tunnel body (1). A maintenance gate (4) is provided in the shaft lock chamber (3). The maintenance gate (4) is a flat gate. The elevation of the inlet bottom plate of the maintenance tunnel body (1) is consistent with the elevation of the inlet bottom plate of the initial diversion tunnel (11). The diameter of the maintenance tunnel body (1) is the larger value of the diameter required to meet the maintenance flow requirement during the maintenance of the initial diversion tunnel (11) and the ecological water supply flow requirement during the water storage period. Step 2: After the initial maintenance construction work of the diversion tunnel (11) is completed, the maintenance gate (4) is lowered to block the maintenance tunnel body (1), and then an outlet blocking body (6) is constructed inside the outlet end of the maintenance tunnel body (1), and a hole (7) is set through the outlet blocking body (6); Step 3: build a bank tower lock chamber (5) at the exit of the inspection tunnel body (1), set a bank tower gate (8) in the bank tower lock chamber (5), and the orifice of the bank tower lock chamber (5) is matched and connected with the hole (7); Step 4: After the construction of the outlet plugging body (6) and the bank tower lock chamber (5) is completed and the operating conditions are met, the initial diversion tunnel (11) is closed to store water; Step 5: During the period of water storage in the initial diversion tunnel (11), the corresponding initial diversion tunnel (11) is sealed by closing the gate, and the inspection gate (4) and the bank tower gate (8) are opened simultaneously to release ecological water supply to the downstream through the inspection tunnel body (1); Step 6: When the water level rises to a level that allows the ecological flow to be released downstream through the later diversion tunnel (12), the gate (4) is lowered to seal the maintenance tunnel body (1), and then a permanent plug (13) is constructed inside the maintenance tunnel body (1); wherein the elevation of the later diversion tunnel (12) is higher than the elevation of the initial diversion tunnel (11).
2. The method for converting a maintenance tunnel into an ecological water supply tunnel as claimed in claim 1, characterized in that: The bank tower gate (8) is a radial gate. In the fifth step, the radial gate is used to adjust the downward flow in the maintenance tunnel body (1) while meeting the requirements of the downward ecological water supply flow and the water level rising speed.
3. The method for converting a maintenance tunnel into an ecological water supply tunnel as claimed in claim 1, characterized in that: An outlet open channel section (9) is provided immediately downstream of the outlet of the inspection tunnel body (1), a bank tower lock chamber bottom plate (10) is provided at the bottom of the upstream end of the outlet open channel section (9), and the bank tower lock chamber (5) is arranged on the bank tower lock chamber bottom plate (10).
4. The method for converting a maintenance tunnel into an ecological water supply tunnel as claimed in claim 1, characterized in that: The bottom plate of the hole (7) is the bottom plate of the maintenance hole body (1), and the outlet blocking body (6) includes a reinforced concrete layer (61) surrounding the two sides and the top of the hole (7), and a blocking concrete body (62) filled between the reinforced concrete layer (61) and the hole wall surface of the maintenance hole body (1). When the second step of constructing the outlet blocking body (6) is to construct the reinforced concrete layer (61) first, and then use the reinforced concrete layer (61) as a template to construct the blocking concrete body (62).
5. The method for converting a maintenance tunnel into an ecological water supply tunnel as claimed in claim 4, characterized in that: The hole (7) is a square hole.
6. The method for converting a maintenance tunnel into an ecological water supply tunnel as claimed in claim 4, characterized in that: The cross-sectional shape of the inspection tunnel body (1) is a city gate tunnel type.